Operate 1 MPCB- CONSENT

Size: px
Start display at page:

Download "Operate 1 MPCB- CONSENT"

Transcription

1 MAHARASHTRA POLLUTION CONTROL BOARD Minutes of 6th Consent Committee Meeting of held on & at 11:00 a.m. at 3rd Floor, Chamber of Hon'ble Member Secretary, Kalpataru Point, Sion, Mumbai. The following members of the Consent Committee were present: 1 Shri E. Ravendiran, IAS, Member Secretary Chairman. Maharashtra Pollution Control Board, Mumbai 2 Shri. R. G. Pethe Member Retired WPAE, MPC Board 3 Shri Y. B. Sontakke, Joint Director (WPC) Member Maharashtra Pollution Control Board, Mumbai 4 Shri Shri P. K. Mirashe, Assistant Secretary Member Maharashtra Pollution Control Board, Mumbai 5 Shri V. M. Motghare, Joint Director (Air Pollution Member Maharashtra Pollution Control Board, Mumbai 6 Shri A. R. Supate, Principal Scientific Officer, Sp. Invitee Maharashtra Pollution Control Board, Mumbai Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of the 5th Consent Committee meeting of held on circulated under Board s letter No. MPCB/AS (T)/TB/B- 763 dated were confirmed. The meeting thereafter deliberated on the agenda items placed before the committee and following decisions were taken. Sr No Application Unique Number Industry Name & Address Decision on grant of consent Consent granted upto Section Remarks/ Discussion (1) Operate 1 MPCB DHARMESH CONSTRUCTIONS P. LTD., "ACME AVENUE" Bhabrekar Nagar, Charkop Kandivali West Mumbai, Maharashtra. Not Consent It was decided to issue SCN for refusal of consent on following non-compliance: (i) Submission of application for revalidation of C to E, (ii) Non- provision of adequate capacity of STP, (iii) Non- completion of OWC and not submitted rectification of CI. Operate, Establish Renewal 6th CC Meeting Minutes

2 2 MPCB M/s. Ritnand Balved Education Foundation & Amity Global Varsity Pvt.Ltd. (Amity Education Complex) Cosnent (part) It was decided to grant consent to 1st operate (Part-I) for total Plot Area Sq. M and Total Build up area sq. M., by imposing following conditions: (i) PP shall compy with the MoEF & CC otification dtd (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install and operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

3 3 MPCB Puranik Builder Pvt. Ltd., 51/2, 59/2, 59/3, 60, 61/3, 61/4/2, 64/2, 64/3 Puranik City Phase III S.No. 51/2 of village vadavali & S.No. 59/2, 59/3, 60, 61/3, 61/4 (3), 64/2 Thane Consent It was decided to grant amalgamation of consent to operate (Part I) and Consent to operate (Part-II) for TPA Sq. M and TBA Sq.M (Part-I) Sq.M (Part-II) = TBA of Sq. M. (EC dtd ) subject to submission of additional consent fees for further period and architect certificate, by imposing condition: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

4 4 MPCB Puranik Builder Pvt. Ltd. (Puranik City III), 51/2, 59/2, 59/3, 60, 61/3, 61/4/2, 64/2, 64/3 S.No. 51/2 of village vadavali & S.No. 59/2, 59/3, 60, 61/3, 61/4/2, 64/2, 64/3 at village Mogharpad Thane Consent (part) It was decided to grant consent to operate (part), 1st Consent to operate (Part) for Building project for TPA sq. M and TBA sq. M out of Sq. M. (EC dtd ), by imposing condition: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should instal, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

5 5 MPCB M/s Om Sai Construction, Sai Mannat, Plot No. 1, 1-A, 1-B/1, 1- B/2, 1-B/3, 1-B/6, Sector 34A Kharghar, Navi Mumbai Panvel Consent (part) It was decided to grant consent to operate 1st operate (Part), for residential project on total plot area of 3, sq. mtrs. & total BUA construction of 48, sq. mtrs. out of 51, sq. mtrs. (As per EC dtd ), subject to verification report from SRO about installation of STP and OWC, by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

