1 Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat by M/s. Eco Homes Developers LLP 109,110, Eco Futurz, New City Light Road, Surat , Gujarat

2 (I) Basic Information ln S.N. ITEM Details 1. Name of the project. High Rise Residential Cum Commercial Building Eco Gardens 2. S.. in the schedule. 8 (a) 3. Proposed capacity/area/length/tonnage to be handled/ command area/ lease area/ number wells to be drilled. 4. New/Expansion/Modernization. New 5. Existing Capacity/Area etc. NA Construction of High Rise Residential Cum Commercial Building Eco Gardens in around 33, m 2 of built up area. 6. Category of Project i.e. A or B B (Building and Construction Projects) 7. Does it attract the general Condition? If yes, please specify. 8. Does it attract the specific condition? If yes, Please Specify. 9. Location: Plot/Survey/Khasra. T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P, Village. Tehsil. District. State. Vesu-Bhartana-Vesu Choryasi Surat Gujarat 10. Nearest railway station/airport along with Distance in kms. Railway station: Surat at approximately 8.0 Km from proposed site in rth East Direction. Airport: Surat at approximately 3.0 Km from the proposed site in South West Direction. 11. Nearest Town, city, District Headquarters Along with distance in kms. Town, City, District Headquarters: Surat at approximately 4.59 Km from proposed site. 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone no s to be given). Municipal Corporation: Name: Surat Municipal Corporation Post. Address: Muglisara, Main Road, Surat Gujarat, India. Tel.: Fax: Name of the applicant. Mr. Gaurav Omprakash Monga 14. Registered address. (Partner) Eco Homes Developers LLP. 109,110, Eco Futurz, New City Light Road, Surat , Gujarat 15. Address for correspondence. Name. Mr. Siddharth Monga, 1

3 Designation (Owner/Partner/CEO). Address. Partner Eco Homes Developers LLP. 109,110, Eco Futurz, New City Light Road, Surat , Gujarat Pin Code Telephone Fax Details of Alternative Sites examined if any. Location of these sites should be shown on a toposheet. 17. Interlinked Project. 18. Whether separate application of interlinked project has been submitted? 19. If yes, date of submission. t Applicable If no, reason. t Applicable Whether the proposal involves approval/clearance under: if yes, details of the same and their status will be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. tification, 1991? 22. Whether there is any Government Order/Policy relevant/relating to the site? t Applicable ne 23. Forests land involved (hectares). ne 24. Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case. (c) Order/Directions of the Court, if any and its relevance with the proposed project. There is no litigation pending against the project and/or land in which the proposed project to be set up. 2

4 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.). / Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan). 1.2 Clearance of existing land, vegetation and buildings? The project will be constructed on the Private Land. Around m 2 land will be utilized for the proposed High Rise Residential Cum Commercial Building Eco Garden project. There is no vegetation. 1.3 Creation of new land uses? The proposed construction will be done in m 2 of land area consisting project. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Soil testing shall be carried out. 1.5 Construction works? Proposed Project is construction of Residential Cum Commercial Building. For details construction work please refer additional documents. 1.6 Demolition works? t Applicable. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including mining or tunneling? There will be no housing facility for construction labours. Construction of different pillars and other architectural structures, buildings. The excavation formed due to the constructional activities is filled up with sand morrum. refer additional documents. t Applicable Reclamation works? Reclamation is not required. Excavated soil shall be restored as Gardens, lawns, or plantation Dredging? t Applicable Offshore structures? t Applicable Production and manufacturing processes? manufacturing process is involved Facilities for storage of goods or materials? Storage facilities will be provided at site during construction phase to keep the raw materials used in construction activities. 3

5 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Post construction Only Domestic Wastewater will be generated which will be disposed off through SMC Drainage to nearest Sewage treatment plant. Door to Door solid waste collection system will be provided at location site. The segregation of wet and dry waste will also be adopted. Local labour will be given preference for employment in construction works. t Applicable. t Applicable. t Applicable. t Applicable. t Applicable Stream crossings? t Applicable 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Water requirement will be only for Domestic and Gardening purpose. The main source of water supply will be SMC water supply. t Applicable. By Road only. t Applicable. Decommissioning is involved. During Construction, around 200 workers per day will be employed on contract basis. As proposed project is Residential building there will be around 946 people present permanently. Visitors : Introduction of alien species? t Applicable Loss of native species or genetic diversity? t Applicable Any other actions? ne. 4

