1 PROPOSED FILITY IMPROVEMENTS RINIER MIDDLE SHOOL No. ategory R-SI-01 Site ccessible Parking Stall dditions hange 3 standard parking stalls to one Three additional handicap parking stalls and handicap stall and two van accessible associated signage required to comply with D. stalls. dd signage designating handicap parking stalls at these three locations. d Project ost Status omments Deficiency 2 $3,788 BLRB D omm. R-SI-12 Site inder Track dd cinders and regrade running track. Existing track surface in uneven with areas settlement and ponding water. Deficiency 3 $128,496 BLRB R-SI-19 EM-W2 Site Irrigation System onnect the irrigation system to the school district's energy management system with a weather station. onnection to the EMS and a weather station will reduce water consumption and utility costs. Operating ost 1 $6,428 Quantum d 3-year R-SI-20 Site Pavement Marking Provide thermo-plastic pavement Thermo-plastic markings needed at critical areas markings at parking lot stop bars, that quickly wear away. Painted lines needed at directional arrows, and bus stall numbers. bus stalls and outdoor basketball courts. Existing dd thermo-plastic directional arrows at lines pickleball courts are faded and difficult to west parking lot. Provide painting lines at see. bus stalls and courtyard basketball courts. Restripe pickleball court lines. Deficiency 1 $2,285 BLRB R-SI-26 Site Traffic ontrol Sign dditions Provide traffic control signs at west parking lot. dditional signage needed at west parking lot to control parking. Deficiency 1 $1,467 BLRB R-SI-28 Site Baseball Stball Infield layblock dditions Provide clay block at baseball and stball field pitcher's mound and homeplate. layblock at pitcher's mound and homeplate provides a better playing surface and is easier to maintain. Deficiency 2 $20,829 SD ost R-EX-01 Exterior utomatic Door Opener ddition - Main Entrance Provide automatic door opener at main entrance. Building does not have automatic door opener at main entry doors. Enhancement 1 $13,440 BLRB J. Traufler R-EX-03 Exterior Exterior Door Hardware Replace exterior door lock cylinders with Primus cylinders. Primus lock cylinders will improve building security. Enhancement 1 $9,238 BLRB R-EX-06 Exterior Masonry Water Repellant pplication Provide application water repellant at exterior masonry. Existing masonry lacks a water repellant coating to protect against moisture penetration. Deficiency 2 $112,780 BLRB R-EX-07 Exterior Ro Replacement - Shingles Replace composition shingles. Existing composition shingles in poor condition. Deficiency 1 $1,723,455 BLRB See R-EX-08. Metal ro recommended over shingle ro for greater longevity and reduced maintenance costs. R-EX-09 Exterior Ro Fall rrest nchors ddition Provide fall arrest system at ro. Pitched ros do not have fall arrest safety system. Health / Safety 2 $294,656 BLRB R-IN-02 Interior arpet Replacement Replace carpet in main fice area, computer classrooms and library. Existing carpet in main fice, computer classrooms and library is worn, past life expectancy and does not meet district's minimum standard for quality. Deficiency 1 $165,937 BLRB R-IN-03 Interior lassroom Tackboard dditions Provide additional tackboards in classrooms. Existing tackboard area in classrooms is less than the district's minimum standard. Deficiency 1 $3,910 BLRB 11/24/ 3:55 PM R - Facility s + ost Data Page 1 9

2 PROPOSED FILITY IMPROVEMENTS No. ategory R-IN-05 Interior oiling Door Modifications onnect coiling fire doors at kitchen and industrial technology to local smoke detector for activation. R-IN-07 Interior Door Hardware Replace 28 door handles with D compliant lever handles. Existing coiling fire doors are connected to fire alarm system and shut during all fire alarms and power outages. When this occurs, the doors must be manually retracted and reset which requires a considerable amount work. onnection the coiling doors to a local smoke alarm will eliminate activation the doors during false alarms and power outages. Existing door handles at 28 locations are not D RINIER MIDDLE SHOOL Operating ost Enhancement d Project ost Status omments 1 $5,092 Quantum Enhancement 4 $15,054 BLRB omm. D R-EQ-01 Equipment lassroom Furniture ddition Provide additional classroom furniture for students. School