1 I) Basic information S.. Item Details 1 Name of the project/s M/s. Rajapushpa Properties (P) Limited Residential Complex 2 S.. in the schedule Project Activity 8a Category B(B2) 3 Proposed capacity /area/ length/ tonnage to be handled/command area/lease area/ of the well to be drilled S. Block Details. of Floors.of Flats Area (Sq.Mts) 1 Block-A 2C+G , Block-B 2C+G , Block-C 2C+G , Amenities Block G+4-2, Total , Parking: Parking Area (Sq. Mtrs) Cellar 1 15, Cellar 2 15, Total Parking Area 30, ( In Square Meters) Total Area of the residential flats: 78, Total Parking Area : 30, Total Built-up area : 1,08, New/Expansion /Modernization New Project. 5 Existing capacity/area etc NA 6 Category of project A or B Category B ( B2 ) As Area is less than 1,50,000 Square Meters, the proposed project comes under category B2 7 Does it attract the general condition? If yes please specify 8 Does it attract the specific condition? If yes please specify

2 Sy. 337/P, Puppalguda Village, 9 Location Plot/ survey /Khasra no Village Tehsil/Mandal District State 10 Nearest Railway station/air port along with the distance in kms 11 Nearest Town, City, District Headquarters along with distances in kms. 12 Village Panchayats Zilla Parishad Municipal Corporation, Local body (complete postal Address with telephone no. to be given Sy.. 337/p, Puppalguda (V), Rajendranagar(M), Ranga Reddy District Telangna Rajiv Gandhi International Air port KM This is Part of Hyderabad City Greater Hyderabad Municipal Corporation 13 Name of the applicant P. Mahender Reddy (Managing Director) 14 Registered address Plot.34, Silicon Valley, Madhapur, Hyderabad, Telangana Address of the correspondence Name Designation /owner/partner/ceo Address P. Mahender Reddy (Managing Director) Plot.34, Silicon Valley, Madhapur, Hyderabad Pin code Telephone no Fax no 16 Details of Alternative Sites examined if any info@rajapushpa.in Ph: Location of these sites Should be shown on a Topo sheet. 17 Interlinked Projects 18 Whether separate application of interlinked projects has been t Applicable PRIDHVI ENVIROTECH (P) LIMITED Page 1

3 Sy. 337/P, Puppalguda Village, submitted 19 If yes, date of submission t Applicable 20 If no reason t Applicable 21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, 1980? (b) The Wild life (protection)act, 1972? (c) The C.R.Z notification, 1991? 22 Whether there is any Government order/policy relevant/relating to the site? 23 Forest land involved (Hectares) 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (II) (a)name of the court (b)case no. (c) Orders/directions of the court, if any and its relevance with the proposed project. Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.). S.. Information /Checklist Details thereof (with approximate quantities /rates, wherever possible ) PRIDHVI ENVIROTECH (P) LIMITED Page 2

4 Sy. 337/P, Puppalguda Village, / 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? The proposed project activity is construction of Residential Complex. The site area is located in GHMC area. This area is earmarked as residential zone as per the Master plan of Hyderabad Urban Development Authority. There is no vegetation in the project site requiring clearance. 1.3 Creation of new land uses? The purpose of proposed project is construction of Residential Complex hence there will not be any change in land use 1.4 Pre-construction investigations e.g. bore holes, soil testing? Soil bearing tests were conducted before construction 1.5 Construction works? The project is residential complex. 1.6 Demolition Works? There are no structures in the proposed area, hence there are no demolition works. 1.7 Temporary sites used for construction works or housing of construction works? Temporary shelters for construction workers are not required as labor will be hired from the surrounding locations 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations The proposed development is Construction of Residential Complex. Cut and fill activity will be there for basement and foundations 1.9 Underground works including mining or tunneling? t Applicable as this is a Construction of Residential Complex Reclamation Works? t Applicable 1.11 Dredging? t Applicable as this is a Construction of Residential Complex. PRIDHVI ENVIROTECH (P) LIMITED Page 3

5 Sy. 337/P, Puppalguda Village, 1.12 Offshore structures? t Applicable as this is a Construction of Residential Complex Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? manufacturing activity. Activity is Construction of Residential Complex. Storage space of building materials will be earmarked onsite Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? Solid waste generated from the construction includes rubble, used up cement, broken bricks etc, which will be used for filling up low lying areas during developmental stage. Treated liquid effluents from domestic waste water will be used for flushing and gardening and rest would be sent to municipal drains. STP Sludge will be used as manure in green belt development Manpower requirement of operational workers is nominal and will be recruited from surroundings therefore no long term housing facilities are envisaged New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? Existing facilities will be used for the proposed project. t envisaged t envisaged diversions PRIDHVI ENVIROTECH (P) LIMITED Page 4

