1 (E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated ) (For the Period 1 st October 17 to 30 th March 18) FOR Gas based Captive Power Plant with installed steam & power capacity of 880 TPH & 195 MW at Dahej Petrochemical Complex M/s. ONGC Petro Additions Ltd. Located at - Plot no. Z-1 & Z-83, Z-83/1, Dahej SEZ Ltd. Village-Ambheta, Taluka Vagra Dist Bharuch (Gujarat)

2

3

4

5

6

7

8 HALF YERALY COMPLIANCE REPORT TO ENVIRONMENTAL CLEARANCE CONDITIONS (Period of October 17 to March 18) Gas based Captive Power Plant with installed steam & power capacity of 880 TPH & 195 MW. Status of Consent to Establish & Operate from GPCB: Consent to establish was granted by GPCB vide reference letter CTE Order Ref. No. : GPCB/BRCH/NOC-3498/297116, Dated: and amended letter CTE Order Ref. No. : GPCB/BRCH/NOC-3498/ID-30328/141778, Dated: which was valid up to Consent to establish (Amendment letter-ii for setting up of an industrial Plant/activity) was granted by GPCB, CTE Amendment No. : (Ref. No. GPCB/BRCH/CCA-154 (3)/ID /334040), Dated: Status of consolidated consent and Authorization from GPCB: Consolidated Consent & Authorization (CC&A) was granted by GPCB vide consent order No. : AWH-73652, Dated: , which was valid up to CPP Project status : As on , the following is the Project status in the form of unit wise progress - Overall Project Progress: 99.5 % against scheduled 100%. Sr. No UNIT EPC DATE OF COMMENCEMENT (ACTUAL &/OR PLANNED) DATE OF COMPLETION (ACTUAL &/OR PLANNED) PROGRESS STATUS (%) DETAILED PROGRESS REPORT 1. STEAM POWER GENERATION SYSTEM [SPTG (2 STG + 2 UB) PHASE I & (4 GTG + 4 HRSG) PHASE II] M/s BHEL / st Unit : Complete CPP : % Basic/Detailed Engineering, Ordering, & Manufacturing are almost complete. Overall Physical Progress of 99.5% achieved against schedule of 100 % and a backlog of 0.5% due to pending commissioning through Liquid Firing.

9 Compliance to Conditions of Environmental Clearance : Sr. No. A Specific conditions Point i. Only permissible activities shall be carried out with prior approval in the 1.05 ha of CRZ area. ii. All the conditions stipulated In the environmental clearance No. J-11011/316/2006- IA II (I) dated 21st November, 2007 accorded for the existing projects shall be Implemented. iii. Adequate stack height shall be provided to gas turbine generator, heat recovery steam generators and boilers. Fig.No.1 :Dual Feed Cracker Unit-stack Height -80 m Compliance status OPaL assure that only permissible activities will be carried out with prior approval in the 1.05 ha of CRZ area during operation phase if required, presently 1.05 Ha area is kept as it is. Compliance report for all the conditions stipulated In the environmental clearance No. J /316/2006-IA II (I) dated 21st November, 2007 accorded for the existing projects is being prepared and submitting on regular basis. Details regarding provision of stack height to the stack attached to Gas Turbine generator, heat recovery steam generator and utility boilers are enclosed as Annexure- I. The dual feed cracker unit stack height is provided as fig.no.1 and 2. Fig.No.2 :Dual Feed Cracker Unit-stack Height -80 m Exit velocity of flue gases shall not be less than 22 m/sec. Exit velocity of flue gas will be more than 10m/sec.