does not have enough desks, chairs and tables for students in each classroom. Deficiency 1 $19,298 SD ost R-EQ-02 Equipment omputer Furniture Provide furniture designed for computer and other technology equipment use. Existing furniture used for computer and technology equipment is lacking and in many cases not designed for this use. Deficiency 1 $6,385 SD ost R-EQ-04 Equipment Foods lassroom Equipment Replacement Replace range / ovens and microwave ovens at student stations in foods classroom. Existing cooking equipment sometimes breaks down and is past life expectancy. Enhancement 1 $24,926 BLRB R-EQ-05 Equipment Gym Volleyball Post ddition Provide power volleyball posts and nets for use at main court in main gym. Power volleyball posts and nets needed for competition volleyball games. Deficiency 2 $3,865 SD ost R-EQ-08 Equipment Kitchen Equipment Provide combi oven and replace convection ovens and dishwasher in kitchen. ombi oven need for food service program. Existing convection ovens and dishwasher are past life expectancy. Deficiency 1 $106,519 BLRB E. Boutin R-ME-01 EM-M12 rt Room Storage Return ir ddition Provide a return air grille at the art room storage area. Installation a return air grille will reduce overheating caused by transformer located in room and will reduce energy costs. Operating ost 1 $1,285 Quantum d 3-year R-ME-02 EM-M2 utomatic ontrols control system front end and Bnet controls will reduce EMS maintenance stware to the district standard - BacNet and service costs. compatible, web based. Operating ost 2 $38,570 Quantum d 8-year R-ME-03 EM-M9 Boiler and Hot Water Heater Demand Limiting ddition Provide controls at the heating boilers and domestic water heaters to take over step control the heating elements with the EMS to reduce electrical demand charges. Demand limiting controls will reduce energy costs. Operating ost 1 $10,285 Quantum d 5-year R-ME-04 EM-M3 O2 ontrol ddition Expand control system to add O2 control to the main air handling systems in commons, gym and library. O2 control will regulate the amount outside air being delivered to the occupied spaces based on O2 levels and reduce energy usage. Operating ost 1 $15,428 Quantum d 4-year R-ME-05 EM-M10 Electric Hot Water Heater Replacement Replace electric hot water heaters with heat pump water heaters Water heater replacement will reduce energy costs. Operating ost 2 $102,850 Quantum d 7-year R-ME-07 EM-M5 Gym Variable Speed Drive ddition Provide a variable speed drive on the gym air handling units to reduce airflow during periods low or no occupancy, as determined by the O2 and occupancy sensors. Variable speed drives will reduce energy costs. Operating ost 1 $19,285 Quantum d 5-year R-ME-08 EM-M7 Heat Pump Replacement - Boilers Replace air-to-water heat pumps with high efficiency boilers. Existing heat pumps are not reliable, are expensive to maintain, and do not provide comfortable room temperatures on a consistent basis. Deficiency 1 $578,532 Quantum 11/24/ 3:55 PM R - Facility s + ost Data Page 2 9

3 PROPOSED FILITY IMPROVEMENTS No. ategory R-ME-10 Heating System ontrol Valve Replacement RINIER MIDDLE SHOOL d Project ost Status omments Replace heating system control valves. Existing valves leak and are not reliable. Deficiency 1 $62,225 Quantum omm. R-ME-11 EM-M1 R-ME-13 EM-M4 HV ontrol System ommissioning Occupancy Sensor Temperature ontrol ddition ommission the HV control system to verify proper operation. Expand control system to add occupancy sensor temperature control to the commons, drama area, gym, library, locker rooms, and music rooms. ommissioning will improve system operation and efficiency. Occupancy sensor control will setback the space temperature and airflow when rooms are unoccupied and will reduce energy costs. Operating ost 1 $64,282 Quantum Operating ost 1 $20,570 Quantum d 2-year d 4-year R-ME-14 EM-M11 R-ME-15 EM-W1 Overhead Door Switch ddition Plumbing Fixture Retrit Review R-ME-16 Refrigerant Piping Modification Provide control switch at overhead door in industrial technology lab that disables heat when door is open. Review water saving opportunities including retrit or replacement sinks, urinals and water closets. Modify refrigerant piping serving walk-in cooler and freezer. Door switch will reduce energy