1 Page 1 of 187 Minutes of the 318 th meeting of the State Level Expert Appraisal Committee held on 21/12/2016 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. The 318 th meeting of the State Level Expert Appraisal Committee (SEAC) was held on 21 st December, 2016 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. Following members attended the meeting: 1. Shri T. P. Singh, Chairman, SEAC. 2. Shri V. C. Soni, Vice Chairman, SEAC. 3. Shri R. J. Shah, Member, SEAC 4. Dr. V. K. Jain, Member, SEAC 5. Shri Rajesh I Shah, Member, SEAC. The agenda of TOR/Scoping/Category 8 (a) cases was taken up. Twenty nine cases of TOR/Scoping/Category 8 (a) cases of were taken up. The applicants made presentations on the activities to be carried out along with other details furnished in the Form-1 / Form-1A, pre-feasibility report and other reports. 1. Industrial Park by Industrial Cluster Pvt. Ltd. at various survey numbers of village Jansali, Dist: Surendranagar. TOR/scoping case. This is a proposed industrial park on land area of ha (17,28,178 m 2 ). It is proposed to develop open plots for industrial shed. Being an Industrial Estate of area below 500 ha., not housing any industry of category A or B and having development area more than 50 ha., they have applied for obtaining Environmental Clearance under project/ activity listed at serial no. 8(b) in the Schedule attached with the EIA Notification It was discussed that Ministry of Environment, Forest & Climate Change, Government of India, vide its Notification No. S.O. 3999(E) dated 9 th December, 2016 made amendment in the EIA Notification As per the said amendment Township & Area Development Projects with >1,50,000 sq.mtrs and < 3,00,000 sq.mtrs built up area or covering an area of >50 ha and <150 ha will be category B projects whereas Township and Area Development Projects with > 3,00,000 sq.mtrs built up area or covering an area of >150 ha will be category A projects and shall require to obtain prior Environmental Clearance from the Central Government in Ministry of Environment, Forest & Climate Change. The provisions of amendment dated 09/12/2016 were discussed during the meeting and it was decided to transfer the application of the proposed project of industrial park having area more than 150 ha. to Ministry of Environment, Forest & Climate Change for further processing. In view of the above it was decided to forward the application for seeking prior Environmental Clearance of the above mentioned project along with Form-1 & Form -1A received from the project proponent to SEIAA Gujarat in original and recommend to transfer the same to Ministry of Environment, Forest & Climate Change for consideration & necessary action at their end. 2. Building construction project by Mr. Ajaybhai Bavkubhai Undhad Block No. 218, Moje: Amadpor, Navsari. Screening/scoping & appraisal Page 1 of 187

2 Page 2 of 187 Details of the proposed project as presented before the committee are described below: Sr. No. Particulars Details 1. Proposal is for New Project [ SIA/GJ/NCP/60186/2016] 2. Type of Project Residential 3. Project / Activity No. 8(a) [8(a) or 8(b )] 4. Name of the project Residential Project 5. Name of Developer Mr. Ajaybhai B Undhad 6. Estimated Project Rs.250 crores Cost (Rs. In Crores) 7. Whether construction No work has been initiated at site? If yes, details thereof 8. Project Details Land / Plot Area (m 2 ):2,24,781.0 FSI area (m 2 ):76,489.8 Total BUA (m 2 ):1,39, Permissible Proposed FSI Area (m 2 ) 2,40, ,489.8 Ground Coverage (m 2 ) 80, , Common Plot Area (m 2 ) , Max. building height (m) 45 m 15m 9. Building Details No. of Buildings:- Scope of buildings/blocks: 225 nos of bungalows of ground floor + 2 floors. No.& size of Residential Units:225 bungalows No. & type of Commercial Units:- Details of amenities if any:club house and jogging track 10. No. of expected 1012 residents / users 11. Water & waste water details during construction phase 12. Water & waste water details during operation phase Water requirement (KL/day):15 Source of water: Borewell water Waste water generation quantity (KL/day):2.1 Mode of disposal: Details of reuse of water, if any: Total water requirement (KL/day): Fresh water requirement (KL/day): 71.5 Source of water: Water supply from Amadpore Gram Panchayat. Waste water generation quantity (KL/day): Mode of disposal: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be completely reused for flushing, gardening & irrigation purposes. In case of STP provision, capacity of STP: 125 KL/day Page 2 of 187

3 Page 3 of Status of water supply and drainage line 14. Solid waste Management STP Technology: FMR based Purposes for treated water utilization: gardening & flushing. Quantity of treated water to be reused:1.gardening (KL/day):43.5, 2. Flushing (KL/day): 70.0, 3. Irrigation in their farm (KL/day): Provision of dual plumbing system (Yes/No): Yes Quantity and type (treated/untreated) of sewage to be discharged: Sewage to be generated will be treated in the proposed onsite STP. Treated Sewage will be completely reused for flushing, gardening & irrigation purposes. During monsoon season the treated sewage will be discharged into the drainage line of Amadpore gram panchayat. Mode of disposal: As above. Local village panchayat will provide water supply & drainage line. Construction Phase: Details Generation (m 3 ) Quantity to be reused (m 3 ) Mode of Disposal / Reuse Top Soil 1,500 1,500 Re utilized for greenbelt Other 2,000 2,000 development or excavated earth backfilling. Construction debris Steel scrap Discarded packing materials 15 kg/day Nil Sold off to recyclers 15 kg/day 6 kg/day Operation Phase: Type of Generation waste Quantity (Kg/day) Mode of waste collection Dry waste 205 kg/day Collection into Wet waste 200 kg/day bins to be provided within premises. Mode of Disposal / Reuse Solid waste segregation at source will be adopted and wet waste will be processed within premises using OWC. Recyclable material will be Page 3 of 187

