STATUS IN FINLAND ON INTERIM REPORT ON MEASURES

Size: px
Start display at page:

Download "STATUS IN FINLAND ON INTERIM REPORT ON MEASURES"

Transcription

1 STATUS IN FINLAND ON INTERIM REPORT ON MEASURES Lasse Järvenpää, Finnish Environment Institute, SYKE Working group 3 - ICT solutions and modelling,

2 Finland s eight river basin districts (RBD s) 1. Vuoksi RBD 2. Kymijoki-Gulf of Finland RBD 3. Kokemäenjoki-Archipelago Sea- Bothnian Sea RBD 4. Oulujoki-Iijoki RBD 5. Kemijoki RBD Two international river basin districts (IRBD) have also been designated covering parts of Finland: 6. Tornionjoki IRBD (shared with Sweden) 7. Teno, Näätämöjoki and Paatsjoki IRBD (shared with Norway) 8. A separate RBD has been defined to cover the autonomous Åland Islands, where the WFD is being implemented by the provincial government

3 Two steps in monitoring National monitoring In Finland we are doing quantity and cost estimation for all measures included in management plans, not only for key type of measures. EU reports Basic and supplementary measure Key type of measures 3

4 Waterbody Measure Measure Ready for reporting 2012 Yes 4

5 RBD, ELY, years, sector, measure, status, waterbodies, EUtype, ready for reporting2012 Amount in plans Amount

6 Measure info Code WB name Lake/river/costal Sector Measure Description Nat. Type EU Type Status Years Present amount Additional amount Total amount Lifespan of investment Unit investment cost Annual maintenance cost Recommendations Used in POM Info tip Present cost /year Additional cost /year Total cost /year Comments How many years of maintenance Average maintenance cost 6

7 Present amount Additional amount Total amount National monitoring in VEMU Recommendations Used in plans Recomm Monitoring 2012 Recomm Monitoring 2015 Info tip Count 2012 Count 2015 Present cost /year Additional cost /year Total cost /year Finance 7

8 Responsibility of monitoring ELY-centers are responsible for monitoring and feeding data to the VEMU system. In SYKE we support ELY-centers by getting monitoring data from other organizations and we also process raw data to more usable form. 8

9 Interim report 2012 Basic measures Other basic measures Supplementary measures The key type of measures We try to do centralized or in co-operation many things as possible. Reporting tools are build in VEMU system and SYKE is responsible of generating XML-files and technical reporting 9

10 Basic Measures Article11-3a One summary for each basic measure Summaries will be used for all RBDs excluding WDA (Åland) Summaries will be formed by SYKE 10

11 Other Basic Measures Art 11-3b-l One information by the schema for each basic measure, That information been used for all RBDs excluding WDA (Åland) Information will be formed by SYKE 11

12 SuppMeasuresArt11_4_5 RBDs (Coordinative ELY-centers) are responsible of making assessment of the progress Description texts of finance and responsibility will formed in co-operation of SYKE and ELY- centers. RBDs have freedom to modify those default texts 12

13 Key Types of Measures versio no Key Type of Measures indicator RBD1 RBD2 RBD3 RBD4 RBD5 RBD6 RBD7 1 Construction or upgrades of wastewater treatment plants beyond the requirements of the Directive on Urban Waste Water Treatment Number of projects 2 Reduce nutrient pollution in agriculture Field (km 2 ) beyond the requirements of the Nitrates Directive 5 Improving longitudinal continuity Number of sites 6 Improving hydromorphological conditions of water bodies other than longitudinal continuity 7 Improvements in flow regime and/or establishment of minimum ecological flow. Number of projects Number of projects 13 Drinking water protection measures Number of GWB 19 Prevention of water pollution in forestry actions x x x 3 x x x x 4 x x x 3 x x 2 x 1 x x x x 4 Number of water protection structures x x x 3 21 Lake restoration Number of lakes x x x 3 22 Protection against acidification Surveying of acid soils (ha) x 1 23 Advisory services for scattered settlement Number of househoulds x x x x 4 25 Protection against fish diseases Disinfection of fishing tackle x

14 14

15 Monitoring of supplementary measures Measure Real measure/ policy measure Sector EU measure type Key type of measure Use as key type of measure Description EU report 2012 Responsibility State of implementation Substantial delay 15

16 Summary of monitoring In POM monitored % stutus of 2012 monitoring Cost Amount 16

17 Techniques in reporting Altova MissionKit XML- toolkit MapForce to make XML-files Alaotsikko tai ingressi Ensimmäinen taso toinen taso kolmas taso 17

18 XML-spy to make style sheets 18

19 Everything is ready for reporting only data is missing! Thank You! 19