costs. Operating ost 1 $6,428 Quantum reduction in water use will reduce utility costs. Operating ost 1 $89,995 Quantum Existing refrigerant piping, which is located in walls and above ceilings, is causing condensation within these spaces. Deficiency 1 $40,627 Quantum d 4-year d 4-year R-ME-17 Telecommunication Rooms ooling and Ventilation ddition Provide independent mechanical ventilation and cooling system in existing M room and H rooms. Existing M and H rooms lack independent HV systems needed to keep data equipment from overheating and damaging equipment. Deficiency 3 $32,655 Quantum N. Vein R-ME-18 EM-M6 VV Unit Variable Speed Drive ddition Provide a variable speed drives and replace inlet vanes on all VV air handling equipment serving 300, 400, and 600 units along with fice and drama areas. Variable speed drives will reduce energy costs. Operating ost 1 $115,707 Quantum d 5-year R-EL-10 EM-L2 Electrical Exit Sign Replacement Replace incandescent and compact fluorescent exit signs with new LED exit signs. Exit light replacement will reduce energy costs. Operating ost 1 $19,285 Quantum d 4-year R-EL-12 EM-L3 Electrical Exterior Lighting Replace HID fixtures on the exterior the building with compact fluorescent. Retrit parking lot lights with pulse start metal halide or inductive lighting. HID and parking lot light fixture replacement will reduce energy costs. Operating ost 2 $25,713 Quantum d 10-year R-EL-13 Electrical Fire larm Smoke Detector Replacement Replace fire alarm smoke detectors. Existing smoke detectors are obsolete and replacement parts are not readily available. Health / Safety Deficiency 1 $239,787 Quantum R-EL-14 Electrical Gym and ommons Sound System Replace sound systems in main gym and commons. Existing sound system in gym and commons has poor sound quality. Deficiency 3 $82,023 Quantum R-EL-15 EM-L4 Electrical HID Lighting Replacement Replace HID fixtures in the gym and commons with new fixtures using T-8 or T- 5 technology. Light fixture replacement will reduce energy costs. Operating ost 2 $25,713 Quantum d 7-year R-EL-16 Electrical Industrial Technology Data and Electrical Outlet ddition Provide 5 data and electrical outlets in industrial technology classroom for student computers. Existing classroom does not have data and electrical outlets for student computers as required by districts minimum standards for specialty classrooms. Deficiency 1 $12,857 Quantum R-EL-18 EM-L1 Electrical Interior Lighting Retrit or replace T-12 fixtures, magnetic ballast and incandescent fixtures with T- 8, electronic ballast and compact fluorescent technology. Fixture replacement or retrit will reduce energy costs. Operating ost 2 $231,413 Quantum d 6-year 11/24/ 3:55 PM R - Facility s + ost Data Page 3 9

4 PROPOSED FILITY IMPROVEMENTS No. ategory R-EL-21 Electrical Library Data and Electrical Outlet ddition Provide 30 data and electrical outlets in library for student computers. Data and electrical outlets desired to allow a full class 30 students to work at computers in library. Existing library does not have data outlets for student computer workstations. RINIER MIDDLE SHOOL d Project ost Status omments Enhancement 1 $77,138 Quantum omm. R-EL-22 Electrical Library Search Station Electrical Outlet ddition Provide 7 additional electrical outlets at search stations in library. Existing library has one electrical outlet for 8 computerized search stations. Deficiency 1 $7,200 Quantum R-EL-23 EM-L5 Electrical Occupancy Sensor Lighting ontrol ddition Provide occupancy sensor in areas with fluctuating occupancy to turn f lights when the spaces are unoccupied. Occupancy sensors will reduce energy costs. Operating ost 2 $25,713 Quantum d 6-year R-MD-03 Modernization Health Restroom Modernization Provide larger and D compliant restroom at health room. Existing restroom is undersized by 20 SF and 40% smaller than district's minimum standard, and is not D Deficiency 2 $18,144 BLRB D R-MD-05 Modernization Kitchen Serving rea Provide a third line for serving lunch. Existing kitchen has two serving lines. third serving line with associated food service equipment is needed to reduce the amount time students wait in line to be served. Enhancement 2 $105,082 BLRB E. Boutin R-MD-17 Modernization Staff Restroom / Storage Provide storage