SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

Size: px
Start display at page:

Download "SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS"

Transcription

1

2

3 Annexure No - 13

4

5 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers Pvt. Ltd., Sl. No DOCUMENTS / X 1 Form -1 2 Form -1 A 3 Environmental management plan [EMP] 4 Conceptual Plan [Site Plan] 5 Topo sheet Duly marking the project site with 10 Kms Radius (2 Km) 6 Original Village Maps duly marking project site. Adjacent village maps of the project site is located at vicinity of the village boundary 7 Latest Google Map Duly marking the project site 8 CDP Duly marking the project site 9 Latest Site Photographs 10 Land Documents a. Sale Deed b. Khatha Certificate c. Mutation Copy d. Land allotment Letter in case of KIADB/SEZ e. Survey Sketch, Podi etc., f. R.T.C g. Joint development agreement if Applicable h. Other i. Gazette Notification regarding land acquisition under section 4(1) & 4 (6) of the Karnataka Land revenue Act in case of Area development/ Township Projects j. List of Survey No's and Extent in case of Area development/ Township Projects k. Disputes if any and copy of documents/ orders there off Copy of earlier E.C/Sanction Plan in case of Expansion and Modification Projects Certified report of the status of compliance of the conditions stipulated in the E.C from the regional office of MoEF& CC

6 13 Latest Traffic study Report Comparative statement of the project profile between the existing and the 14 proposed with difference thereof in case of Expansion and Modification project 15 Copy of Clearance obtained from other Regulatory Authority a. NOC regarding water supply from the competent Authority b. NOC from Airport Authority c. NOC from Fire and Emergency Department d. MOU regarding supply of treated water for construction a per FEE 188 ENV 2003 dated and As per NGT Direction in O.A 222 of 2014 dated with the prospective supplier and water quality analysis report. e. MoU Letter/Approval letter from GAIL regarding supply of PNG for DG set. f. Applicability of CRZ Notification and Clearance /recommendations from the competent Authority g. Other Specify 16 Accreditation certificate for Consultant 17 Letter of Authorization issued by the company, Partnership/ proprietor if the authorized signatory other than the proprietor himself for filing of application before SEIAA 18 DD towards processing fee in accordance with G.O No. FEE 46 EPC 2013, dated amended from time to time

7 SEIAA KARNATAKA BREIF NOTE FOR BUILDING & CONSTRUCTION PROJECTS File No : Sl. No. PARTICULARS INFORMATION M/s. Bagmane Developers Pvt. Ltd. 1 Name & Address of the Project Lake View A Block, 8 th Floor Proponent Bagmane Tech Park C.V. Raman Nagar, Bengaluru Name & Location of the Project Bagmane - RIO Campus Proposed Commercial Building of M/s. Bagmane Developers Pvt. Ltd., Sy. No s 63 of Doddanekundi Village and 112, 128, 129, 130/2, 131, 135/1, 135/2 & 136/2 130/1(P) & 130/3(P) of KIADB land of Mahadevapura Village, K.R. Puram Hobli, Bengaluru East Taluk, Bengaluru. 3 Co-ordinates of the Project Site Sl.No North Latitude East Longitude 1 N: E: N: E: N: E: N: E: Environmental Sensitivity Distance from periphery of nearest Nakkundhi Lake 0.32km towards NE a. Lake and other water bodies (Lake, Doddanekundi Lake 0.69 km towards SW Rajakaluve, Nala etc.,) Kagdasapura Lake 1.99km towards SW Type of water body at the vicinity of Not Applicable the project site and Details of Buffer b. provided as per NGT Direction in O.A 222 of 2014 dated , if Applicable. 5 Type of Development Residential Apartment / Villas / a. Row Houses / Vertical Development Commercial Offices / Office / IT/ ITES/ Mall/ Hotel/ Hospital /other b. Residential Township/ Area -- Development Projects 6 Plot Area (Sqm) 36, Sqm 7 Built Up area (Sqm) Total BUA = 1,95, Sqm 8 Building Configuration [ Number of Blocks / Towers / Wings etc., with Numbers of Basements and Upper Floors 3B+1G+12UF 9 Number of units in case of --

