1 EXHIBIT A The Transportation ystem A-1 Overview FILØ BOOTER TATION Note: Hydrocarbon liquid: Hydrocarbon gas (LP): Hydrocarbon gas (HP): Water liquid: Battery limit: etering (Fiscal) ampling (Fiscal) etering & ampling (Fiscal) The Terminal and The tabilisation Plant Gorm "E" Platform 16 BLOCK VALVE INTALLATION Nybro Gas Treatment Plant JETTY

2 TRY HARALD VEND TYRA WET TYRA EAT GOR F GOR B GOR A GOR C EXHIBIT A The Transportation ystem A-2 GOR "E" Platform Notes: 1. ain allocation eters. 2. Common aster- and pare eter for both streams. 3. The Tyra by-pass of Gorm "E" platform is not in use and is permanently closed. 4. Automatic sampling done via fast loop. Hejre LIIT OF OWNERHIP APLE POINT HALFDAN GOR "E" Platform Note 1 DAGAR ROLF DAN F OWNERHIP of the Hejre License OWNERHIP of the ole Concession P-117A/G OWNERHIP OF THE TRANPORTER LP FLARE FAT LOOP FAT LOOP PARE Note 4 Note KJOLD Note 3 V-3601 WATER P-117B/C/D/E/F FAT LOOP Note km 20 Pipeline (offshore) 2

3 DENITY DENITY WATER CUT 0,5L RECEIVER 0,5L RECEIVER 0,5L RECEIVER 0,5L RECEIVER 10L RECEIVER EXHIBIT A The Transportation ystem A-3 GOR E Fast Loop etup (each stream + pare) PT TT RVP Pressurised Receivers (Pressurised samples for Allocation) Non-Pressurised Receiver (Dead ample for Value Adjustment) PI P-117 Off-hore Pipeline 3

4 EXHIBIT A The Transportation ystem A-4 Filsø Booster tation FILØ BOOTER TATION PC 20 Pipeline (onshore) 20 Pipeline (onshore) FIC P-304-A/B/C/D/E 4

5 EXHIBIT A The Transportation ystem A-5 Condensat injection line LINE VALVE TATION HELTO 20" Pipeline (onshore) TO TERINAL Notes: 1. Delivery Point from Nybro Gas Treatment Plant. 2. Condensate injection Line is decommissioned and filled with N2. 3. Pumps and eter Runs are decommissioned but stored at Nybro Gas Treatment Plant. (2) 4" CONDENATE INJECTION LINE N2 PREERVED BATTERY LIIT (3) NORTH FENCE of Nybro Gas Treatment Plant Nybro Gas Treatment Plant Transporter (1) PUP 5

6 EXHIBIT A The Transportation ystem A-6 Line Valve tations (except Heltoft) IG PT PDT 6

7 CONDENATE FRO Nybro Gas Treatment Plant EXHIBIT A The Transportation ystem A-7 Line Valve tation Heltoft PT PT PDT 7

8 REDELIVERY AT FLANGE CONNECTION TABILIER C-9401 DEETHANIER C-9402 DEPROPANIER C-9403 Battery limit EXHIBIT A The Transportation ystem A-8 Terminal and tabilisation Plant ED DEWATER V-9501/2 Note: All water from separators and columns return to degassers (not shown) /020 The Pipeline DEGAER V-9601 The tabilisation Plant COPREOR K A/B HOT OIL FURNACE F-9601 EPARATOR V-9606/8A/B P-9617/8A/B 96086A/B 99052A/B 54145A/B 99053A/B Fuel Gas EXPORT (LP ) Fuel Gas IPORT (LP) Fuel Gas EXPORT (HP) LPG EXPORT JETTY 95002/ A/B P-9616A V-9301A-F V LPG C3 TORAGE TORAGE TANK T T-53/67/71 98LIT001-6/24/25 34L553/567/571 P-9615A V-9302A-F 92FQI070A/B 92FQI080A/B V-9208 LPG OFF PEC V LPG C4 TORAGE 92LIA021-8 C5+ TO JETTY JETTY LOP TO REFINERY T-9901/2 BUFFER T-9929 RECYCLE P-9802 CRUDE OIL LOADING P-9801A/B/C/D WATER TREATENT (LURGI) 99FQ015 TO LILLEBÆLT NC TO EWER 8

9 REDELIVERY AT FLANGE CONNECTION TABILIER C-9401 DEETHANIER C-9402 DEPROPANIER C-9403 Battery limit EXHIBIT A The Transportation ystem A-9 Terminal and tabilisation Plant ED 95002/012 DEWATER V-9501/2 Note: All water from separators and columns return to degassers (not shown). TORAGE TANK T T-53/67/71 98LIT001-6/24/25 34L553/567/571 The Pipeline The tabilisation Plant Fuel Gas EXPORT (LP ) 95019/ A/B DEGAER V-9604B P-9616B P-9615B COPREOR K A/B HOT OIL FURNACE F-9601 EPARATOR V-9606/8A/B P-9617/8A/B 96086A/B V-9301A-F V-9302A-F 99052A/B 54145A/B 99053A/B 92FQI070A/B 92FQI080A/B Fuel Gas IPORT (LP) Fuel Gas EXPORT (HP) LPG EXPORT JETTY V LPG C3 TORAGE V-9208 LPG OFF PEC V LPG C4 TORAGE 92LIA021-8 C5+ TO JETTY JETTY LOP TO REFINERY T-9901/2 BUFFER T-9929 RECYCLE P-9802 CRUDE OIL LOADING P-9801A/B/C/D WATER TREATENT (LURGI) 99FQ015 TO LILLEBÆLT NC TO EWER 9

10 The tabilisation Plant The Pipeline EXHIBIT A The Transportation ystem A-10 Degassing Facilities Notes: 1. Battery limit 2. E = Heat Exchanger From LD metering E-9605A/C E-9605E/G 3. V = Vessel Crude Oil to storage E-9606A Degassing Facility 1 HTF upply/return our water return from tabilisation Plant DEGAER V-9601 P-9615A our water to treatment 99136B NC P-9616A NC E-9605B/D E-9605F/H Degassing Facility 2 HTF upply/return E-9606B DEGAER V-9604B A our water return from tabilisation Plant P-9615B Off Gas to tabilisation Plant P-9616B 10

11 EXHIBIT A The Transportation ystem A-11 The tabilisation Plant (Flare) FRO HP TEA DITRIBUTION (IPORT FRO REFINERY) FRO KO-DRU A B Note: A High Range B Low Range FLARE GA RELEAE PURGE GA Fuel Gas FRO HELL REFINERY PILOT GA 11

12 hell Refinery OUTIDE FENCE OUTIDE FENCE JETTY AREA EXHIBIT A The Transportation ystem A-12 LPG Loading Facilities The tabilisation Plant Used by hell only FRO LPG Butane TORAGE P ) HIP ANIFOLD Z-8406 JETTY 1 FRO LPG Propane TORAGE hell Refinery P ) 1) DONG Property Propane/Butane Refinery import/export HIP ANIFOLD Z-8420 JETTY 2 1) 6" Pipe line approx. 7 km Notes: 1. Redelivery Point(s) 2. Battery limit(s) 12

13 EXHIBIT A The Transportation ystem A-13 GOR "E" Platform Riser GOR "E" Platform jacket leg THE PIPELINE PLOT OF GOR "E" Platform 20" RIER BOTTO RUN DATE: OCT