4 Page 4 of 187 Page 4 of 187 sold to recycler. Details of segregation if to be done: Solid waste segregation at source will be adopted and wet waste will be processed within premises using OWC. Recyclable material will be sold to recycler. Capacity and no. of community bins to be placed within premises:1 nos of bin having capacity of 250 kg for dry waste and 200 kg for wet waste will be provided. Landfill site where waste will be ultimately disposed by local authority: As above. 15. Parking Details Total parking area requirement for the project as per GDCR: 11, m 2. Parking area requirement for residential units as per GDCR: 11, m 2. Total number of CPS requirement for the project as per NBC :225 Number of CPS requirement for residential units as per NBC: 225 Total Parking area provided (m 2 )& No. of CPS:12, m 2 and 538 CPS Parking area provided as open surface (m 2 ) & No. of CPS: 12, m 2 and 538 CPS 16. Traffic Management Width of adjacent public roads: National Highway-8 Number of Entry & Exit provided on approach road/s: Two gates will be provided. Width of Entry & Exit provided on approach road/s:18 m Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation):7.5m Width of all internal roads: 7.5 m 17. Details of Green Building measures proposed. 18. Energy Requirement, Source and Conservation Provision to install aerated coke (Foam Type) in wash basins, kitchen, low flush water closets in toilet and pressure reducing valves in water pipeline, ground water recharge thorugh rain water harvesting system etc. Power supply: Maximum demand:1800 KW Connected load:1900 KW Source: DGVCL Energy saving measures: Maximum utilization of natural light, roof-top thermal insulation, LED lighting fixtures in the common areas, appropriate design to shut out excess heat and gain loss, use of solar energy in external lighting (landscape lighting), aerated block [Cement + Fly Ash + Air mixture] will be used to reduce heat stress inside building etc. DG Sets: No. and capacity of the DG sets:4 x 62.5 KVA Fuel & its quantity: HSD (10 Liter/h) Note :- D.G. Sets will be used in case of power failure or fire emergency

5 Page 5 of Fire and Life Safety ---- Measures 20. Details on staircase: One staircase will be provided one stair case in each bungalow. 21. Rain Water Harvesting (RWH) 22. Green area details 23. Budgetary allocation for Environmental Management Plan (Rs. in lacs) 24. Proposed dust control measures during the construction phase 25. Eco friendly building material usage details. Level of the Ground water table:13m No. & dimensions of RWH tank(s) :- No. and depth of percolations wells :57 Details on Pre-treatment facilities: only roof top rainwater harvesting is proposed Tree covered area (m 2 ):15,000 Area covered by shrubs and bushes (m 2 ): included in lawn covered area. Lawn covered area (m 2 ):10,000 Total Green Area (m 2 ):25,000 Green Area % of plot area:11.12% No. of trees and species to be planted:5000 trees of local flora species Green belt development : 50 Lacs STP, Drainage and rain water harvesting: 140 lacs Solar and energy saving: 30 lacs Total: 220 Lacs Loading & transportation in covered trucks, covered shed for cement unloading activity, temporarily wind screen around project site, sprinkling of water on roads and in vicinity of storage area etc. Fly ash bricks & aerated block for wall partition, paving blocks in parking areas & walk way, RMC (Ready Mix Concrete) for flooring, foundation, lead free paints for wall & ceiling. 26. Facilities to be provided to the construction workers 27. Documents related to land possession. All the basic facilities like tap water, sanitation & drinking water, first aid box, free medicines & doctor service, adequate PPE s etc. Copy of village Form No:7 shows that NA land is in the name of applicant of others. Applicant is authorised person (Kulmukhtyar) on behalf of other land owners as per the registered sale deed submitted. Copies of N.A order for all the survey numbers are in the name of the applicant. During the meeting, it was presented that there are total 2300 trees existing at the project site, out of them 845 trees will be cut and total 5000 trees will be planted within premises. The project proponent was suggested to plant trees on both the sides of the internal roads & all along the boundary wall of the project site. Project site is at a distance of 287 m from river Purna. It was clarified that no any village road is passing through the project site. It was suggested to carry out gardening & landscape development through drip irrigation, the project proponent was agreed for greenbelt development Page 5 of 187

6 Page 6 of 187 Page 6 of 187 within premises through drip irrigation. It was presented that all the 25 bungalows are identical having plot area of 500 m2 with open space of 300 m2 and hence car parking space will be provided within premises of each individual bungalow. The project proponent was asked to carry out construction activity after leaving adequate margin space from the boundary of the nearby natural drain as per the permission from the irrigation department. After detailed discussion, it was decided to recommend the project to SEIAA Gujarat for granting Environment Clearance subject to the strict compliance of the following project specific conditions as well as the standard conditions finalized during the meeting of SEAC held on 09/09/2015 for building construction projects falling under project activity no. 8(a) as per the schedule of the EIA Notification 2006: SPECIFIC CONDITION: 1. Provision of required margin space shall be made between the boundary of the adjacent Kotar / natural drain and the building line of the proposed project as per the requirement of the local bylaws and permission from the concerned competent authority shall be obtained in this regard. CONSTRUCTION PHASE : WATER: 2. Fresh water requirement during the construction phase shall be 15.0 KL/day and it shall be met through the borewell water. Permission of concerned authority shall be obtained for ground water abstraction. 3. Sewage generated during the construction phase shall be disposed off through septic tank and soak pit. OPERATION PHASE: WATER: 4. Total water requirement during the operation phase shall be 185 KL/day, out of which 71.5 KL/day of fresh water requirement shall be met through the water supply from Amadpore Grampanchayat. Remaining water requirement for gardening and flushing purposes shall be met by reuse of treated sewage from the proposed onsite STP. No ground water shall be tapped during the operation phase. Metering of the water shall be done and its records shall be maintained. 5. The sewage generation during the operation phase shall be KL/day, which shall be treated in the proposed sewage treatment plant (STP) of adequate capacity. The STP shall be operated regularly and efficiently so as to achieve the GPCB norms at the STP outlet. 6. Treated sewage conforming to GPCB norms shall be completely reused for gardening & flushing purposes within premises & for irrigation purpose in their adjacent farm. Hence there shall not be any kind of sewage discharge outside the premises. Only during the monsoon season, treated sewage shall be discharged through the drainage line of Amadpore gram panchayat when the treated sewage reuse for gardening & irrigation purpose shall not be possible. 7. A proper logbook of STP operation and also showing the quantity of treated sewage reused in flushing and gardening shall be maintained and furnished to the GPCB from time to time. 8. Dual plumbing system with separate tanks and lines shall be provided for utilization of treated sewage for flushing. 9. Rain water harvesting from rooftop and paved areas and ground water recharge through 57 nos. of percolation wells shall be carried out as per the details submitted. Before recharging the runoff, pretreatment must be done to remove suspended matter. AIR: 10. D. G. sets ( KVA) proposed as backup power shall be of enclosed type and confirm to prescribe standards under EPA rules. Necessary acoustic enclosures shall be provided at diesel

