1 ES Web Conferences 7, 00 (08) ICENIS 08 Analysis Of Raw Water Supply In Pucang Gading Housing Complex, District Of Demak To Preparation Of Water Resources And Water Resources Management Solikhul Abdi, Sudarno Magister Program Environmental Science, School Postgraduate Studies, Diponegoro University, Semarang - Indonesia Department Environmental Engineering, Faculty Engineering, Diponegoro University, Semarang - Indonesia Abstract. Pucang Gading Housing Complex is an area within the Village Batursari, District Demak with a population 08 as many as,7 inhabitants. Raw service system Mranggen Unit is divided into areas service (service area Mranggen, Batursari I, Batursari II, Batursari III and Kebon) which utilize raw source treatment plant (IPA Waru) and 8 Wells In a total discharge 0 liter/second. The number home connections in Pucang Gading area is currently,7 house connections, with a total usage. liter/second Water discharges from clean sources in Pucang Gading region are currently not maximally available to supply to Pucang Gading service area. In this research will know the problems and readiness that exist by looking from the achievement Medium Term Development Plan Demak Regency Year 0-0. This research uses SWOT analysis method that is internal and external factors. The selection raw sources for drinking should pay attention to aspects quality, quantity and continuity. Demak Regency has the potential surface either river/ reservoir/dam. The problems and challenges drinking supply include issues safe access to supply, and regulation ground utilization for the community. Keywords : raw supply, SWOT analysis, government policy, resources management. Introduction Mranggen Sub-district is one the sub-districts in Demak District. In the north it is adjacent to Sayung Subdistrict, Regency Karangawen in the east, Regency Semarang in the south and Regency Semarang in the west. The farthest distance from west to east is km long and from north to south along 9 km. Distance to the Capital Demak 9 km, while the distance to the district around is to District Karangawen 7 km and to District Sayung km. The condition clean production in drinking supply in Pucang Gading area Mranggen district Demak Regency is 77.%. This shows that in Pucang Gading service, the loss rate is quite high, because it exceeds the maximum allowable loss rate 0% (General Cipta Karya Dinas PU). While the level loss in the distribution pipe is 0.7%. he current condition drinking supply in Indonesia is that access to safe drinking is only 7.7% consisting 7.9% pipeline network instead 9.8% pipeline network. For the drinking service Provincial Government Central Java for urban areas amounted to 7.8% while for rural areas reached.7%. Referring to the policy drinking provision in Indonesia with the goal meeting the needs drinking adequately that meet health requirements, the targets mandated in the National Medium-Term Development Plan 0-09 namely the achievement 00% secure access to drinking in 09, consisting from drinking service through piped network (JP) 0% or 7.7 Million house connections, and through non-piped network (BJP) protected by 0% or.9 Million Household. In order to achieve 00% safe and sustainable drinking access target in 09, the Directorate Development Drinking Water Supply System proclaimed the 0 million house connections program which is the target adding % per year pipeline access network or million house connections per year, with the total addition house connections to with 09 0 million house connections. One the mandates Law Number 0 on Regional Government is that the regions have the right to enact local policies to administer the Government affairs which are the regional authorities. Through Government Regulation. 0 on RPJM that the target and target drinking is 00% appropriate in 09. In order to achieve the mandate the legislation in question is required preparation study drinking needs in Central Java Province. Based on Drinking Water Supply System (SPAM) Existing condition Pucang Gading and in the The Authors, published by EDP Sciences. This is an open access article distributed under the terms the Creative Commons Attribution License.0 (

2 ES Web Conferences 7, 00 (08) ICENIS 08 r framework projection raw requirement for drinking until 00, the government tries to make improvements to SPAM eksisiting conditions in the areas and to identify raw sources that can be utilized to fulfill drinking service up to 00 and identify a list alternative locations for drinking. The Study Raw Water Needs for Drinking Water is a reference document regional planning in solving the problems and challenges SPAM implementation. Problems and challenges the regions to be addressed include the issue safe access to drinking, the issue meeting the needs raw for drinking, the issue alternative sources raw for drinking that can be utilized. = Annual population growth rate (%) n = Number years projection then it can be calculated: Pn = Po (+r) n Pn =.7 (+0,) Pn =. > Projection 07. then its growth will look like picture.. Problems ) Availability raw resources potential in Mranggen district, Demak regency. ) Community-based and non-supervised utilization, due to unclear installation piping and supply in Pucang Gading housing complex. ) How far the achievement targets the Medium Term Development Plan Demak Regency Year 0-0 against the fulfillment needs. ) The