6 . 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha). 2.2 Water (expected source & competing users) unit: KLD. / 2.3 Minerals (MT). ne. 2.4 Construction material stone, aggregates, sand / soil (expected source MT). Details thereof (with approximate quantities /rates, wherever possible) with source of information data The proposed residential cum commercial project will be constructed on private land. Around sq. m. land will be utilized for the proposed project. During Construction Phase 15 KLD water will be required which will be sourced from through SMC water supply. During Operation Phase around KLD will be required. Source of water will be from SMC water supply. Refer Annexure II Construction materials will be procured from the local market as per requirements. Approx Quantities are: SR. MATERIAL QUANTITY NO. 1. Cement Bags (50kg) 2. Steel kg 3. Sand CFT 4. Aggregate CFT 5. Aerated Concrete Blocks s 2.5 Forests and timber (source MT). Timber will only be used as shuttering material during construction phase, which will be removed and used at another site after completion of work. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW). 2.7 Any other natural resources (use appropriate standard units). During Construction Power Requirement: 500 KVA Source: Dakshin Gujarat Vij Company Limited Stand By: D.G. Set of 200 KVA (2 s) Fuel: Diesel Source: Nearby Petrol Pump During Operational Phase Power Requirement: 1200 KVA for Flats and offices. Source: Dakshin Gujarat Vij Company Limited ne. 5

7 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.. / Details thereof (with approximate quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies). 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases). 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., hazardous substance or materials will be used. t Applicable. t Applicable. t Applicable. 3.5 Any other causes. ne.. 4. Production of solid wastes during construction or operation or decommissioning (MT/month) / 4.1 Spoil, overburden or mine wastes. ne Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.2 Municipal waste (domestic and or commercial wastes). 4.3 Hazardous wastes (as per Hazardous Waste Management Rules). During Construction Phase construction waste (e. g. metal, wood) will be generated which will be recycled or sold to vendors. During Operational Phase Only domestic municipal waste shall be generated which will be suitably disposed off through SMC network. hazardous waste will be generated from the proposed project. 4.4 Other industrial process wastes. t Applicable 4.5 Surplus product. t Applicable 4.6 Sewage sludge or other sludge from effluent treatment. t applicable 4.7 Construction or demolition wastes. Constructional waste will be utilized during internal road making etc. 4.8 Redundant machinery or equipment. ne. 4.9 Contaminated soils or other materials. t Applicable Agricultural wastes. t Applicable Other solid wastes. ne. 6

8 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr).. / Details thereof (with Approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources. continuous source of air emission. D.G. sets will be operated during emergency only. 5.2 Emissions from production processes. t Applicable. 5.3 Emissions from materials handling including storage or transport. 5.4 Emissions from construction activities including plant and equipment. 5.5 Dust or odours from handling of materials including construction materials, sewage & waste. There will be temporary increase in SPM level during construction phase. Movement of construction equipment, for these operations as well as for transport of material, Due to vehicular emission increased level of SPM, SO 2, NO X, however, emission in the construction activities shall be low in magnitude, temporary in nature. Dust will generate during construction and handling of materials, due care will be taken. 5.6 Emissions from incineration of waste. t Applicable. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris). t Applicable. 5.8 Emissions from any other sources. ne. 6. Generation of ise and Vibration, and Emissions of Light and Heat:. 6.1 From operation of equipment e.g. engines, ventilation plant, crushers. / 6.2 From industrial or similar processes. t Applicable. Details thereof (with approximate quantities/rates, Wherever possible) with source of information data During construction noise will be generated from various equipments and construction activities. Enclosures will be provided where ever possible. PPEs to the construction workers working near source of noise will be given. 6.3 From construction or demolition. During the construction, some of the activities would temporarily enhance the ambient noise levels for short period. 6.4 From blasting or piling. t Applicable 6.5 From construction or operational traffic. During the construction or operational traffic would temporarily enhance the ambient noise levels for short period. 6.6 From lighting or cooling systems. t Applicable. 6.7 From any other sources. ne. 7