6 6 MPCB Reliable Housing India Pvt. Ltd., S.No.153 B, S.No.154/pt,Vill- Achole,Nallasopara (E),Tal- Vasai,Dist-Palghar Consent to Operate It was decided to grant consent (part) on Total Plot area sqm and cons. BUA Sqm. out of (EC Obtained on ) total BUA m2., by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 7 MPCB S. N. Developers, 345pt, 346 and others Juchandra naigaon east Vasai Consent (Part) It was decided to grant consent (part) on Total Plot area sqm and cons. BUA Sqm. out of (EC obtained on ) total BUA m2 by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

7 8 MPCB Versatile Realtors Pvt. ltd., 1 to 4 and others... Nalasopara East Vasai Consent to Operate (Part) It was decided to grant consent (part) on Total Plot area sqm and cons. BUA 18, out of BUA 39, sq. mtrs. (EC obtained on ), by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 9 MPCB Sears Constructions Pvt Ltd., 48 P 145 B 145 B 2, 233, 234, 235 Sahar Village Andheri - (East) Consent to Operate It was decided to grant consent to 1st operate for residential project of total plot area of 12, sq. mtrs. & total construction BUA of 22,758 sq. mtrs., by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

8 10 MPCB MPCB Yekona I Open Cast Coal Mine Project, Village: Yekona, PO: Warora, Th: Warora, District: Chandrapur, Maharashtra Warora Pyrotek India Pvt Ltd, 1228 &1229 Sanaswadi Shirur Not Consent Consent APC APC It was decided to issue SCN for refusal of consent, on following non-compliances: (i) Unit has not yet completed land acquisition and also not provided any pollution control arrangement as per EC and consent conditions. It was decided to grant Renewal of consent to operate with amalgamation of 1st consent to operate for expansion, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control systems and compliance of consent conditions. Consent shall be issued after obtaining NOC from CGWA / Irrigation department for utilization of ground / surface water and after submission of requisite consent fee, if any. 12 MPCB Shree Satpuda Tapi Parisar S.S.K.Ltd (Distillery Unit), Nagar & 27/32 Dongargaon, Tal. Shahada, Dist. Nandurbar. Consent to Operate WPC It was decided to grant consent to first operate by imposing following conditions: Industry shall submit Bank Guarantee of Rs. 5 Lakhs towards O & M of pollution control system. Consent shall be issued after requisite consent fee, if any. 13 MPCB BHARAT PETROLEUM CORPORATION LTD.(LPG PLANT), P-21 P- 27,Addl.MIDC,Ajantha Road Jalgaon Not Consent AS(T) It was decided to keep the case in abeyance till clarification regarding ZLD provision. Operate, Establish Renewal 6th CC Meeting Minutes

9 14 MPCB M/S. SUNTECK REALTY LTD.,Plot bearing CTS No. 166/A, 166/B, 166/C, 166/D, Signia High Plot bearing CTS No. 166/A, 166/B, 166/C, 166/D, at village- Magathane, Borivali (East), Mumbai Consent It was decided to grant Consent for residential project for SRA development total plot area sq. mtrs and BUA of sq. mtrs., (EC dtd ), by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 15 MPCB M/s. Universe Developers, At plot bearing C. S. No. 420, 420/1 to 38, 421, 421/1 to 3, 422, 422/1 to 33 & 423 (PL) At Village Bhandup, Tehsil: Kurla, District: Mumbai Not Consent It was decided to issue SCN for refusal of consent and stop work, on following non-compliance: (i) PP has not submitted reply to letter issued by SRO office regarding the application for the revalidation of consent to establish, non-provision of OWC for disposal of biodegradable waste and non-submission of details of STP to treat the domestic effluent quantity of 103 CMD. 16 MPCB M/s. Western Coalfields Limited, Durgapur Rayatwari Colliery Not Consent APC It was decided to issue SCN for refusal of consent and stop work, on following non-compliance: (i) As board has already issued consent for coal mining in same premises and this activity should be added in same consent. 17 MPCB SEVENSTAR HOSPITAL A UNIT OF NAGPUR INSTITUTE OF SURGICAL SCIENCES AND RESEARCH CENTRE PVT LTD Combined Consent Establsih & Operate & BMW Authorisation PSO It was decided to grant consent to Combined Consent Establish & Operate & BMW Authorisation by imposing standard Bank Guarantee. Operate, Establish Renewal 6th CC Meeting Minutes

