1

2 FORM 1 Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project At C.S. 990 situated at 243-G Patthe Bapurao Marg (Falkland Road), at Girgaon, Division D ward, Mumbai By M/s. Rubberwala Housing & Infrastructure Ltd. Rubberwala House, Dr. A. R. Nair Road, Agripada, Mumbai Redevelopment project at Girgaon, Mumbai 1

3 APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Item Details 1. Name of the project/s Redevelopment Project (Amendment in EC) at Girgaon, Division D ward, Mumbai. 2. S. in the schedule 8 (a) 3. Proposed Total plot area: Sq. mt. capacity/area/length/tonnage to Deductions: Sq. mt. be handled/command area/lease area/number of wells to be drilled Net plot area: Sq. mt. Built up area as per FSI: Sq. mt. (including fungible area) Total construction Built up area: Sq.mt. Project Proposal: 1 Composite Building with 4 Wings Wing A, B, C : 3 Basements + Ground + 20 Floors Wing D : 3 Basements + Ground + 13 Floors Redevelopment : Flats: 131 s. Shops: 93 s. Sale: Flats: 125 s. Shops: 782 s. 4. New/Expansion/Modernization Amendment in EC 5. Existing Capacity/ Area etc. Received Prior Environmental Clearance (EC), wide letter SEAC- 2014/CR 411/TC II dt. 05/09/2014. Copy of EC is attached as Enclosure-1. As there is Amendment in Proposal reapplied for Environmental Clearance. Total Constructed area (FSI + n FSI) on site till date : Sq.mt. 6. Category of project i.e. A or 8 (B2) B 7. Does it attract the general t Applicable condition? If yes, please specify. 8. Does it attract the specific t Applicable condition? If yes, please specify. 9. Location Patthe Bapurao Marg (Falkland Road) Plot/Survey/Khasra C.S. 990 situated at 243-G Village Girgaon Tehsil Mumbai District Mumbai. State Maharashtra. 10. Nearest railway station Nearest airport Grant Road Railway Station: Within 1.0 Km. (Road distance) Mumbai Central Railway Station: Within 1.50 Km. (Road distance) Airport: Mumbai Chhatrapati Shivaji Terminals: Within 21 Km.(Road 11. Nearest Town, city, District headquarters Along with distance in kms. Distance) Mumbai Metropolitan Region 12. Village Panchayats, Zilla Municipal Corporation of Greater Mumbai (M.C.G.M.) Form 1- Redevelopment project at Girgaon, Mumbai 0

4 Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Rubberwala Housing & Infrastructure Ltd. 14. Registered Address Rubberwala House, Dr. A. R. Nair Road, Agripada, Mumbai Address for correspondence Rubberwala House, Dr. A. R. Nair Road, Agripada, Mumbai Name Mr. Tabrez Shaikh Designation Partner (Owner/Partner/CEO) Address Rubberwala House, Dr. A. R. Nair Road, Agripada, Mumbai Pin Code rubberwala.com Telephone (022) , Fax -- t Applicable 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects 18. Whether separate application of interlinked project has been submitted? t applicable 19. If yes, date of submission t applicable 20. If no, reason t applicable 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a.) The Forest (Conservation) Act, t Applicable 1980? (b.) The Wildlife (Protection) Act, t Applicable 1972? (c.) The C.R.Z tification, 1991? t Applicable 22. Whether there is any Government Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) t applicable 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case (c) Order /directions of the Court, if any and its relevance with the proposed project. Received NOC From MHADA dt Copy of NOC is attached as Enclosure -2. Form 1- Redevelopment project at Girgaon, Mumbai 1

5 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and building? / Details thereof (with approximate quantities /rates, wherever possible) with source of Project site is in residential zone as per DP remarks. DP remarks are attached as Enclosure-5 Existing chawls were already demolished. 1.3 Creation of new land uses? Pre-construction investigation e.g. bore houses, soil testing? Geotechnical investigation has been carried out. Soil report is enclosed herewith as Enclosure Construction works? Redevelopment Project 1.6 Demolition works? Existing chawls were already demolished 1.7 Temporary sites used for construction works or housing of construction workers? Temporary hutments on site with facilities like drinking water, toilets etc. 1.8 Above ground building, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or Tunneling? 1.10 Reclamation works? Dredging? Offshore structures? Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail, or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic Movements? --- Demolition debris generated due to demolition of existing Chawl was partly recycled and remaining disposed to authorized landfill site. Construction of Basements only Temporary storage facilities on site to store construction material. STP for treatment of sewage Segregation of solid waste into nonbiodegradable and biodegradable garbage Treatment of biodegradable waste in Organic Waste Converter n-biodegradable waste: To recyclers Dried sludge from STP: As manure Form 1- Redevelopment project at Girgaon, Mumbai 2