rooms for emergency Modernizations dditions supplies, furniture and records. Modernize and expand staff restrooms. See s for R-MD-01, 02, 07 and 10. Deficiency 1 $101,096 BLRB D R-SI-04 Site Baseball and Stball Field Drainage s Provide underdrain system at baseball and stball field infield and outfield areas. Existing baseball and stball fields drain poorly and are saturated with water for much the school year. Enhancement 2 $14,663 BLRB B R-SI-05 Site Baseball and Stball Dugout Ro ddition Provide ro at baseball and stball field dugouts. Ro desired to protect players and equipment from rain. Enhancement 3 $24,438 BLRB B R-IN-06 Interior orridor Tackboard dditions Provide additional tackboards in corridors. dditional tackboards are desired in corridor for announcements and displays. Some areas existing tackable wall surface in 100 and 600 units are difficult to use. Placement additional tackboards in classroom units difficult because most wall areas covered with lockers. Deficiency 1 $14,663 BLRB B R-EQ-06 Equipment Gym Wall Padding dditions Provide additional wall pads in auxiliary gym. dditional wall pads desired to reduce potential for injuries especially during wrestling and gymnastics activities. Health / Safety 1 $25,668 BLRB B R-ME-12 Natural Gas System Metering Provide electronic meter for natural gas system connected to energy management system. Electronic meter will allow remote monitoring gas service and improve potential for reducing natural gas use. Operating ost 3 $22,370 Quantum B R-EL-09 Electrical Electrical Service Metering Provide electronic meter for electrical service connected to energy management system. Electronic meter will allow remote monitoring electrical service and improve potential for reducing electrical use. Operating ost 2 $49,883 Quantum B R-EL-20 Electrical Intrusion larm udible Signal intrusion alarm system to provide audible alarm. Use audible alarm could reduce intrusions and false alarms. Enhancement 3 $102,337 Quantum B R-EL-25 Electrical Surveillance amera ddition Provide surveillance camera system to monitor parking lots and areas around building. Surveillance cameras could reduce vandalism and theft around building. Enhancement 1 $177,494 Quantum B R-EL-26 Electrical Telephone System telephone system to provide voice mail. Existing telephone system does not have voice mail feature and does not meet district's minimum Deficiency 2 $485,709 Quantum B 11/24/ 3:55 PM R - Facility s + ost Data Page 4 9

5 PROPOSED FILITY IMPROVEMENTS RINIER MIDDLE SHOOL No. ategory R-SI-14 Site Exterior Bench dditions Provide 8 additional exterior benches. One additional exterior benches needed at front entry and 8 needed at student courtyard. d Project ost Status omments Deficiency 3 $26,393 BLRB omm. B+ R-SI-16 Site Exterior Waste Receptacle Provide ornamental waste receptacle at front entry and waste receptacles with push door tops at other areas. Existing exterior waste receptacles are galvanized cans and many do not have covers. Enhancement 3 $11,926 BLRB B+ R-SI-02 Site D Site s Provide miscellaneous site improvements to comply non-mandatory D School was built before implementation D regulations and does not require full compliance to current Miscellaneous site areas, which do not significantly affect access to the building, could be improved to comply with current D Site improvements needed to provide D required program access are identified separately. Enhancement 2 $87,914 BLRB Minor need and nonmandatory improvements. D R-SI-06 Site Baseball and Stball Infield s dd and regrade soil at baseball and stball infields. dd clay block soil amendment to baseball field's pitcher's mound and batter's box. Existing soil at infields is uneven and clay block is needed at baseball field's pitcher's mound and batter's box to improve drainage. Deficiency 2 $152,505 BLRB Not cost effective. See R-SI-28 for a portion these improvements. R-SI-08 Site Baseball Field Netting ddition - NE Field Provide ball netting at east side northeast stball field. Ball netting desired to reduce the number foul balls from being hit and lost in wooded area beyond ball field fence. Enhancement 4 $69,280 BLRB Minor need. R-SI-09 Site Baseball Field Netting ddition - SE Field Provide ball netting at south side southwest baseball / stball field. Ball netting desired to reduce the number foul balls from being hit and lost in wooded area beyond ball field fence. Enhancement 4 $174,850 BLRB Minor need. R-SI-10 Site Batting age ddition Provide batting cage for baseball and stball teams. R-SI-15 Site Exterior Bleacher ddition Provide additional bleachers for 50 spectators at football / soccer field. Batting cage desired to contain balls and reduce the number balls lost over fence into woods during batting practice. Existing bleachers at football / soccer field seat 100 spectators. dditional bleachers needed to accommodate district's minimum standard 150. Enhancement 3 $24,438 BLRB Deficiency 4 $43,988 BLRB Minor need. R-SI-17 Site Football Field Synthetic Turf Replace grass turf football field with infill system synthetic turf field. Existing field has uneven and worn grass turf with holes and an inadequate irrigation system. Field can be used only part the school year and requires considerable maintenance and irrigation to provide a safe and durable playing surface. Synthetic turf would provide a better surface that could be used all year and cost less to maintain. Operating ost Enhancement 1 N D Hogan osts included in R-SI-27. R-SI-18 Site Football Field Scoreboard ddition Provide electronic scoreboards at football field. Electronic scoreboard desired for use during competition football games. Enhancement 3 $85,532 BLRB Minor need and not a school district standard. R-SI-22 Site Reader Board ddition Provide reader board and associated electrical power and controls at street in front school. Reader board needed to display school information and is identified in the district's minimum Deficiency 3 $61,095 BLRB Minor deficiency anc can be paid for by fundraising activities. R-SI-23 Site Running Track and Field Event Replace cinder track, long jump and high jump areas with rubberized surface. Existing cinder track and field event areas do not provide a good running surface, is a source dust that is objectionable to users the track and adjacent football / soccer field, requires considerable maintenance and can be used only part the school year. rubberized track and field event areas would provide a better surface that could be used all year and cost less to maintain. Enhancement 2 N D Hogan osts included in R-SI /24/ 3:55 PM R - Facility s + ost Data Page 5 9

6 PROPOSED FILITY IMPROVEMENTS No. ategory R-SI-27 Site Synthetic thletic Surface dditions - Football Field and Track Replace grass turf football field with infill system synthetic turf field. Replace cinder track, long jump and high jump areas with rubberized surface. See s for R-SI-17 and R-SI-23. synthetic turf football field and rubberized track and field event areas would provide better surfaces that could be used all year and cost less to maintain. onstructing these improvements at the same time will cost less than building them separately because a combined underdrain system could be used. RINIER MIDDLE SHOOL d Project ost Status omments Enhancement 2 $3,167,535 D Hogan omm. R-EX-02 Exterior utomatic Door Opener ddition - Secondary Entrances Provide automatic door opener at 5 secondary entrances. utomatic door openers desired at entry doors from staff parking lot, student courtyard and bus loading area. Enhancement 2 $67,203 BLRB Minor need. R-EX-08 Exterior Ro Replacement - Metal Replace composition shingle ro with metal roing. Existing composition shingle ro is in poor condition Metal ro will reduce long-term maintenance costs. Enhancement 1 $3,724,885 BLRB R-IN-01 Interior D Building s Provide miscellaneous building improvements to comply non-mandatory D School was built before implementation D regulations and does not require full compliance to current Miscellaneous building areas, which do not significantly affect access within the building, could be improved to comply with current D s needed to provide D required program access within the building are identified separately. Enhancement 3 $936,309 BLRB Minor need and nonmandatory improvements. D R-IN-04 Interior lassroom Wainscot ddition R-EQ-03 Equipment Fiber Optic onnection ddition Provide protective wainscot at classroom exterior walls. Provide data communications equipment to accommodate installation a leased fiber optic circuit. Existing