7 Page 7 of 187 generator set to mitigate the impact of noise. 11. The gaseous emissions from the D.G. Sets shall conform to the standards prescribed under EPA rules as amended from time to time. At no time, the emission levels shall go beyond the stipulated standards. 12. The stack height of the D.G.sets shall be equal to the height needed for the combined capacity of all proposed D.G.sets. SOLID WASTE: 13. The solid waste generated shall be properly collected and segregated at source. Wet waste shall be processed within premises using OWC. The recyclable material shall be sold to vendors whereas the other garbage shall be disposed off properly as per the provisions made by the concerned local authority. SAFETY: 14. Adequate number of staircases shall open out at ground level for emergency evacuation. PARKING / TRAFFIC CONGESTION: 15. Minimum parking space of 12, m 2 as open surface parking shall be provided as proposed. ENERGY CONSERVATION: 16. Energy conservation measures viz. Maximum utilization of natural light, roof-top thermal insulation, LED lighting fixtures in the common areas, appropriate design to shut out excess heat and gain loss, use of solar energy in external lighting (landscape lighting), aerated block [Cement + Fly Ash + Air mixture] will be used to reduce heat stress inside building etc. shall be implemented as proposed. GREEN BELT: 17. Green belt area of 25,000.0 m 2 comprising of 15,000 m 2 tree covered area with 2800 nos. trees shall be developed as proposed. The other open spaces inside the plot shall be suitably landscaped and covered with vegetation of indigenous tree species. 3. Glorious F.P.No , O.P.No.76, B.No , T.P.S.No.49, Katargam, Choryasi, Surat. Details of the proposed project as presented before the committee are described below: Sr. No. Particulars Details 1. Proposal is for New Project 2. Type of Project Residential project 3. Project/Activity 8(a) No. [8(a) or 8(b)] 4. Name of the Glorious project 5. Name of Developer Shri Bhagwanbhai Kheni 6. Estimated Project Rs. 180 crores Cost (Rs. in Crores) 7. Whether construction work has been initiated at site? If yes, details thereof No any construction activity has been initiated at site. Screening/scoping & appraisal. Page 7 of 187

8 Page 8 of Project Details Land / Plot Area (m 2 ): 9,513.0 FSI area (m 2 ): 37, Total BUA (m 2 ): 64, Permissible Proposed FSI Area (m 2 ) 37, , Ground Coverage (m 2 ) -- 2, Common Plot Area (m 2 ) Max. building height(m) Building Details No. of Buildings: = 5 No. of Blocks: = 5 Blocks Scope of buildings/blocks: 2 level basement + hallow plinth + 21 floors No. & size of Residential Units: 210 units, No. & type of Commercial Units: Not Applicable Details of amenities if any: No. of expected Fixed population = 210 Flats x 5 persons/flat= 1050 persons residents / users 11. Water & waste water details during construction phase 12. Water & waste water details during operation phase 13. Status of water supply and drainage line 14. Solid waste Construction Phase: Floating population= 210 Flats x 2 persons/flat/day= 420 persons/day Water requirement (KL/day): 28 Source of water: Local water tankers Waste water generation quantity (KL/day): 2 Mode of disposal: Septic tank / soak pit system Details of reuse of water, if any: None Total water requirement (KL/day): Fresh water requirement (KL/day): Source of water: Water supply from S.M.C Waste water generation quantity (KL/day): Mode of disposal: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be reused for gardening and flushing purpose within premises and remaining quantity of treated sewage will be discharged into the underground drainage line of Surat Municipal Corporation. In case of STP provision, capacity of STP: Yes, 150 KL/day STP Technology: STP with primary, secondary & tertiary treatment facilities Purposes for treated water utilization: Gardening & Flushing Quantity of treated water to be reused: 1.Gardening (KL/day): 6.0, 2. Flushing (KL/day): 47.0 Provision of dual plumbing system (Yes/No): Yes Quantity and type (treated/untreated) of water to be discharged: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be reused for gardening and flushing purpose within premises and remaining quantity of treated sewage will be discharged into the underground drainage line of Surat Municipal Corporation. Mode of disposal: As above. Water will be supplied by SMC, drainage line is exactly on roadside of the project boundary i.e. approx. 6m away Page 8 of 187