6 1.20 New or diverted transmission lines or pipelines? / Impoundment, damming, culverting, --- realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or runoff? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Introduction of alien species? Loss of native species or genetic --- diversity? 1.31 Any other actions? --- Details thereof (with approximate quantities /rates, wherever possible) with source of By considering the runoff prior to development and runoff after development there is some increment in runoff of storm water Incremental Run off from Site= 0.02 m3/sec Transport of construction materials. Precautions are taken to reduce the impact of the vehicular movement by trying to avoid the vehicular trips during peak hours. There will be influx of ~ 2846 persons (Occupancy of additional sale tenements only) 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Information/checklist 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit : KLD / Details thereof (with approximate quantities /rates, wherever possible) with source of The land is in developed infrastructure area. During Construction Phase For Workers : From M.C.G.M.: 18 KLD For Construction (From Tanker): KLD (Depending upon the activity). During Operational Phase Fresh water from M.C.G.M.: 158 KLD (Domestic) 2.3 Minerals (MT) Construction material stone, Quantity : As per requirement Form 1- Redevelopment project at Girgaon, Mumbai 3

7 Information/checklist aggregates, and / soil (expected source MT) 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) / Details thereof (with approximate quantities /rates, wherever possible) with source of Sources: The material required for construction activities procured from company s authorized / approved vendors only. Timber required for doors sourced from local suppliers. During Constructional Phase- From Brihanmumbai Electric Supply & Transport (BEST) : 100 KW D.G. Sets: As per requirement 2.7 Any other natural resources (use appropriate standard units) -- During Operational Phase Source : Brihanmumbai Electric Supply & Transport (BEST) Connected load 4284 KW Maximum demand D.G sets (For emergency back-up in case of power failure 2336 KW 1 DG set of capacity 1010 kva 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. / 3.1 Use of substances or materials, -- which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or -- affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by --- changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. --- hospital patients, children, the elderly etc., 3.5 Any other causes --- Details thereof (with approximate quantities/rates, wherever possible) with source of 4. Production of solid wastes during construction or operation or decommissioning (MT/month): Details thereof (with approximate quantities / rates, wherever possible) with source of / Form 1- Redevelopment project at Girgaon, Mumbai 4

8 / 4.1 Spoil, overburden or mine wastes Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous waste Management Rules) Details thereof (with approximate quantities / rates, wherever possible) with source of During Construction Phase: Total quantity of solid waste = 25 kg/day (Biodegradable and n-biodegradable) During Operation Phase: The total quantity of solid waste: 725 Kg/day. (Biodegradable and n-biodegradable) Waste oil shall be stored at separate location duly marked and will be sold to the CPCB authorized recyclers. 4.4 Other industrial process wastes Surplus product Sewage sludge or other sludge from effluent treatment. Dried sludge from STP will be used as manure for the plants. 4.7 Construction or demolition wastes. Demolition debris generated due to demolition of existing Chawl was partly recycled and remaining disposed to authorized landfill site. Partly reuse/recycle and disposal of remaining waste to authorized site with the permission of M.C.G.M. 4.8 Redundant machinery or equipment Contaminated soils or other --- materials Agriculture wastes Other solid wastes Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) : 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources / 5.2 Emissions from production processes Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste Emissions from burning of waste in --- open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources --- Details thereof (with approximate quantities/rates, wherever possible) with source of CPCB approved D.G. Sets will be used during power failure. Frequent water sprinkling to minimize the fugitive dust emissions due to handling and loadingunloading activities Precautions taken to reduce dust generation during construction phase: Water sprinkling at regular intervals to reduce dust generation Dust generation controlled as described above. Proper ventilation will be provided around STP and SWM. Form 1- Redevelopment project at Girgaon, Mumbai 5