6 Sy. 337/P, Puppalguda Village, 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? The proposed development will not disturb the natural terrain of the area and will not disturb the water courses in any ways i.e. no drain flows through the site. Rain Water Harvesting system is proposed to recharge the GWL 1.22 Stream crossings? There are no stream crossings the proposed site Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? Water requirement of the project will be met from Municipal supply and Bore well. The development will be carried out with no disturbance to major water or the land surface, affecting drainage or runoff. Transportation of personnel or material will be by trucks on road 1.26 Long-term dismantling or decommissioning which could have an impact on the environment? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? t envisaged t envisaged 1.28 Influx of people to an area in either temporarily or permanently? 1.29 Introduction of alien species? t envisaged Total of 298 flats are proposed. The local area is developing at a faster pace due to development in the surrounding areas Loss of native species or genetic diversity? t envisaged 1.31 Any other actions? Nil PRIDHVI ENVIROTECH (P) LIMITED Page 5

7 Sy. 337/P, Puppalguda Village, 2.0 USE OF NATURAL RESOURCES for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): S.. Information /Checklist / Details thereof (with approximate quantities /rates, wherever possible) 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) Unit : KLD Total land available for the project is 21, Sq.Mts and the net site area of the plot is 18, Sq.mts Water Requirement : 220 KLD Fresh water requirement 145 KLD Source: Borewell & Municipal Supply Recycled water 75 KLD Source : S.T.P 2.3 Minerals (MT) t Applicable as this is a construction project. 2.4 Construction material stone, aggregates, and / soil (expected source- MT) Construction materials like coarse aggregate, fine aggregate, granite. Kota stone, Dolhpur stone, Marble, bricks, sand, cement, steel will be used. The raw materials will be sourced from local dealers & traders. 2.5 Forests and timber (source MT) Wood will be used only for preparing window and door frames. The required timber will be procured from local authorized timer dipos 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Power Required : 970 KVA Source: Central Power Distribution Company Limited (TSCPDCL). Back-up power: 2 x 625KVA DG sets for emergency during power failures. 2.7 Any other natural resources (use appropriate standard units) Fuel: HSD Liters, will be sourced from local traders t Applicable PRIDHVI ENVIROTECH (P) LIMITED Page 6

8 Sy. 337/P, Puppalguda Village, 3.0 Use, storage, transport, handling or production of substances or materials which could be harmful to human health or THE ENVIRONMENT or raise concerns about actual or perceived RISKS TO HUMAN HEALTH. S.. Information /Checklist 3.1 Use of substance or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare or people e.g. by changing living conditions? / Details thereof (with approximate quantities /rates, wherever possible ) Only HSD in small quantities will be used for backup power DG sets. Paints are used during construction t envisaged Good quality housing is proposed with good living environment for 298 families 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patient s children, the elderly etc., Any other causes Production of SOLID WASTES during construction or operation or decommissioning (MT/ month) S.. Information /Checklist / Details thereof (with approximate quantities /rates, wherever possible ) 4.1 Soil, overburden or mine wastes There are no overburden or mine waste 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Garbage 773 kgs/day disposed to GHMC Used Oils from 100 LPA Used Batteries 2 no s/year Transformer Oil 40 LPA PRIDHVI ENVIROTECH (P) LIMITED Page 7

9 Sy. 337/P, Puppalguda Village, Rules) 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment 4.7 Construction or demolition wastes 4.8 Redundant machinery or equipment Sewage 30 kgs/d will be used as manure for green belt development. During construction some amount of construction debris may be generated which will be segregated and whatever re-saleable will be sold to supplier and rest waste will be used for filling up of low lying areas and development of internal roads and boundary walls etc Most of the equipment used for the construction will be hired. 4.9 Contaminated soils or other materials 4.10 Agricultural wastes t Applicable 4.11 Other solid wastes -- soil contamination is anticipated as the proposed project is a construction project all the waste generated will be in the form of solid waste of reusable nature. 5.0 Release of pollutants or any hazardous, toxic or noxious substances to AIR (Kg/hr) S.. Information /Checklist 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources / Details thereof (with approximate quantities /rates, wherever possible ) Emissions will be mainly from vehicles moving at the project site during construction and operation period and secondly from the 2 x 625 KVA DG sets used for backup power source operated only during power failures only for a short duration. PRIDHVI ENVIROTECH (P) LIMITED Page 8

10 Sy. 337/P, Puppalguda Village, 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport NO As HSD will be used for the DG sets, the main emissions will be SO2 and NOx. For Proper dispersion of pollutants, the stack height meeting CPCB rms will be maintained. This is not an industry to have emissions from production process Vehicular emissions are anticipated both during construction and during operation. 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odors from handling of materials including construction materials, sewage and waste. 5.6 Emissions from incineration of waste Fugitive emissions are likely during construction activities from the materials. These are temporary in nature. The main emissions during the construction will be PM from the loading and unloading of materials on the site. SO2 and NOx from the combustion of fossil fuels and from vehicles. The particulate matter will be mainly generated from loading and unloading of the material at the site. Other municipal solid waste will be disposed off to the Municipal solid waste dump yard. The construction material will be handled carefully to prevent any spill over or wastage. Construction labor will be provided with proper sanitation to avoid any unhygienic conditions. Therefore no odor generation is expected t envisaged PRIDHVI ENVIROTECH (P) LIMITED Page 9