sheet rock walls in classrooms are susceptible to and damaged in areas from normal wear and tear. Exterior walls are most vulnerable because they have the greatest exposure to student's chairs. Other walls in rooms usually have computers, teacher's desk or whiteboards. Wainscot installation will reduce damage and maintenance costs. Equipment needed when school upgrades its internet connection with a fiber optic circuit leased from Qwest. Enhancement 3 $164,953 BLRB Enhancement 1 $11,410 SD Minor need. N. Vein R-EQ-11 Equipment Wrestling Mat Holder ddition Provide mat holders and associated electrical power and control in auxiliary gym to hang wrestling mats from ceiling. Mat holders desired to allow f-season ceiling storage wrestling mats to free up storage space in PE equipment room. Enhancement 2 $43,126 BLRB Minor need. R-ME-06 Fire Sprinkler System Bracing Provide additional seismic bracing to existing fire sprinkler system in compliance with FM Global dditional bracing will reduce risk broken fire sprinkler lines during an earthquake. Enhancement 3 $205,700 Quantum Minor need and not cost effective. R-ME-09 EM-M8 Heat Pump Replacement - Ground Source Heat Pumps Replace heat pumps with a new ground source heat pump system. Existing heat pumps are not reliable, are expensive to maintain, and do not provide comfortable room temperatures on a consistent basis. Operating ost 3 $1,285,625 Quantum Not cost effective because estimated 25- year R-ME-19 Water Quality s Replace plumbing at sinks in kitchen (3) and foods classroom (8). Replace one drinking fountain. Water quality tests at some sinks in kitchen and foods classroom, and one drinking fountain exceeded EP water quality standards for lead or copper. Health / Safety 1 $30,726 Quantum Not needed. Further testing revealed water quality standards being met. R-EL-01 Electrical rt Room Lighting ddition Provide track lights in art classroom. Track lighting desired for accent lighting as identified in district's recommended Enhancement 4 $5,658 Quantum Minor need. 11/24/ 3:55 PM R - Facility s + ost Data Page 6 9

7 PROPOSED FILITY IMPROVEMENTS No. ategory R-EL-03 Electrical eiling Mounted LD Projector ddition Provide ceiling mounted LD projector and associated V and power outlets in each classroom with connection to teacher's work station. eiling mounted projectors desired for ease use, to reduce theft, and to protect equipment and cables from damage. RINIER MIDDLE SHOOL d Project ost Status omments Enhancement 2 $755,176 Quantum Not cost effective. omm. R-EL-05 Electrical omputer lassroom Master Switch ddition Provide master shut-f switch for student Master shut-f switch needed to allow instructor computers and monitors. to control students operational access to computers and to allow computers and monitors to be easily shut f at end school day. Deficiency 3 $6,300 Quantum R-EL-06 Electrical Data ommunications Equipment data communications equipment filter, router, switch, traffic shaping and connectivity speed. Existing filter, router, switch, traffic shaping and connectivity speed do not meet district's minimum Deficiency 1 $185,222 SD ost N. Vien R-EL-07 Electrical Data Outlet ddition - Teacher's Work Station Provide data outlets for computers and lassrooms do not have V outlets at teacher's V equipment at teacher's work station in work station and do not have floor box with data each classroom. outlets at front classroom. Enhancement 1 $407,286 Quantum Not cost effective. See R-EQ-12 for an alternate approach using wireless work station. R-EL-11 Electrical Exterior Lighting s Provide additional illumination at bus area, delivery area, parking lots and pathways. Existing exterior lighting at exterior areas lacks adequate illumination levels and is below district's minimum Health / Safety Deficiency 3 $302,894 Quantum See R-EL-12 for a portion improvements. R-EL-17 Electrical Interior Lighting s Provide additional illumination at classrooms, corridors, emergency lighting, kitchen, library, restrooms and support spaces. Existing lighting at interior areas lacks adequate illumination levels and is below the district's minimum Health / Safety Deficiency 1 $257,125 Quantum See R-EL-18 for a portion improvements. R-MD-06 Modernization Laundry Room ddition Provide a laundry