10 18 MPCB Kalpataru ltd., C.T.S. No.25A/3 of Village Vile Parle (West) JVPD scheme, Vile Parle (W), Mumbai Consent to Operate It was decided to grant of consent to operate for residential project total plot area sq. mtrs and BUA 32, sq. mtrs (EC dtd ) by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 19 MPCB MPCB Bhagwati Developers, Plot No. 01, Sector-09 Ulwe, Navi Mumbai Panvel M/s Sharon Bio-Medicine Ltd. Formerly known as M/s Stonewood Cem-Fab Pvt. Ltd.) (Plot No. L-6, MIDC Taloja Not Consent Amendment in Consent under Product Mix AS(T) It was decided to issue SCN for refusal of consent on following non-compliances: (i) PP has not provided OWC is not provided for solid waste management. It was decided to grant Amendment in Consent under Product Mix with, by imposing following conditions: (i) Industry shall improve the solvent recovery by 3 to 4 %, solvent recovery should be at least 95%. (ii) Hazardous Waste category and quantity should be as per the Environmental Clearance (iii) Industry shall comply the recommendations mentioned in the NIPL certificate issued by ICT. Operate, Establish Renewal 6th CC Meeting Minutes

11 21 MPCB Exicutive Eng. Goregoan division, 183(pt) 184 (pt) 185(pt) 196 (pt) 197(pt) and 201 (pt) existing transit & mig type tenaments camp at village Magathane, Borivali (East), Mumbai Consent to Operate It was decided to grant C to O for part for total plot area sq.m. & part BUA sq.m. out of total BUA sq. (EC dtd ) mtrs after receipt of architectural certificate from PP by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 22 MPCB Reliance Industrial Infrastructure Limited, Plot No 03 Reliance Tank-Farm, JNPT, Sheva, Navi Mumbia Uran Not Consent It was decided to issue SCN for refusal on following noncompliance: (i) PP has not obtained revalidated EC and also not applied for the same. (ii) PP has not obtained revalidated consent to Establish from Board. (iii) PP has started commercial utilization of pipeline without obtaining consent to operate from Board 23 MPCB Kirloskar Oil Engines Ltd., A- 11/1 Ambad MIDC Nashik Consent to Establish APC It was decided to grant for DG Sets & Oil Engines for 30 Nos./M., by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakh towards compliance of consent conditions. 24 MPCB KLT Automotives and Tubular Products Ltd., 6/1/1, 6/1/2, 7/2, 7/3, 8/1, 8/3 & 24 Vill Shelvali Palghar Not Consent APC It was decided to issue final refusal of consent and closure directions, on following non compliances: (i) Industry has failed to obtain permission of CGWA for utilization of ground water. Operate, Establish Renewal 6th CC Meeting Minutes

