PRE-FEASIBILITY REPORT. NR TMT (India) Private Limited

Size: px
Start display at page:

Download "PRE-FEASIBILITY REPORT. NR TMT (India) Private Limited"

Transcription

1 SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, CHHATTISGARH By NR TMT (India) Private Limited at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh For Expansion of Steel Plant [Upgradation of existing 3 x 7 T Induction Furnaces to 3 x 12 T, establishment of New 2 x 12 T Induction Furnaces and Upgradation of existing Rolling Mill from 55,000 TPA to 1,57,500 TPA)

2 TABLE OF CONTENTS Chapter 1 : EXECUTIVE SUMMARY ABOUT THE PROPOSED PROJECT 1 Chapter 2: INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION IDENTIFICATION OF PROJECT AND PROJECT PROPONENT BRIEF DESCRIPTION OF NATURE OF THE PROJECT NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION DEMAND AND SUPPLY GAP EXPORT POSSIBILITY DOMESTIC/EXPORT MARKETS EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT 3 Chapter 3 : PROJECT DESCRIPTION TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS TYPE OF PROJECT INTERLINKED PROJECT LOCATION OF THE PROJECT DETAILS OF ALTERNATE SITES CONSIDERED SIZE OR MAGNITUDE OF OPERATION MANUFACTURING PROCESS ROLLED PRODUCTS (THROUGH HOT CHARGE INDUCTION FURNACE AND ROLLING MILL PROCESS) RAW MATERIAL REQUIREMENT, ITS SOURCES AND TRANSPORTATION RAW MATERIAL REQUIREMENT AND ITS SOURCE MODE OF TRANSPORT FOR RAW MATERIALS AND FINISHED PRODUCTS AVAILABILITY OF WATER ITS SOURCE, ENERGY / POWER REQUIREMENT AND SOURCE WATER REQUIREMENT AND ITS SOURCES SOURCES OF ENERGY/ POWER AND ITS SOURCES GENERATION AND DISPOSAL OF WASTES [WASTE WATER AND SOLID WASTES] WASTE WATER GENERATION SOLID WASTE GENERATION AND ITS DISPOSAL 12 Chapter 4 : SITE ANALYSIS CONNECTIVITY LAND FORM, LAND USE AND LAND OWNERSHIP LAND FORM TOPOGRAPHY 13 1

3 4.4 EXISTING LAND USE PATTERN LAND USE PATTERN OF THE PROJECT SITE ENVIRONMENTAL SETTING OF THE PROJECT SITE EXISTING INFRASTRUCTURE CLIMATIC DATA FROM SECONDARY SOURCES 14 Chapter 5 : PLANNING BRIEF PLANNING CONCEPT POPULATION PROJECTION LAND USE PLANNING AMENITIES/FACILITIES 17 Chapter 6 : PROPOSED INFRASTRUCTURE INDUSTRIAL AREA (PROCESSING AREA) RESIDENTIAL AREA (NON PROCESSING AREA) GREEN BELT SOCIAL INFRASTRUCTURE CONNECTIVITY DRINKING WATER MANAGEMENT SEWERAGE SYSTEM INDUSTRIAL WASTE MANAGEMENT SOLID WASTE MANAGEMENT 19 Chapter 7 : Rehabilitation and Resettlement (R & R) Plan 20 Chapter 8 : Project Schedule & Cost Estimates PROJECT IMPLEMENTATION SCHEDULE ESTIMATED PROJECT COST 21 Chapter 9 : Analysis of proposal FINANCIAL AND SOCIAL BENEFITS SOCIO-ECONOMIC DEVELOPMENTAL ACTIVITIES 22 2

4 Chapter 1 : EXECUTIVE SUMMARY 1.1 ABOUT THE PROPOSED PROJECT NR TMT (India) Private Limited has obtained Environment Clearance from Chhattisgarh Environment Conservation Board (CECB), Raipur vide letter no. 390 / SEIAA / Rolling / Raigarh / 576 Naya Raipur dt for establishment of 3 x 7 T Induction Furnaces for manufacturing 56,700 TPA of Hot metal & Rolling Mill to manufacture 55,000 TPA of Rolled products at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh. Accordingly obtained Consent to Establishment and Consent to Operate from CECB. Now, we proposed to upgrade existing 3 x 7 T to 3 x 12 T Induction Furnaces and establishment of New 2 x 12 T Induction Furnaces and upgrade the existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] in the existing plant premises of 10.5 acres at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh. Following is the Plant Configuration and production Capacity: S.No. Unit Existing (In operation) 1. Induction Furnace 3 x 7 T (56,700 TPA) Proposed Expansion Modernisation of existing Induction Furnaces 3 x 7 T to 3 x 12 T (97,200 TPA) & New Induction Furnaces 2 x 12 T (64,800 TPA) Total = 1,62,000 TPA 2. Rolling Mill 55,000 TPA Modernisation of existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] After Proposed Expansion Modernisation of existing Induction Furnaces 3 x 7 T to 3 x 12 T (97,200 TPA) & New Induction Furnaces 2 x 12 T (64,800 TPA) Total = 1,62,000 TPA Modernisation of existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] Present proposal will be taken up in the existing 10.5 acres of land allotted by O.P. Jindal Industrial Park. 1

