1 GRI SSE Cooperation with the Energy Community 17 th Stakeholder Group Meeting GRI SSE Bucharest, 12 December 2014 Andrius Energy Simkus, Community Gas Secretariat Expert 1

2 Contents 1. Legal developments Third Energy Package Network Codes Regulation (EU) No. 994/2010 Equal treatment (reciprocity) 2. Projects of the Energy Community Interest (PECIs) 3. Priorities for the regional cooperation 2

3 Energy Community Contracting Parties with existing gas consumers European Union Contracting Parties Candidate Observers 3

4 Legal developments 4

5 Transposition of the Third Energy Package Draft laws reviewed by the EnCS: Bosnia and Herzegovina (electricity all levels) Kosovo* (electricity, gas) FYR of Macedonia (electricity, gas) Montenegro (electricity, gas) Serbia (electricity, gas) Draft laws prepared by the EnCS: Albania (electricity, gas) Bosnia and Herzegovina (gas State level) Moldova (electricity, gas) Ukraine (electricity, gas) 5

6 Network Codes (gas) 1. Capacity allocation / congestion management Adapted drafts prepared by the EnCS and sent to the EC Discussed at joint EnCS ENTSOG Workshop Discussions to be continued in the 1 st half of Balancing Joint EnCS ENTSOG Workshop held in Nov Adapted draft initially prepared by the EnCS 6

7 Regulation (EU) No. 994/2010 Adoption for the Energy Community: Adapted draft prepared by the EnCS Recommended partial transposition before formal extension of the EnC acquis Adoption to be discussed in the 1 st half of

8 Treatment of interconnectors / IPs EU MS EU MS EnC CP EnC CP Definition 3rd package EU / EnC Definition existing NC Regulations Interconnector Spanning the territories of 2 or more MS No interconnector IP treated as IP to 3rd country Interconnector Spanning the territories of 2 or more CPs EU NRA can choose to apply or not apply NC rules on border to 3rd country Solved by Interpretative Note adopted by the September 2014 EnC Ministerial Council Institutional TPA exemptions; CB cost allocation EU NRA EU NRA EnC NRA EnC NRA ACER decision in case of disagreement / specific request Neither ACER nor ECRB responsible ECRB opinion in case of disagreement / specific request 8

9 Projects of Energy Community Interest (PECIs) 9

10 Projects of Energy Community Interest Gas Infrastructure G021 G011 G010 G007 G006 G009 G003 G013 G008 LNG terminal G002 G022 Gas pipeline Map source: ENTSOG

11 Activities Gas Infrastructure Development Iasi Ungheni - Chisinau LNG Krk North Interconenction Cro-BiH (Zenica Brod) South Interconnection Cro-BiH (Zagvozd-N.Travnik / Ploce-Sarajevo) IBS IAP LNG terminal Planned Gas pipeline (WBIF studies) Planned Gas pipeline TAP Map source: ENTSOG

12 Priorities for the regional cooperation 12

13 Priorities for the regional cooperation Sharing EU s best practices in the implementation of the Third Energy Package Assistance in strengthening the independence and functional capabilities of NRAs of the CPs Enhanced implementation of new interconnection projects (technical and financial assistance) Equal treatment vis-à-vis the Contracting Parties Harmonised regulatory and operational practices Regional approach in solving security of supply Cooperative involvement of the CPs 13

14 HLRG recommendations NRA related Proposal 4.1: EnC institutions should be better and more efficiently linked with the institutions set up within the EU internal market under the Third Energy Package In particular, the CP NRAs should be represented in ACER Participation of CP NRAs in ACER should be developed more explicitly than envisaged in Regulation (EC) No 713/2009 which refers to the participation of regulatory bodies of any third countries applying EU energy law. Moreover, an option for a meaningful participation in ACER will raise the attractiveness of the Energy Community vis-a-vis those countries who are not yet members Proposal 4.9: In the light of progressive integration of markets, the membership of CP NRAs in ECRB should be gradually phased out and replaced by CP NRAs membership in ACER, while keeping the ECRB for energy regulators from Associated Members 14

15 HLRG recommendations TSO related Proposal 4.1: EnC institutions should be better and more efficiently linked with the institutions set up within the EU internal market under the Third Energy Package In particular, [...] TSOs [should be represented] in ENTSO-E and ENTSOG TSOs from Contracting Parties should also have a right to become members of ENTSOG as they can become members of ENTSO-E 15

16 Cooperation within the GRI SSE framework Regional approach incl. the Energy Community Potential nomination of new pilot projects Potential formal extension of GRI SSE members Extended regional SoS-related cooperation 16

17 Thank you for your attention! Workshop Energy Community on Underground Secretariat Gas Storage 17