12 25 MPCB Shree Dutt India Pvt Ltd., Gat No. 127 to 132, 135/2, Gat No. 127 to 132, 135/2, A/P- Hamidwada, Tal- Kagal, Dist - Kolhapur Kagal Not Consent WPC It was decided to issue SCN for refusal of consent to operate, on following non compliances: (i) JVS results are exceeding consented standards. Hence forfeit bank guarantee of Rs. 5 lakhs and obtaining bank guarantee of Rs. 10 lakhs. 26 MPCB Radha Madhav Developers, Kh. Nos. 248, 257/2, 258/1K, 258/1G, 258/2 Mouza - Jamtha, Tahsil - Nagpur (Gramin), District - Nagpur Consent to Operate It was decided to grant C to O for part for residential cum commercial project on total plot area sq. mtrs and BUA sq. out of total BUA 2,54,900 Sq. mtrs. (EC dtd ) subject to verification of OWC, by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 27 MPCB M/s Anuraj Sugars Ltd., Gut No. 786 At-Post Yawat (Pune Solapur Road,Back Side of Hotel Kanchan) Daund Renewal of Consent to Operate WPC It was decided to grant renewal of consent to operate for sugar unit, subject to verification of JVS results, by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. Operate, Establish Renewal 6th CC Meeting Minutes

13 28 MPCB Indian Oil Corporation Ltd., Sr.No 174/3 Tadali depot Chandrapur Not Consent (Expansion) _ It was decided to issue SCN for refusal of consent to operate for following non-compliances: (i) The qty of products mentioned in application differs from the qty of C to O and C to E and also PP has not submitted EC and BG as per C to E condition, hence it seems industry has undertaken change /expansion in storage qty with obtaining prior EC from competent authority and consent/permission from MPCB. (ii) PP has not submitted proper CA certificate for the whole unit. (iii) PP has not yet installed oil skimmers as suggested by SRO. 29 MPCB Sheth Infraworld Pvt. Ltd Proposed Residential Development, On plot bearing CTS No 2400/E Village Dahisar- Tal- Borivali. Mumbai. State: Maharashtra Taluka Dahisar Borivali Consent to Operate It was decided to grant of consent to operate (Part) for residential project total plot area sq. mtrs and part BUA sq. mtrs out of total BUA sq. mtrs. (EC dtd , by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 30 MPCB Padmavati Pulp and Paper Mills, Plot No N 55 Additional Ambernath East Ambernath Consent to Operate WPC It was decided to grant the first operate for expansion by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

14 31 MPCB Calyx Paradies, S. No. 124 MaujePirangut Mulshi Consent to Operate It was decided grant consent to operate (part) and renewal of C to O for Residential Project on total plot area:57800 sq.m. and construction built up area sq.m. out of sq.m., (EC dtd ) after obtaining additional consent fees and with following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

15 32 MPCB Pristine Greens, Gat no 216/1 (P), 216/2 (P),228/1(P) and 228/2 (P) Borhadewadi-Moshi, Haveli Consent to Operate It was decided to grant of consent (First) for Construction of residential cum commercial project on total plot area sq. mtrs and part BUA out of BUA of sq. mtrs. (EC dtd ), by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 33 MPCB Aarti Industries Ltd., Plot no. K- 17/18/19 MIDC Tarapur Palghar Not Consent _ AS(T) It was decided to issue SCN for consent to operate, on following non compliances: (i) PP has submitted mismatch of water budget and even not installed ZLD system, (ii) PP has not submitted CA certificate, ETP, APC details & also Bank Guarantee details. 34 MPCB Dlecta foods pvt ltd., S No 221 part 1&2, New S No :148 Part 1&2 Village umbre,khopoli Pali Road, Post Khambewadi Khalapur Not Consent to First Operate (Expansion) _ WPC It was decided to issue SCN for refusal, on following noncompliance: (i) Industry has failed to obtain permission of CGWA for utilization of ground water. 35 MPCB Kidder India Pvt Ltd., Gat No 584/2 Gat No 584/2, Koregaon Bhima, Tal. Shirur, Dist. Pune, Maharashtra Shirur Not Consent _ APC It was decided to issue SCN for refusal of consent on following non-compliance: (i) PP has not submitted CGWA NOC for utilization of ground water for industrial activity as per C to E condition. (ii) PP has not submitted BG of Rs.5.0 Lakhs towards compliance of consent to establish conditions. Operate, Establish Renewal 6th CC Meeting Minutes