9 Page 9 of 187 Management Generation Quantity to be Mode of Disposal / (m 3 ) reused (m 3 ) Reuse Top Soil 1,670 1,670 Will be stored onsite and used for development of greenbelt. Other excavated 14,883 14,883 m 3 will excess (if any) will be reused for refilling be sent to another earth of site where need may foundation & be exist. plinth, green belt and levelling low lying areas at project site itself. Construction Will be used for debris levelling, roads, pavements etc. Steel scrap Whatsoever -- Will be returned to supplier or sold to scarp dealer/ end users. Discarded packing materials Whatsoever -- Will be returned to suppler/ sold to authorized recycler Operation Phase: Type of Generation waste Quantity (Kg/day) Dry waste 525 kg/day Wet waste Mode of waste collection Two separate bins (one for dry and one for wet waste) each of 10 L capacity will be provided to each unit. These bins will be emptied in to community bins provided at various locations. Page 9 of 187 Mode of Disposal / Reuse The said common community bins will be regularly emptied by SMC. STP Sludge Whatever quantity generated will be used as soil conditioner Details of segregation if to be done: Two separate bins (one for dry and one for wet waste) each of 10 L capacity will be provided to each unit. Capacity and no. of community bins to be placed within premises: 27 community bins of 80 lit capacity will be provided at various locations Landfill site where waste will be ultimately disposed by local authority: At the nearby MSW collection site of SMC. 15. Parking Details Total parking area requirement for the project as per GDCR: 7, m 2 Parking area requirement for residential units as per GDCR: 7, m 2

10 Page 10 of Traffic Management 17. Details of Green Building measures proposed. 18. Energy Requirement, Source and Conservation 19. Fire and Life Safety Measures Total number of CPS requirement for the project as per NBC : 210 CPS Number of CPS requirement for residential units as per NBC : 210 CPS Total Parking area provided (m 2 )& No. of ECS: 15, m 2 & 595 CPS Parking area provided in basement (m 2 )& No. of CPS : 14, m 2 & 460 CPS Parking area provided in hollow plinth (m 2 )& No. of CPS : m 2 & 23 CPS Parking area provided as mechanical parking in basement (m 2 ) & No. of CPS (m 2 )& 111 CPS Width of adjacent public roads: 30 m wide TPS road Width of Entry & Exit provided on approach road/s: 7.5 m Number of Entry & Exit provided on approach road/s: Two gates will be provided. Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation): 5 m Width of all internal roads: 7.5 m & 6 m Maximum use of Ready Mix Concrete (RMC), fly ash paver blocks for pavements/walkways, most of the carpentry structures will be made up of processed engineering wood instead of wood, maximum use of Portland Pozzolona Cement (PPC), rainwater harvesting by recharging the ground water table with provision for percolation wells, PVC electrical boards, aluminium window frame instead of wood, rain water harvesting & ground water recharge through 4 nos. of percolation wells, provision of STP & reuse of treated sewage etc. Power supply: Maximum demand: During construction phase: 40 kw, during operation phase: 1 MW. Connected load: Will be applied once EC will be granted Source: M/s. Torrent Power. Energy saving measures: Maximum use of LED lights in each block, use of solar lights, use of variable frequency drive motors to optimize power consumption, use of building material having lower U-value and the insulating material having higher R-value to have optimum energy performance, use of light and silent colours in the building envelope so that UV absorption is reduced and associated cooling requirements are minimized. DG Sets: No. and capacity of the DG sets: KVA Fuel & its quantity: HSD (25 l/h) Nearest fire station is Katargam which is approx. (3.5 km).time required for the fire tender to reach at the project site is 5-10 minutes. During operation phase: 3 underground firewater storage tanks having total 210 KL capacity, fire extinguishers, fire hydrant system, Page 10 of 187

11 20. Details on staircase Page 11 of 187 Page 11 of 187 sprinkler system, CO sensors & ventilation system in basement etc. During the construction phase: Fire extinguishers in common areas, personal protective equipments like earplugs, dust masks, safety shoes, helmets, hand gloves, etc will be provided to all workers, all workers will be trained to use welding shields and follow safer practices, provision of first aid facilities & related training to the construction workers, maintaining hoists and lifts, lifting machines, chains, ropes, and other lifting tackles in good condition, H frame scaffolds & ladders made of mild steel, completely concealed copper wiring, all electrical fittings / equipments used will meet the relevant IS standards etc. Type & no. No. of floors Floor area No. of Width of Travel of buildings (Max. Floor Area staircase the staircase distance (m) of Ground Floor) Block- A 2B+HP m & 1.5m Approx. Block- B 2B+HP m & 1.5m 18 m Block- C 2B+HP m & 1.5m Block- D 2B+HP m & 1.5m Block- E 2B+HP m & 1.5m And three separate staircase for commercial units having 1.5 m width will be provided. 21. Rain Water Harvesting (RWH) 22. Green area details 23. Budgetary allocation for Level of the Ground water table: depth of water level 40 m as per CGWB report No. & dimensions of RWH tank(s): 4 nos. RWH structure of 0.60 m dia. will be provided. No. and depth of percolations wells : 4 nos., 40 m Details on Pre-treatment facilities: Before recharging rain water, suitable arrangements of filtering (preferably sand filtration media) will be provided. Gratings at mouth of each drainpipe will be provided on terraces to trap leaves, debris and floating materials. Filter media will be cleaned before every monsoon season. First rain separator will be provided to flush off first rains. During rainy season, the whole system (roof catchment, pipes, screens, first flush and filters) will be checked before and after each rain and preferably cleaned after every dry period exceeding a month. Tree covered area (m 2 ) : Area covered by shrubs and bushes (m 2 ):-- Lawn covered area (m 2 ): Total Green Area (m 2 : 1370 Green Area % of plot area: 14% No. of trees and species to be planted: Local species such Ashok, Gulmohur, Neem etc. will be preferred for plantation. Budgetary allocation of Rs lacs as capital cost & Rs. 3.2 lacs as recurring cost/annum has been proposed towards sewage treatment &