10 Low NOx burners shall be provided to control NOx emissions. Low NOx burners are to be provided to control NOX emissions. The water injection skid for NO X emission control is provided as fig. No. 3. Fig.No.3 : water injection skid for NO X Emission control iv. Ambient air quality data shall be collected as per NAAQES standards notified by the Ministry vide G.S.R. No. 826(E) dated 16th November, The company shall upload the results of monitored data on Its website and shall update the same periodically. It shall simultaneously be sent to the Regional office of MoEF, the respective Zonal office of CPCB and Gujarat Pollution Control Board (GPCB). Ambient air quality monitoring stations are set up as per GPCB NOC Order dated for Parameters like PM 10, PM 2.5, SO 2, NOx, HCl, Cl 2, NH 3, Hydrocarbon and H 2 S. NAAQES standards notified by the Ministry vied G.S.R. No. 826(E) dated 16 th Nov., 2009, in consultation with GPCB. Installation of 3 Nos. CAAQMS Stations have been in progress. However manual monitoring of AAQ has been started from 1 st December, 2012 and the results of Ambient air quality monitoring are regularly uploaded on website of Opal. The data is also simultaneously being sent to the Regional office of MoEF, Zonal office of CPCB and Gujarat Pollution Control Board (GPCB). The Ambient air quality monitoring reports are enclosed as Annexure-II. The results of Ambient air quality monitoring is provided in the Table no.1 mention below:

11 LOCATION Table.No.1: Ambient Air Quality Monitoring Data Max. and Min. of Ambient Air Quality Monitoring Data (Period : October to March ) Parameter with Results ( µg/m 3 ) Max. / Min. PM 10 PM 2.5 SO 2 NO 2 HCl Cl 2 H 2S HC NH 3 HF CS 2 AAQM-1 (Near 220 KV Max BDL BDL BDL 78.0 BDL BDL BDL 0.00 Switch Yard Control Room) Min BDL BDL BDL 46.0 BDL BDL BDL 0.00 AAQM-2 Max BDL BDL BDL 77 BDL BDL BDL 0.00 (Near Sub Station:11) Min BDL BDL BDL 52 BDL BDL BDL 0.00 AAQM-3 (Near Sub Max BDL BDL BDL 82.0 BDL BDL BDL 0.00 Station:15) Min BDL BDL BDL 52.0 BDL BDL BDL 0.00 Specific Value as per NAAQMS/ GPCB/CTE NOTE: 1). Ambient Air Monitoring carried out during dry day, 2). BDL : Below Minimum Detectable Limits, 3) NAAQMS: National Ambient Air Quality Monitoring Standard 4). Minimum Detection Limits : HC (10 μg/m3), HCl (0.5 μg/m3),cl2(0.5 μg/m3), H2S(6.0 μg/m3), NH3(5.00 μg/m3),hf(0.9 μg/m3), CS2 (0.5 μg/m3), CO (0.1 mg/m3) Ambient Air quality monitoring was carried out by NABL accredited laboratory M/s. UniStar Environment and Research Labs Pvt. Ltd., Vapi, NABL Certificate No. T-2239, NABL Valid Until: CO mg/m 3 v. In plant control measures for checking fugitive emissions from all the vulnerable sources shall be provided. Fugitive emissions shall be controlled by providing closed storage, closed handling & conveyance of chemicals/materials, multi cyclone separator and water sprinkling system. Fig.No.4:Closed Pipeline Photographs In plant, control measures for checking fugitive emission from all the vulnerable sources are implemented. All the raw material and products are handled in closed pipelines wherever required. The closed pipeline photographs are provided as fig.no.4 and 5. Fig.No.5:Closed Pipeline Photographs Dust suppression system including water sprinkling system shall be provided at loading and unloading areas to control dust emissions. There is not any dust emission as there is no usage of any solid fuel like coal.