16 36 MPCB Mahindra Lifespace Developers Ltd., S. No. 6017, 6017/1, 6017/2, 6017/3, part 6018, 6020/4, Village-Waghere, Tenshil-Pimpri, Dist Pune. Consent to Operate (Part III) It was decided to grant of consent to operate (Part-III) for residential cum commercial project on total plot area sq. mtrs and part BUA of sq. mtrs out of total BUA sq. mtrs. (EC dtd ), by imposing following conditions: (i) In case the project is not completed within validity period of EC and/ or C to E, PP shall not carry out construction work without obtaining revalidated EC and/ or C to E for remaining project. (ii) PP shall submit fresh BG of Rs. 10 lakhs towards O & M of pollution control system. (iii) PP shall regularly and properly operate and maintain online monitoring system for the parameters BOD, SS, and flow at the outlet of STP. PP shall submit BG of Rs Lacs towards O & M of online monitoring system. (iv) PP shall achieve the treated domestic effluent standards for the parameter BOD-10 mg/lit. (v) The treated domestic effluent shall be 60 % recycled for secondary purpose such as toilet flushing, air conditioning, cooling tower make up, fire fighting etc. and reaming shall be (vi) Project Proponent shall submit an affidavit in Board's prescribed format within 15 days regarding the compliance of conditions of EC /CRZ clearance and C to O. Consent shall be issued after requisite consent fee, if any. 37 MPCB Concrete Builders, CTS No. 328 Morya SRA CHS (Ltd.) Not Consent (Part) It was decided to issue SCN for refusal on following noncompliance: (i) PP has not provided OWC even though SRA Building is completed and occupied. 38 MPCB H. B. Fuller India Adhesives Pvt. Ltd., Plot No. 1 E, Gat No. 1140, 1295 and 1296 Plot No. 1 E, Gat No. 1140, 1295 and 1296, Vill. Shirwal, Tq. Khandala, Dist. Satara. Khandala Consent to Operate (Expansion) AS(T) It was decided to grant First consent to operate for expansion and amalgamation of existing consent to operate, subject to verification of JVS results of existing unit, by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. Operate, Establish Renewal 6th CC Meeting Minutes

17 39 MPCB Kolte Patil Developers Ltd- "Green Groves", 2188B(Old), 1185A(New), Plot No. 9B, 10, 11, Wagholi, Tal: Haveli, Dist: Pune Consent to Operate (Part) It was decided to grant of consent to operate (Part) for residential project on total plot area sq. mtrs and part BUA of sq.mtrs out of total BUA sq. mtrs. (EC dtd ), by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 40 MPCB Deoyani Multispeciality Hospital, Plot No.121,Dahanukar Colony,PLOT NO-121,LANE NO- 4,DAHANUKAR COLONY,KOTHRUD,Kothrud,P une Not Consent It was decided to issue SCN for Refusal for non-submission of required documents for considering CCA. 41 MPCB Eisha Properties Unit 5 (EISHA ZENITH), Gat No. 95/2,95/3, Tathawade, Mulshi, Pune. Not Consent (Part) It was decided to issue SCN for refusal on following noncompliance: (i) PP has not provided OWC even though SRA Building is completed and occupied. (ii) PP has not submitted bank guarantee as per consent to establish. Operate, Establish Renewal 6th CC Meeting Minutes

18 42 MPCB M/s Vedant Properties "ARV Royale", Sr. No 63,Handewadi Road, Near GSPM Collage, Hadapsar, Tal: Haveli, Dist: Pune. Consent to Operate (Part) It was decided to grant of consent (First) for Construction of residential cum commercial project on total plot area sq. mtrs and part BUA sq. mtrs out of total BUA sq. mtrs.(ec dtd ), by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. Operate, Establish Renewal 6th CC Meeting Minutes

