HOWELL TOWNSHIP SCHOOLS TAUNTON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 4 TAUNTON DR HOWELL, NJ 07731

Size: px
Start display at page:

Download "HOWELL TOWNSHIP SCHOOLS TAUNTON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 4 TAUNTON DR HOWELL, NJ 07731"

Transcription

1 HOWELL TOWNSHIP SCHOOLS TAUNTON ELEMENTARY SCHOOL 4 TAUNTON DR HOWELL, NJ FACILITY ENERGY REPORT

2 TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7 III. MAJOR EQUIPMENT LIST... 9 IV. ENERGY CONSERVATION MEASURES V. ADDITIONAL RECOMMENDATIONS Appendix A ECM Cost & Savings Breakdown Appendix B New Jersey Smart Start Program Incentives Appendix C Portfolio Manager Statement of Energy Performance Appendix D Major Equipment List Appendix E Investment Grade Lighting Audit July 18, FINAL Page 1 of 50

3 I. HISTORIC ENERGY CONSUMPTION/COST The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. Electric Utility Provider: Electric Utility Rate Structure: Third Party Supplier: Natural Gas Utility Provider: Utility Rate Structure: Third Party Supplier: JCP&L General Service Secondary 3 Phase N/A NJ Natural Gas General Service Large Transportation (GSL) Hess The electric usage profile represents the actual electrical usage for the facility. The electric utilitymeasures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several non-utility generation charges. Rates used in this report reflect the historical data received for the facility. The gas usage profile within each facility report shows the actual natural gas energy usage for the facility. The gas utility measures consumption in cubic feet x 100 (CCF), and converts the quantity into Therms of energy. One Therm is equivalent to 100,000 BTUs of energy. July 18, FINAL Page 2 of 50

4 Table 1 Electricity Billing Data ELECTRIC USAGE SUMMARY Utility Provider: JCP&L Rate: General Service Secondary - 3 Phase Meter No: Account # Third Party Utility N/A TPS Meter / Acct No: N/A MONTH OF USE CONSUMPTION KWH DEMAND KW TOTAL BILL Dec-10 32, $5,081 Jan-11 46, $6,892 Feb-11 25, $4,152 Mar-11 32, $4,865 Apr-11 26, $4,021 May-11 34, $4,967 Jun-11 13, $2,205 Jul-11 20, $3,142 Aug-11 13, $1,952 Sep-11 27, $3,705 Oct-11 20, $3,085 Nov-11 30, $4,219 Totals 322, Max $48,284 AVERAGE DEMAND KW average AVERAGE RATE $0.150 $/kwh July 18, FINAL Page 3 of 50

5 Figure 1 Electricity Usage Profile Demand (kw) 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 Howell Township Schools - Taunton Elementary School Electric Usage Profile Dec-2010 through Nov-2011 Month ELECTRIC USAGE KWH DEMAND KW Usage (kwh) July 18, FINAL Page 4 of 50

6 Table 4 Natural Gas Billing Data NATURAL GAS USAGE SUMMARY Utility Provider: NJ Natural Gas Rate: General Service Large Transportation (GSL) Meter No: Account Number Third Party Utility Provider: Hess TPS Meter No: N/A CONSUMPTION MONTH OF USE TOTAL BILL (THERMS) Dec-10 10, $11, Jan-11 11, $12, Feb-11 12, $13, Mar-11 8, $9, Apr-11 5, $6, May $1, Jun $ Jul $ Aug $ Sep $ Oct $1, Nov-11 6, $6, TOTALS 57, $66, AVERAGE RATE: $1.17 $/THERM July 18, FINAL Page 5 of 50

7 Figure 2 Natural Gas Usage Profile 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Howell Township Schools - Taunton Elementary School Gas Usage Profile Dec-2010 through Nov-2011 Month Gas Usage Usage (Therms) July 18, FINAL Page 6 of 50

8 II. FACILITY DESCRIPTION The Howell Township Taunton Elementary School is located on 41 Taunton Drive in Howell, New Jersey. The Elementary School was built in 1964 with an addition in The facility has a total square footage of 89,187 SF. The Elementary School consists of classrooms, offices, gymnasium, an auditorium and cafeteria. Occupancy Profile The typical hours of operation for the Elementary School are Monday through Friday from 8:45 am to 3:15 pm for students but further occupancy occurs from 3:15 pm to 11:00 pm for cleaning. The Elementary School employs approximately 62 people, with student enrollment estimated to be around 480. Building Envelope Exterior walls for the Elementary School facility are a 4 brick. The exterior wall assembly consists of 4 inches of brick, 2 inches of cavity and 6 inches of concrete block. The amount of insulation within the walls is not known. The newest addition has gypsum wall board on the interior. The windows throughout the School are in good condition and appear to be well maintained. Typical windows throughout facility are double pane, ¼ tinted glass with aluminum frames. Some sections of the school, such as hallways and entrances, have single pane, ¼, un-insulated glass windows. The roof is a flat built up roofing system with a light stone covering. The amount of insulation below the roofing is unknown. HVAC Systems The boiler plant section consists of two (2) Weil McLain cast iron sectional boilers. The boilers are both gas-fired. Both boilers have an input raring of 4,474 MBH and output rating of approximately 3,087 MBH with an estimated efficiency of 75%. These boilers were installed approximately 20 years ago (based on model and condition), and appear to be replacements to the original building boilers. These boilers are within their ASHRAE recommended service life and are in good condition. Newer, high efficiency condensing boilers would provide superior operating efficiency over the existing boilers making these boilers candidates for replacement. Hot water is circulated throughout the building s heating hot water loop via two (2) base mounted end suction pumps. These pumps have 7-1/2 HP motors and appear to be original to the building. The motors, however, appear to be replacements. These motors are standard efficiency and are ideal candidates for replacement. The classrooms of the school are served by perimeter unit ventilator units. These units are heating and ventilation only and have hot water coils controlled by two-way valves and wall mounted thermostats. July 18, FINAL Page 7 of 50

9 The multi-purpose room is served by two (2) ceiling mounted H&V units. These units provide outside air and heating to the space. Each unit is equipped with a hot water coil and three-way control valve. The Library/Media Center is served by two (2) 10-Ton packaged rooftop, cooling only air conditioning units, manufactured by Carrier. These units were all installed in 1972 and are well past their useful service life, per ASHRAE. In addition, the EER of these units is far below what is available by today s standards. These units are all ideal candidates for replacement. Exhaust System Air is exhausted from classrooms and toilet rooms through the roof mounted exhaust fans. HVAC System Controls The HVAC systems throughout the facility, with the exception of the 1995 addition, are controlled via vintage electronic controls, manufactured by Barber Coleman. The building equipment (Unit ventilators, exhaust fans, H&V units) operational status (on/off) are controlled through a switchboard, located in the boiler room. These controls operate based on a time clock. Individual space temperature is controlled via wall mounted thermostats. The Boilers are operated based on an outside air reset controller. A three-way control valve modulates the flow of boiler water into the loop based on an outside air sensor. When the loop temperature drops below the set-point, the boiler(s) are turned on and run until the desired loop temperature is achieved. The boiler loop pumps operate continuously Domestic Hot Water Domestic hot water is provided by an A.O. Smith, storage tanky-type water heater. The water heater is rated for 365 MBH input with an overall efficiency of up to 80%. This unit is in good condition and is within the ASHRAE recommended service life. Lighting Refer to the Investment Grade Lighting Audit Appendix for a detailed list of the lighting throughout the facility and estimated operating hours per space. July 18, FINAL Page 8 of 50

10 III. MAJOR EQUIPMENT LIST The equipment list contains major energy consuming equipment that through implementation ofenergy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix. Refer to the Major Equipment List Appendix for this facility. July 18, FINAL Page 9 of 50

11 IV. ENERGY CONSERVATION MEASURES Energy Conservation Measures are developed specifically for this facility. The energy savings and calculations are highly dependent on the information received from the site survey and interviews with operations personnel. The assumptions and calculations should be reviewed by the owner to ensure accurate representation of this facility. The following ECMs were analyzed: ENERGY CONSERVATION MEASURES (ECM's) Table 1 ECM Financial Summary ECM NO. DESCRIPTION NET INSTALLATION COST A ANNUAL SAVINGS B SIMPLE PAYBACK (Yrs) SIMPLE LIFETIME ROI ECM #1 Lighting Upgrade $24,238 $4, % ECM #2 Lighting Controls Upgrade $12,630 $4, % ECM #3 Boiler Replacement $178,500 $10, % ECM #4 RTU Replacement $33,540 $2, % ECM #5 Unit Ventilators w/ Energy Recovery $403,000 $8, % ECM #6 NEMA Premium Motors $3,780 $ % ECM #7 Hot Water VFD $34,000 $1, % ECM #8 ECM #9 ECM #10 Demand Controlled Ventilation for MPR DDC System Installation / Expansion Domestic Hot Water Heater Replacement $16,000 $1, % $267,561 $11, % $10,500 $1, % ECM #11 Water Conservation $68,897 $1, % RENEWABLE ENERGY MEASURES (REM's) ECM NO. DESCRIPTION NET INSTALLATION COST ANNUAL SAVINGS SIMPLE PAYBACK (Yrs) SIMPLE LIFETIME ROI REM # Kw PV Array $1,500,704 $128, % Notes: A. Cost takes into consideration applicable NJ Smart StartTM incentives. B. Savings takes into consideration applicable maintenance savings. July 18, FINAL Page 10 of 50

12 ENERGY CONSERVATION MEASURES (ECM's) ECM NO. Table 2 ECM Energy Summary ECM #1 Lighting Upgrade ,562 - ECM #2 Lighting Controls Upgrade ,921 - ECM #3 Boiler Replacement ,517 ECM #4 RTU Replacement ,846 - ECM #5 Unit Ventilators w/ Energy Recovery - 2,845 7,103 ECM #6 NEMA Premium Motors ,741 - ECM #7 Hot Water VFD - 7,481 ECM #8 ECM #9 ECM #10 DESCRIPTION Demand Controlled Ventilation for MPR DDC System Installation / Expansion Domestic Hot Water Heater Replacement ELECTRIC DEMAND (KW) ELECTRIC CONSUMPTION (KWH) - - 1,118-32,212 5, ECM #11 Water Conservation RENEWABLE ENERGY MEASURES (REM's) ANNUAL UTILITY REDUCTION ANNUAL UTILITY REDUCTION NATURAL GAS (THERMS) ECM NO. DESCRIPTION ELECTRIC DEMAND (KW) ELECTRIC CONSUMPTION (KWH) NATURAL GAS (THERMS) REM # Kw PV Array ,255 - July 18, FINAL Page 11 of 50

