Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Size: px
Start display at page:

Download "Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN"

Transcription

1 Appendix I Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 27/1990 ( R ) 53/2009 PROPOSED PRODUCTION CAPACITY: 97,420 TPA PROJECT PROPONENT SMT. RAJKUMARI W/O CHENARAM PANWAR NEAR RAILWAY STATION, DIDWANA TEHSIL- DIDWANA DISTRICT NAGAUR STATE- RAJASTHAN

2 Form - I APPENDIX I (See paragraph 6) I. Basic Information S.. Item Details 1. Name of Project Masonary Stone Mining Project Near Village Koliya, Tehsil Didwana, District Nagaur, Rajasthan M.L. NO. 27/1990 ( R ) 53/ Serial no. in the schedule 1 (A) 3. Proposed capacity 97,420 TPA of Masonary Stone 4. New expansion / Modernization Enhancement 5. Existing capacity / Area etc. 5,000 TPA 6. Category of project B 2 7. Does it attract general condition? If yes, please specify. 8. Does it attract specific condition? 9. Location Lease area 1.00 ha is near village Koliya, Tehsil Didwana, District Nagaur, Rajasthan. 10. Nearest Railway station Nearest Airport 11. Nearest Town city, District HQ along with distance, in km 12. Village Panchayat, Zila Parishad, local body Didwana ( NW Railway) 31 KM Jaipur Didwana ( 32 km) Nagaur (Dist HQ) 70 km Village Pancayat Koliya Zilla Parishad Nagaur 13. Name of Applicant Smt. Rajkumari 14. Registered Address Near Village Koliya Tehsil - Didwana District - Nagaur, Rajasthan 15. Address of correspondence Near Railway Station, Didwana Tehsil- Didwana District- Nagaur, Rajasthan 16. Details of alternative site examined, if any t considered\it is a site specific project mineral mining project

3

4 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. Information/Checklist confirmation Yes/N o Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes The Mining activity shall change land form of the project area to some extent. Project area in due cause shall be changed into a water reservoir at the end of life of mines. Out of 1.0 hectare project area 0.65 hectare shall be converted into a water reservoir The project is situated in desertic sand dune country devoid of vegetation. There is no building existing within project which requires clearance. Mining operations will be carried out within project area to win mineral 1.3 Creation of new land uses? At the end of life of mines 0.65 Hectare area will be converted into a water reservoir. 1.4 Pre-construction investigations e.g. Bore house, soil testing? The area is part of existing mining project and the mineral potential is fully identified. 1.5 Construction works? Yes A Small office and rest shelter are already constructed.

5 1.6 Demolition works? demolition of any existing structure is proposed. 1.7 Temporary sites used for construction works or housing of construction workers? temporary shelters shall be required to be erected. 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? Yes Above ground building structures like office, rest shelters have been created. underground structures are in place nor shall be constructed in due course of time Reclamation works? At the end of next five years excavated area shall acquire dimension of 100x 65x 30 m 3. Part of the pit may be back filled Dredging? dredging 1.12 Offshore structures? This an inland Project 1.13 Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? Yes The area of mining project covers 1.0 ha non forest land. Mining Shall be done manually/ semi mechanized soil and overburden shall be removed by small excavator with the help of tractor trolley. The mining shall be carried out by hand tools like crowbar hammers and Picks. 1. Mining & Quarrying Storage for top soil o/b Dumps Mineral Storage 0.10 Total 0.77 Small Partion 0.10 hactare shall be used for storage of mineral produce. liquid and solid waste shall be generated and do not required any treatment or Disposal A rest shelter shall be created within mining lease area. long term housing is envisaged.

6 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? new road rail or sea traffic shall be created due to this project alteration of existing road rail air water transport infrastructure diversion diversion 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? impounding or diversion of water courses of to hydrology of the area 1.22 Stream crossings? crossing of streams 1.23 Abstraction or transfers of water form obstructions or transfer of ground or surface waters? water Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? change foreseen construction activity in next five years no transport of man material is envisages dismantling of existing structure shall take place decommission of any kind influx of workers 1.29 Introduction of alien species? induction of any alien species envisages 1.30 Loss of native species or genetic loss of native species diversity? 1.31 Any other actions? any other action is warranted

7

8

9

10

11

12

13

14

15

16