12 vi. vii. Fugitive emissions in the work zone environment, product, raw materials storage area etc. shall be regularly monitored. The emissions shall conform to the limits stipulated by the GPCB. The gaseous emissions from DG set shall be dispersed through adequate stack height as per CPCB standards. Well-designed acoustic enclosures for the DG sets and noise emitting equipment s to achieve the desirable Insertion loss viz. 25dB (A) shall be provided. Total fresh water requirement from GIDC/DSL water supply shall not exceed 98,400m 3/day. Implementation of environmental monitoring program for the whole petrochemical complex including CPP is formulated and implemented. The details of monitoring program and reports of the monitoring are enclosed herewith as Annexure-II. OPaL assures that the emission conform to the limits stipulated by GPCB. Provision of adequate stack height is made as per CPCB standards (Stack height = height of the roof + 0.2*(KVA) 1/2 ) for the D.G. sets. Provision of Acoustic enclosures are made to achieve the desirable insertion loss viz 25 db(a). Total fresh water will not be exceeding 98,400 m3/day. Last six month water consumption data is provided as fig.no.6. Fig.No.6:Last Six Months water consumption data: viii. As proposed, Industrial effluent generation shall not exceed 35,520m3/day. Industrial effluent shall be treated In ETP. The industrial wastewater generation is not exceeding 35,520m3/day. The Waste water Treatment Plant (ECTS) for the Complex is designed to ensure that maximum amount of treated effluent is recycled within the complex. The Effluent Collection and Treatment System (ECTS) also include RO Based Tertiary Treatment section to further process. The treated Effluent is recycled as make-up water to Cooling Towers (around 14400m3/day) and as DM water (around 17520m3/day).

13 The last six months effluent generation data is provided as fig.no.7. Fig.No.7:Last Six Months effluent generation data: Treated effluent {14400m 3/day) shall be recycled for cooling tower make up water and treated effluent (17520m1/day) shall be reused as DM plant feed. High TDS effluent stream (3600 m3/day) shall be discharged into Gulf of Cambay through close pipeline of GIDC after conforming to the standards prescribed for the effluent discharge and obtaining permission from the GPCB. No process effluent shall be discharged Inland and around the project site. Fig.No.8: Primary Treatment System The effluent considered for discharge to Sea from the complex is not exceeding 3600 m3/day and is meeting the prescribed Quality standards. Domestic effluent is treated in a Separate Package Unit within the Effluent Collection and Treatment System (ECTS) and the treated domestic effluent is recycled back as horticulture water within the premises. The ETP primary, secondary and tertiary treatment Photographs are provided as fig.no.8, 9 and 10.

14 Fig.No.9: Secondary Treatment System Fig.No.10: Tertiary Treatment System ix. High TDS effluent stream shall be passed through guard pond. Online ph meter, flow meter and TOC analyzer shall be installed. High TDS effluent stream is being passed through guard pond. Online ph meter, flow meter and TOC analyzer are installed.

15 x. Process effluent/any wastewater shall not be allowed to mix with storm water. xi. Storm water drain shall be passed through guard pond. Monitoring of surface water quantity and quality shall also be regularly conducted and records maintained. The monitored data shall be submitted to the Ministry regularly. Further, monitoring points shall be located between the plant and drainage in the direction of flow of ground water and records maintained. Monitoring for heavy metals in ground water shall be undertaken. Fig. No.11: Water Supply Bill-Oct-17 Separate storm water channels network is laid to collect and discharge storm water. Dedicated arrangement is made to separately collect effluent from process areas and to direct it to ETP for its treatment and discharge. Source of Surface water is GIDC water supply which is being metered. Surface and ground water quality is being monitored at fixed monitoring points with required parameters considering heavy metals content on regular basis. Report of analysis is enclosed herewith as Annexure-II. Fig. No.12: Water Supply Bill-Nov-17 Fig. No.13: Water Supply Bill-Dec-17 Fig. No.14: Water Supply Bill-Jan-18