5 Chapter 2: INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT NR TMT (India) Private Limited is registered company. The firm has been promoted by Shri. Vijay Kumar Agrawal. 2.2 BRIEF DESCRIPTION OF NATURE OF THE PROJECT NR TMT (India) Private Limited has obtained Environment Clearance from Chhattisgarh Environment Conservation Board (CECB), Raipur vide letter no. 390 / SEIAA / Rolling / Raigarh / 576 Naya Raipur dt for establishment of 3 x 7 T Induction Furnaces for manufacturing 56,700 TPA of Hot metal & Rolling Mill to manufacture 55,000 TPA of Rolled products at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh. Accordingly obtained Consent to Establishment and Consent to Operate from CECB. Now, we proposed to upgrade existing 3 x 7 T to 3 x 12 T Induction Furnaces and establishment of New 2 x 12 T Induction Furnaces and upgrade the existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] in the existing plant premises of 10.5 acres at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh. 2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION Indian demand is projected to rise to 300 million tonnes by Given the strong demand scenario, most global steel players are in a massive capacity expansion mode, either through brownfield or Greenfield route. Steel production capacity in India is expected to touch 170 million tonnes by While Greenfield projects are slated to add 30 million tonnes, brownfield expansions are estimated to add 50 million tonnes to the existing capacity of 90 million tonnes. Steel is manufactured as a globally tradable product with no major trade barriers across national boundaries to be seen currently. There is also no inherent resource related constraints which may significantly affect production of the same or its capacity creation to respond to demand increases in the global market. Even the government policy restrictions have been negligible worldwide and even if there are any the same to respond to 2

6 specific conditions in the market and have always been temporary. Therefore, the industry in general and at a global level is unlikely to throw up substantive competition issues in any national policy framework. Further, there are no natural monopoly characteristics in steel. Therefore, one may not expect complex competition issues as those witnessed in industries like telecom, electricity, natural gas, oil, etc. 2.4 DEMAND AND SUPPLY GAP Demand for steel is high and as soon as they are processed, they will be supplied on PAN India basis to various type of consumers & users. 2.5 EXPORT POSSIBILITY Export of steel is always available. The government of India is also encouraging export of steel. Though there is the possibility of export of steel in and also a good demand of steel in local market as building and construction material. The proposed expansion project is to fulfill the local demand and address to local market..2.6 DOMESTIC/EXPORT MARKETS While the demand for steel will continue to grow in traditional sectors such as infrastructure, construction, housing automotive, steel tubes and pipes, consumer durables, packaging, and ground transportation, specialized steel will be increasingly used in hi-tech engineering industries such as power generation, petrochemicals, fertilizers, etc. The new airports and railway metro projects will require a large amount of steel. Hence the domestic and export markets for steel sector will rise. 2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT The local areas will be benefited by way of generation of employment opportunities, increased demand for local products and services. There will be an overall improvement in the income level of the local people. The project creates employment to about 100 persons directly once the whole plant comes to the operational stage and about 200 persons during construction stage. Top priority will be given to locals for Semi-Skilled and Unskilled jobs. With the development of this Plant there will be lot of scope for more ancillary development, which in turn will benefit the nation. 3

7 There will be a certain enhancement of educational and medical standards of people in the study area. There will be generally positive and beneficial impacts by way of economic improvements, transportation, aesthetic environment and business generation. There will be an overall upliftment of socio-economic status of people in the area with the implementation of the project. 4