13 Table 3 Facility Project Summary ENERGY SAVINGS IMPROVEMENT PROGRAM - POTENTIAL PROJECT ENERGY CONSERVATION MEASURES ANNUAL ENERGY SAVINGS ($) PROJECT COST ($) SMART START INCENTIVES CUSTOMER COST SIMPLE PAYBACK Lighting Upgrade $4,884 $24,238 $0 $24, Lighting Controls Upgrade $4,338 $14,250 $1,620 $12, Boiler Replacement $10,452 $182,500 $4,000 $178, RTU Replacement $2,077 $35,000 $1,460 $33, Unit Ventilators w/ Energy Recovery $8,737 $403,000 $0 $403, NEMA Premium Motors $268 $3,942 $162 $3, Hot Water VFD $1,122 $34,000 $0 $34, Demand Controlled Ventilation for MPR DDC System Installation / Expansion Domestic Hot Water Heater Replacement $1,308 $16,000 $0 $16, $11,535 $267,561 $0 $267, $1,071 $11,000 $500 $10, Water Conservation $1,562 $68,897 $0 $68, Design / Construction Extras (15%) $159,058 $159,058 Total Project $47,354 $1,219,446 $7,742 $1,211, Note: ECM's with the strike-through font are not included in the ESIP. Design / Construction Extras is shown as an additional cost for the facility project summary. This cost is included to estimate the costs associated with construction management fees for a larger combined project. July 18, FINAL Page 12 of 50

14 ECM #1: Lighting Upgrade General Description: The majority of the interior lighting throughout Taunton Elementary School is provided with fluorescent fixtures with older generation, 700 series 32W T8 lamps and electronic ballasts. Although 700 series T8 lamps are considered fairly efficient, further energy savings can be achieved by replacing the existing T8 lamps with new generation, 800 series 28W T8 lamps without compromising light output. CEG recommends, re-lamping all of the fixtures with 28W T8 lamps. In addition, the receiving area and a classroom area still have incandescent lamps. It is recommended to retrofit or replace all of the older fluorescent fixtures and the incandescent lights in these areas with newer fluorescent fixtures and compact fluorescent lamps. This ECM includes re-lamping of the existing fluorescent fixtures with 800 series, 28W T8 lamps. The ECM also includes retrofit of all older fluorescent fixtures with T8 or T5 fluorescent fixtures with electronic ballasts in the building. The new, energy efficient T8 fixtures will provide adequate lighting and will save on electrical costs due to better performance of the lamp and ballasts. The gymnasium is currently lit via eighteen HID, 400W, Metal Halide fixtures. The space would be better served with a more efficient, LED lighting system. CEG recommends upgrading the existing lighting to energy efficient, 93 Watt LED lamps. These lamps can be retrofitted within the existing MH fixture, reducing the overall cost of the replacement. The ECM also includes replacement of any incandescent lamps with compact fluorescent lamps. Compact fluorescent lamps (CFL s) were designed to be direct replacements for the standard incandescent lamps which are common to table lamps, spot lights, hi-hats, bathroom vanity lighting, etc. The light output of the CFL has been designed to resemble the incandescent lamp. The color rendering index (CRI) of the CFL is much higher than standard fluorescent lighting, and therefore provides a much truer light. The CFL is available in a myriad of shapes and sizes depending on the specific application. Typical replacements are: a 13-Watt CFL for a 60-Watt incandescent lamp, an 18-Watt CFL for a 75-Watt incandescent lamp, and a 26-Watt CFL for a 100-Watt incandescent lamp. The CFL is also available for a number of brightness colors that is indicated by the Kelvin rating. A 2700K CFL is the warmest color available and is closest in color to the incandescent lamp. CFL s are also available in 3000K, 3500K, and 4100K. The 4100K would be the brightest or coolest output. A CFL can be chosen to screw right into your existing fixtures, or hardwired into your existing fixtures. Where the existing fixture is controlled by a dimmer switch, the CFL bulb must be compatible with a dimmer switch. In some locations the bulb replacement will need to be tested to make sure the larger base of the CFL will fit into the existing fixture. The energy usage of an incandescent compared to a compact fluorescent approximately 3 to 4 times greater. In addition to the energy savings, compact fluorescent fixtures burn-hours are 8 to 15 times longer than incandescent fixtures ranging from 6,000 to 15,000 burn-hours compared to incandescent fixtures ranging from 750 to 1000 burnhours. However, the maintenance savings due to reduced lamp replacement is offset by the higher cost of the CFL s compared to the incandescent lamps. July 18, FINAL Page 13 of 50

15 Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the hours of operation, proposed retrofits, costs, savings, and payback periods for each set of fixtures in the each building. Currently, there are no Smart Start incentives for re-lamping of existing fixtures. Energy Savings Summary: ECM #1 - ENERGY SAVINGS SUMMARY Installation Cost ($): $24,238 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $24,238 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $4,884 Total Yearly Savings ($/Yr): $4,884 Estimated ECM Lifetime (Yr): 15 Simple Payback 5.0 Simple Lifetime ROI 202.3% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $73,260 Internal Rate of Return (IRR) 19% Net Present Value (NPV) $34, July 18, FINAL Page 14 of 50

16 ECM #2: Lighting Controls Upgrade Occupancy Sensors Description: Some of the lights in the Taunton Elementary School are left on unnecessarily. In many cases the lights are left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. This is common in rooms that are occupied for only short periods and only a few times per day. In some instances lights are left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off. Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways, document posted for public use April The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report: Occupancy Sensors for Lighting Control 20% - 28% energy savings. Savings resulting from the implementation of this ECM for energy management controls are estimated to be 20% of the total light energy controlled by occupancy sensors (The majority of the savings is expected to be after school hours when rooms are left with lights on) This ECM includes installation of ceiling or switch mount sensors for individual offices, classrooms, large bathrooms, and libraries. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls implemented in this ECM and outlines the proposed controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls. Energy Savings Calculations: Energy Savings Savings. Energy Savings % Savings Controlled Light Energy $ kwh kwh Ave Elec Cost July 18, FINAL Page 15 of 50 kwh/yr

17 Rebates and Incentives: From the NJ Smart Start Program Incentives Appendix, the installation of a lighting control device warrants the following incentive: Smart Start Incentive # Wall mount sensors $20 per sensor # Ceiling mount sensors $35 per sensor Energy Savings Summary: ECM #2 - ENERGY SAVINGS SUMMARY Installation Cost ($): $14,250 NJ Smart Start Equipment Incentive ($): $1,620 Net Installation Cost ($): $12,630 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $4,338 Total Yearly Savings ($/Yr): $4,338 Estimated ECM Lifetime (Yr): 15 Simple Payback 2.9 Simple Lifetime ROI 415.2% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $65,070 Internal Rate of Return (IRR) 34% Net Present Value (NPV) $39, July 18, FINAL Page 16 of 50

18 ECM #3: Boiler Systems Upgrade Condensing Boilers Description: Space heating for Taunton Elementary School is provided by heating hot water loop. The source of hot water for this equipment is two cast iron sectional hot water boilers located in the boiler room. The output capacity of each boiler is 3,087 MBH. The boilers were installed approximately 25 years ago, which brings them close to their ASHRAE service life. The units are in fair condition; however it is recommended that they be replaced with newer high efficiency units. This ECM provides insight into the energy efficiency benefit of condensing boiler technology compared to standard cast iron boilers. Standard (non-condensing) boilers provide lower than nominal efficiency compared to condensing boilers. Standard boilers suffer further efficiency losses at part load operating conditions mainly due to limitations in the reduction of the flue gas temperature. Current average combustion efficiency of each boiler is estimated to be 70% due to standard non-condensing boiler technology, limited turn down ratio, cycling losses and outdated design and controls. A new condensing boiler could substantially improve the operating efficiency of the heating system of the building. Condensing boiler s peak efficiency tops out at 99% depending on return water temperature. This ECM is based on the replacement of one of the existing hot water boilers with two (2) Aerco Benchmark 2.0 modular condensing boilers. This would allow the remaining boiler to act as a backup. Since the boilers currently installed operate as primary and standby, installing two boilers that would run at part load would result in less runtime at full load, compared to the existing boilers. The annual average operating efficiency of the proposed boiler set is expected to be 90%, which gives the heating system a 20% increase in efficiency. This ECM is based on variable supply water temperature adjusted based on outdoor temperature. The owner is recommended to retain a professional engineer to confirm equipment sizing and finalize design. BOILER REPLACEMENT SUMMARY EXISTING UNIT LOCATION PROPOSED UNITS (1) Cast Iron Sectional Boiler Boiler Room (2) Aerco Benchmark 2.0 July 18, FINAL Page 17 of 50

19 First, domestic hot water usage is estimated and subtracted from the total usage in order to estimate the net natural gas usage for space heating. Current total hot water usage can be found in the table below: TOTAL USAGE THERMS ANNUAL GAS USAGE DOMESTIC HW USAGE MONTH Dec-10 14,509 3,390 8,339 $9,340 Jan-11 19,140 3,390 11,813 $13,230 Feb-11 14,063 3,390 8,005 $8,965 Mar-11 12,433 3,390 6,783 $7,597 Apr-11 8,546 3,390 3,867 $4,331 May-11 3,563 3, $194 Jun-11 3,322 3,322 0 $0 Jul-11 3,550 3,550 0 $0 Aug-11 3,113 3,113 0 $0 Sep-11 3,401 3, $12 Oct-11 6,285 3,390 2,895 $3,243 Nov-11 8,832 3,390 5,442 $6,096 TOTAL 100,758 40,495 47,328 $53,008 Estimated Gas Used Heating Nat. Gas Therm Heating Eff % Fuel Heat Value BTU Therm Bldg. Heat Required BTU Proposed Heating Gas Usage New Heating Eff % Fuel Heat Value $ Energy Cost Heating Gas Usage Therms Ave Fuel Cost Therm Energy savings calculations are summarized in the table below: HEATING ONLY COST July 18, FINAL Page 18 of 50

20 CONDENSING BOILER CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS (1) Existing Hot (2) New ECM INPUTS - Water Boiler Condensing Boilers Boiler Input Capacity (MBH) 4,258 4,000 - Boiler Output Capacity (MBH) 2,930 3,733 - Existing Nat Gas (Therms) 47, Boiler Efficiency (%) 70% 90% 20% Nat Gas Heat Value (BTU/Therm) 100, ,000 - Building Heating Energy Usage (MMBTUs) 3,313 3,313 - Ave. Gas Cost ($/Therm) ECM RESULTS EXISTING PROPOSED SAVINGS Natural Gas Usage (Therms) 47,328 36,811 10,517 Energy Cost ($) $53,008 $41,228 $11,779 COMMENTS: ENERGY SAVINGS CALCULATIONS Project Cost, Incentives and Maintenance Savings Estimated cost for removing the existing boilers and installing (2) Aerco Benchmark 2.0 condensing boilers plus labor is estimated to be $182,500. From the New Jersey Smart Start Program Incentives Appendix, installation of a high efficiency hot water boiler falls under the category Gas Heating and warrants an incentive based on efficiency at or above 84% for this type of equipment. The program incentives are calculated as follows: July 18, FINAL Page 19 of 50

21 UNIT DESCRIPTION 300 MBH MBH > MBH > 4000 MBH GAS FIRED BOILER REBATE SUMMARY UNIT EFFICIENCY REBATE $/MBH PROPOSED CAPACITY, NUMBER OF UNITS TOTAL REBATE, $ 84% AFUE for Hot Water boilers $ $0 84% AFUE for Hot Water boilers $1 2,000 2 $4,000 84% AFUE for Hot Water boilers $1 0 0 $0 TOTAL $4,000 Maintenance savings associated with this ECM is estimated to be minimal. Energy Savings Summary: ECM #3 - ENERGY SAVINGS SUMMARY Installation Cost ($): $182,500 NJ Smart Start Equipment Incentive ($): $4,000 Net Installation Cost ($): $178,500 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $10,452 Total Yearly Savings ($/Yr): $10,452 Estimated ECM Lifetime (Yr): 15 Simple Payback 17.1 Simple Lifetime ROI -12.2% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $156,780 Internal Rate of Return (IRR) -2% Net Present Value (NPV) ($53,724.70) July 18, FINAL Page 20 of 50