room with shelving and a ventilation system. laundry room with shelving and ventilation system could be used for washing uniforms. Enhancement 3 $8,651 BLRB Minor need. R-MD-08 Modernization Special Education Restroom Modernization Provide larger and D compliant Existing restrooms are undersized by 12 SF and restroom at special education classrooms 24% smaller than district's minimum standard, and 403 and 404. are not D Deficiency 1 $75,149 BLRB D R-MD-11 Modernization Staff Telephone Room Expansion Expand one the staff telephone rooms. Existing staff telephone rooms are each undersized by 23 SF and is 57% smaller than district's minimum standard, and are not D Deficiency 3 $20,528 BLRB R-MD-12 Modernization Student Restroom s Modify student restrooms to be D Existing student restrooms are not fully D Deficiency 3 $134,011 BLRB Minor deficiency because student restrooms are accessible by the disabled. D R-MD-14 Modernization Teaching Station Window dditions Provide exterior windows at auxiliary Existing rooms do not have exterior windows and gym, main gym, and band and technology exposure to daylight. classrooms. Enhancement 3 $61,494 BLRB Minor need. R-SI-03 Site Baseball and Stball Bullpen dditions Provide chainlink bullpens enclosures at baseball and stball fields. Fenced bullpens desired to allow pitching practice to occur within a confined area close to the field. Enhancement N N No ost Minor deficiency and not a school district standard. N R-SI-07 Site Baseball and Stball Field Scoreboard dditions Provide electronic scoreboards at baseball and stball fields. Electronic scoreboards desired for use during competition baseball and stball games. Enhancement N N No ost Minor deficiency and not a school district standard. N R-SI-11 Site Bicycle Rack ddition Provide additional bike racks. Existing bike rack will accommodate 10 bikes and district's minimum standard identifies space for 24 bikes. Deficiency N N No ost Principal reports existing bike racks adequate. N 11/24/ 3:55 PM R - Facility s + ost Data Page 7 9

8 PROPOSED FILITY IMPROVEMENTS No. ategory R-SI-13 Site Exterior Basketball Hoop ddition Provide an additional exterior basketball hoop at student courtyard area. Existing student courtyard area has 3 basketball hoops and district's minimum standards identify 4 hoops. RINIER MIDDLE SHOOL d Project ost Status omments Deficiency N N No ost Principal reports existing hoops are adequate. omm. N R-SI-21 Site Pipe Rail Gate Provide reflective tape on pipe rail vehicle gates. Existing pipe rail gates do not have reflective tape and can be difficult to see at night. Deficiency N N No ost Maintenance item. N R-SI-24 Site Site Sign Modify or replace site sign to provide school name and address. Existing site sign does not include school address. Deficiency N N No ost N R-SI-25 Site Student Pick-Up / Drop-Off Expansion Provide larger area for student drop f and pick up. Existing student drop f area will accommodate 14 vehicles and district's minimum standard identifies 18 vehicles. Deficiency N N No ost North parking lot has extra capacity that will accommodate student pick up and drop f. N R-EX-04 Exterior Exterior Painting Paint areas exterior wood. Existing paint is in good condition. Enhancement N N No ost Maintenance item and not an eligible capital improvement expenditure. N R-EX-05 Exterior Exterior Window Replace dual-glazed thermal pane windows with dual-glazed windows with integral blinds. Integral blinds will reduce damage to and maintenance window blinds. Enhancement N N No ost Minor deficiency and not cost effective. N R-IN-08 Interior Interior Painting Paint building interior. Existing paint is in fair condition. Enhancement N N No ost Maintenance item and not an eligible capital improvement expenditure. N R-IN-09 Interior Interior Signage Replacement Replace interior signs that are missing. Some interior signs have been removed and not replaced. Deficiency N N No ost Maintenance item. N R-EQ-07 Equipment Instructional Equipment Replace 6 laser printers used in classrooms. Laser printers are over 8 years old and past life expectancy. Deficiency N N No ost Obtained with Technology Levy funds. N R-EQ-09 Equipment Library Equipment dditions Provide 30 computers for student use in library. 