9 6. Generation of ise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate / quantities/rates, wherever possible) with source of 6.1 From operation of equipment e.g. engines, ventilation plant, crushers. but negl igibl e Measures to control noise pollution : Regular noise monitoring to maintain the noise level within the levels prescribed by CPCB during day and night time Provision of ear plugs to workers Use of high efficiency mufflers noise polluting work in night shifts Provision of barricades of 5m. height along the periphery of the site 6.2 From industrial or similar processes From construction or demolition. ise levels may increase due to operation of machinery as well as transportation vehicles. This may cause nuisance to the nearby area. Following precautions are taken to control noise pollution: Regular noise monitoring to maintain the noise level within the levels prescribed by CPCB during day and night time Provision of ear plugs to workers Use of high efficiency mufflers noise polluting work in night shifts Provision of barricades of the height 5 mt. along with the periphery of the site Proposed Plantation of 54 nos. of new trees on site 6.4 From blasting or piling From construction or operational traffic. During Construction phase: Proper traffic management for the construction vehicles Regular maintenance of vehicles with suitable enclosures and intake silencers Planning and ensuring effective implementation of the waste movement plan for loading and offsite movement in non-traffic hours. Operation Phase : The project proponents have proposed to provide adequate well organized parking arrangement This project would have entry /exit points Proper internal road designed for avoiding traffic Traffic wardens will be assigned to during peak hours Adequate traffic signs will be provided to notify the residents Most of the junctions inside the premises Form 1- Redevelopment project at Girgaon, Mumbai 6

10 / 6.6 From lighting or cooling systems From any other sources. -- Details thereof (with approximate quantities/rates, wherever possible) with source of will be made 3-arm junctions to minimized Traffic Congestion Proposed Plantation of 54 nos. of new trees on site will also help to reduce the noise level and enhance air quality 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea : / Details thereof (with approximate quantities/rates, wherever possible) with source of 7.1 From handling, storage, use or -- spillage of hazardous materials. 7.2 From discharge of sewage or other effluents to water or the land During Construction Phase: Disposal of sewage to municipal sewer line. (expected mode and place of discharge). During Operation Phase: The treated sewage will be reused for flushing and gardening within the premises. Excess treated sewage will be disposed to sewer line. 7.3 By deposition of pollutants emitted to air into the land or into water. Dust during construction phase from earthworks and movement of vehicles. Provision of dust control measures, including water sprinkling of exposed areas and dust covers for trucks, to minimize any impacts. Stack height of DG set shall be as per CPCB guidelines. 7.4 From any other sources Is there a risk of long term build up of pollutants in the environment from these sources? Risk of accidents during construction or operation of the Project, which could affect human health or the environment : 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances / --- Details thereof (with approximate quantities/rates, wherever possible) with source of 8.2 From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, and cloudburst)? -- Landslides and cyclone are not expected in the area. Management plan for flood and earthquake is as follows Floods : Minimizing the incremental runoff from the site with the help of Rain water harvesting tank of capacity 65 KL Proper management of channelization of storm Form 1- Redevelopment project at Girgaon, Mumbai 7

11 water from site by using proper internal SWD system and discharge points of adequate capacity Use of screens and silt traps to SWD Proper maintenance of storm water drainage to avoid choking of drains and flooding on site Existing external drain of adequate capacity Earthquake : The structure of the building is designed as per IS codes for zone III. Disaster Management Plan is attached as Enclosure Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality: 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects / --- Details thereof (with approximate quantities/rates, wherever possible) with source of Supporting infrastructure is already in existence. Redevelopment Project. The Redevelopment endeavour would provide the tenants with homes and contemporary living conditions which would improve their quality of life. Project will generate more employment opportunities and result in wider socio-economic benefits for the people in the area and beyond. Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc. Form 1- Redevelopment project at Girgaon, Mumbai 8

12 (III) Environmental Sensitivity Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Name/ Identity Elephanta Caves Mahim Bay Arabian sea Jijamata Udyan Aerial distance (within 15 km.) from Proposed project location boundary Approx 11.0 km Approx.7.0 Km Approx. 1.0 Km Approx. 3.0 Km -- Mahim Bay Arabian sea Approx. 7.0 Km Approx. 1.0 Km 5 State, National boundaries ne 6 Routes or facilities used by the public for -- access to recreation or other tourist, pilgrim areas 7 Defence installations -- 8 Densely populated or built-up area Mumbai Metropolitan Region 9 Areas occupied by sensitive man-made Mumbai Metropolitan land uses (hospitals, schools, places of Region worship, community facilities) 10 Areas containing important, high quality or scarce resources -- (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or -- environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which -- could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) (IV) Proposed Terms of Reference for EIA studies: t Applicable Form 1- Redevelopment project at Girgaon, Mumbai 9

13