12 Environmental Management Plan (Rs. in lacs) 24 Dust control measures 25 Eco friendly building materials 26 Facilities to be provided to the construction workers 27 Documents related to land possession. Page 12 of 187 Page 12 of 187 reuse, solid waste management, rain water harvesting, greenbelt development etc. Temporary windshield barriers, regular water sprinkling, tarpaulin sheet cover on the material during the transportation, maximum use of Ready Mix Concrete (RMC), uniform piling of sand and proper storage to avoid dusting. Maximum use of Ready Mix Concrete (RMC), fly ash paver blocks for pavements/walkways, most of the carpentry structures will be made up of processed engineering wood instead of wood, maximum use of Portland Pozzolona Cement (PPC) containing high amount of fly ash. Sanitation facilities, drinking water, municipal solid waste collection facility etc. Copy of village form no. 7 submitted by them shows that the land is in the name of applicant & others. Zoning certificate shows that the project site is falling in the residential zone. During the meeting, after detailed discussion on various aspects regarding the project, it was decided to appraise the project only after submission of the following: 1. Copy of permission obtained from the concerned competent authority for availability of the proposed FSI & ground coverage. 2. Documents showing ownership of the land by the project proponent. Notarized consent of other land owners for issuance of Environmental Clearance in the name of the applicant. 3. Details of provisions to make the project energy efficient and adoption of modes of alternative eco friendly sources of energy, solar water heater, solar street lighting, LED lighting etc. Details along with back up calculation showing how the additional energy consumption in such type of high rise buildings will be compensated with the proposed energy conservation measures. 4. Details on operation & maintenance of STP during operation phase of the project along with financial provision made for its installation, operation & maintenance. Design details of the dual plumbing system to be provided for reusing treated sewage for flushing purpose. 5. Details on seismic zone considered for designing of the proposed high rise buildings and design aspects required to be adhered to as per national standards for buildings to make it earthquake proof. Certificate from a structural engineer in this regard. 6. Details on provision of ventilation, lighting arrangements, CO sensors & their functioning etc. in basement. 7. Details of fire fighting system including location of fire water tanks & capacity, separate power system for fire fighting, automatic sprinkler system, fire detection system with alarms & automatic fire extinguishers, location of fire lift and fire retardant staircases, details of qualified and trained fire personnel & their job specifications, nearest fire station & time required to reach the proposed site etc. 4. Building construction project by Meet Associates S.No.1525/120, F.P.No.114/1, T.P.S.No.408, Ognaj, Ghatlodiya, Ahmedabad. Screening/scoping

13 Page 13 of 187 The project proponent did not remain present during the meeting. It was decided to call them in one of the upcoming meetings of SEAC. 5. bsafal Parivesh S.No.452, 453/2, 454, 464/1, 464/2, 534/3 & 534/4, F.P.No.349/2, 350, 362/1 & 456 of T.P.S.No.204 (Sarkhej- Okaf- Makarba-Vejalpur), Makarba, Vejalpur, Ahmedabad. Details of the proposed project as presented before the committee are described below: Sr.No. Particulars Details 1. Proposal is for New Project [SIA/GJ/NCP/59435/2016] 2. Type of Project Residential & commercial project 3. Project / Activity 8 (a) No. [8(a) or (b) 4. Name of the bsafal Parivesh project 5. Name of the Agendra Infra Projects Private Limited Developer 6. Estimated Project Corers cost (Rs. in Corers) 7. Whether No construction activity started construction work has been initiated at site? if yes, details thereof 8. Project Details Land/Plot Area (m 2 ): 16,442.0 FSI area (m 2 ): 44, Total BUA (m 2 ): 73, Permissible Proposed FSI Area (m 2 ) 44, , Ground Coverage(m 2 ) --- 4, Common Plot Area(m 2 ) 1, , Max. building height(m) Building Details No. of Buildings: 12 (1 Commercial, 10- residential, 1-gym) 10. No. of expected residents/users No. of Blocks: 12 Screening/scoping & appraisal. Scope of building: Commercial basement + ground floor + 6 floors, 4 residential buildings Basement + Hollow Plinth + 14 floors, 6 residential buildings: Basement + Hollow Plinth + 13 floors, gym ground floor only No. & type of residential units: 524 flats No. & type of commercial units:28 Nos. shops & 33 offices Details of amenities if any: One club house (Visitors) Page 13 of 187

14 Page 14 of Water & waste water details during construction phase 12. Water & waste water details during operation phase 13. Status of water supply and drainage line 14. Solid waste Management Water requirement (KL/day):23.25 Source of water: Local water tankers. Waste water generation quantity (KL/day):10.54 Mode of disposal: The domestic waste water will be discharged via mobile toilet unit to AMC treatment plant. Details of reuse of water, if any: No Total water requirement (KL/day): Fresh water requirement (KL/day): Source of water: water supply from Ahmedabad Municipal Corporation (AMC). Waste water generation quantity (KL/day): Mode of disposal: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be reused for gardening & flushing purposes within premises and only remaining quantity of treated sewage will be discharged into the drainage line of Ahmedabad Municipal Corporation (AMC). In case of STP provision, capacity of STP: 400 KL/day Purposes for treated sewage utilization: Flushing & Gardening Quantity of treated sewage to be reused: 1.Gardening(KL/day): Flushing (KL/day): Provision of dual plumbing system (Yes/No): Yes Quantity and type (treated/untreated) of sewage to be discharged: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be reused for gardening & flushing purposes within premises and only remaining quantity of treated sewage will be discharged into the drainage line of Ahmedabad Municipal Corporation (AMC). Mode of disposal: as above. AMC drainage line and water supply line are available at site. Construction Phase: Generation (m 3 ) Quantity to be reused (m 3 ) Page 14 of 187 Mode of Disposal/Reuse Top soil 3, , Greenbelt Development Other excavated earth 28, , Internal Road, other paved area and back filling Constructi on debris Back filling and internal road development Steel Sold to vendors