occurrence Continuity supply which is still constrained overallr. ) Continuity supply that is still constrained Figure. Projection the resident Pucang Gading According from Figure can be seen that the projected population growth in Pucang Gading Housing in 07 reached, people, the year 0 reached,00 people and in 00 reached, inhabitants. The projected amount clean demand in Pucang Housing is shown in Table.. Research purposes The purpose the study are: ) Availability existing source data source in Pucang Gading area. ) As a material to analyze any raw resources available. ) Determine the amount drinking needs that will be used by the community ) Being a reference for the relevant government regulation on raw supply system for drinking ) Provide knowledge to the public about the importance maintaining the sustainability resources Table. The Need for Clean Water in Pucang Gading Area Maximum Daily Clock rmal Year Debit (,) Discharge Peak (ltr/sec) (ltr/sec) (,0) (ltr/sec) Source: Calculation Result, 07. Methodology And Results. Clean Water Requirement Pucang Gading Housing The calculation demand begins with the calculation population growth projection. The planning area is located in Pucang Gading Housing, Batursari Village, Mranggen District, Demak District. The chosen projection method is using a geometric formula. When viewed from population growth, the population increase in Pucang Gading Housing area projected for years with is as follows : Pn = Po (+r) Domestic demand is greatly affected by the amount per person per day which includes bathing, washing, personal hygiene and other domestic necessities. The need for domestic purposes is influenced by two factors: population and domestic usage levels. n Pn = Population at the end the n year (people) Po = Number population in the year reviewed (people)

3 ES Web Conferences 7, 00 (08) ICENIS 08 SWOT Analysis Pucang Gading Raw Water Needs From the results the research on PDAM Demak District to the Mranggen unit supported by the analysis data and information obtained by other supporting documents on the management the existing raw source based on the National Medium-Term Development Plan 0-09 as previously described, then further through SWOT analysis tool will be described the analysis internal and external environmental conditions which are the factors that affect the management PDAM Demak District Unit Mranggen Service so it can be known the management raw resources today. Raw management will determine the direction development into clean in the future.. The target mandated in the National Medium-Term Development Plan (RPJMN) 0-09 is 00% secure access to drinking in 09. The projected demand in Pucang Gading Housing area with average usage in 07 reaches.0 liter/second, 0 reaches 7, liter/second, and year 00 reaches 78,7lt / dt. Projection clean demand for is presented in Figure.... Internal Scope On the internal scope then what happens is in PDAM Unit Mranggen yeng which within the internal scope in carrying out services in Pucang Gading Housing in particular can reduce or eliminate existing weaknesses and at the same time be a driver to achieve the goals the company or unit. In the internal sphere is divided into corporate strengths and corporate weaknesses. The internal scope that is the current strength for PDAM Unit Mranggen is the MDGs program mandated in the National Medium-Term Development Plan (RPJMN) 0-09 that is reaching 00% access to drinking by the end 09, the percentage service is also an important force for the company to continue to serve the needs clean, the addition raw sources which course as a material to increase the production clean, the increasing number customers every year, the income on sales clean continues to increase and the effort to improve the transmission and distribution network for the benefit clean services community or customer. Internal scope for the company that become weakness at this time that is well or source raw which still not optimal to fulfill requirement clean, service level also still become obstacle for company, leakage level in transmission and distribution network still very high that reach,% or about. liter/second, the production clean at this time is not maximal so it must find the source raw, the quality raw source can not be utilized as drinking, the decrease discharge in production and dristribution, and reservoir capacity which is still not sufficient accommodate raw sources from sources. The calculation value and internal factors are listed in table below : Figure. Projected Growth In Demand For Clean Water Raw Water Source Unit Mranggen The raw source currently used is 7.9 liter/second which consists six wells. The availability raw in Mranggen Sub-district is derived from the total capacity potential and existing debits is shown in Table. Table. Availability Raw Water Mranggen Source Production m³/month liter/second Well /Terminal 8, Well /Argo 0, Well / Santoso 7,.7. 7 Well 7/ Tlogo 0, Well 8 / Kantor 8, WTP / IPA Waru 7, Total, Source: Existing Data PDAM Unit Mranggen, 07 The amount clean demand in Pucang Gading Housing with the amount clean supply available at the present time is shown in Figure below : Table. The calculation quality and internal factors A Figure. Clean Water Requirement Pucang Gading Housing Internal Factors Strenght Value Rating Score RPJMN 009 0,0 0,0 Percentage Services 0,0 0,7 Continued.

