1 APPENDIX C WADE TRIM/U.S. WATER REVIEW OF UTILITY ASSETS

2 MajesticOaks Water Treatment Facility is located at SW54th St., & SW 82 nd St., Ocala, Fl The plant is designated as a Community water supply system with 300 connections and a population of 490. FDEP classifies the plant as a Category V, Class C water system, which requires 6 visits per week and 0.1 hrs. per visit. The PWS ID No. is and has a permitted maximum design capacity of 1,950,000 gpd. The water is drawn from 3 onsite wells with a maximum flow capacity of 1900 gpm. The water is chlorinated only. The facility is completely fenced in. No outdoor lighting noted. There is signage around the facility with an emergency response number. Last Sanitary survey conducted by FDEP was on 1/11/2010. There was one deficiency noted: Generator log not current. Typical neighborhood housing Water Treatment Plant StorageTanks Two Hydro pneumatic tank and one elevated storage tank with a total volume of 230,000 gallons. The last time tank was inspected is unknown at the time of this report.

3 The hydro tank units are equipped with clear sight tubes which were flooded at the time of inspection to create more contact time, surge relief provided by the elevated tank.

4 200,000gal.Elevatedtank Lightcorrosiononbottomofelevatedtank Tankaccesshatchboltscorroding ElevatedTankinformationplate

5 Wells This treatment facility has three permitted wells on site. Well No. 1.is powered by a 60HP, 800 gpm submersible pump. Well No. 2 is powered by a 40 HP, 400 gpm submersible pump. Well No. 3 is powered by a 60 HP, 700 gpm submersible pump. Well information regarding depth and installation date is unknown at the time of this report. WellNo.1 WellNo.1corrosiononwellcasing

6 WellNo.1SWFWMDIDtag WellNo.1sampletap WellNo.2 SWFWMDIDTagsforWellNo.2 WellNo.2somecorrosionissues pressureswitchandsampletaponwell#2

7 WellNo.2disconnectswitch WellNo.4 WellNo.4lightcorrosiononcasingflange SWFWMDIDTagforWell#4 ControlPanelforWell#4

8 Tieinforallthreewellstoone6inchpipe Pipelinefromwellssplittotwohydrotanks 6 WellpipinggoingtoWTP Housingfor6 SensusWellMeter 6 Sensusflowmeterforwells

9 WellNo.3locatedatElevatedTank(capped) Well#3360ft.deep,casing190ft. Chlorination Chlorination is accomplished by 3 Stenner chemical feed pumps, which feeds a maximum of 17 gpd/unit. The chlorine is contained in a 125 gallon plastic container with spill containment. No signagenotingchlorineusage. Chlorinepumproom 125gallonchlorinetank

10 317GPDStennerchemicalfeedpumpsforchlorine Stennerpumpinformation ChlorineInjectionPoints Chlorinelinesleavingbuilding EmergencyGeneratorUnit(EGU) 100KWCaterpillarEGU EGUHousing EGUMotor

11 EGUControlPanel Miscellaneous MCC Building SCADASystemforElevatedTank Sensaphonecalloutsystem

12 MCCforwellsandATS

13 SunCountry/PaddockDowns Water Treatment Facility is located at 6738 SW 85 th St., Ocala, FL The plant is designated as a Community water supply system with 154 connections and a population of 385. FDEP classifies the plant as a Category V, Class C water system, which requires 6 visits per week and 0.1 hrs. per visit. The PWS ID No. is and has a permitted maximum design capacity of 430,000 gpd. The water is drawn from 2 onsite wells with a maximum flow capacity of 300 gpm. The facility has one storage tank with a total capacity of 10,000 gallons. The water is chlorinated only. The facility is completely fenced in. No outdoor lighting noted. There is signage around the facility with an emergency response number. Last Sanitary survey conducted by FDEP was on 3/23/2011. There was one deficiency noted No distribution pressure gauge. Typical neighborhood housing StorageTanks One Hydropneumatic tank with a total volume of 10,000 gallons. The tanks have a Whitewater unit to maintain the air/water ratio. The unit was operational during visit. 10,000gallonHydropneumatictankandflowpatternfromwells

14 HydroTankw/Whitewaterunit HydroTankDischargetodistributionsystem HydroTankbypassline Wells This treatment facility has two permitted wells on site. Well No. 1 is powered by a 10HP, 70 gpm submersible pump. Well No. 2 is powered by a 15HP, 229 gpm submersible pump. SWFWMD information sticker