22 ECM #4: RTU Upgrades Description: The Media Center of Taunton Elementary School is air conditioned by two (2) packaged rooftop units. These units are in poor condition and have far surpassed their useful ASHRAE service life. The units currently installed are much less efficient compared to modern equipment and can be replaced with new high efficiency units. New air conditioners provide higher full load and part load efficiencies due to advances in inverter motor technologies, heat exchangers and refrigerants. This ECM includes one-for-one replacement of the older air conditioning units with new higher efficiency systems. It is recommended to fully evaluate the capacity needed for all new systems prior to moving forward with this ECM. A summary of the unit replacements for this ECM can be found in the table below: IMPLEMENTATION SUMMARY ECM INPUTS UNIT TAG COOLING TOTAL NUMBER CAPACITY, CAPACITY, OF UNITS BTU/HR TONS REPLACE UNIT WITH RTU RTU , Carrier Weathermaster RTU RTU , Carrier Weathermaster Total 2 240, Some unit sizes are estimated. See Major Equipoment List Appendix. The manufacturers used as the basis for this calculation is Carrier. All units are one for one style replacements with matching capacity of the new units to the old units. The unit pricing and install cost were estimated based on current rates. The payback may change based on actual unit pricing and install costs if the ECM is implemented. Energy Savings Calculations: July 18, FINAL Page 21 of 50

23 Cooling Energy Savings: Seasonal energy consumption of the air conditioners at the cooling mode is calculated with the equation below: Energy Savings, kwh Cooling Capacity, BTU Hr 1 1 Operation Hours SEER SEER 1000 Demand Savings, kw Energy Savings kwh Hours of Cooling Cooling Cost Savings Energy Savings, kwh Cost of Electricity $ kwh ECM INPUTS COOLING CAPACITY, BTU/Hr ENERGY SAVINGS CALCULATIONS NEW EXISTING UNITS UNITS (S)EER (S)EER ANNUAL COOLING HOURS # OF UNITS ENERGY SAVINGS kwh DEMAND SAVINGS kw RTU 120,000 1,200 8 EER 13 EER 1 6, RTU 120,000 1,200 8 EER 13 EER 1 6, Total 2 13, Project Cost, Incentives and Maintenance Savings July 18, FINAL Page 22 of 50

24 From the NJ Smart Start Program appendix, the replacement of split system AC units and unitary systems with high efficiency AC systems falls under the category Unitary HVAC Split System and warrants an incentive based on efficiency (EER/SEER). The program incentives are calculated as follows: Smart Start Incentive CoolingTons $/TonIncentive UNIT DESCRIPTION AC UNITS REBATE SUMMARY UNIT EFFICIENCY REBATE $/TON PROPOSED CAPACITY TONS TOTAL REBATE $ 20 to 30 tons 10.5 EER $79 0 $ to < 20 tons 11.5 EER $79 0 $0 5.4 to < tons 11.5 EER $73 20 $1, tons or less Unitary AC and 14 SEER $ $0 Split System TOTAL 20 $1,460 July 18, FINAL Page 23 of 50

25 Summary of cost, savings and payback for this ECM is below. ECM INPUTS UNIT COST # OF UNITS COST & SAVINGS SUMMARY TOTAL COST REBATES NET COST ENERGY SAVING PAY BACK YEARS RTU $17,500 1 $17,500 $730 $16,770 $1, RTU $17,500 1 $17,500 $730 $16,770 $1, Total $35,000 $2 $35,000 $1,460 $33,540 $2, There is no significant maintenance savings due to implementation of this ECM. Energy Savings Summary: ECM #4 - ENERGY SAVINGS SUMMARY Installation Cost ($): $35,000 NJ Smart Start Equipment Incentive ($): $1,460 Net Installation Cost ($): $33,540 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $2,077 Total Yearly Savings ($/Yr): $2,077 Estimated ECM Lifetime (Yr): 15 Simple Payback 16.1 Simple Lifetime ROI -7.1% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $31,155 Internal Rate of Return (IRR) -1% Net Present Value (NPV) ($8,744.91) July 18, FINAL Page 24 of 50

26 ECM #5: Install Unit Ventilators with Energy Recovery Description: The heating and air conditioning for the classrooms in Taunton Elementary School are provided by vintage Nesbitt unit ventilators, which are original to the building. Some of the units have had control upgrades/replacements; however, they are over 30 years old and far beyond the end of expected useful service life, which is fifteen (15) years per ASHRAE. The estimated total number of unit ventilators in the school is 33. The units are heating only and controlled with electronic controllers and actuators. It is recommended to replace older unit ventilators with modern unit ventilators with energy recovery wheels. The advantage of this setup is the utilization of the energy recovery system to recover the energy in the exhaust air in order to reduce the heating and cooling demand of the classrooms. This ECM replaces existing 33 older unit ventilators with new unit ventilators with hot water heating coils and built-in energy recovery wheels. The basis for this ECM is Trane HUVC series unit ventilator with corresponding Energy Recovery ventilators. The ECM also includes attaching the unit ventilator controls to the Building Energy Management System (ECM#9) to achieve superior scheduling and controls. Energy Savings Calculations: The energy savings calculations are based reduction of the outside air heating, reduction of the overheating and infiltration due to opening of the windows and temperature setback during nights and weekends. Nominal recovery capacity of the proposed unit is calculated based on typical outside air percentage, heating degree days and design day temperature difference. Total energy recovery of each unit at heating modes is calculated using heating degree days: Therms Heating Energy Recovered Yr Unit Recovery Rate 65 Btu Hr. HDD Btu Therms Hr. Day Day F # 0.60 F Fuel Heat Value Heating Efficiency % Amount of addition infiltration at each classroom due to open windows: July 18, FINAL Page 25 of 50

27 Infiltration Ave ClassroomSize (SF) 10' Ceiling BTU / Hr F 60 Minutes Hr # Air Changes Hr Therms Infiltration Energy Yr Unit 65 Btu Infiltration HDD Day Hr. Btu Therms Hr. Day F# 0.60 F Fuel Heat Value Heating Efficiency % Fan Energy Cost: 0.746kW Fan Power (HP) 0.8 (Load Factor) Annual Hrs Fan Energy, kwh HP 0.9 (Power Factor) Results of the calculations can be found in the table below: July 18, FINAL Page 26 of 50

28 UNIT VENTILATOR CALCULATIONS ECM INPUTS EXISTING PROPOSED UNITS UNITS SAVINGS ECM INPUTS Existing Unit New UVs with Ventilators UVs ERVs Number of Units Ave. Unit Flow Capacity (CFM) Outside Air % 30% 30% Outside Air Flow (CFM) Heating Design Day Temp. Diff ( F) Average Classroom Size (SF) Additional Air Changes per Hour* 2 0 Infiltration (CFM) Windows Open Hours/Day 4 0 Infiltration Energy Loss (MBH/Unit) Heating Energy Recovery, MBH/Unit ERV Operation Hours / Day Supply Fan Motor HP 1/3 1/4 0 Fan Annual Hours of Operation Heating Degree Days Net Heating System Efficiency (Exist.) 70% 70% - Electric Cost ($/KWH) $0.150 $ Natural Gas Cost ($/Therm) $1.17 $1.17 $1.17 ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED UNITS SAVINGS Fan Energy (kwh) 11,379 8,534 2,845 Heating Energy Infiltration (Therms) 1, ,920 Heating Energy Recovery (Therms) 0-5,183 5,183 Fan Energy Cost ($) $1,707 $1,280 $427 Infiltration Energy Cost ($) $2,246 $0 $2,246 Heating Energy Recovered ($) $0 -$6,064 $6,064 Total ($) $3,953 -$4,784 $8,737 COMMENTS: * Due to open windows and overheating Project cost, incentives and maintenance savings: Total installed cost for 33 unit ventilators with hot water coils, energy recovery ventilators (ERV) and controls upgrade is $403,000. The selected equipment does not qualify for any of the NJ Smart Start rebates. July 18, FINAL Page 27 of 50

29 There is no significant maintenance savings associated to this ECM. Energy Savings Summary: ECM #5 - ENERGY SAVINGS SUMMARY Installation Cost ($): $403,000 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $403,000 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $8,737 Total Yearly Savings ($/Yr): $8,737 Estimated ECM Lifetime (Yr): 15 Simple Payback 46.1 Simple Lifetime ROI -67.5% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $131,055 Internal Rate of Return (IRR) -12% Net Present Value (NPV) ($298,698.26) July 18, FINAL Page 28 of 50

30 ECM #6: Install NEMA Premium Efficiency Motors Description: The improved efficiency of the NEMA Premium efficient motors is primarily due to better designs with use of better materials to reduce losses. Surprisingly, the electricity used to power a motor represents 95% of its total lifetime operating cost. Due to the fact that many motors operate continuously 24 hours a day, even small increases in efficiency can yield substantial energy and dollar savings. The school has two (2) motors that are candidates to be replaced with a NEMA Premium efficiency motors. The motors are located in the boiler room which serves the hot water loop and zone loops. Boiler operating hours were estimated based on hours of operation obtained from the school. The pumps operate in parallel, which means these pumps operate simultaneously. This energy conservation measure replaces the existing lower efficiency electric motor with a NEMA Premium efficiency motor. NEMA Premium is the most efficient motor designation in the marketplace today. The energy savings and payback are subject to change based on the pool filtration usage during the year. An implementation summary of the motor is provided below. EQMT ID FUNCTION IMPLEMENTATION SUMMARY MOTOR HP HOURS OF OPERATION EXISTING EFFICIENCY NEMA PREMIUM EFFICIENCY P-1 Hot Water Loop 7.5 2, % 91.7% P-2 Hot Water Loop 7.5 2, % 91.7% Energy Savings Calculations: Electric usage, kwh HP LF Hours of Operation Motor Efficiency where, HP Motor Nameplate Horsepower Rating LF Load Factor Motor Efficiency Motor Nameplate Efficiency Electric Usage Savings, kwh Electric Usage Electric Usage July 18, FINAL Page 29 of 50

31 Electric cost savings Electric Usage Savings Electric Rate $ kwh The calculations were carried out and the results are tabulated in the table below: EQMT ID MOTOR HP PREMIUM EFFICIENCY MOTOR CALCULATIONS NEMA POWER LOAD EXISTING PREMIUM SAVINGS FACTOR EFFICIENCY EFFICIENCY kw ENERGY SAVINGS kwh COST SAVINGS P % 85.0% 91.7% $134 P % 85.0% 91.7% $134 TOTAL 0.9 1,740.7 $268.1 Equipment Cost and Incentives Below is a summary of SmartStart Building incentives for premium efficiency motors: INCENTIVES NJ SMART HORSE POWER START INCENTIVE 1 $ $45 2 $54 3 $54 5 $ $81 10 $90 15 $ $ $ $ $162 The following table outlines the summary of motor replacement costs and incentives: July 18, FINAL Page 30 of 50