4 ES Web Conferences 7, 00 (08) ICENIS 08 Internal Factors Addition Raw Water Source Income Level Increases Number Customers Rising Sales increase Efforts to Improve Distribution and Transmission Network Weakness Deep Well t Optimal Leakage Level Raw Water Production Decrease Water Debit Maximum Service Existing Reservoir Capacity The Quality Raw Water Source Can t Be Utilized As Drinking Water Total 7 B 7 Value Rating communities, the declining level service leads to lower levels trust in PDAMs, reduced reforestation areas around raw sources resulting in lower production clean, damage to transmission pipelines and distribution due to natural disasters and excavations carried out by irresponsible third parties, the easy licensing private wells, the reform era that the community is very strong to seek prit around the location raw sources, and the geographic location the very low source becomes a possible factor minimal service to deliver to customers The calculation value and external factors is shown in Table below : Table. Value calculation and External Strategic Factors Score 0,8 0,0 0, 0,7 0, 0,0 0,7 0,8 0,0 0,0 0,7 0, 0,0 0,0 0, 0,0 0,0 0, A,00, B Source: Calculation Result, 07 The main weakness a regional supply company (PDAM) Demak unit Mranggen is reservoir capacity with score 0,0, raw production on transmission and distribution pipelines with score 0,. The results PDAM Demak unit Mranggen during this time is to keep trying to reduce the leakage level that exist in transmission and distribution pipeline network. Another weakness that occurs in PDAM Demak unit Mranggen is the source raw in not optimal and the decrease flow each get score 0,0, and for quality raw source can not be used as drinking get score 0,. For score 0, is not maximal service and leakage rate get score 0,7. Overall, the total score score six strengths and six weaknesses the IFE matrix is.. Thus, the company's internal condition is above the average value.0. Based on the total value quality, it can be concluded that the PDAM Demak unit Mranggen is in a strong position in harnessing the power possessed and sufficient to overcome the weakness. External Factors Opportunity Water Consumption Level Population Growth Rate Needs Clean Water Community Awareness Level Market Potential is Good Gaining Capital From Outside Threat Use the Private Well Service Greening Areas Transmission Damage Permissions Reform Era Total Value Rating Score 0, 0, 0,7 0, 0, 0,7 0,0 0, 0,0 0,0 0,0 0, 0, 0,0,0 0,7 0,, Source: Calculation Result, 07 Based on the EFE matrix table, the main opportunity PDAM Demak unit Mranggen is the high level clean consumption with score 0,. The highest score shows that support from the community is an opportunity that should be utilized for PDAM unit Mranggen, because without support and participation from society can hamper performance level PDAM Demak unit Mranggen own. A score 0.7 is the population growth rate and the market potential is quite good indicating the rate use is increasing. The increasing demand for clean with a score 0. becomes capital for PDAM Demak unit Mranggen to keep increasing the level clean service to the customer. While the score 0. for the level public awareness the use clean provided by PDAM Demak unit Mranggen become its own motivation for PDAM unit Mranggen. Last is the opportunity to get capital from outsiders with a score 0.. The main threat factor for PDAM Demak unit Mranggen is greening area around the source with score 0,. With a score 0.0 each is the use private wells and transmission network damage. As for the threat... External Scope The external scope opportunity is the level consumption clean every year increased quite high, the number population growth tends to increase rapid checks between the year 07 amounted to, inhabitants and in 00 amounted to, people with 0.% growth rate, the level demand for clean which the community uses is also increasing, and the awareness level the community to use clean from the PDAM is progressing. The external scope that threatens PDAMs is the widespread use private wells by some housing

5 ES Web Conferences 7, 00 (08) ICENIS 08 service level with a score 0., this indicates that the level service PDAM Demak unit Mranggen still relatively low. Score 0. is for the reform era, this hala is due to every change leader will have an impact on policy policy that has been built by the company and will result in less good impact for the company's own performance. And last is a score 0.7, which is a threat to licensing, indicating that many people use land that is considered as a field to find their own source or other work so that the production clean becomes reduced. Overall, the total score six opportunities and six threats on the EFE matrix is. or above the average value.0. Based on the total value quality can be concluded, if the PDAM Demak unit Mranggen able to respond to the external environment the company by exploiting opportunities owned by the company to face the threat. PDAM unit Mranggen. The SWAT matrix PDAM Demak unit Mranggen is shown in table below: Table. Tabel Matriks IFE dan EFE Internal Strenght (S) Weakness. RPJMN Factors (W) Source. Rate raw service. Leakage. Source rate raw. Raw. Income production level. Decrease increases in. Subscribers discharge increasing. Lack External. Sales capital Factors increase. Service coverage is low Opportunity