16 Fig. No.15: Water Supply Bill-Feb-18 Fig. No.16: Water Supply Bill-March-18 xii. The company shall obtain Authorization for collection, storage and disposal of hazardous waste under the Hazardous Waste (Management, Handling and Trans-Boundary Movement} Rules, 2008 and amended as on date for management of Hazardous wastes and prior Permission from GPCB shall be obtained for disposal of solid / hazardous waste in the TSDF. Measures shall be taken for firefighting facilities in case of emergency. OPaL obtained GPCB authorization No: dated: which will be valid till , for collection, storage and disposal of hazardous waste under the Hazardous Waste (Management, Handling and Trans-Boundary Movement} Rules, The copy of CC&A is enclosed herewith as Annexure-IX. CC&A Order No: AWH-73652, Date of issue: Valid up to: OPaL has obtained TSDF membership from M/s. Bharuch Enviro Infrastructure Limited (BEIL), Ankleshwar, Geo-hybrid Industrial Solution Pvt Ltd, (GSPL, Surat ) for disposal of Solid/ hazardous waste and same are enclosed as Annexure-III. OPaL also initiated membership tie up process with other TSDF/CHWIF for disposal of hazardous waste. Disaster management plan with firefighting facilities is considered for OPaL s petrochemical complex and details of the same are enclosed as Annexure- IV. The firefighting system photographs are provided as fig.no.17, 18, 19, 20, 21 and 22.

17 Fig.No.17:Firefighting system details Fig.No.18:Firefighting system details Fig.No.19:List of Firefighting system Fig.No.20: List of Firefighting system Fig.No.21:Firefighting system photographs Fig.No.22:Firefighting system photographs

18 xiii. xiv. The unit shall make the arrangement for protection of possible fire hazards during manufacturing process in material handling. Firefighting system shall be as per the norms. A well designed rain water harvesting system shall be put in place within six months, which shall comprise of rain water collection from the built up and open area In the plant premises. Fig.No.23:Rain water harvesting system OPaL has made arrangement for Protection of possible fire hazards during manufacturing process in material handling. Firefighting system as per the norms. Details are given in Disaster management plan which is enclosed as Annexure- IV. The firefighting system photographs are provided as fig.no.17, 18, 19, 20, 21 and 22. Rain water harvesting measures have been provided for roof top rainwater harvesting from buildings. Rain Water from the Process unit areas is pumped to the Effluent Collection and Treatment System (ECTS) and is treated in a dedicated Contaminated Rain Water Treatment section. The Treated water will be reused. The rain water harvesting system photograph is provided as fig.no.23.

19 xv. ESR schemes identified based on need assessment shall be implemented in consultation with the village Panchayat and the District Administration starting from the development of project itself. Company shall provide separate budget for community development activates and income generating programmes. xvi. An Environmental Cell comprising of at least one expert. In environmental science/engineering, occupational health and social scientist, shall be created preferably at the project site itself and shall be headed by an officer of appropriate superiority and qualification. It shall be ensured that the Head of the Cell shall directly report to the head of the organization who would be accountable for implementation of environmental regulations and social impact improvement/mitigation measures. Fig.no.24:Environmental Management Cell OPaL has initiated various community development activities and income generating programs within the Bharuch district under the Enterprise Social Responsibility Scheme with the provision of separate budget. Details for the same are enclosed as Annexure-V. An Environmental Cell comprising of required personnel /expert has been formed and implemented. The necessary duties and responsibilities are assigned to all members of all level of the Environmental Cell. The Environmental Cell is provided as fig.no.24. xvii. Training shall be Imparted to all employees on safety and health aspects of chemicals handling. A separate Occupational Health Center is developed to carry out the different activities of occupational health services. The medical facility and medical checkup details of employees are provided as fig. No. 25, 26, 27 and 28.

20 Fig.No.25:Opal Medical Center Fig.No.26:Emergency Treatment room and admission /recovery Room Fig.No.27:Ambulance and Emergency Resuscitation Equipments Fig.No.28: Back Up Ambulance Pre-employment and routine periodical medical examinations for all employees shall be undertaken on regular basis. Occupational health Surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act. Presently Pre-employment medical examinations for employees are being carried out. OPaL will comply with this condition on commissioning of plant. In order to take care of the health of the people working at the site and to provide optimal physical and mental health to all its employees and workers, OPaL in line with their Occupational Health Services policy makes it mandatory to all the Contractors. OPaL assures to carry out Occupational health Surveillance of the workers on a regular basis and records are maintained as per the Factories Act. Company has displayed HSE policy all over the site at conspicuous location for information. The medical facility and medical checkup details of employees are provided as fig.no.29, 30, 31, 32, 33, 34, 35, 36, 37, 38 and 39.