11 Sy. 337/P, Puppalguda Village, 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) t envisaged 5.8 Emissions from any other sources t envisaged 6.0 Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information /Checklist 6.1 From operation of equipment e.g. engines, ventilation plant, crushers / Details thereof (with approximate quantities /rates, wherever possible ) ise is anticipated during construction activities, movement of construction material and use of machinery. These are temporary in nature and will be minimized by adopting proper maintenance such as greasing, oiling and insulations (acoustic enclosures) for DG Set. 6.2 From industrials or similar processes t applicable 6.3 From construction or demolition The noise and vibrations are only during the construction phase and proper precautions are taken to ensure that the decibel levels are below the standards and the equipment utilized for constructions are properly serviced and maintained for reducing vibration and noise levels 6.4 From blasting or piling t envisaged 6.5 From construction or operational traffic. ise levels of 55dB (A) are anticipated during daytime due to the vehicular movement and construction activities, but it will be of temporary nature 6.6 From lighting or cooling systems The lighting systems have a major component of LED to save an energy for the whole project PRIDHVI ENVIROTECH (P) LIMITED Page 10

12 Sy. 337/P, Puppalguda Village, 6.7 From any other sources Risks of CONTAMINATION OF LAND OR WATER from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea : S.. Information /Checklist 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge ) 7.3 By deposition of pollutants emitted to air into the land or into water / Details thereof (with approximate quantities /rates, wherever possible ) Used batteries and waste oil shall be stored separately and shall not lead to contamination of land during normal operation. The sewage shall be treated to achieve the standards prescribed by MoE&F during operation phase. While the discharges from temporary toilets during construction shall be sent to septic tank followed by municipal sewer lines. pollutants are emitted in to air. Hence no deposition of pollutants into land or water. 7.4 From any other sources Is there a risk of long term build up of pollutants in the environment from these sources? Proper Environmental management plan will be followed for air, water, noise and solid waste. Hence no long term impacts are envisaged. 8.0 Risk of accidents during construction or operation of the Project, which could affect human or the environment S.. Information /Checklist 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances / Details thereof (with approximate quantities /rates, wherever possible ) Fire hydrant and Fire fighting systems will be installed and safety precautions will be followed as per the safety rules. Only Diesel in small quantity and paints during construction phase will be flammable material used and stored. PRIDHVI ENVIROTECH (P) LIMITED Page 11

13 Sy. 337/P, Puppalguda Village, 8.2 From any other causes t Applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? The project site is located at a higher elevation and the seismic zone for the project area is Zone-II, which is considered safe. 9.0 Factors which should be considered (such as consequential DEVELOPMENT) which could lead to ENVIRONMENTAL EFFECTS or the potential for cumulative impacts with other existing or planned activates in the locality S.. Information /Checklist 9.1 Lead to development of supporting. utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) / Details thereof (with approximate quantities /rates, wherever possible ) The proposed project is a construction of Residential Complex. So it leads to development of supporting facilities and ancillary & related activities. Housing development Extractive industries Supply industries Other 9.2 Lead to after use of the site, which could have impact on the environment Set a precedent for later developments The area is developed residential and commercial area. PRIDHVI ENVIROTECH (P) LIMITED Page 12

14 Sy. 337/P, Puppalguda Village, 9.4 Have cumulative effects due to proximity to other existing or planned project as with similar effects ) -- (III) Environment Sensitivity S.. Areas Name/ Identity Aerial distances (within 15 km.) Proposed project location boundary 1. Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related values Kasu brahmanandareddy National park 7.26 Km east. 7 tombs 5.99 Km and GolgKonda fort 7.03 Km north east 2. Areas which are important or sensitive for ecological reasons Wetlands, water courses or other water bodies, coastal zone, biospheres. Mountains, forests Osman Sagar KM in South-West direction, Himayat Sagar - 8 km in south direction, Battemma cheruvu KM in East, Chinta Kunta KM in rth East, Musi River KM in South, Musa River KM in South East. 3. Areas and by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or underground waters Chilkur Protected Forest 5.41 km in South, Kottaguda R.F 4.08km from site in rth East direction. 5. State, National boundaries - 6. Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas PRIDHVI ENVIROTECH (P) LIMITED Page 13

15 Sy. 337/P, Puppalguda Village, 7. Defense installations ne 8. Densely populated or built-up area 9. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities ) The area is developing into a densely populated area. 10. Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) IV. Proposed Terms of Reference for EIA Studies - -- B-2 Category Project PRIDHVI ENVIROTECH (P) LIMITED Page 14

16 Sy. 337/P, Puppalguda Village, PRIDHVI ENVIROTECH (P) LIMITED Page 15