Strategy SO Strategy WO. RPJMN. Lack (O). Amount 0-09 capital as a decrease consumption reference level. Population level PDAM growth rate needs. The rate. Needs clean. The level public population. Level awareness growth public the will awareness importance increase. The market raw the need potential is for clean quite good. Getting capital from outside Threat (T) Strategy ST Strategy WT. Use. Control over. Lowering private wells the leakage. Service preservation rate and. Reforestation nature damage to area. Providing transmissi. Damage services to on pipes transmission the. Lower the due to nature community use. Permissions according to private. Reformation PDAM wells Era program... Matriks IE The IE matrix is based on the results internal factor analysis and external factors combined from the IFE matrix and the EFE matrix. IE Matrix PDAM Demak Mranggen unit can be seen in picture below: IFE TOTAL SCORE Strenght Average Weakness,00,00,00,00, EFE TOTAL SCORE High I II III IV V VI VII VIII IX,00,7 Average,00 Low,00 Figure. Total Score IFE The result internal factor analysis using IFE matrix obtained the total score score.. While the result the analysis external factors using EFE matrix obtained the total score.7. Based on the total scores the IFE and EFE matrices it places the PDAM Demak unit Mranggen on cell V in IE matrix. Strategies that can be taken on the position the cell is the strategy maintaining and maintaining (Hold and Maintain). The best strategy that can be done is a strategy to improve services and development clean network. From each strategy can be described or derived various development programs that support the development Source: Calculation Result, 07 Based on the above strategy matrix, then alternative operational strategies that can be done for PDAM Demak unit development Mranggen is as follows.. RPJMN 0-09 program as a reference level needs.. The level public awareness the importance raw resources.

6 ES Web Conferences 7, 00 (08) ICENIS 08 Lack capital decreased level PDAM performance Mranggen unit.. The rate population growth will increase the need for clean.. Control nature conservation.. Providing services to the community according to PDAM program. 7. Lowered leakage level and damage to transmission pipes. 8. Reduced level use private wells. b. The result the identification the external environment which is an opportunity for PDAM Demak unit Mranggen is the rate consumption increase, the rate population growth, the need clean, the level public awareness, the market potential is good enough and get the capital from outside. The threat faced by the company is the use private wells, services, green areas, natural transmission damage, licensing and reform era.. ) Based on the SWOT matrix analysis a commonly used strategy is maintaining and maintaining strategies or unchanging strategies. Strategy undertaken, namely by improving services and development clean network. An alternative strategy for developing production and distribution levels is the addition transmission and distribution networks, the maintenance green areas to maintain the preservation raw resources.. Conclusion Based on the results and discussions that have been described above before, then got some conclusions as follows: ) Population is increasing every year, by 00 the population is, people. ) The total need clean Pucang Gading housing area in 00 is 78,7 liter / second with service percentage reach 00%. ) Fluctuation needs Pucang Gading service area are: a. The average need for Pucang Gading service area is 78.7 liters / second. b. The need for maximum day debit (.) is 90. liters / second c. The peak hour requirement is 7.8 liters / second ) Demand for clean Pucang Gading area is getting bigger while the raw source production capacity is only 70 liters / second, so for the next few years the PDAM should try to add new network to continue to supply clean needs. ) The result SWOT analysis PDAM unit identification Mranggen unit is as follows: a. The result identification internal environment which is the strength PDAM Demak unit Mranggen is RPJMN 0-09, percentage service, utilization raw source, income level increase, customer number increase and sales raw increases. Weaknesses are raw source capacity, leakage rate, raw production, decrease discharge, lack capital and service coverage. References. Arya Rezagama dan Arwin (0), Supply And Demand Scenario In Drinking Water Supply Semarang City On Achieving MDGs In 0 Until 00, Journal Geography Media Information and Geograph Science and Pression.. Central Bureau Statistics Demak Regency, Mranggen Sub District In Figures 07.. Dody Kurniawan (008), inal Task Fulfillment Clean Water Needs for Communities At Perumnas Pucang Gading, Department Regional Planning And City Faculty Engineering Diponegoro University Semarang.. Clean Water, Regional Water Company Demak Regency Year 0.. Government Regulation. 0 on the Management Water Resources. Government Regulation the Republic Indonesia Number Year 0 on Water Supply System 7. Rangkuti (009: ), SWOT Analysis Techniques Dissecting Business Cases. 8. National Medium Term Development Plan (RPJMN) Robert J. Kodoatie, Roestam Sjarief. (00), Integrated Water Resources Management Yogyakarta Andi Offset. 0. Tri Joko (009), Raw Water Unit in Drinking Water Supply System.. Law the Republic Indonesia Number 7 Year 00, Water Resources..