15 Page 15 of 187 scrap Discarded packing materials Sold to vendors Remaining quantity of excavated earth and construction debris will be used for back filling for the other projects in the vicinity as well as road development outside the premises. Operation Phase: Generation Quantity (Kg/day) Mode of waste collection Total Into bins to be provided within premises Page 15 of 187 Mode of disposal reuse Bio Degradable waste will be disposed into nearby bins and none biodegradable waste will be sold to vendors Details of segregation if to be done: Green bins for bio degradable waste and white bins for non-biodegradable waste. Capacity and no. of community bins to be placed within premises: Total 1172 bins will be provided with 5 litre & 74 bins of 80 litre capacity. Landfill site where waste will be ultimately disposed by local authority: To be collected and disposed off by AMC. 15. Parking Details Total parking area requirement for the project as per GDCR: m 2 Parking area requirement for residential units as per GDCR: m 2 Parking area requirement for commercial units as per GDCR: m 2 Total number of CPS requirement for the project as per NBC: 702 Number of CPS requirement for residential units as per NBC: 524 Number of CPS requirement for commercial units as per NBC: 178 Total parking area provided (m 2 ) & No. of CPS: Area 18, m 2, 703 CPS Parking area provided in basement (m 2 ) & No. of CPS: 12, m CPS Parking area provided in hollow plinth (m 2 ) & No. of CPS: 3, m 2 & 130 CPS Parking area provided as open surface (m 2 ) & No. of CPS: 2, m 2, 105 CPS Parking area provided as mechanical stackable parking on open

16 Page 16 of Traffic Management 17. Details of Green Building measures proposed. 18. Energy Requirement, Source and Conservation 19. Fire and Life Safety Measures 20. Details on staircase surface : 920 m 2 & 40 CPS. Width adjacent public roads: 60 m and 12 m Number of Entry & Exit provided on approach road/s: 3 gates will be provided. Width of Entry & Exit provided on approach road/s 9 m Minimum width of open path all around the building for easy access of fire tender (excluding the width for the plantation): 5 m Width of all internal roads: 6 m & 7 m Maximum use of natural light through architectural design, use of energy efficient motor and pumps, maximum use of aerated blocks, use of CFL and low voltage lighting, LED lighting in open and landscape areas, rooftop thermal insulation, solar lights in open & landscape areas, energy efficient motors & pumps, rainwater harvesting & ground water recharge, provision of STP & reuse of treated sewage etc. Power Supply: UGVCL Power Maximum demand:3000 KWA Connected load: ---- Source: UGVCL Power Energy saving measures: Maximum use of natural light through architectural design, use of energy efficient motor and pumps, maximum use of aerated blocks, use of CFL and low voltage lighting, LED lighting in open and landscape areas, rooftop thermal insulation, solar lights in open & landscape areas, energy efficient motors & pumps etc. DG Sets: No. and capacity of the DG sets: 2 X 125 KVA Fuel & its quantity: 15 Lit/Hr Fire extinguishers, hose reel, wet riser, automatic sprinkler system (basement), manually operated electric fire alarm system, automatic detection and fire alarm system, pump near underground static water storage tank with minimum pressure of 3.5 kg/cm2 etc. Nearest fire station is Sarkhej fire station which is approx. 4.3 km. Time required for a fire tender to reach at the project site is about15 minutes. Block No. of Floor area Number of Stair Case Travel distance (m) Floors (m2) stair case width (m) A B+H.P B B+H.P C B+H.P D B+H.P E B+H.P F B+H.P Page 16 of 187

17 G B+H.P H B+H.P I B+H.P J B+H.P COMM. B+G Club House G 320 o Rain Water Level of the Ground water table:--- Harvesting (RWH) No. & dimensions of RWH tank(s):--- No. and depth of percolation wells: 5 Nos. & 80 m Page 17 of 187 Details on Pre treatment facilities: De-silting cum filter chamber 22. Green area details Tree covered area (m 2 ): Budgetary allocation for Environmental Management plan (Rs. in lacs) 24. Proposed dust control measures during the construction phase 25. Eco friendly building material usage details. 26. Facilities to be provided to the construction workers 27. Documents related to land possession. Area covered by shrubs and bushes (m 2 ): 1, Total Green Area (m 2 ): 1, Green Area % of plot area (m 2 ): 10.83% No. of trees and specials to be planted: 101 Rs Lacs as capital lost & Rs lacs as recurring lost will be used for proposed EMP. Dust suppression by spraying of water, peripheral barricading the project site, covering the construction material during transportation and storage, compaction of soil during various construction activities etc. Fly ash bricks/fly ash blended concrete blocks, fly ash paving blocks. Sanitation facility for labour and staff members, drinking water facility welfare facility as per Gujarat building and other construction rules and regulations. Copies of village from No: 7 submitted for all the F.P.Nos. show that NA land a residential use in the name of M/s Agendra Infra Projects Pvt. Ltd. (F.P.No.350, 362/1, 349) & bsafal Estate Holding (F.P.No.456). During the meeting, while discussing about ownership of the land of F.P.No.456, it was clarified that promoters of M/s Agendra Infra Projects Pvt. Ltd. & bsafal Estate Holding are the same persons. After detailed discussion on various aspects regarding the project, it was decided to consider the project only after submission of the following: 1. Authentic supporting documents showing promoters of M/s Agendra Infra Projects Pvt. Ltd. & bsafal Estate Holding and notarized NOC from bsafal Estate Holding for issuance of Environmental Clearance in the name of M/s Agendra Infra Projects Pvt. Ltd for the project on the proposed site. Page 17 of 187