9 . 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: 7.1 From handling, storage, use or spillage of hazardous materials. 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge). 7.3 By deposition of pollutants emitted to air into the land or into water. / 7.4 From any other sources. ne. 7.5 Is there a risk of long term build-up of pollutants in the environment from these sources?. Details thereof (with approximate quantities/rates, wherever possible) with source of information data hazardous material will be used. During Construction Phase Domestic waste water shall be generated which will be treated through drainage system of SMC at nearest Sewage treatment plant. During Operational Phase Only domestic waste water shall be generated which will be suitably disposed off through drainage system of SMC. t Applicable. ne. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances. / Details thereof (with approximate quantities/rates, wherever possible) with source of information data t Applicable. 8.2 From any other causes. t Applicable. 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Project site comes under seismic zone III. The structural design will be compliant with the requirements from earthquake point of view. Chances of landslides are not there as the site falls in flat area. 8

10 . 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. 9.1 Lead to development of supporting. Facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Housing development Extractive industries Other 9.2 Lead to after-use of the site, which could have an impact on the environment. / 9.3 Set a precedent for later developments Have cumulative effects due to proximity to other existing or planned projects with similar effects. Details thereof (with approximate quantities/rates, wherever possible) with source of information data Refer Annexure II. t Applicable t Applicable 9

11 . (III) Environmental Sensitivity Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2 Areas which are important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters. ne Name/Identity Tapi river ne Aerial distance (within 15 km.) Proposed project location boundary t Applicable Tapi River is around 2.5 km in rth West Direction t Applicable Arabian Sea Around 15.0 Km in West Direction 5 State, National boundaries. ne t Applicable 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas. ne t Applicable 7 Defence installations. ne t Applicable 8 Densely populated or built-up area. Surat Project site is located within Surat City. 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities). 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals). 11 Areas already subjected to pollution or environmental damage. (Those where existing legal environmental standards are exceeded). 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions). Hospitals, Schools place of worship & community facilities ne ne history of landslides and cloud bursts Present within 15 Km radius t Applicable. t Applicable. t Applicable. 10

12 I hereby give an under taking that the data and information given in the application and enclosure are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: 14/05/2018 Place: Surat, Gujarat Gaurav Ompraksh Monga, Rajendrasinh Dilipsigh Solanki Authorized Signatory Eco Homes Developers LLP 109,110, Eco Futurz, New City Light Road, Surat , Gujarat 11

13 LIST OFANNEXURE ANNEXURE NO. TITLE 1 WATER REQUIREMENT AND ITS SOURCE II SUPPORTING INFRASTRUCTURE AND FACILITY 12

14 ANNEXURE I WATER REQUIREMENT AND ITS SOURCE During Construction Phase total water requirement shall be met through Ground. Domestic waste water shall be generated during construction phase which will be disposed off through SMC drainage. During Operational Phase total water requirement shall be met through SMC water supply. Domestic waste shall be generated during operational phase which will be treated through proposed STP and STP treated water will be used for gardening and flushing purpose. DETAILS OF WATER REQUIREMENT SR. NO. PURPOSE A. DURING CONSTRUCTION TOTAL WATER REQUIREMENT (KLD) TOTAL WASTEWATER GENERATION (KLD) 1. Domestic Construction & Sprinkling B. DURING OPERATIONAL Permanent People (68 Flats X 5 Person X 150 Lit/day/person Permanent People (202 Offices X 3 Person X 45 Lit/day/person Visitors (2360 Person X 25 Lit/day/person TOTAL (A) Gardening and other activity TOTAL (B)

15 ANNEXURE II SUPPORTING INFRASTRUCTURE & FACILITY A. INTERNAL FACILITIES: 1. Earthquake proof, R.C.C. Design 2. Basement Parking and ground floor parking 3. Building Details Basement 1 st and 2nd Parking Tower-A1 Ground Floor 27 Shops 1 st Floor 28 Shops 2 nd to 6 th Floor 147 Shops Tower-A2 Basement 1 st Parking Ground Floor Parking 1 st to 17 th Floor 34 (4BHK) Tower-A3 Basement 1 st Parking Ground Floor Parking 1 st to 17 th Floor 34 (4BHK) Total 68 (4BHK) 202 Shops 5. Granamite tiles flooring 6. Glazed tiles in flooring & dado for bath & WC. 7. Internal Plumbing & sanitation 8. Internal & Common electrification 9. Roof with water proofing 10. U.G. tank & O/H tank with Pump. B. PHYSICAL INFRASTRUCTURE FACILITIES: 1. Surround pavement (paver blocks) 2. Drainage Network 3. Water supply Network 4. RCC internal roads 5. Street lights on internal roads 6. Fire and Safety Provisions in campus and individual buildings. 14