32 EQMT ID MOTOR POWER HP MOTOR REPLACEMENT SUMMARY SMART INSTALLED TOTAL START NET COST COST SAVINGS INCENTIVE SIMPLE PAYBACK P $1,971 $81 $1,890 $ P $1,971 $81 $1,890 $ TOTAL $3,942 $162 $3,780 $ Energy Savings Summary: ECM #6 - ENERGY SAVINGS SUMMARY Installation Cost ($): $3,942 NJ Smart Start Equipment Incentive ($): $162 Net Installation Cost ($): $3,780 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $268 Total Yearly Savings ($/Yr): $268 Estimated ECM Lifetime (Yr): 15 Simple Payback 14.1 Simple Lifetime ROI 6.3% Simple Lifetime Maintenance Savings 0 Simple Lifetime Savings $4,020 Internal Rate of Return (IRR) 1% Net Present Value (NPV) ($580.63) July 18, FINAL Page 31 of 50

33 ECM #7: Install HW Pump VFD s Description: The heating and ventilation units and the unit ventilators throughout the school are utilizing a constant volume pumping design. 2-way control valves provide flow through the heat exchanger equipment only when there is a call for heating or cooling, unlike 3-way control valves that allow constant flow of the water loop. 3-way control valves require full pumping energy continuously, while 2-way control valves allow the system to reduce flow when it is not needed. This measure includes capping off the bypass port on the 3-way control valves which effectively turns the valves into 2-way control valves. When the unit is not calling for heating, the control valve closes reducing overall flow of the system. Variable frequency drives allow the pumps to slow down in response to a reduction in overall system flow. The reduction in operating flow allows the pumps to reduce energy consumption for all hours that the heating system is not at its peak load. This ECM includes the installation of Variable Frequency Drives on the three (3) existing pumps within the boiler room. To control flow through the system, this ECM includes piping modifications at the H&V units, and unit ventilators to cap off the bypass port on the 3-way control valves. The VFD s would be controlled by a differential pressure sensor in the water loop to measure demand for water (typical for each of the three pump sets). The furthest unit from the loop pumps would remain as 3-way control valves (constant flow) to eliminate dead heading potential. This ECM also includes replacement of the existing pump motors with inverter duty motors that meet NEMA Premium Efficiency Standard, which also helps to reduce energy consumption. CEG recommends that this ECM be implemented in conjunction with ECM#6, replacement of the existing hot water pump motors with inverter duty motors that meet NEMA Premium Efficiency Standard. Implementation of both measures will further reduce energy consumption. Energy and cost savings calculations are based on calculation software PumpSave v4.2, provided by ABB. The PumpSave calculation software is used to estimate the pumping energy for variable speed pump systems. The boiler water loop pumps operate approximately 4,320 Hrs per year since this system is used for about 6 month s total. The pump flow, HD, and resultant energy are calculated based on the existing pump horse power installed. The calculation is based on all existing equipment to be modified to operate as 2-way control valves. Where control valves are already 2-way style, these control valves shall remain. The exact quantity of equipment with hot water coils is unknown. The operation of all equipment control valves should be verified before implementing this ECM. Energy Savings Calculations: Cons. Volume Power Specific Gravity Flow Rate HP 3960 Pump Efficiency Gal min Head % Motor Efficiency % Ft July 18, FINAL Page 32 of 50

34 Energy Cons. KW HP kwh Power HP Operation Hrs. Energy Cost Energy Usage $ kwh kwh Ave Electric Cost Boiler Room P-1&2 (same size and efficiency) Hot Water VFD Pumping Energy: July 18, FINAL Page 33 of 50

35 BOILER ROOM P-1 HOT WATER PUMP VFD CALULATION ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS CV Pumps VFD Pumps Flow Control CV VFD - Total Flow* (GPM) Head* (Ft) Pump Efficiency (%) 80% 80% - Ave. Motor Efficiency (%) 85.0% 85.0% 0.0% Operating Hrs Estimated Total Horse Power Elec Cost ($/kwh) ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Electric Energy (kwh) 6,926 3,185 3,740 Electric Energy Cost ($) $1,039 $478 $561 COMMENTS: - VFD pump energy is based on ABB energy savings calculator for pumps, "Pump Save," version 4.2. Flow rate for VFD Pump calculation is summarized in the operating profile shown in the Pump Save output. - Hot water flow & head estimated based on pump horse power. July 18, FINAL Page 34 of 50

36 BOILER ROOM P-2 HOT WATER PUMP VFD CALULATION ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS CV Pumps VFD Pumps Flow Control CV VFD - Total Flow* (GPM) Head* (Ft) Pump Efficiency (%) 80% 80% - Ave. Motor Efficiency (%) 85.0% 88.5% 3.5% Operating Hrs Estimated Total Horse Power Elec Cost ($/kwh) ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Electric Energy (kwh) 6,926 3,185 3,740 Electric Energy Cost ($) $1,039 $478 $561 COMMENTS: - VFD pump energy is based on ABB energy savings calculator for pumps, "Pump Save," version 4.2. Flow rate for VFD Pump calculation is summarized in the operating profile shown in the Pump Save output. - Hot water flow & head estimated based on pump horse power. Installation cost for two (2) VFDs, piping work, re-balancing, capping of 3-way valves and controls is estimated to be $34,000. Currently there are no NJ Smart Start Program Incentives for installation of hot water pump Variable Frequency Drives. July 18, FINAL Page 35 of 50

37 Energy Savings Summary: ECM #7 - ENERGY SAVINGS SUMMARY Installation Cost ($): $34,000 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $34,000 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $1,122 Total Yearly Savings ($/Yr): $1,122 Estimated ECM Lifetime (Yr): 15 Simple Payback 30.3 Simple Lifetime ROI -50.5% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $16,830 Internal Rate of Return (IRR) -8% Net Present Value (NPV) ($20,605.64) July 18, FINAL Page 36 of 50

38 ECM #8: Demand Controlled Ventilation Multipurpose Room Demand Controlled Ventilation (DCV) is a means to provide active, zone level control of ventilation for spaces within a facility. The basic premise behind DCV is monitoring indoor CO2 levels versus outdoor CO2 levels in order to provide proper ventilation to the spaces within the facility as well as saving costly dollars treating unconditioned ventilation air. Carbon dioxide ventilation control or demand controlled ventilation (DCV) allows for the measurement and control of outside air ventilation levels to a target cfm/person ventilation rate in the space (i.e., 15 cfm/person) based on the number of people in the space. It is a direct measure of ventilation effectiveness and is a method whereby buildings can regain active and automatic zone level ventilation control, without having to open windows. The fixed ventilation approach depends on a set-it-and-forget-it methodology that is completely unresponsive to changes in the way spaces are utilized/occupied or how equipment is maintained. A DCV system utilizes various control algorithms to maintain a base ventilation rate. The system monitors space CO2 levels and the algorithm automatically adjusts the outdoor and return air dampers to provide the quantity of outdoor air to maintain the required CO2 level in the space. System designs are normally designed for maximum occupancy and the ventilation rates are designed for this (maximum) occupancy. In areas where occupancy swings are prevalent there is ample opportunity to reduce outdoor air quantity to satisfy the needs of the actual number of occupants present. By installing the DCV controls, energy savings are realized by the reduced quantities of outdoor air that do not require heating and cooling energy from the steam and chilled water plants. There are two (2) heating and ventilation units that serve the Multipurpose Room. When operating, this unit provides minimum amount of outside air to the space. The outside air volume is typically based on the maximum occupancy of the space conditioned. When a given space is not fully occupied the outside air quantity delivered to the space is greater than the amount needed for adequate ventilation. This ECM includes the installation of CO 2 sensors integrated into a demand control ventilation system, for the unit mentioned above. This system allows the air handling unit to respond to changes in occupancy and therefore reduce the amount of outside air that has to be conditioned. Outside air accounts for a large portion of the energy consumption in the HVAC system, especially in high occupancy spaces. The components required for the demand control ventilation system installation include damper actuators, Variable Frequency Drives, CO2 sensors, wiring, Energy Management System equipment expansion and programming. Each occupied zone would require minimum one CO 2 sensor installed to monitor occupancy levels. Often heating and air conditioning units switch to occupied mode several hours before the actual occupancy in order to provide pre-heating or pre-cooling of the space. Energy savings achieved through Demand Control Ventilation is calculated based on actual occupancy of the spaces and the hours the units are in occupied mode. Energy Savings Calculations: July 18, FINAL Page 37 of 50

39 Following table summarizes the estimated occupancy characteristics of the spaces and the HVAC equipment at this school. ENERGY SAVINGS ECM INPUTS DCV Average Full Occupancy Hours 10:00 AM - 1:00 PM Full Occupancy Hours per Day 3 HVAC Eqp. On Occupied Mode 7:00 AM - 4:00 PM Occupied Hours per day 9 HVAC occupied / spaces not occupied 6 Est. Conditioned outside air savings 67% Following is a list of HVAC equipment and corresponding spaces identified for Demand Controlled Ventilation. INPUTS DCV-1 Service Multi-Purpose Room # of CO2 SENSORS IMPLEMENTATION SUMMARY HVAC Total Cooling Unit Type Capaity, Tons Total Heating Capaity, Mbh Outside Air Cooling, Outside Air Heating, 2 HV Total Assumptions: 400 CFM/Ton, 40% average fresh air, 65 F design day ΔT Total heating capacity estimated based on each unit with6,000 CFM flow capacity. Max outside air heating capacity = 1.08 x Fresh Air CFM x design day ΔT Heating Energy Therms Btu Outside Air Heating Capacity HDD Day Hr. Btu 65 Therms Hr. Day F F Fuel Heat Value Heating Efficiency % Heating Cost Heating Energy $ Therms Therms Ave Fuel Cost July 18, FINAL Page 38 of 50

40 DEMAND CONTROLLED VENTILATION ECM INPUTS DCV Equipment Multi Purpose Room HV-1&2 OA Heating Capacity, MBh (Est) 337 Net Heating Efficiency (Exis. Boilers) 70% Heating Degree Days (65 F) 4193 Occupied Hours per day 9 Heating Energy Saving 67% A/C Energy Savings 67% Elec Cost ($/kwh) $0.150 Natural Gas Cost ($/Therm) $1.17 Cost and Incentives: ECM RESULTS ENERGY SAVINGS DCV Heating Energy (Therms) 1,677 Heating Energy Savings (Therms) 1,118 Total Gas Cost Savings ($) $1,308 Total Cost Savings ($) $1,308 COMMENTS: HDD estimated based on McGwire AFB, NJ OA: Outside Air Estimated installed cost for demand controlled ventilation for the Multipurpose Room is $16,000. Estimated cost includes CO2 sensors, control wiring, VFD s for supply fans, electrical wiring, controls. There are currently no Smart Start incentives available for a Demand Control Ventilation System. July 18, FINAL Page 39 of 50