18 6. Building construction project by Mr. Dadabhai A. Lalu B.No.76, F.P.No.91, O.P.No.91, T.P.S.No.51 (Dabholi), Surat. Page 18 of 187 Screening/scoping & appraisal. Details of the proposed project as presented before the committee are described below: Sr. Particulars Details No. 1. Proposal is for New Project[SIA/GJ/NCP/60272/2016] 2. Type of Project Residential 3. Project / Activity 8(a) No. [8(a) or 8(b)] 4. Name of the Residential project. project 5. Name of Dadabhai A. Lalu Developer 6. Estimated 40 Crore Project Cost (Rs. In Crores) 7. Whether No. construction work has been initiated at site? If yes, details thereof 8. Project Details Land / Plot Area (m 2 ): 6,599.0 FSI area (m 2 ): 22, Total BUA (m 2 ): 38, Permissible Proposed FSI Area(m 2 ) 26, , Ground Coverage(m 2 ) 1, , Common Plot Area(m 2 ) Max. building height(m) Building Details No. of Buildings: 5 Nos. No. of Blocks: 6 Scope of buildings/blocks: 2 level basement + hollow plinth + 14 floors & size of Residential Units: 336 Nos. No. & type of Commercial Units: -- Details of amenities if any: No. of expected 1512 nos. residential users residents / users 11. Water & waste Water requirement (KL/day): water details Source of water: Water supply from S.M.C during Waste water generation quantity (KL/day): 1.15 construction Mode of disposal: disposed through onsite septic tank and soak pit phase Details of reuse of water, if any: washing water of construction equipments 12. Water & waste water details during will be reused for curing Fresh water requirement (KL/day): 210 Source of water: Water supply from S.M.C Waste water generation quantity (KL/day): 166 Page 18 of 187

19 Page 19 of 187 Page 19 of 187 operation phase Mode of disposal: Will be disposed through underground drainage line of SMC. 13. Status of water Water supply & drainage lines are available in the area. supply and drainage line 14. Solid waste Management Construction Phase: Generation Quantity to be Mode of Disposal / Reuse (m 3 ) reused (m 3 ) Top Soil 3,8000 3,8000 Excavated surplus earth and construction Other excavated earth debris will be refilled at low lying areas in the project premises and top soil will be used for development of greenbelt. Construction debris Steel scrap 3.8 MT 3.04 MT Will be sold to recyclers Discarded packing materials 1 MT -- Will be sold to vendors. Operation Phase: Type of waste Generation Quantity (Kg/day) Mode of waste collection Dry waste Wet waste Kg Into separate bins to be provided for dry & wet waste Mode of Disposal / Reuse Collection & final disposal through SMC. Details of segregation if to be done: The solid wastes generated will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins. Capacity and no. of community bins to be placed within premises: 140 liter each; 06 nos. of bins; Landfill site where waste will be ultimately disposed by local authority: Final disposal at Khajod disposal site 15. Parking Details Total parking area requirement for the project as per GDCR: 11, m 2 Parking area requirement for residential units as per GDCR: 11, m 2 Total number of CPS requirement for the project as per NBC: 336 Number of CPS requirement for residential units as per NBC: 336 Total Parking area provided (m 2 )& No. of CPS: 11, m 2, 361 nos. Parking area provided in basement (m 2 )& No. of CPS: 9, m 2, 289 nos Parking area provided in hollow plinth (m 2 )& No. of CPS: 1, m 2, 54 nos. Parking area provided as open surface (m 2 )& No. of CPS: : m 2, 18 nos. 16. Traffic Management Width of adjacent public roads: 24 m wide road Width of Entry & Exit provided on approach road/s: 9.0 m & 7.5 m Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation): 3.5 m

20 Page 20 of Details of Green Building measures proposed. 18. Energy Requirement, Source and Conservation 19. Fire and Life Safety Measures 20. Details on staircase Name of Building A,B, E, F C-D 21. Rain Water Harvesting (RWH) 22. Green area details 23. Budgetary allocation for Environmental Management Plan (Rs. in lacs) 24. Proposed dust control measures Width of all internal roads:, 9.0 m & 7.5 m Maximum utilization of natural light, LED lighting fixtures in common areas, use of solar energy in external lighting, rain water harvesting & ground water recharge etc. Power supply Maximum demand: 1000 KVA Connected load: -- Source: D.G.V.C.L Energy saving measures: Maximum utilization of natural light, CFL & LED lighting fixtures in common areas, use of solar energy in external lighting, aerated block [Cement + Fly Ash + Air mixture will be used to reduce heat stress inside building etc. DG Sets No. and capacity of the DG sets- 1 x 85 KVA Fuel & its quantity: Diesel & 12 lit/hr. Fire extinguisher, hose reel, wet riser, automatic sprinkler system in basement, manually operated electric fire alarm system, underground water tank of 75 KL capacity, terrace tank of 25 KL capacity etc. Type & no. of buildings Single Joint No. of floors Floor area No. of staircas e Width of the staircase(m) Page 20 of 187 Travel distance (m) 2B+HP <30 2B+HP <30 Level of the Ground water table: ft No. & dimensions of RWH tank(s) : No. and depth of percolations wells: 2 nos. Details on Pre-treatment facilities : Gravity filter, MOC: PE Tree covered area (m 2 ) : Area covered by shrubs and bushes (m 2 ): inclusive in lawn area Lawn covered area (m 2 ): Total Green Area (m 2 ): Green Area % of plot area: % No. of trees and species to be planted: 160 nos. of trees like Asopalav, Gulmahor, Palm, Neem,Badam etc. Sr. No. Description 1 Landscaping 12 Lacs 2 Groundwater Recharge Structure 5 Lacs 3 Solar Energy Utilization 3 lacs 4 Energy Efficient Lighting 2 lacs 5 Solid Waste Management 2 lacs 6 Monitoring of Air, Water, Noise & Soil 0.75 lacs Total Lacs Capital Cost (Rs. In Lacs) Vertical curtails, water sprinkling, covering the building materials with the tarpaulin sheet etc.