19 43 MPCB B. A. Consulting " Plumeria Drive", 7,8/1A,8/1B,8/2(Pt), 8/3(,8/4,8/5,8/6,8/7,8/8A+8/9B+8 /8B,+9A+8/9C+8/10/1+2+3,11.6/ Punavale Consent to Operate (Part) It was decided to grant C to O (part) for Residential & Commercial project on total plot area sq.m. & BUA sq.m out of total BUA sq.m., (EC dtd ), by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should instal, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 44 MPCB HARITA SEATING SYSTEMS LTD., PLOT NO. A2, MIDC RANJANGAON, SHIRUR Consent to Operate with amalgamation APC It was decided to grant C to O with amalgamation of Existing C to O subject to verification from SRO and submission of BG. by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. Operate, Establish Renewal 6th CC Meeting Minutes

20 45 MPCB Aramus Realty - Plot No. 87, Sector 21, Ulwe, Navi Mumbai Plot No. 87, Sector 21, Ulwe, Navi Mumbai Panvel Consent to Operate It was decided to grant 1st Consent to operate for Building project for TPA sq. M and TBA- 26, sq.m., (EC dtd ), by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 46 MPCB Grainotch Industries Limited, Gat No. 238/239 Bhendala Gangapur Consent WPC It was decided to grant consent to first operate with amalgamation of both consent which shall be valid up to , by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. Operate, Establish Renewal 6th CC Meeting Minutes

21 47 MPCB Konark Orchid (Residential Project) Karia Realty Gut No , Plot No. 1 to 5 Village - Wagholi, Tal: Haveli, Dist: Pune Consent to Operate It was decided to C to O for part-iii with amalgamation of renewal of part-i & Part-II for total plot area sq.m. & part BUA sq.m. ie. ( sq. mtrs sq. mtrs sq. mtrs) out of total BUA sq. mtrs by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 48 MPCB Heath View Holiday Resorts Ltd., CTS No. 182 Medha Satara Road, Nr. Wilson Point, Mahabaleshwar Renewal of Consent WPC It was decided to grant Plain with no additional rooms, by imposing following conditions: (i) PP shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. Operate, Establish Renewal 6th CC Meeting Minutes

22 49 MPCB Arihant Paradise Realty Pvt. Ltd., Plot No. 13/1, TTC Plot No. 13/1, TTC Industrial Area, Turbhe, MIDC, Navi Mumbai Thane Consent to Operate (Part) It was decided to grant consent to operate (Part) for Building Project (IT Activity) for TPA sq. M and BUA sq. M out of total construction area of Sq. M as per Architect Certificate, by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and PP shall submit BG of Rs. 10 lakh towards compliance of EC and consent conditions. (ii) In case the project is not completed within validity period of EC and /or C to E, PP shall not carry out construction work without obtaining revalidated EC and / or C to E for remaining project. (iii) PP should install, operate and maintain the online monitoring system installed for the parameters BOD, SS and flow at the outlet of STP. (iv) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (v) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be Consent shall be issued after requisite consent fee, if any. 50 MPCB Clean Science and Technology Pvt. Ltd., Plot No.D-26/3 Plot No.D-26/3, MIDC Kurkumbh Daund Consent to Operate AS(T) It was decided to grant consent to operate (Part III) with amalgamation of existing consent to operate, by imposing following conditions: (i) PP shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. 51 MPCB SHARAD SSK LTD., 298,299,300,338,339 Pratibhanagar, Chaundala, Vihamandawa Paithan Not Consent WPC It was decided to issue SCN for refusal of consent, on following non-compliance: (i) Industry has not installed Online monitoring system as per CPCB directions. (ii) Industry has not paid adequate consent fees of Rs. i.e 150,000/-, for consent to first operate for period up to MPCB PRABHAT DAIRY LIMITED, 121/2 TO 121/4 RANJANKHOL TILAKNAGAR RAHATA Consent to 1st Operate (Expansion) WPC It was decided to grant Consent to 1st Operate for expansion project along with amalgamation with existing consent to operate having validity period , by imposing following conditions: (i) PP shall submit bank guarantee of Rs. 5 lakhs towards O & M of pollution control systems. Operate, Establish Renewal 6th CC Meeting Minutes