8 Chapter 3 : PROJECT DESCRIPTION 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS TYPE OF PROJECT NR TMT (India) Private Limited has obtained Environment Clearance from Chhattisgarh Environment Conservation Board (CECB), Raipur vide letter no. 390 / SEIAA / Rolling / Raigarh / 576 Naya Raipur dt for establishment of 3 x 7 T Induction Furnaces for manufacturing 56,700 TPA of Hot metal & Rolling Mill to manufacture 55,000 TPA of Rolled products at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh. Accordingly obtained Consent to Establishment and Consent to Operate from CECB. Now, we proposed to upgrade existing 3 x 7 T to 3 x 12 T Induction Furnaces and establishment of New 2 x 12 T Induction Furnaces and upgrade the existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] in the existing plant premises of 10.5 acres at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh INTERLINKED PROJECT Proposed project is upgradation of existing Induction Furnace and establishment of New Induction Furnace and upgradation of existing Rolling Mill. No interlinked project is envisaged. 3.2 LOCATION OF THE PROJECT Existing plant is located in 10.5 acres of land at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh acres of land is allotted to NR TMT by O.P. Jindal Industrial Park. Proposed expansion will be carried out in the existing plant premises only. The coordinates of the Project site area S.No. Coordinates of the project site '42.40"N 83 20'5.42"E '31.87"N 83 20'7.47"E '30.75"N 83 20'0.53"E '34.24"N 83 19'59.88"E '34.88"N 83 20'3.24"E '41.86"N 83 20'2.00"E The entire project area will fall in the Survey of India topo sheet no. 64 N/8. 5

9 Figure 1 : Google Earth Map showing boundary of the Project site 6

10 Figure 2 : General location of the Project site 7

11 Figure 3 : Topographical Map (10 Kms. radius) 8

12 3.3 DETAILS OF ALTERNATE SITES CONSIDERED No alternative site has been considered, as present proposal will be taken up in the existing plant premises only. 3.4 SIZE OR MAGNITUDE OF OPERATION The plant configuration, production capacity of Existing & proposed expansion of steel plant is as follows: S.No. Unit Existing (In operation) 1. Induction Furnace 3 x 7 T (56,700 TPA) Proposed Expansion Modernisation of existing Induction Furnaces 3 x 7 T to 3 x 12 T (97,200 TPA) & New Induction Furnaces 2 x 12 T (64,800 TPA) Total = 1,62,000 TPA 2. Rolling Mill 55,000 TPA Modernisation of existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] After Proposed Expansion Modernisation of existing Induction Furnaces 3 x 7 T to 3 x 12 T (97,200 TPA) & New Induction Furnaces 2 x 12 T (64,800 TPA) Total = 1,62,000 TPA Modernisation of existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] 3.5 MANUFACTURING PROCESS ROLLED PRODUCTS (THROUGH HOT CHARGE INDUCTION FURNACE AND ROLLING MILL PROCESS) Steel Melt Shop (SMS) is crated to melt the Sponge Iron along with melting scrap and fluxes to make pure liquid steel and then to mould it in required size billets. The shop consists of following equipment and subassemblies: Induction Furnaces: Induction Furnace is a device to melt the charge material using electrical power. It consists of Crucible lined with water cooled induction coils, Electrical system to give controlled power to induction coil, Hydraulic tilting system, Heat exchanger to cool the circulating water, water softener for generating soft water, furnace transformer, Power Factor improvement system and surge suppressor. Ladles: Ladles are pots with refractory lining inside to withstand 1600 degc temperature. It has side arms so that can be lifted with the help of crane. Ladles are used to stores the liquid 9

13 steel from Induction Furnace and take it for further processing. Ladles are with bottom nozzle and pneumatically operated gate for discharge of liquid. Cranes: Electric Over-head(EOT) cranes of various capacities are used to carry the ladles/materials at different places. Cranes are used in Melting hall to charge melting scrap, remove the ladles to the LRF, further to place it over the Tundish of the Continuous Caster, to remove billets from the cooling bed and store at designated places, and also for other petty use. Accordingly the sizes, capacity and numbers of cranes are decided. Continuous Casting Machine (CCM) : CCM is used to continuously cast the liquid steel in required cross section and in length. It consists of Tundish, Mould, Bow with Withdrawal mechanism, straightening mechanism and cooling bed, hydraulic system for withdrawal mechanism, water pumps and cooling towers for water spray on the withdrawn section as well as on the cooling bed. Dummy bar is provided to start the casting. Tundish is a rectangular vessel, lined with refractory and having discharge nozzle with pneumatically operated gate. A stand is erected over it where the ladle is stationed for discharging the liquid in it. Mould is of copper with water-cooled jacked. Its cross-section in the bottom is of the size of which hot billet is to be drawn. Initially the dummy for of the same size is kept inserted. When the liquid steel is poured in the mould the dummy bar is drawn slowly, so that the liquid steel in partially frozen state comes out of the mould, which directly taken to Rolling Mill for production of Rolled products. In the present proposal, it is proposed to upgrade existing 3 x 7 T to 3 x 12 T Induction Furnace and establishment of New 2 x 12 T Induction Furnace to manufacture 1,62,000 TPA of Hot metal and Upgrade the existing Rolling Mill from 55,000 TPA to 1,57,500 TPA. The following is the Process flow diagram 10