21 Page 21 of 187 during the construction phase 25. Eco friendly building material usage details. 26. Amenities for the construction workers. 27. Documents related to land prossession Fly ash based bricks, Ready Mix Concrete, A.C.C Blocks will be used. Sanitation facility, drinking water & tap water, soak pit for domestic waste water collection, first aid box, free medicine, doctor service, PPEs etc. Copy of village form no. 7 & 12 submitted by them shows that the agricultural land is in the name of applicant. Copy of application made for obtaining N.A permission has been submitted. During the meeting, after detailed discussion on various aspects of the project, it was decided to consider the project only after submission of the following: 1. Copy of permission obtained from the concerned competent authority for the proposed FSI. 2. Details on number of trees existing at the project site, number of trees to be cut and number of trees to be retained along with the permission from the concerned competent authority for cutting the trees. 7. Building construction project by Mr. Vasantbhai Tribhovanbhai Patel B.No.32/B, Moje: Khasad, Ta: Kamrej, Dist: Surat. Screening/scoping & appraisal. Details of the proposed project as presented before the committee are described below: Sr. Particulars Details No. 1. Proposal is for New Project [SIA/GJ/NCP/60530/2016] 2. Type of Project Residential 3. Project / Activity No. [8(a) or 8(b)] 4. Name of the project 5. Name of Developer 6. Estimated Project Cost (Rs. In Crores) 7. Whether construction work has been initiated at site? If yes, details thereof 8(a) Vansantbhai Tribhovanbhai Patel Vansantbhai Tribhovanbhai Patel Rs Crore No Page 21 of 187

22 8. Project Details Land / Plot Area (m 2 ): 32,346.0 FSI area (m 2 ): 72, Total BUA (m 2 ): 90, Permissible Proposed FSI Area (m 2 ) 72, , Ground Coverage (m 2 ) 9, , Common Plot Area (m 2 ) 3, ,268.0 Max. building height (m) Page 22 of Building Details No. of Buildings: 13 Nos. No. of Blocks: 13 Scope of buildings/blocks:10 buildings - Basement+ hollow plinth+ 12 floors, 3 buildings: Basement+ hollow plinth+13 floors No. & size of Residential Units: 1,164 Flats No. & type of Commercial Units: -- Details of amenities if any: No. of expected residents / users 11. Water & waste water details during construction phase 12. Water & waste water details during operation phase 13. Status of water ---- Expected residents: 4,656 Expected shop users: -- Expected visitors: 2,000 Water requirement (KL/day): 15.0 Source of water: Bore well Waste water generation quantity (KL/day): 2.70 Mode of disposal: Soak pit Details of reuse of water, if any: W/W generated from washing of equipment will be reused for curing after necessary treatment. Total water requirement (KL/day): Fresh water requirement (KL/day): Source of water: water supply from SMC/SUDA Waste water generation quantity (KL/day): Mode of disposal: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be used for gardening & flushing purpose within premises and remaining quantity of treated sewage will be discharged into the drainage line of SMC/SUDA. In case of STP provision, capacity of STP: Yes KL/day STP Technology: STP with primary, secondary & tertiary treatment facilities. Purposes for treated water utilization: Gardening and Flushing Quantity of treated water to be reused:1.gardening (KL/day):13.0, 2. Flushing (KL/day): Provision of dual plumbing system (Yes/No): yes Quantity and type (treated/untreated) of sewage to be discharged: Treated sewage will be used for gardening & flushing purpose within premises and remaining quantity of treated sewage will be discharged into the drainage line of SMC/SUDA Mode of disposal: As above. Page 22 of 187

23 Page 23 of 187 supply and drainage line 14. Solid waste Management Construction Phase: Generation (m 3 ) Quantity to be reused (m 3 ) Mode of Disposal / Reuse Top Soil 1, ,634.0 Reuse for developing garden area Other 7, , Will be arranged from excavated m 3 will be other project site earth required for plinth filling Construction Reused as a filler up to debris 945 plinth level & remaining 450 will be reused for outer road development Steel scrap Sold to local scrap vendors Discarded -- Sold to local vendors packing 23 materials Operation Phase: Type of waste Generation Quantity (Kg/day) Mode of waste collection Dry waste 1,676.0 Blue colour bucket Wet waste 1,117.0 Green colour bucket Page 23 of 187 Mode of Disposal / Reuse Through door to door waste collection system of SMC. Through door to door waste collection system of SMC. STP Sludge 60 On SDB Reused in gardening as manure within project premises Details of segregation if to be done: Separate bins will be provided to collect dry and wet waste. Capacity and no. of community bins to be placed within premises: 0.5 m 3 in each building Landfill site where waste will be ultimately disposed by local authority: Khajod Landfill site of SMC. 15. Parking Details Total parking area requirement for the project as per GDCR: 10, m 2 Parking area requirement for residential units as per GDCR: 10, m 2 Total number of CPS requirement for the project as per NBC : 582