41 Energy Savings Summary: ECM #8 - ENERGY SAVINGS SUMMARY Installation Cost ($): $16,000 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $16,000 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $1,308 Total Yearly Savings ($/Yr): $1,308 Estimated ECM Lifetime (Yr): 15 Simple Payback 12.2 Simple Lifetime ROI 22.6% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $19,620 Internal Rate of Return (IRR) 3% Net Present Value (NPV) ($385.18) July 18, FINAL Page 40 of 50

42 ECM #9: DDC Controls Upgrade Description: Taunton Elementary School is currently controlled primarily through the use of vintage electronic control systems. CEG recommends installing a central DDC system to control the HVAC systems in the school including the air handling units, unit ventilators, wall thermostats, air conditioning units, rooftop units, boilers and pumps and incorporate the existing rooftop unit control system. The addition of DDC control systems will allow easier and remote operation for building facility management personnel. This ECM includes installation of a Building Automation system to include control of the majority of the HVAC equipment in the facility. The system will include new temperature sensors and new local thermostats with limited over-ride capability, a front end computer and main controller. The system will also include central controls for lighting. With the communication between the control devices and the front end computer interface, the facility manager will be able to take advantage of scheduling for occupied and unoccupied periods based on the actual occupancy of each space in the facility. Due to the fact that the building may have diverse hours of occupancy, including evening and weekend activities, having supervisory control over all of the equipment makes sense. The DDC system will also aid in the response time to service / maintenance issues when the facility is not under normal maintenance supervision, i.e. after-hours. The new DDC system has the potential to provide significant savings by controlling the HVAC systems as a whole and provide operating schedules and features such as space averaging, night set-back, temperature override control, etc. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways, document posted for public use April The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the referenced report: Energy Management and Control System Savings: 5%-15%. Savings resulting from the implementation of this ECM for energy management controls are estimated to be 10% of the electricity and 10% for the gas utility in this building. The basis for the DDC system expansion is the Automated Logic Energy Management System or similar. Energy Savings Calculations: Since some of the key utility consumption and cost information was not available, estimated values are used for the unit cost of natural gas, total electricity usage and unit cost of electricity. July 18, FINAL Page 41 of 50

43 Energy savings for each utility is calculated with the equation below. Energy Savings Utility Current Energy Consumption Estimated Savings, % Following table summarizes energy savings for this facility via implementation of an Energy Management System: DDC ENERGY MANAGEMENT SYSYEM CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS Existing Controls w/ Local Thermostats DDC Controls Existing Nat Gas Usage (Therms) 57,293 - Existing Electricity Usage (kwh) 322,120 - Energy Savings, Nat. Gas - 10% Energy Savings, Electricity - 10% Gas Cost ($/Therm) $1.17 $1.17 Electricity Cost ($/kwh) $0.150 $0.150 ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Natural Gas Usage (Therms) 57,293 51,564 5,729 Electricity Usage (kwh) 322, ,908 32,212 Natural Gas Cost ($) $67,033 $60,330 $6,703 Electricity Cost ($) $48,318 $43,486 $4,832 Energy Cost ($) $115,351 $103,816 $11,535 COMMENTS: Demand savings due to implementation of this ECM is minimal. July 18, FINAL Page 42 of 50

44 The cost of a full DDC system with new field devices, controllers, computer, software, programming, etc. is approximately $3.00 per SF in accordance with recent Contractor pricing for systems of this magnitude. Savings from the implementation of this ECM will be from the reduced energy consumption currently used by the HVAC system by proper control of schedule and temperatures via the DDC system. Cost of complete DDC System = ($3.00/SF x 89,187) = $267,561 Currently, there are no prequalified NJ SmartSmart Incentives for installation of the DDC system. Energy Savings Summary: ECM #9 - ENERGY SAVINGS SUMMARY Installation Cost ($): $267,561 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $267,561 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $11,535 Total Yearly Savings ($/Yr): $11,535 Estimated ECM Lifetime (Yr): 15 Simple Payback 23.2 Simple Lifetime ROI -35.3% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $173,025 Internal Rate of Return (IRR) -5% Net Present Value (NPV) ($129,856.92) July 18, FINAL Page 43 of 50

45 ECM #10: High Efficiency Gas Fired Hot Water Heaters Description: Taunton Elementary School has an existing gas-fired hot water heater. This hot water heater is an AO Smith 85 Gallon tank type heater with a 365 MBH input. This heater is within its useful service life; however it can still be replaced with a newer, much more efficient hot water heater. This ECM will replace the existing heater and install a new, high efficiency condensing style hot water heater. Basis for the replacement is as follows. It is recommended to retain a plumbing professional to confirm equipment sizing before pursuing with this ECM. HOT WATER HEATER REPLACEMENT EXISTING PROPOSED One (1) A.O Smith 365 MBH Input One (1) 100 Gallon - 250,000 BTU AO Smith Cyclone Xi BTH-250A Energy Savings Calculations: Calculations are estimated base on Domestic Hot Water Energy Usage for Educational buildings is 5.2 kbtu / SF / year. kbtu yr DHW Heat Usage Energy Density Building Square Footage (SF) SF DHW Total Usage Heating Eff. Dom HW Heat Cons. Btu % Fuel Heat Value FuelUnit BTU Energy Cost Heating Fuel Usage FuelUnits Ave Fuel Cost FuelUnit $ July 18, FINAL Page 44 of 50

46 CONDENSING DOM. HOT WATER HEATER CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS Existing Hot Water AO Smith High ECM INPUTS Heater Efficiency Building Type Education Education Building Square-foot 89,187 89,187 Domestic Water Usage, kbtu 463, ,772 DHW Heating Fuel Type Gas Gas Ave. Heating Efficiency 80% 95% 15% Total Usage (kbtu) 579, ,181 91,534 Nat Gas Cost ($/Therm) $1.17 $1.17 ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Natural Gas Usage (Therms) 5,797 4, Energy Cost ($) $6,783 $5,712 $1,071 COMMENTS: Savings are based on Energy Information Administration Commercial Building Energy Consumption Survey 2003 Information Cost, Rebates and Incentives: The total installed cost for the replacement of gas fired hot water heater with gas piping is estimated to be $11,000. From the NJ Smart Start Program appendix, the hot water heater installation falls under the category Gas Water Heating and warrants an incentive as follows: NJ Smart Start Incentives: $2/MBH x Unit Capacity, MBH (Water Heaters > 50 Gallons, up to 300 MBH) 250 MBH x $2/MBH = $500 July 18, FINAL Page 45 of 50

47 Energy Savings Summary: ECM #10 - ENERGY SAVINGS SUMMARY Installation Cost ($): $11,000 NJ Smart Start Equipment Incentive ($): $500 Net Installation Cost ($): $10,500 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $1,071 Total Yearly Savings ($/Yr): $1,071 Estimated ECM Lifetime (Yr): 15 Simple Payback 9.8 Simple Lifetime ROI 53.0% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $16,065 Internal Rate of Return (IRR) 6% Net Present Value (NPV) $2, July 18, FINAL Page 46 of 50

48 ECM #11: Water Efficiency & Conservation Description: The school utilizes standard plumbing fixtures. The typical water closet and urinal water consumption only meet the minimum federally required standard for water efficiency. New fixtures are available that use less water than today s requirements and can add up to significant water reduction over a long period. This ECM includes the replacement of the existing sink faucets, water closets and urinals within the bathrooms the facility. The estimated usage of the plumbing fixtures is based on the total population of the facility. The proposed retrofit includes installation of auto flow sink faucets, low flow aerators, low flow flushometer style water closets that utilize 1.28 gallons per flush and ultra-low flushometer style urinals that utilize 1/8 gallons per flush. For the basis of this calculation the LEED rating system was used to estimate the occupancy usage for students within the school. When water consumption information was not available, the GPF values were estimated for the existing fixtures. Energy Savings Calculations: Urinals and Toilets: Water Consumption Faucets: Water Consumption Days Occupancy Yr Days Occupancy Yr Use Use Flush Person per Use Person per Fixture Day Use Time Day Gal Flush Sec Use Fixture Gal Min Water Cost Water Consumption Gallons Ave Cost 1000 Gal $ 1000 Gal Gas Cost (Therms) 8.34 BTU Faucet Water Consumption (Gallons) Gal Therm 100,000 BTU July 18, FINAL Page 47 of 50

49 WATER CONSERVATION CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS Existing Fixtures Low Flow / Auto Flow Fixtures - Total Number of Students % Male to Female 50% 50% - Estimated % Floor Area Served by Older Bathrooms 100% 100% - Occupied Days Per Year Lavatory Uses per Day per Person Sink flow time per use, sec Sink Aerator Flow, GPM WC Uses per Day per Person Urinal Uses per Day per Person Total Urinal Flushes Per Day Total WC Flushes Per Day Urinal Gallons Per Flush (GPF) WC Gallons Per Flush (GPF) ** Water Cost ($/1000 Gal) $8.00 $ Gas Cost ($/Therm) $1.17 $ ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Water Consumption, Urinal and WC (Gal) 196, ,658 70,902 Water Consumption, Faucets (Gal) 105,300 28,080 77,220 Total Water Consumption, (Gal) 301, , ,122 Water Cost ($) $2,415 $1,230 $1,185 Gas Consumption (Therms) Gas Cost ($/Year) $514 $137 $377 Total Savings ($/Year) - - $1,562 COMMENTS: *Savings are based on LEED Reference Guide for Green Building Design and Construction Edition for WC and Urinal water usage. ** Cost of Water estimated. The cost for installation and materials of water closets, low flow urinals and new auto flow sink faucets throughout the facility is estimated to be $68,897. July 18, FINAL Page 48 of 50

50 There are no Smart Start rebates for installation of low flow plumbing fixtures. Energy Savings Summary: ECM #11 - ENERGY SAVINGS SUMMARY Installation Cost ($): $68,897 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $68,897 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $1,562 Total Yearly Savings ($/Yr): $1,562 Estimated ECM Lifetime (Yr): 15 Simple Payback 44.1 Simple Lifetime ROI -66.0% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $23,430 Internal Rate of Return (IRR) -11% Net Present Value (NPV) ($50,249.45) July 18, FINAL Page 49 of 50

51 V. ADDITIONAL RECOMMENDATIONS The following recommendations include no cost/low cost measures, Operation & Maintenance (O&M) items, and water conservation measures with attractive paybacks. These measures are not eligible for the Smart Start Buildings incentives from the office of Clean Energy but save energy none the less. A. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%. B. Maintain all weather stripping on windows and doors. C. Clean all light fixtures to maximize light output. D. Provide more frequent air filter changes to decrease overall systempowerusage and maintain better IAQ. E. Turn off computers when not in use. Ensure computers are not running in screen saver mode which saves the monitor screen not energy. F. Ensure outside air dampers are functioning properly and only open during occupied mode. July 18, FINAL Page 50 of 50