21 Fig.No.29: Medical checkup Reports Fig.No.30: Medical checkup Reports Fig.No.31: Medical checkup Reports Fig.No.32: Medical checkup Reports Fig.No.33: Medical checkup Reports Fig.No.34: Medical checkup Reports

22 Fig.No.35: Medical checkup Reports Fig.No.36: Medical checkup Reports xviii. Green belt shall be developed In 50 ha land out A Green Belt of 50.0 m wide all along the of the total plant area. Selection of plant complex is provided. species shall be as per the CPCB guidelines. At present, green belt maintenance and development activity is taken care by in house horticulture team. The green belt photographs are provided as fig.no.37. Fig.No.37: Green Belt Photographs xix. All the recommendations mentioned in the rapid risk assessment report, disaster management plan and safety guidelines shall be Implemented. All Recommendations made in the rapid risk assessment report, disaster management plan and safety guidelines are complied with.

23 xx. B Provision shall be made for the housing for the construction labour within the site with all necessary Infrastructure and facilities such as fuel for cooking, mobile toilets, safe drinking water, medical health care, creche etc. The housing may be In the form of temporary structure to be removed after the completion of the project. All the construction wastes shall be managed so that there is no Impact on the surrounding environment. General Conditions i. The project authorities shall strictly adhere to the stipulations made by the Gujarat Pollution Control Board. ii. iii. No further expansion. or modifications in the plant shall be carried out without prior approval of the Ministry of Environment and Forests. In case of deviations or alterations In the project proposal from those submitted to this Ministry for clearance, a fresh reference shall be made to the Ministry to assess the adequacy of conditions Imposed and to add additional environmental protection measures required, if any.. The locations of ambient air quality monitoring stations shall be decided In consultation with the State Pollution Control Board (SPCB) and it shall be ensured that at least one stations is Installed in the upwind and downwind direction as well as where maximum ground level concentrations are anticipated. We have made all necessary infrastructures for the labour. All construction waste was properly managed and there is no impact on the surrounding environment. All the construction wastes was properly managed to prevent any impact on the surrounding environment. We do comply with the conditions. We have started the quarterly monitoring of all applicable parameters of the process stack emissions as per the CC&A issued by the GPCB. Treated effluent from ETP is being tested regularly on quarterly bases to conform to the industry specific and CETP discharge standards. Ambient Air Quality is also being monitored regularly on quarterly bases as per the CPCB guidelines of AAQ monitoring. The Test report of effluent from ETP and Monitoring of Stack, Work place, AAQM are enclosed as Annexure-II. We undertake that, we will not carry out any expansion without prior approval of the Ministry of Environment and Forest. There is no deviation/ alternation in the project, which is as per submission to the MoEF. Ambient Air quality monitoring station locations are decided in consultation with GPCB with one in the upwind and the other in the downwind direction for monitoring of the ambient air quality. Ambient Air Quality is also being monitored on monthly bases as per the CPCB guidelines of AAQ monitoring. The Test reports of AAQM are enclosed as Annexure-II. The AAQMS photographs are provided as fig.no.38.

24 Fig.No.38: AAQMS Stations Photographs iv. The overall noise levels In and around the plant area shall be kept well within the standards by providing noise control measures Including acoustic hoods, silencers, enclosures etc. On all sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environment (Protection) Act,1986 Rules,1989 viz. 75 dba (day time) and 70 dba (night time). We regularly monitor noise level within the premises through NABL accredited laboratory. The results of which are enclosed herewith as Annexure: II. Noise control measures like acoustic hoods, silencers, enclosures etc. The ambient noise level are well within the permissible limit prescribed under Environment (protection) Act, 1986 Rules,1989 viz. 75 dba (day time ) and 70 dba (night time). The Summary of noise level monitoring is provided in the Table no.2 mention below:

25 Month Max./ Min. Table No.2:Noise Monitoring Data Noise Monitoring Data (Period : October to March ) NM-1, (Near NM-2, (Near NM-4, (Near Gate No.1) Gate No.2) Gate No.4) NM3, (Near Gate No.3) NM-5, (Near Oil Catcher-02 Area) NM-6, (Near Fire Water Pump House) Result db (LEQ) October Max Min November Max Min December Max Min January Max Min February Max Min March Max Min Max Min NOTE: Permissible Limit CPCB (Day Time): <75 Db(A), Permissible Limit CPCB (Night Time): <70 Db(A) Noise monitoring was carried out by NABL accredited laboratory M/S UniStar Environment and Research Labs Pvt. Ltd., Vapi, NABL Certificate No. T-2239, NABL Valid Until: v. Training shall be Imparted to all employees on safety and health aspects of chemicals handling. vi. Pre-employment and routine periodical medical examinations for all employees shall be undertaken on regular basis. Training to all employees on handling of chemicals shall be imparted. Usage of Personnel Protection Equipment s (P.PEs) by all employees/ workers shall be ensured. OPaL assures to comply with this condition throughout the operation phase of the plant. We have provided training about health & safety aspects to our employees in chemicals handling and we do medical checkup of our employees on regular interval. Pre-employment medical examination is being carried out and periodical medical examination will be carried out on regular basis. The medical checkup details of employees are provided in condition no.xvii, as fig.no.29, 30, 31, 32, 33, 34, 35, 36, 37, 38 and 39. Training to all employees on handling of chemicals will be imparted on regular basis. All employees of the unit are provided with necessary PPEs on their joining. Damaged PPEs are also replaced as per requirement on regular basis as and when required. OPaL is providing training on usage and importance of PPEs to all employees/ workers. The list of personal protective equipments and PPE S photographs are providing as fig.no.39 and 40.

26 Fig.No.39:List of Personal Protective Equipment Fig.No.40: Personal Protective Equipment vii. viii. The company shall also comply with all the environmental protection measures and safeguards proposed In the documents submitted to the Ministry. The recommendations made In the EIA, EMP in respect of environmental management, risk mitigation measures and Public Hearing relating to the project shall be Implemented. The company shall undertake all relevant measures for improving the socio-economic conditions of the surrounding area. CSR activities shall be undertaken by Involving local villages and administration. ix. The company shall undertake ecodevelopmental measures including community well fare measures In the project area for the overall Improvement of the environment. x. A separate Environmental Management Cell equipped with full-fledged laboratory facilities shall be set up to carry out the Environmental Management and Monitoring functions. OPaL assures to comply with the condition. We do comply with all the environmental protection measures and safeguards Proposed in the documents submitted to the Ministry. Risk mitigation measures relating to the project are also taken care of and are implemented. We are involved in community developmental measures as well as social welfare measures in our project area for the overall improvement of the environment. We are involved in all the activities which are mentioned in CSR for improving the socioeconomic condition of the surrounding area and we are also involved with local villages and administration. Details of CSR initiatives and activities by OPaL are enclosed in Annexure-V. OPaL has undertaken eco-development measures including community well fare measures in the project area for overall improvement of the environment. We have developed environmental management system within the premises and full-fledge laboratory for the analysis of waste water sample, Ambient Air monitoring, process gas, flue gas, fugitive and VOC monitoring we have contracted with NABL approved laboratory on Quarterly basis.

27 The environmental management cell is provided as fig.no.41. Fig.No.41: Environmental Management cell xi. The company shall earmark sufficient funds towards capital cost and recurring cost per annum to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government along with the implementation schedule for all the conditions stipulated herein. The funds so earmarked for environment management/ pollution control measures shall not be diverted for any other purpose. Funds under a separate budget head have been earmarked for environmental protection. These funds are exclusively for environment management/ pollution control measures and are not utilized for any other purpose.