8 10 Construction Projects Number of Plots in case of Residential Township/ Area Development Projects 11 Project Cost (Rs. In Crores) 12 Recreational Area in case of Residential Projects / Townships 13 Details of Land Use (Sqm) a. Ground Coverage Area 9570Sqm b. Kharab Land c. Total Green belt on Mother Earth for projects under 8(a) of the schedule of the EIA notification, Total project Cost : 654Crores Land Cost : 279Crores Construction Cost, Plant & Machinery : 375 Crores Sqm d. Internal Roads 6800Sqm e. Paved area Sqm f. Others Specify 232Sqm g. Parks and Open space in case of Residential Township/ Area Development Projects h. Total Sqm 14 Details of demolition debris and / or Excavated earth Details of Debris (in cubic meter/mt) if it involves Demolition of existing structure and Plan for re a. use as per Construction and Demolition waste management Rules 2016, If Applicable. b. c. d. e. Total quantity of Excavated earth (in cubic meter) Quantity of Excavated earth propose to be used in the Project site (in cubic meter) Excess excavated earth (in cubic meter) Plan for scientific disposal of excess excavated earth along with Coordinate of the site proposed for such disposal 15 WATER I. Construction Phase a. Source of water b. c. Quantity of water for Construction in KLD Quantity of water for Domestic Purpose in KLD cum 63600cum cum Bangalore Water Supply and Sewerage Board (BWSSB). 20 KLD 10 KLD

9 d. Waste water generation in KLD 8.5 KLD e. Treatment facility proposed and scheme of disposal of treated water II. Operational Phase a. Total Requirement of Water in KLD 722 KLD b. Source of water c. Waste water generation in KLD 480 KLD d. STP capacity 550 KLD e. Technology employed for Treatment MBBR technology f. Scheme of disposal of excess treated No excess treated water water if any 16 Infrastructure for Rain water harvesting a. Capacity of sump tank to store Roof 8 No s run off b. No's of Ground water recharge pits 15 No s. 17 Storm water management plan 18 Waste Management I. Construction Phase a. Quantity of Solid waste generation and mode of Disposal as per norms Onsite sanitation facilities will be provided an disposed off in to septic tank. Also no large surface water bodies are in the vicinity. Bangalore Water Supply and Sewerage Board (BWSSB) for drinking purpose. Rainwater harvesting & storm water management plan has been proposed. Solid waste from Proposed Non residential office building unit will be sent to OWC waste collection and disposal system. II. Operational Phase Quantity of Biodegradable waste 890 kg/day & will be treated in OWC. a. generation and mode of Disposal as per norms Quantity of Non- Biodegradable b. waste generation and mode of Disposal as per norms Quantity of Hazardous Waste c. generation and mode of Disposal as per norms d. Quantity of E waste generation and mode of Disposal as per norms 19 Power a. Total Power Requirement KVA from BESCOM. Operational Phase b. Numbers of DG set and capacity in KVA for Standby Power Supply c. Details of Fuel used for DG Set HSD d. Energy conservation plan and Percentage of savings including plan for utilization of solar energy as per ECBC PARKING 590 kg/day Waste will be disposed by authorized recyclers. Disposed to pollution control board approved reprocessor. E waste will be handed over to the approved and authorized KSPCB E-Waste recyclers. DG set of capacity 1500 KVA for back-up purpose (9 running DG set + 3 standbys). Low loss Copper wound Transformers HF Ballast in place of conventional ballast T5/T8/LED lights for lighting against conventional fluorescent lamps. Energy Saving % for Commercial Offices

10 a. Parking Requirement as per norms Level of Service (LOS) of the -- b. connecting Roads as per the Traffic Study Report c. Internal Road width (RoW) Min 8 mtrs Total Car parking provided = 2865 No s. Remarks:- The proposal is commercial in nature and falls under B1categoty(Total Built Up Area 1,50,000 SQM) hence attracts EIA Notification 2006.