52 Appendix APPENDIX A

53 APPENDIX A 1 of 1 ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY ECM NO. DESCRIPTION MATERIAL LABOR REBATES, INCENTIVES NET INSTALLATION COST LIFETIME ENERGY SAVINGS ENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime) LIFETIME MAINTENANCE SAVINGS (Yearly Maint Svaing * ECM Lifetime) LIFETIME ROI (Lifetime Savings - Net Cost) / (Net Cost) SIMPLE PAYBACK (Net cost / Yearly Savings) INTERNAL RATE OF RETURN (IRR) ($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($) ECM #1 Lighting Upgrade $9,695 $14,543 $0 $24,238 $4,884 $0 $4, $73,260 $ % % $34, ECM #2 Lighting Controls Upgrade $5,700 $8,550 $1,620 $12,630 $4,338 $0 $4, $65,070 $ % % $39, NET PRESENT VALUE (NPV) ECM #3 Boiler Replacement $73,000 $109,500 $4,000 $178,500 $10,452 $0 $10, $156,780 $0-12.2% % ($53,724.70) ECM #4 RTU Replacement $25,000 $10,000 $1,460 $33,540 $2,077 $0 $2, $31,155 $0-7.1% % ($8,744.91) ECM #5 Unit Ventilators w/ Energy Recovery $241,800 $161,200 $0 $403,000 $8,737 $0 $8, $131,055 $0-67.5% % ($298,698.26) ECM #6 NEMA Premium Motors $2,232 $1,710 $162 $3,780 $268 $0 $ $4,020 $0 6.3% % ($580.63) ECM #7 Hot Water VFD $17,000 $17,000 $0 $34,000 $1,122 $0 $1, $16,830 $0-50.5% % ($20,605.64) ECM #8 Demand Controlled Ventilation for MPR $8,000 $8,000 $0 $16,000 $1,308 $0 $1, $19,620 $0 22.6% % ($385.18) ECM #9 DDC System Installation / Expansion $133,781 $133,780 $0 $267,561 $11,535 $0 $11, $173,025 $0-35.3% % ($129,856.92) ECM #10 Domestic Hot Water Heater Replacement $8,400 $2,600 $500 $10,500 $1,071 $0 $1, $16,065 $0 53.0% % $0.00 ECM #11 Water Conservation $27,600 $41,297 $0 $68,897 $1,562 $0 $1, $23,430 $0-66.0% % $0.00 REM RENEWABLE ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY INSTALLATION COST ECM COST & SAVINGS BREAKDOWN YEARLY SAVINGS CONCORD ENGINEERING GROUP Howell Township BOE - Taunton Elementary School REM # Kw PV Array $1,500,704 $0 $0 $1,500,704 $36,038 $92,644 $128, $1,930,230 $1,389, % % $35, ECM LIFETIME Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period. 2) The variable DR in the NPV equation stands for Discount Rate 3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period.

54 Appendix APPENDIX B

55 Appendix B Page 1 of BURNT MILL ROAD VOORHEES, NEW JERSEY PHONE: (856) FAX: (856) SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives as of February 15, 2011: Electric Chillers Water-Cooled Chillers $12 - $170 per ton Air-Cooled Chillers $8 - $52 per ton Energy Efficiency must comply with ASHRAE Gas Cooling Gas Absorption Chillers $185 - $400 per ton Gas Engine-Driven Chillers Calculated through custom measure path) Desiccant Systems $1.00 per cfm gas or electric Electric Unitary HVAC Unitary AC and Split Systems $73 - $92 per ton Air-to-Air Heat Pumps $73 - $92 per ton Water-Source Heat Pumps $81 per ton Packaged Terminal AC & HP $65 per ton Central DX AC Systems $40- $72 per ton Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat (Hospitality & Institutional Facility) $75 per thermostat Energy Efficiency must comply with ASHRAE Gas Fired Boilers < 300 MBH Gas Fired Boilers MBH Gas Heating $300 per unit $1.75 per MBH Gas Fired Boilers MBH $1.00 per MBH Gas Fired Boilers > 4000 MBH (Calculated through Custom Measure Path) Gas Furnaces $300 - $400 per unit, AFUE 92%

56 Appendix B Page 2 of 4 Ground Source Heat Pumps $450 per ton, EER 16 Closed Loop $600 per ton, EER 18 $750 per ton, EER 20 Energy Efficiency must comply with ASHRAE Variable Frequency Drives Variable Air Volume $65 - $155 per hp Chilled-Water Pumps $60 per VFD rated hp Compressors $5,250 to $12,500 per drive Cooling Towers 10 hp $60 per VFD rated hp Natural Gas Water Heating Gas Water Heaters 50 gallons, 0.67 energy factor or better $50 per unit Gas-Fired Water Heaters > 50 gallons $ $2.00 per MBH Gas-Fired Booster Water Heaters Gas Fired Tankless Water Heaters $17 - $35 per MBH $300 per unit Prescriptive Lighting Retro fit of T12 to T-5 or T-8 Lamps $10 per fixture w/electronic Ballast in Existing (1-4 lamps) Facilities Replacement of T12 with new T-5 or T-8 Lamps w/electronic Ballast in $25 per fixture (1-4 lamps) Existing Facilities Replacement of incandescent with screw-in PAR 38 or PAR 30 (CFL) bulb T-8 reduced Wattage (28w/25w 4, 1-4 lamps) Lamp & ballast replacement Hard-Wired Compact Fluorescent Metal Halide w/pulse Start Including Parking Lot $7 per bulb $10 per fixture $25 - $30 per fixture $25 per fixture T-5 and T-8 High Bay Fixtures $16 - $200 per fixture HID 100w Retrofit with induction lamp, power coupler and generator (must be 30% less watts/fixture than HID system) HID 100w Replacement with new HID 100w $50 per fixture $70 per fixture

57 Appendix B Page 3 of 4 LED New Exit Sign Fixture Existing Facility < 75 kw Existing Facility > 75 kw Prescriptive Lighting - LED $20 per fixture $10 per fixture LED Display Case Lighting $30 per display case LED Shelf-Mtd. Display & Task Lights $15 per linear foot LED Portable Desk Lamp $20 per fixture LED Wall-wash Lights LED Recessed Down Lights LED Outdoor Pole/Arm-Mounted Area and Roadway Luminaries LED Outdoor Pole/Arm-Mounted Decorative Luminaries $30 per fixture $35 per fixture $175 per fixture $175 per fixture LED Outdoor Wall-Mounted Area Luminaries $100 per fixture LED Parking Garage Luminaries LED Track or Mono-Point Directional Lighting Fixtures LED High-Bay and Low-Bay Fixtures for Commercial & Industrial Bldgs. LED High-Bay-Aisle Lighting $100 per fixture $50 per fixture $150 per fixture $150 per fixture LED Bollard Fixtures $50 per fixture LED Linear Panels (2x2 Troffers only) $100 per fixture LED Fuel Pump Canopy LED Refrigerator/Freezer case lighting replacement of fluorescent in medium and low temperature display case $100 per fixture $42 per 5 foot $65 per 6 foot

58 Appendix B Page 4 of 4 Lighting Controls Occupancy Sensors Wall Mounted $20 per control Remote Mounted $35 per control Daylight Dimmers $25 per fixture Occupancy Controlled hi-low Fluorescent Controls $25 per fixture controlled Lighting Controls HID or Fluorescent Hi-Bay Controls Occupancy hi-low $75 per fixture controlled Daylight Dimming $75 per fixture controlled Daylight Dimming - office $50 per fixture controlled Premium Motors Three-Phase Motors $45 - $700 per motor Fractional HP Motors Electronic Communicated Motors $40 per electronic communicated motor (replacing shaded pole motors in refrigerator/freezer cases) Other Equipment Incentives $1.00 per watt per SF below program incentive threshold, currently 5% more Performance Lighting energy efficient than ASHRAE for New Construction and Complete Renovation Custom Electric and Gas Equipment not prescriptive Incentives $0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year payback on estimated savings. Custom Measures Minimum required savings of 75,000 KWh or 1,500 Therms and a IRR of at least 10%. Multi Measures Bonus 15%

59 Appendix APPENDIX C

60 OMB No STATEMENT OF ENERGY PERFORMANCE Taunton Elementary School Building ID: For 12-month Period Ending: November 30, Date SEP becomes ineligible: N/A Date SEP Generated: May 01, 2012 Facility Taunton Elementary School 41 Taunton Drive Howell, NJ Year Built: 1964 Gross Floor Area (ft 2 ): 89,187 Facility Owner Howell Township Board of Education 200 Squankum Yellowbrook Road Farmingdale, NJ Primary Contact for this Facility N/A Energy Performance Rating 2 (1-100) 8 Site Energy Use Summary 3 Electricity - Grid Purchase(kBtu) 1,099,073 Natural Gas (kbtu) 4 5,729,267 Total Energy (kbtu) 6,828,340 Energy Intensity 4 Site (kbtu/ft 2 /yr) 77 Source (kbtu/ft 2 /yr) 108 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO 2 e/year) 460 Electric Distribution Utility Jersey Central Power & Light Co [FirstEnergy Corp] National Median Comparison National Median Site EUI 48 National Median Source EUI 68 % Difference from National Median Source EUI 59% Building Type K-12 School Stamp of Certifying Professional Based on the conditions observed at the time of my visit to this building, I certify that the information contained within this statement is accurate. Meets Industry Standards 5 for Indoor Environmental Conditions: Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A Certifying Professional N/A Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA. 2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR. 3. Values represent energy consumption, annualized to a 12-month period. 4. Values represent energy intensity, annualized to a 12-month period. 5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality. The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) and welcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C EPA Form

61 ENERGY STAR Data Checklist for Commercial Buildings In order for a building to qualify for the ENERGY STAR, a Professional Engineer (PE) or a Registered Architect (RA) must validate the accuracy of the data underlying the building's energy performance rating. This checklist is designed to provide an at-a-glance summary of a property's physical and operating characteristics, as well as its total energy consumption, to assist the PE or RA in double-checking the information that the building owner or operator has entered into Portfolio Manager. Please complete and sign this checklist and include it with the stamped, signed Statement of Energy Performance. NOTE: You must check each box to indicate that each value is correct, OR include a note. CRITERION Building Name Type Location Single Structure School (K-12 School) CRITERION Gross Floor Area Open Weekends? VALUE AS ENTERED IN PORTFOLIO MANAGER Taunton Elementary School K-12 School 41 Taunton Drive, Howell, NJ Single Facility VALUE AS ENTERED IN PORTFOLIO MANAGER 89,187 Sq. Ft. No Number of PCs 50 Number of walk-in refrigeration/freezer units Presence of cooking facilities 0 No Percent Cooled 10 % Percent Heated 100 % Months 10(Optional) VERIFICATION QUESTIONS Is this the official building name to be displayed in the ENERGY STAR Registry of Labeled Buildings? Is this an accurate description of the space in question? Is this address accurate and complete? Correct weather normalization requires an accurate zip code. Does this SEP represent a single structure? SEPs cannot be submitted for multiple-building campuses (with the exception of a hospital, k-12 school, hotel and senior care facility) nor can they be submitted as representing only a portion of a building. VERIFICATION QUESTIONS Does this square footage include all supporting functions such as kitchens and break rooms used by staff, storage areas, administrative areas, elevators, stairwells, atria, vent shafts, etc. Also note that existing atriums should only include the base floor area that it occupies. Interstitial (plenum) space between floors should not be included in the total. Finally gross floor area is not the same as leasable space. Leasable space is a subset of gross floor area. Is this building normally open at all on the weekends? This includes activities beyond the work conducted by maintenance, cleaning, and security personnel. Weekend activity could include any time when the space is used for classes, performances or other school or community activities. If the building is open on the weekend as part of the standard schedule during one or more seasons, the building should select?yes? for open weekends. The?yes? response should apply whether the building is open for one or both of the weekend days. Is this the number of personal computers in the K12 School? Is this the total number of commercial walk-in type freezers and coolers? These units are typically found in storage and receiving areas. Does this school have a dedicated space in which food is prepared and served to students? If the school has space in which food for students is only kept warm and/or served to students, or has only a galley that is used by teachers and staff then the answer is "no". Is this the percentage of the total floor space within the facility that is served by mechanical cooling equipment? Is this the percentage of the total floor space within the facility that is served by mechanical heating equipment? Is this school in operation for at least 8 months of the year? NOTES NOTES Page 1 of 4