28 xii. A copy of the clearance letter shall be sent by the project proponent to concerned Panchayat, Zila Parisad/Municipal Corporation, Urban local Body and the local NGO, If any, from who suggestions/ representations,if any, were received while processing the proposal. The acknowledged copy of submitted EC letter copy to Panchayat, Zila Parisad/Municipal Corporation, Urban local Body is enclosed as Annexure- VI. The Acknowledge copy of Environmetal clearance letter submission is provided as fig.no.42. Fig.No.42: Ack Copy of EC letter Submission xiii. The project proponent shall also submit six monthly reports on the status of compliance of the stipulated Environmental Clearance conditions including results of monitored data (both in hard copies as well as by ) to the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the Gujarat Pollution Control Board. A copy of Environmental Clearance and six monthly compliance status reports shall be posted on the website of the company. We are regularly submitting Comprehensive EC compliance report for the period of April to September and October to March to the Ministry s regional office at Bhopal, respective Zonal Office of CPCB and the Gujarat Pollution Control Board well within the stipulated date. The copy of Environmental Clearance and six monthly compliance status reports is being posted on the website of the company. The Six-Monthly EC Compliance Submission dates for the last three year are as under: 1. (April 15 to September 15) Date: (Octo 15 to March 16) Date: (April 16 to Sept 16) Date: (Octo 16 to March 17) Date: (April 17 to Sept 17) Date: The acknowledge copy of submission is enclosed as Annexure- X. Acknowledge copies are provided as fig. No. 43, 44, 45 and 46.

29 Fig.No.43:EC Compliance Submission Acknowledge copy Fig.No.44:EC Compliance Submission Acknowledge copy Fig.No.45:EC Compliance Submission Acknowledge copy Fig.No.46:EC Compliance Submission Acknowledge copy xiv. The environmental statement for each financial year ending 31st March in Form-V as is mandated shall be submitted to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules,1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental clearance conditions and shall also be sent to the respective Regional Offices of MoEF by e mail xv. The project proponent shall Inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the SPCB/Committee and may also be seen at Website of the Ministry at This shall be advertised within seven days from the date of Issue of the clearance letter, at We are regularly submitting the environmental statement for each financial year ending 31st March in Form-V to the Gujarat pollution control committee. We have already informed to the public by local newspaper that we have accorded environmental clearance by the Ministry and copies of clearance letter are available with the state Pollutions Control Board and may also be seen at website of the Ministry of Environmental and Forests at website of the Ministry of Environmental and Forests at http/envfor.nic.in. The advertisement (Public notice) has been made

30 least In two local newspapers that are widely circulated In the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the concerned Regional Office of the Ministry. Fig.No.47:Pulic Notice within 7 days of obtaining environment clearance. A copy of public notice in newspaper Divya Bhaskar Vadodra dated 10 July 2014 is enclosed herewith as Annexure:-VII. The public notice is provided as fig.no.47, 48 and 49. Fig.No.48:Divyahakar.dt Fig.No.49:Divyahakar.dt xvi. The project authorities shall inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of start of the project. The date of financial closures - the project is still under commissioning and Overall Project Progress: 99.5 % against scheduled 100%. Final approval of the project by the concerned authorities - Consolidated Consent

31 & Authorization (CC&A) was granted by GPCB vide consent order No. : AWH-73652, Dated: The date of commencing the land development work.- 05/05/2008 List of Annexure No. of Annexure I. Captive Power Plant details II. III. IV. Name of Annexure Ambient Air Quality Monitoring Reports, meteorological data along with noise monitoring and ground water testing reports measured during the period. Copy of TSDF membership Copy of Disaster management plan with firefighting facilities for OPAL. V. Details of CSR activities. VI. VII. VIII. IX. The acknowledged copy of submitted EC letter copy to Panchayat, Zila Parisad/Municipal Corporation, Urban local Body A copy of public notes for obtained EC in two local newspapers Copy of Consent to Established Copy of Consolidated Consent and Authorization