14 3.6 RAW MATERIAL REQUIREMENT, ITS SOURCES AND TRANSPORTATION RAW MATERIAL REQUIREMENT AND ITS SOURCE S.No. Raw Material Quantity Sources Mode of Transport 1. For Induction Furnace (MS Billets) - 1,62,000 TPA a) Sponge Iron 1,35,000 TPA Chhattisgarh & Orissa By Road (through covered trucks) b) Scrap 58,000 TPA Chhattisgarh & Orissa By road (through covered trucks) c) Ferro Alloys 2430 TPA Chhattisgarh & Orissa By road (through covered trucks) 2. For Rolling Mill (TMT bars & Structural Steel) 1,57,000 TPA a) Hot Billets 1,62,000 TPA Own generation MODE OF TRANSPORT FOR RAW MATERIALS AND FINISHED PRODUCTS The aforesaid raw materials will be transported to the site through tarpaulin covered trucks. 3.7 AVAILABILITY OF WATER ITS SOURCE, ENERGY / POWER REQUIREMENT AND SOURCE WATER REQUIREMENT AND ITS SOURCES Water required for the existing project is 80 KLD and same is envisaged to source through Ground water resources. Water required for the expansion project will be 123 KLD and same will be sourced through Ground water resources Water permission from Central Ground Water Authority will be obtained before the commencement of the project. Following is the breakup of water requirement: S.No. Unit For Existing For Expansion After Expansion (in KLD) (in KLD) (in KLD) 1. Induction Furnaces Rolling Mill Greenbelt Domestic Total

15 3.7.2 SOURCES OF ENERGY/ POWER AND ITS SOURCES Power required for the existing plant will be supplied by O.P. Jindal Industrial Park. Total 22.0 MW will be required after expansion proposal. The following will be the power consumption break-up for each unit S.No. Unit Power Requirement (in MW) Existing Expansion After Expansion 1. SMS Rolling Mill Total GENERATION AND DISPOSAL OF WASTES [WASTE WATER AND SOLID WASTES] WASTE WATER GENERATION There will be no effluent discharge in the SMS & Rolling mill units as closed-circuit cooling system will be adopted. The sanitary wastewater will be treated in septic tank followed by subsurface dispersion trench. Hence, there will not be any chance of contamination of water bodies due to proposed project SOLID WASTE GENERATION AND ITS DISPOSAL S.No. WASTE The following will be the solid waste generation and disposal from the existing and proposed expansion project. Induction Furnace Existing (TPD) Expansion (TPD) METHOD OF DISPOSAL 1 Slag Slag from SMS will be crushed and iron will be recovered & remaining non-magnetic material being inert by nature will be used as sub base material in road construction / will be given to brick manufacturer Rolling mill 2 Mill scales Mill scales will be given to nearby Ferro alloys manufacturing units or casting units. 3 End cutting Recycled back as raw material in own induction Furnaces 12

16 Chapter 4 : SITE ANALYSIS 4.1 CONNECTIVITY The Project site is well connected with Rail and Road connectivity. The nearest railway station is Bhupdeopur R.S. The following table gives brief regarding connectivity of the plant site: Component Road Rail Air port Description : Raigarh Ambikapur Highway (2.1 Kms) : Bhupdeopur R.S - 11 Kms. : Raipur Airport Kms. 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP LAND FORM Present land is industrial land acres of land is allotted by O.P. Jindal Industrial Park. 4.3 TOPOGRAPHY Topography of land is more or less flat terrain without much undulation. 4.4 EXISTING LAND USE PATTERN LAND USE PATTERN OF THE PROJECT SITE 10.5 acres of land is allotted by O.P. Jindal Industrial Park. S.No. Area Extent (Sq.M) Extent (Acres) 1 Induction Furnace area Rolling Mill area Storage area Admin Building Water Tank Sub-Station Weigh Bridge Green Belt Internal Road Parking Total