30 computers desired to set up computer lab in library. Enhancement N N No ost Obtained with Technology Levy funds. N R-EQ-10 Equipment Office Equipment Replace and add printers for fice staff use. Existing printers are past life expectancy and additional printers needed to accommodate fice staff. Deficiency N N No ost Obtained with Technology Levy funds. N R-EQ-12 Equipment Wireless omputer Station dditions Provide wireless computer equipment and workstation furniture for use at front each classroom. Wireless computer equipment will allow teachers to use ceiling mounted LD projectors from work station and front classroom in lieu adding power and data outlets in floor at much higher cost. Enhancement 1 N No ost Obtained with Technology Levy funds. N R-EL-02 Electrical Band lassroom Speaker Repair Repair or replace non-functional sound system speakers in band room. Existing speakers do not operate. Deficiency N N No ost Maintenance item. N R-E-04 Electrical lassroom Electrical Outlet dditions Provide an additional electrical outlet at the student computer area in each classrooms. lassrooms have 5 electrical outlets for student use and 6 are required by districts minimum Deficiency N N No ost N R-EL-08 Electrical Data Outlet ddition - lassrooms Provide one more data outlets in each classroom for student use. lassrooms have 5 data outlets for student use and 6 are required by districts minimum Deficiency N N No ost Outlets can be added by district using splitter and existing data wiring. N 11/24/ 3:55 PM R - Facility s + ost Data Page 8 9

9 PROPOSED FILITY IMPROVEMENTS RINIER MIDDLE SHOOL No. ategory R-EL-19 Electrical Internet onnection Provide an additional T-1 line for internet connection. n additional T-1 line is needed to meet district's minimum standard for internet connection. d Project ost Status omments Deficiency N N No ost Maintenance item. N. Vien omm. N R-EL-24 Electrical Stage Lighting dditions Provide production -level stage lighting. Production-level stage lighting desired for use during student theater productions. Enhancement N N No ost N R-MD-01 Modernization Emergency Storage Room ddition Provide space within building for storage emergency supplies. Building does not have space for storage emergency supplies. Existing supplies kept in exterior storage container. Enhancement 1 N BLRB osts included in R-MD-17. N R-MD-02 Modernization Furniture Storage Room ddition Provide furniture storage room. Building does not have dedicated room for furniture storage. urrently, extra furniture is stored with different areas along with building supplies and equipment. Deficiency 4 N BLRB osts included in R-MD-17. N R-MD-04 Modernization Isolated Waiting Room ddition Provide isolate waiting room adjacent to main fice area. Building does not have an isolated waiting room for students who are sent to the main fice. Deficiency N N No ost N R-MD-07 Modernization Record Storage Room ddition Provide a storage room for student records in main fice area. Building does not have a dedicated storage room for student records. Deficiency 1 N BLRB osts included in R-MD-17. N R-MD-09 Modernization Staff Lounge Expansion Provide larger staff lounge. Existing staff lounge is undersized by 65 SF and 11% smaller than district's minimum standard. Deficiency N N No ost Principal reports existing space is adequate. N R-MD-10 Modernization Staff Restroom s Modify staff restrooms to be D Existing staff restrooms not fully compliant to D Deficiency 1 N BLRB osts included in R-MD-17. D N R-MD-13 Modernization Teaching Station Skylight dditions Provide skylight at orchestra classroom. Existing room does not have exterior windows and exposure to daylight. Window addition not feasible because orchestra room is an interior space. Skylight addition difficult because high ro above this classroom. Enhancement N N No ost Minor defect and not cost effective. N R-MD-15 Modernization Vending Machine lcove ddition Provide a vending machine area within the building. Existing vending machines are located in corridors. Deficiency N N No ost N R-MD-16 Modernization Walk-in Freezer Expansion Provide larger walk-in freezer. Existing freezer is undersized by 13 SF and 13% smaller than district's minimum standard. Deficiency N N No ost N 11/24/ 3:55 PM R - Facility s + ost Data Page 9 9