15 WellNo.1(newlypainted) Wellpanelboxes&ATS WellNo.2(newlypainted) 4 SensusWellMeter

16 Chlorination Chlorination is accomplished by 2 Stenner chemical feed pumps, which feeds a maximum of 17 gpd/unit. The chlorine is contained in a 55 gallon plastic container with no spill containment. No signagenotingchlorineusage. 55gal.ChlorineDrumw/Stenner17GPDFeedPumps ChlorineInjectionPoint ChlorineRoom ChlorinefeedlinesfromCL2Room

17 EmergencyGeneratorUnit TheEGUisa30KWPerkinsXQ30unit. Generatorenclosure GeneratorControlPanel Interiorofgeneratorenclosure GeneratorControlPanel

18 AutomaticTransferSwitch Miscellaneous Sensaphoneautomaticcalloutunitforpowerloss

19 Windstream&CarriageHillSubdivision Water Treatment Facility is located at SE 34 th Pl. & SE 3 rd Rd., Ocala, FL The plant is designated as a Community water supply system with 145 connections and a population of 301. FDEP classifies the plant as a Category V, Class C water system, which requires 6 visits per week and 0.1 hrs. per visit. The PWS ID No. is and has a permitted maximum design capacity of 273,600 gpd. The water is drawn from 3 onsite wells with a maximum flow capacity of 200+ gpm. The water is chlorinated only. The facility is completely fenced in. No outdoor lighting noted. There is signage around the facility with an emergency response number. Last Sanitary survey conducted by FDEP was on 5/12/2010. There were two deficiencies noted during the inspection. 1. No Cross Connection Program. 2. Failure to document storage tank cleaning. Typicalneighborhoodhousing Water Treatment Plant

20 StorageTanks One Hydropneumatic tank with a total volume of 15,000 gallons. The tank was last inspected in 10/2007. The unit is equipped with clear sight tube showing a 60/40 air blanket. The tank also has a Whitewater Unit to maintain the hydro tank air/water ratio. 15,000gal.Hydrotank HydroTankw/WhitewaterUnit SightTubeLevel HydroTankInformationPlate

21 Flowmetersfor POE s SupportsforanotherHydrotank&flowtoPOE s 6 Haysflowmeter 6 Hershey sflowmeter Wells This treatment facility has three permitted wells on site. Well No. 1was constructed in The overall depth is 230 feet with a casing depth of 98 feet. The casing is 6 black steel piping. The well is powered by a 10HP, 120 gpm submersible pump. Well No. 2 was constructed in The overall depth is 200 feet with a casing depth of 180 feet. The casing is 4 black steel piping. The well is powered by a 7.5HP, 80 gpm submersible pump. Well No. 3 was constructed in The overall depth is 227 feet with a casing depth of 125 feet. The casing is 8 black steel piping. The well is powered by a 60 HP vertical turbine pump.

22 Well#1 Well#2 Well No. 1 Well No. 1 Control Panel

23 Well No. 2 SJRWMD ID Tag for Well No. 2 Well # 2 Control Panel Well No. 3 Vertical Turbine

24 Well No. 3 WellNo.3informationplate SJRWMDIDTagforWellNo.3 ControlpanelsforWells1,2,&3

25 Chlorination Chlorination is accomplished by 3 Stenner chemical feed pumps, which feeds a maximum of 17 gpd/unit. The chlorine is contained in a 30 gallon plastic container with no spill containment. No signagenotingchlorineusage. ChlorineBuilding 30gal.chlorinetankw/17GPDStennerfeedpump ChlorineInjectionPoint

26 EmergencyGeneratorUnit(EGU) Emergencypowersuppliedbya30KWOlympiangenerator. 30KWOlympianEGU Olympianinformationplate

27 Miscellaneous MCCBuilding Emergencycalloutunitforpowerfailure Storagetankinspectioncoversheet

28 Marion County Windstream Preliminary CIP Estimate Item Cost Collection & Distribution CADD Mapping $20,000 Majestic Oaks Sandblast & Paint Elevated Storage Tank $80,000 South Hydro Tank - Sandblast & Recoat Interior $12,000 North Hydro Tank - Sandblast & Recoat Interior $12,000 Miscellaneous Mechanical Repairs $15,000 Windstream Miscellaneous Mechanical Repairs $15,000 Sun Country Hydro Tank - Sandblast & Recoat Interior $12,000 Subtotal = $166,000 10% = $16,600 Project 10% = $16,600 Subtotal = $199,200 Planning Level 25% = $49,800 Grand Total = $249,000