17 4.4.2 ENVIRONMENTAL SETTING OF THE PROJECT SITE The Salient Features / Environmental features within 10 km of the Project Site are given below. S.No. Salient Features / Environmental Aerial Distance w.r.t. site / Remarks features 1. National Park/ Wild life sanctuary / None Biosphere reserve / Tiger Reserve / Elephant Corridor / migratory routes for Birds 2. Historical places / Places of Tourist None importance / Archeological sites 3. Industrial areas / cluster (MoEF&CC office None memorandum dated 13 th January 2010) 4. Defence Installations None 5. Nearest Village Nearest Habitation is at Village Tumidih (0.3 Kms.) 6. Reserved forests Taraimal RF (0.3 Kms.), Samaruma RF (3.5 Kms), Suhai RF (5.8 Kms.), Rabo RF (6.4 Kms), Urdana RF (6.0 Kms.) Punjipathra PF (0.7 Kms.), Pajhar PF (4.5 Kms.), Maghat P.F. (5.3), Kharidungri PF (9.0 Kms.), Lakha PF s (8.0 Kms.) are exist within 10 Km. radius of the plant site. 7. Water body Kelo river (6.5 Kms.) & Kurket River (7.0 Kms.), Rabo Dam back water (7.0 Kms.) & Few seasonal nalas, ponds exist within 10 Km. Radius of the plant site. 8. Nearest Highway Raigarh Ambikapur Highway (1.9 Kms.) 9. Nearest railway station Bhupdeopur R.S - 11 Kms. 10. Nearest Port facility Nil 11. Nearest Airport Nil (Raipur 190 Kms.) 12. Seismic zone as per IS-1893 Seismic zone II 13. R & R Not applicable as there are no habitations in the additional land proposed for expansion. 4.5 EXISTING INFRASTRUCTURE All required infrastructure is prevailing in the site. As the Plant is situated in Industrial Park. 4.6 CLIMATIC DATA FROM SECONDARY SOURCES The climatic conditions of the district consist of extremely hot summers and mild winters and may be classified as tropical. The period starting from April to June is the hottest. The annual rainfall in the region is about 1584 mm and is contributed to by the Southwest monsoon. 14

18 Chapter 5 : PLANNING BRIEF 5.1 PLANNING CONCEPT NR TMT (India) Private Limited has obtained Environment Clearance from Chhattisgarh Environment Conservation Board (CECB), Raipur vide letter no. 390 / SEIAA / Rolling / Raigarh / 576 Naya Raipur dt for establishment of 3 x 7 T Induction Furnaces for manufacturing 56,700 TPA of Hot metal & Rolling Mill to manufacture 55,000 TPA of Rolled products at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh. Accordingly obtained Consent to Establishment and Consent to Operate from CECB. Now, we proposed to upgrade existing 3 x 7 T to 3 x 12 T Induction Furnaces and establishment of New 2 x 12 T Induction Furnaces and upgrade the existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] in the existing plant premises of 10.5 acres at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh. Following is the Plant Configuration and production Capacity: S.No. Unit Existing (In operation) 1. Induction Furnace 3 x 7 T (56,700 TPA) Proposed Expansion Modernisation of existing Induction Furnaces 3 x 7 T to 3 x 12 T (97,200 TPA) & New Induction Furnaces 2 x 12 T (64,800 TPA) Total = 1,62,000 TPA 2. Rolling Mill 55,000 TPA Modernisation of existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] After Proposed Expansion Modernisation of existing Induction Furnaces 3 x 7 T to 3 x 12 T (97,200 TPA) & New Induction Furnaces 2 x 12 T (64,800 TPA) Total = 1,62,000 TPA Modernisation of existing Rolling Mill from 55,000 TPA to 1,57,500 TPA [Hot Charging] Present proposal will be taken up in the existing 10.5 acres of land allotted by O.P. Jindal Industrial Park. 15

19 5.2 POPULATION PROJECTION There are no major human settlements in the vicinity of the project site. The manpower requirement will be sourced from the local areas to the extent possible; hence not much of settlement of outside people in the area. However, population concentration may increase around the project site due to increase in ancillary activities. 16

20 5.3 LAND USE PLANNING Existing plant is located in 10.5 acres of land at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra, Tehsil Gharghoda, District Raigarh, Chhattisgarh acres of land is allotted to NR TMT by O.P. Jindal Industrial Park. Proposed expansion will be carried out in the existing plant premises only. Following is the land use breakup: S.No. Area Extent (Sq.M) Extent (Acres) 1 Induction Furnace area Rolling Mill area Storage area Admin Building Water Tank Sub-Station Weigh Bridge Green Belt Internal Road Parking Total AMENITIES/FACILITIES Facilities like canteen, rest room and indoor games facilities are already been provided in the existing plant as basic facilities to workers. No other additional facilities are proposed. 17