62 High School? No Is this building a high school (teaching grades 10, 11, and/or 12)? If the building teaches to high school students at all, the user should check 'yes' to 'high school'. For example, if the school teaches to grades K-12 (elementary/middle and high school), the user should check 'yes' to 'high school'. Page 2 of 4

63 ENERGY STAR Data Checklist for Commercial Buildings Energy Consumption Power Generation Plant or Distribution Utility: Jersey Central Power & Light Co [FirstEnergy Corp] Fuel Type: Electricity Meter: Electric (kwh (thousand Watt-hours)) Space(s): Entire Facility Generation Method: Grid Purchase Start Date End Date Energy Use (kwh (thousand Watt-hours)) 11/01/ /30/ , /01/ /31/ , /01/ /30/ , /01/ /31/ , /01/ /31/ , /01/ /30/ , /01/ /31/ , /01/ /30/ , /01/ /31/ , /01/ /28/ , /01/ /31/ , /01/ /31/ , Electric Consumption (kwh (thousand Watt-hours)) 322, Electric Consumption (kbtu (thousand Btu)) 1,099, Total Electricity (Grid Purchase) Consumption (kbtu (thousand Btu)) 1,099, Is this the total Electricity (Grid Purchase) consumption at this building including all Electricity meters? Fuel Type: Natural Gas Meter: Gas (therms) Space(s): Entire Facility Start Date End Date Energy Use (therms) 11/01/ /30/2011 6, /01/ /31/ /01/ /30/ /01/ /31/ /01/ /31/ /01/ /30/ /01/ /31/ /01/ /30/2011 5, /01/ /31/2011 8, /01/ /28/ , Page 3 of 4

64 01/01/ /31/ , /01/ /31/ , Gas Consumption (therms) 57, Gas Consumption (kbtu (thousand Btu)) 5,729, Total Natural Gas Consumption (kbtu (thousand Btu)) 5,729, Is this the total Natural Gas consumption at this building including all Natural Gas meters? Additional Fuels Do the fuel consumption totals shown above represent the total energy use of this building? Please confirm there are no additional fuels (district energy, generator fuel oil) used in this facility. On-Site Solar and Wind Energy Do the fuel consumption totals shown above include all on-site solar and/or wind power located at your facility? Please confirm that no on-site solar or wind installations have been omitted from this list. All on-site systems must be reported. Certifying Professional (When applying for the ENERGY STAR, the Certifying Professional must be the same PE or RA that signed and stamped the SEP.) Name: Date: Signature: Signature is required when applying for the ENERGY STAR. Page 4 of 4

65 FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA. Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance (SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR. Facility Taunton Elementary School 41 Taunton Drive Howell, NJ Facility Owner Howell Township Board of Education 200 Squankum Yellowbrook Road Farmingdale, NJ Primary Contact for this Facility N/A General Information Taunton Elementary School Gross Floor Area Excluding Parking: (ft 2 ) 89,187 Year Built 1964 For 12-month Evaluation Period Ending Date: November 30, 2011 Facility Space Use Summary Space Type School K-12 School Gross Floor Area (ft2) 89,187 Open Weekends? No Number of PCs 50 Number of walk-in refrigeration/freezer units 0 Presence of cooking facilities No Percent Cooled 10 Percent Heated 100 Months o 10 High School? School District o No Howell Township Energy Performance Comparison Evaluation Periods Comparisons Performance Metrics Current (Ending Date 11/30/2011) Baseline (Ending Date 11/30/2011) Rating of 75 Target National Median Energy Performance Rating N/A 50 Energy Intensity Energy Cost Greenhouse Gas Emissions Site (kbtu/ft2) N/A 48 Source (kbtu/ft2) N/A 68 $/year $ 115, $ 115, $ 56, N/A $ 72, $/ft2/year $ 1.29 $ 1.29 $ 0.63 N/A $ 0.81 MtCO 2 e/year N/A 289 kgco 2 e/ft2/year N/A 3 More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Median column presents energy performance data your building would have if your building had a median rating of 50. Notes: o - This attribute is optional. d - A default value has been supplied by Portfolio Manager.

66 Statement of Energy Performance 2011 Taunton Elementary School 41 Taunton Drive Howell, NJ Portfolio Manager Building ID: The energy use of this building has been measured and compared to other similar buildings using the Environmental Protection Agency s (EPA s) Energy Performance Scale of 1 100, with 1 being the least energy efficient and 100 the most energy efficient. For more information, visit energystar.gov/benchmark. This building s score Least Efficient Median Most Efficient This building uses 108 kbtu per square foot per year.* *Based on source energy intensity for the 12 month period ending November 2011 Buildings with a score of 75 or higher may qualify for EPA s ENERGY STAR. I certify that the information contained within this statement is accurate and in accordance with U.S. Environmental Protection Agency s measurement standards, found at energystar.gov Date of certification Date Generated: 05/01/2012

67 Appendix APPENDIX D

68 Appendix DPage 1 of 5 MAJOR EQUIPMENT LIST Concord Engineering Group Howell Township Schools -Taunton Elementary School AC Units Tag Unit Type CU-1 Ductless Split Heat Pump Qty 1 Location Area Served Manufacturer Model # Roof MDF/IDF Closet Sanyo CL1271 Serial # Cooling Type D/X, R-22 Cooling Capacity (Btuh) 11,900 Cooling Efficiency (SEER/EER) Heating Type Heating Input (Btuh) Efficiency (COP) Fuel 11.5 N/A N/A N/A N/A Approx Age 5 ASHRAE Service Life 15 Remaining Life 10 Comments Note: "N/A" = Not Applicable. "-" = Info Not Available

69 Appendix DPage 2 of 5 MAJOR EQUIPMENT LIST Concord Engineering Group Howell Township Schools - Taunton Elementary School RTU, HV & UV Tag UV-1 HV-1, 2 RTU-1,2 Hot Water Heating and Unit Type Unit Ventilators Packaged Rooftop Unit Ventilating Unit Qty Approx Location Thru-wall in classroom Ceiling, Stage Roof Area Served Classrooms Multi-Purpose Room Library / Media Center Manufacturer Nesbitt Nesbitt Carrier Model # DP012520AA Serial # - - Z197725; Z Cooling Type N/A N/A D/X, R-22 Cooling Capacity (Tons) N/A N/A 10 Cooling Efficiency (SEER/EER) N/A N/A 8 Heating Type Hot Water Hot Water N/A Heating Input (MBH) - - N/A Efficiency N/A N/A N/A Fuel N/A N/A N/A Approx Age ASHRAE Service Life Remaining Life (20) (20) (25) Comments Note: "N/A" = Not Applicable. "-" = Info Not Available Various units have had Fair condition, exceeded controller, valve and actuator ASHRAE Service Life uprgrades Poor condition, exceeded ASHRAE Service Life

70 Appendix DPage 3 of 5 MAJOR EQUIPMENT LIST Concord Engineering Group Howell Township Schools - Taunton Elementary School Boilers Tag B-1, 2 Unit Type Cast Iron Sectional Qty 2 Location Area Served Manufacturer Boiler Room Heating hot water loop Weil McLain Model # Series Serial # - Input Capacity (Btu/Hr) 4,474,000 Rated Output Capacity (Btu/Hr) 3,087,000 Approx. Efficiency % 75.0% Fuel Natural Gas Approx Age 25 ASHRAE Service Life 35 Remaining Life 10 Comments Boilers are in good condition Note: "N/A" = Not Applicable. "-" = Info Not Available

71 Appendix DPage 4 of 5 MAJOR EQUIPMENT LIST Concord Engineering Group Howell Township Schools - Taunton Elementary School Pumps Tag P-1 P-2 Base mounted end Base mounted end Unit Type suction suction Qty 1 1 Location Boiler Room Boiler Room Area Served Heating hot water loop Heating hot water loop Manufacturer Armstrong Armstrong Model # Serial # Horse Power 7-1/2 7-1/2 Flow - - Motor Info Century Leland Faraday Electrical Power V / 3Ph V / 3Ph RPM Motor Efficiency % 85% (est) 85% (est) Approx Age ASHRAE Service Life Remaining Life 0 0 Comments Note: "N/A" = Not Applicable. "-" = Info Not Available

72 Appendix DPage 5 of 5 MAJOR EQUIPMENT LIST Concord Engineering Group Howell Township Schools - Taunton Elementary School Domestic Water Heaters Tag Unit Type HWH-1 Storage Tank Qty 1 Location Area Served Manufacturer Boiler Room Kitchen, Restrooms AO Smith Model # BTR 365A 110 Serial # H07M00258 Size (Gallons) 85 Input Capacity (MBH/KW) 365 Recovery (Gal/Hr) Efficiency % 80% Fuel Natural Gas Approx Age 5 ASHRAE Service Life 12 Remaining Life 7 Comments Note: "N/A" = Not Applicable. "-" = Info Not Available

73 Appendix APPENDIX E

74 Investment Grade Lighting Audit APPENDIX E1 of 13 CEG Job #: Project: Howell Twp. LGEA Taunton Elementary School Bldg. Sq. Ft. 89,187 ECM 1&2: Lighting Upgrade - General & Gym EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings Conference Room Conference Room Conference Room Conference Room Library Copy Room Restrooms (2) Classroom Classroom Classroom Classroom Classroom Girl's Restroom Boy's Restroom x4, 2 Lamp, 32w 700 Series T8, 1x4, 2 Lamp, 32w 700 Series T8, 1x4, 2 Lamp, 32w 700 Series T8, 1x4, 2 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed Mnt., 2x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., 1x4, 1 Lamp, 32w 700 Series T8, 1x2, 2 Lamp, 17w T8, Elect. Ballast, 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 1 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 1x4, 1 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, $ $ $ $ ,128.0 $1, ,028.0 $ $ Sylvania Lamp FBO30/841XP/6//SS/ECO $39.00 $14.00 $ $39.00 $14.00 $ $39.00 $14.00 $ $39.00 $14.00 $ $1, $28.00 $1, $ $24.00 $ $39.00 $7.00 $ $ No Change $0.00 $0.00 $ ,418.0 $ ,418.0 $ ,418.0 $ ,418.0 $ ,418.0 $ $ $ $ $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $9.75 $7.00 $ $76.44 $28.00 $ $9.75 $7.00 $ $76.44 $28.00 $