23 53 MPCB- CONSENT_AM MENDMENT MPCB- CONSENT_AM MENDMENT MPCB- CONSENT_AM MENDMENT MPCB- CONSENT_AM MENDMENT MPCB- CONSENT_AM MENDMENT MPCB- CONSENT_AM MENDMENT Establish IPCA Laboratories Ltd., plot no C-89 to C-95, MIDC- Mahad Amendment Shri Venkateshwara Biorefineries and Biofuels Pvt Ltd., C-9, MIDC Shir Galaxy Surfactants Ltd., M-3 MIDC Tarapur Not Amendment Amendment Camlin Fine Sciences Ltd., D- 2/3, MIDC, Tarapur Not Amendment Shyam Indofab Pvt. Ltd., Plot No.T-1 Addl. MIDC Nandgaon Peth, Tq. & Dist. Amravati Lupin Limited, Plot No. 6A Sector -17 Special economic Zone, Notified area MIHAN Nagpur Not Amendment Amendment AS(T) AS(T) WPC AS(T) It was decided to amend the consent to operate for inclusion of two products as per EC name and additional HW category as well as amendment in Hazardous Waste quantity. It was decided to issue SCN for refusal of amendment as industry shall apply for consent to establish and operate for such kind of modification. It was decided to Amend the existing consent for waiver of BG condition after verification of APC provided as Coal consumption is increased. It was decided to issue final refusal as industry has already applied for separate consent to establish for increase in production. It was decided to call verification report from SRO amendment and if CETP has capacity to take additional load. It was decided to amend the existing consent except for the installation of additional new baby boiler of capacity 850 Kg/hr. Industry shall apply separately for consent to establish for installation of baby boiler having capacity 850 Kg/hr. Operate, Establish Renewal 6th CC Meeting Minutes

24 1 MPCB KMC Developers, Sangharsh CHS, CTS No. 510, 510/1 to 8, 1, 1/1 to 16, 514, 514/1 to 5, Part of 518/A/2, 561/1 to 14 Village Kanheri, Borivali (East), Mumbai Consent to Establish It was decided to grant of revalidation consent to Establish for residential project (SRA Scheme) of total plot area sq. mtrs and BUA of sq. mtrs after receipt of the additional consent fees (as CI Cr.) (EC dtd ) by imposing following conditions: (i) PP shall comply with the conditions stipulated in EC and C to E and submit BG of Rs Lakhs towards compliance of the same. (ii) PP shall apply for the revalidation of Environmental Clearance as per EIA notification, 2006 and PP shall not take any effective steps towards implementation of the project without obtaining revalidated Environmental Clearance as per EIA notification, (iii) PP shall install online monitoring system to the O/L of STP for monitoring ph, SS and flow. (iv) The treated domestic effluent shall be 60 % recycled for secondary purpose such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and reaming shall be (iv) Project Proponent shall submit an affidavit in Board's prescribed format within 15 days regarding the compliance of conditions of EC /CRZ clearance and C to E. (v) PP shall submit BG of Rs Lacs towards the compliance of Consent Conditions. 2 MPCB Dhaval Developers, CTS.No. 5,6,7,8,9,10,11,12,13,17,18,25 Charkop Mumbai It was decided to grant for Expansion - Total Plot area sq.mtrs, Total BUA 39, sq.mtrs (FSI area sq.mtrs, Non FSI area sq.mtrs) (EC dtd ), by imposing following conditions: (i) PP shall comply with conditions stipulated in EC and shall submit BG of Rs. 10 lakh towards compliance of the same. (ii) PP shall install the online monitoring system for the parameters BOD, SS and flow at the outlet of STP. (iii) PP shall achieve the treated domestic effluent standard for the parameter BOD- 10 mg/lit. (iv) The treated domestic effluent shall be 60% recycled for secondary purposes such as toilet flushing, air conditioning, cooling tower make up, firefighting etc. and remaining shall be (v) Project Proponent shall submit an affidavit in Board s prescribed format within 15 days regarding the compliance of conditions of EC/CRZ clearance and C to E Operate, Establish Renewal 6th CC Meeting Minutes