21 Chapter 6 : PROPOSED INFRASTRUCTURE 6.1 INDUSTRIAL AREA (PROCESSING AREA) Present use of land is Industrial land. The proposed expansion will be carried out in the existing plant premises only. The main plant area comprises of Furnace sheds, Rolling mill area, raw material storage and product storage etc. 6.2 RESIDENTIAL AREA (NON PROCESSING AREA) No colony is proposed; however facilities like canteen, rest room and indoor games facilities have been provided in the existing plant premises. 6.3 GREEN BELT About 1/3 rd of total land availability will be developed with greenbelt i.e 3.51 Acres of land will be allocated (including expansion). Greenbelt development plan Local DFO will be consulted in developing the green belt. Greenbelt of 33% of the area will be developed in the plant premises as per CPCB guidelines. Around 10 m wide greenbelt is being maintained all around the plant. The tree species to be selected for the plantation are pollutant tolerant, fast growing, wind firm, deep rooted. A three tier plantation is proposed comprising of an outer most belt of taller trees which will act as barrier, middle core acting as air cleaner and the innermost core which may be termed as absorptive layer consisting of trees which are known to be particularly tolerant to pollutants. 6.4 SOCIAL INFRASTRUCTURE Social infrastructure will be developed as per need based in the Villages of the vicinity of the project. 18

22 6.5 CONNECTIVITY The Project site is well connected with Rail and Road connectivity. The nearest railway station is Bhupdeopur R.S. The following table gives brief regarding connectivity of the plant site: Component Road Rail Air port Description : Raigarh Ambikapur Highway (2.1 Kms) : Bhupdeopur R.S - 11 Kms. : Raipur Airport Kms. 6.6 DRINKING WATER MANAGEMENT Drinking water will be supplied to the workers at the plant. 6.7 SEWERAGE SYSTEM Domestic effluent collected through toilet blocks will be collected through well designed sewer network and send to Septic tanks followed by sub surface dispersion trenchs. 6.8 INDUSTRIAL WASTE MANAGEMENT The wastewater generated from SMS and Rolling mill units will be recycled through closed circuit cooling system. No wastewater will be discharged outside the plant premises. The sanitary wastewater will be treated in septic tank followed by sub surface dispersion trench. Hence, there will not be any chance of contamination of water bodies due to proposed project. 6.9 SOLID WASTE MANAGEMENT Slag from SMS will be crushed and iron will be recovered & remaining non-magnetic material being inert by nature will be used as sub base material in road construction / will be given to brick manufacturer. Mill scales from Rolling Mill will be given to nearby Ferro alloys manufacturing units or casting units and End cutting will be Recycled back as raw material in own induction Furnaces. 19

23 Chapter 7 : Rehabilitation and Resettlement (R & R) Plan No rehabilitation and resettlement is required as the existing plant is situated in the Industrial area. 20

24 Chapter 8 : Project Schedule & Cost Estimates 8.1 PROJECT IMPLEMENTATION SCHEDULE Proposed expansion Project will be implemented in 72 months from the date of receipt of Environmental Clearance from the SEIAA & Consent from CECB. 8.2 ESTIMATED PROJECT COST The estimated project cost for the proposed is about Rs.24.0 Crores. 21

25 Chapter 9 : Analysis of proposal 9.1 FINANCIAL AND SOCIAL BENEFITS With the implementation of the proposed expansion project, the socio-economic status of the local people will improve substantially. The land rates in the area will improve in the nearby areas due to the proposed activity. This will help in upliftment of the social status of the people in the area. 9.2 SOCIO-ECONOMIC DEVELOPMENTAL ACTIVITIES The management is committed to uplift the standards of living of the villagers by undertaking following activities / responsibilities as the part of Corporate Environment Responsibility. Health & hygiene Drinking water Education for poor Village roads Lighting HEALTH & HYGINE Personal and domestic hygiene, Maintaining clean neighborhood, Weekly health camps offering free-checkup & medicines Ambulance services Education & drug de-addiction, aids. DRINKING WATER Making drinking water available at centralized locations in the village. SUPPORTING EDUCATION Providing books to all poor children, Conducting annual sports festival in the village schools, 22