75 Investment Grade Lighting Audit APPENDIX E2 of 13 ECM 1&2: Lighting Upgrade - General & Gym EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings IDF Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Guidance Office Nurse's Office Classroom Classroom Classroom Boy's Restroom x4, 1 Lamp, 32w 700 Series T8, 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed Mnt., 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, $ ,418.0 $ ,418.0 $ ,418.0 $ ,418.0 $ ,418.0 $ ,418.0 $ ,418.0 $ ,225.6 $ ,225.6 $ ,225.6 $ ,225.6 $ ,225.6 $ ,225.6 $ $ ,391.0 $ ,225.6 $ ,225.6 $ ,225.6 $ $ $9.00 $7.00 $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $ $14.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $76.44 $28.00 $

76 Investment Grade Lighting Audit APPENDIX E3 of 13 ECM 1&2: Lighting Upgrade - General & Gym EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings Girl's Restroom Classroom Classroom Classroom Hall and Restrooms Classroom Classroom Classroom Hall and Restrooms Classroom Classroom Classroom Hall and Restrooms Classroom Classroom Classroom Girl's Restroom Boy's Restroom Copy Room Classroom Classroom Classroom Main Office x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, $ ,225.6 $ ,225.6 $ $ ,060.2 $ ,060.2 $ $ ,225.6 $ ,225.6 $ $ ,225.6 $ ,225.6 $ ,225.6 $ $ $ $ ,225.6 $ ,225.6 $ ,060.2 $ ,338.4 $ $76.44 $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $76.44 $28.00 $ $76.44 $28.00 $ $76.44 $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $ $ $28.00 $

77 Investment Grade Lighting Audit APPENDIX E4 of 13 ECM 1&2: Lighting Upgrade - General & Gym EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings Main Office Restroom Principal's Office Boy's Restroom Girl's Restroom Cafeteria x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., 2x4, 4 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed Mnt., 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, $ ,112.8 $ $ $ ,571.6 $1, Gym w MH, Clear ,762.0 $3, Kitchen Stage Custodial Office x4, 2 Lamp, 32w 700 Series T8, 2x4, 4 Lamp, 32w 700 Series T8, 1x4, 1 Lamp, 32w 700 Series T8, ,158.4 $ $ $ Sylvania Lamp FBO30/841XP/6//SS/ECO 93 Watt LED Replacement Lamp, Nue-Tech Model 4293/yoke/mogul/adaptor/ V Driver $8.82 $24.00 $ $ $28.00 $ $76.44 $28.00 $ $76.44 $28.00 $ $1, $28.00 $1, $ $ $11, $ $14.00 $ $88.20 $28.00 $ $9.00 $7.00 $ Boiler Room x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant Mnt., No ,392.0 $ No Change $0.00 $0.00 $ Teacher's Lounge Teacher's Restroom Music Room Corridors x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., 2x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., 2x4, 4 Lamp, 32w 700 Series T8, 2x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed Mnt., $ $ ,225.6 $ ,368.0 $2, Sylvania Lamp FBO30/841XP/6//SS/ECO Sylvania Lamp FBO30/841XP/6//SS/ECO $76.44 $24.00 $ $17.64 $24.00 $ $ $28.00 $ $1, $14.00 $1, Totals ,308 $22, ,272 $17,441 $24, ,562

78 APPENDIX E9 of 13 CEG Job #: Project: Howell Twp. LGEA Taunton Elementary School KWH COST: $0.150 Address: 0 0 Building SF: 89,187 ECM 3: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback Conference Room 1 Conference Room 2 Conference Room 3 Conference Room Library Copy Room x4, 2 Lamp, 32w 700 1x4, 2 Lamp, 32w 700 1x4, 2 Lamp, 32w 700 1x4, 2 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 Recessed Mnt., Prismatic 2x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., Prismatic 1x4, 1 Lamp, 32w $ No Change % $48.36 $0.00 $ $ $ No Change % $48.36 $0.00 $ $ $ No Change % $48.36 $0.00 $ $ $ No Change % $48.36 $0.00 $ $ $1, $ Dual Tech. Occupancy Sensor w/2 Pole Powerpack - Remote Mnt. Remote Mnt % $1, $ $ $ % $ $ $ $ $ No Change % $51.48 $0.00 $ $ Restrooms (2) Classroom Classroom Classroom Classroom Classroom Girl's Restroom x2, 2 Lamp, 17w T8, Elect. Ballast, Surface Mnt., 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 1 Lamp, 32w 700 2x4, 4 Lamp, 32w $ No Change % 81.6 $12.24 $0.00 $ $ $ $ $ $ $ Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ $ No Change % 85.8 $12.87 $0.00 $ $ $ No Change % $83.46 $0.00 $ $

79 APPENDIX E10 of 13 ECM 3: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback Boy's Restroom IDF Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom x4, 1 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 1x4, 1 Lamp, 32w 700 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 1x4, 2 Lamp, 32w 700 Pendant Mnt., Prismatic 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w $ No Change % 85.8 $12.87 $0.00 $ $ $ No Change % $83.46 $0.00 $ $ $ No Change % 79.2 $11.88 $0.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $

80 APPENDIX E11 of 13 ECM 3: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback Guidance Office Nurse's Office Classroom Classroom Classroom Boy's Restroom Girl's Restroom Classroom Classroom Classroom Hall and Restrooms Classroom Classroom Classroom Hall and Restrooms Classroom Classroom Classroom Hall and Restrooms x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 Recessed Mnt., Prismatic 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w $ $ $ $ $ $ $ $ $ Switch Mnt. Switch Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Switch Mnt. Switch Mnt. Remote Mnt. Remote Mnt % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $66.77 $ $ $ % $66.77 $ $ $ % $ $ $ $ % $ $ $ $ $ No Change % $ $0.00 $ $ $ $ Remote Mnt. Remote Mnt % $ $ $ $ % $ $ $ $ $ No Change % $ $0.00 $ $ $ $ Remote Mnt. Remote Mnt % $ $ $ $ % $ $ $ $ $ No Change % $ $0.00 $ $

81 APPENDIX E12 of 13 ECM 3: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback Classroom Classroom Classroom Girl's Restroom Boy's Restroom Copy Room Classroom Classroom Classroom Main Office Main Office Restroom Principal's Office Boy's Restroom Girl's Restroom Cafeteria x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., Prismatic 2x4, 4 Lamp, 32w 700 Recessed Mnt., Prismatic 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 2x4, 4 Lamp, 32w $ $ $ $ $ $ $ $ $ $ Remote Mnt. Remote Mnt. Remote Mnt. Switch Mnt. Switch Mnt. Switch Mnt. Remote Mnt. Remote Mnt. Remote Mnt. Remote Mnt % $ $ $ $ % $ $ $ $ % $ $ $ $ % $66.77 $ $ $ % $66.77 $ $ $ % $66.77 $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ $ No Change % 78 $11.70 $0.00 $ $ $ $ $ $1, Switch Mnt. Switch Mnt. Switch Mnt. Dual Tech. Occupancy Sensor w/2 Pole Powerpack - Remote Mnt % $ $ $ $ % $66.77 $ $ $ % $66.77 $ $ $ % $1, $ $ $ Gym w MH, Clear $3, Remote Mnt % $2, $ $ $

82 APPENDIX E13 of 13 ECM 3: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback Kitchen Stage Custodial Office x4, 2 Lamp, 32w 700 2x4, 4 Lamp, 32w 700 1x4, 1 Lamp, 32w $ Remote Mnt % $ $ $ $ $ No Change % 642 $96.30 $0.00 $ $ $ No Change % 79.2 $11.88 $0.00 $ $ Boiler Room x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant Mnt., No $ No Change % 1392 $ $0.00 $ $ Teacher's Lounge Teacher's Restroom Music Room Corridors x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., Prismatic 2x2, 2 Lamp, 32w 700 series T8, Elect. Ballast, Recessed Mnt., Prismatic 2x4, 4 Lamp, 32w 700 2x4, 2 Lamp, 32w 700 Recessed Mnt., Prismatic $ Switch Mnt % $81.12 $ $ $ $ No Change % 156 $23.40 $0.00 $ $ $ Remote Mnt % $ $ $ $ $2, No Change % $2, $0.00 $ $ Totals ,675.6 $25, ,754.8 $20, $14, ,921 $4, ^^^^^^

83 Appendix APPENDIX F

84 Appendix F Page 1 of 2 Project Name: LGEA Solar PV Project - Taunton Elementarty School - Howell Township BOE Location: Howell, NJ Description: Photovoltaic System 100% Financing - 15 year Simple Payback Analysis Photovoltaic System 100% Financing - 15 year Total Construction Cost $1,097,729 Annual kwh Production 240,255 Annual Energy Cost Reduction $36,038 Average Annual SREC Revenue $92,644 Simple Payback: 8.53 Years Life Cycle Cost Analysis Analysis Period (years): 15 Financing %: 100% Discount Rate: 3% Maintenance Escalation Rate: 3.0% Average Energy Cost ($/kwh) $0.150 Energy Cost Escalation Rate: 3.0% Financing Rate: 6.00% Average SREC Value ($/kwh) $0.386 Period Additional Energy kwh Energy Cost Additional SREC Interest Loan Net Cash Cumulative Cash Outlay Production Savings Maint Costs Revenue Expense Principal Flow Cash Flow 0 $ $ $0 240,255 $36,038 $0 $132,140 $64,597 $46,562 $57,019 $57,019 2 $0 239,054 $37,119 $0 $131,480 $61,725 $49,434 $57,440 $114,459 3 $0 237,858 $38,233 $0 $118,929 $58,676 $52,483 $46,003 $160,462 4 $0 236,669 $39,380 $0 $106,501 $55,439 $55,720 $34,722 $195,184 5 $0 235,486 $40,561 $2,426 $105,969 $52,003 $59,157 $32,945 $228,130 6 $0 234,308 $41,778 $2,413 $105,439 $48,354 $62,805 $33,645 $261,774 7 $0 233,137 $43,032 $2,401 $93,255 $44,480 $66,679 $22,726 $284,500 8 $0 231,971 $44,323 $2,389 $92,788 $40,368 $70,791 $23,563 $308,063 9 $0 230,811 $45,652 $2,377 $80,784 $36,001 $75,158 $12,900 $320, $0 229,657 $47,022 $2,365 $80,380 $31,366 $79,793 $13,877 $334, $0 228,509 $48,432 $2,354 $68,553 $26,444 $84,715 $3,472 $338, $0 227,366 $49,885 $2,342 $68,210 $21,219 $89,940 $4,594 $342, $0 226,230 $51,382 $2,330 $56,557 $15,672 $95,487 ($5,550) $337, $0 225,098 $52,923 $2,319 $56,275 $9,783 $101,376 ($4,280) $333, $0 223,973 $54,511 $2,307 $44,795 $3,530 $107,629 ($14,160) $318,916 Totals: 3,480,383 $670,272 $26,023 $1,342,054 $569,658 $1,097,729 $318,916 $3,935,961 Net Present Value (NPV) $269,946

85 Appendix F Page 2 of 2 Location Description Taunton Roof PV Array Area (Sq FT) Panel Qty SHARP NU-U235F2 Panel Sq Ft Panel Total Sq Ft Total KW DC Total Annual kwh Total KW AC Panel Weight (41.9 lbs) W/SQFT , , , Notes:.= Proposed PV Layout 1. Estimated kwh based on the National Renewable Energy Laboratory PVWatts Version 1 Calculator Program.