25 3 MPCB MMP INDUSTRIES LIMITED, POST SHAHPUR VILLAGE MAREGAON BHANDARA Not APC It was decided to issue final refusal for expansion, on following non-compliance: (i) PP failed to obtain NOC from CGWB for utilization of water. (ii) PP has not submitted EC copy as said proposed activity comes under secondary metallurgical process. (iii) Industry has not provided STP for 30 CMD sewage effluent (iv) PP has failed to submit details of Hazardous waste annual returns submitted. (v) PP has not submitted details of Bank Guarantee as per pervious consent condition (schedule no. III) with compliance of consent conditions. 4 MPCB BHARAT PETROLEUM CORPORATION LIMITED, 300 and 338/3 AT-POST AKOLNER AHMEDNAGAR AS(T) It was decided to grant for Expansion - without prejudice to any order passed/being passed by the Hon'ble NGT., subject to verification from SRO regarding H.W. Bottom Sludge is being treated through Bio-remediation process, installed dome roof for their flooding roof tank and as per NIH report their storage does not show any sign of leakages, by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakhs towards compliance of consent conditions. 5 MPCB Western Coalfields Limited, Murpar Underground Mine Project, Topo Sheet No. 55-P/4 Near Murpar Village Chimur APC It was decided to grant consent to establish for expansion as per EC granted, with conditions decided in CAC meeting and Bank Guarantee regime. 6 MPCB MAHARASHTRA SCOOTERS LTD., C-1, OLD MIDC MIDC SATARA APC It was decided to grant for expansion, by imposing following conditions: (i) Industry shall submit bank guarantee of Rs. 5 lakhs towards compliance of consent conditions. 7 MPCB MPCB Vighnaharta Multi Speciality Hospital, 0,1st Floor, Pachora Central, APMC Compound, Bhadgaon Road, Pachora, Tal. Pachora, Dist. Jalgaon Multi Organics Pvt. Ltd., A-1 MIDC Industrial area Chandrapur Not _ PSO AS(T) It was decided to grant C to E and CCA from to after obtaining required documents by imposing standard Bank Guarantee for Health Care Facilities. It was decided to issue SCN for refusal as closure direction is in force due to noncompliance of fly ash notification and hazardous waste rule. Operate, Establish Renewal 6th CC Meeting Minutes

26 9 MPCB Wipro Enterprise (P) Ltd., L - 8 MIDC Waluj Gangapur Not _ APC It was decided to issue final refusal of the consent to establish for expansion of the industry, on following non compliances: (i) Industry has not submitted B.G.s as per the existing consent granted by Board. (ii) Industry has not submitted details of Non Hazardous solid waste. 10 MPCB MPCB Gabriel India Ltd., B-2 Ambad Nashik Mahindra Happinest Developers Limited, Gut no.183 (P), 183 (P) and 158 Nandore Palghar _ APC It was decided to grant consent to establish for the construction of New Godown for the storage of raw material. in CAC meeting dtd MPCB Kumar Sinew Developers Pvt. Ltd., 44/1 Erandwane, Tal: Haveli, Dist: Pune It was decided to for grant of consent to Establish (revalidation) for residential project of total plot area sq. mtrs and total BUA of sq. mtrs. (As per EC dtd ) by imposing following conditions: (i) PP shall not take further effective steps without revalidation of Environment Clearance and submit BG of Rs Lakhs towards compliance of same and consent conditions. (ii) PP shall install online monitoring system to the O/L of STP for monitoring ph, SS and flow and BOD. (iii) The treated domestic effluent shall be 60 % recycled for secondary purpose such as toilet flushing, air conditioning, cooling tower make up, fire fighting etc. and reaming shall be (iv) PP shall submit an affidavit in Board s prescribed format within 15 days regarding compliance of conditions stipulated in EC and C to E. Operate, Establish Renewal 6th CC Meeting Minutes