1 Mining THE GROUP Engineering & Consulting worldwide Water Supply Waste Water September 2017 Environment FICHTNER GmbH & Co. KG Sucursal del Perú Calle Monterrey No. 355 Oficinas Santiago de Surco, Lima 33 Perú Tel.: (+511) Slide 1

2 Mining Efficient Water Management in Mining Processes Water Supply Waste Water Dr. Bernd Vels Senior Advisor Mining Environment Slide 2

3 The Fichtner Group Established in 1922 and family-owned ever since Mining Water Supply Germany s biggest independent engineering and consultancy enterprise for infrastructure projects More than 1,500 employees worldwide over 500 of these in our Home Office Project experience in more than 160 countries Over 1800 ongoing projects 500 of these in our Home Office Waste Water Total turnover of approx. 300 million in 2016 Environment Capital investment volume now under planning in the home office: 215 billion of which some 108 billion is in renewable energies Slide 3

4 Fichtner s Areas of Activity Mining Energy Energy economics conventional power plants renewables district heating energy transmission and distribution I&C and power system technology smart grids electric mobility energy efficiency CO2 sequestration/ccs gas caverns Water Supply Waste Water Environment Environment & Mining Environmental management environmental information systems mine planning environmental studies permit management/strategy environmental protection technologies soil and water protection air pollution control reserve calculation waste management mine closure concepts mining legislation EITI studies Water & Infrastructure Total water management drinking water supply and sanitation seawater desalination integrated infrastructure concepts site development traffic, transportation and civil engineering mining and mineral economics Consulting & IT Studies org4anization and strategy consultancy privatizations project management financial modeling infrastructure management IT consultancy and services geo-solutions political advice restructuring corporate governance Slide 4

5 Services in the field of Environment and Mining Consultancy for mining projects Mining Water Supply Waste Water Reserve calculation and classification (according to JORC or NI43-101) Geotechnical studies, planning of tailings ponds, CCS sites, dam sites, etc. Technical risk assessment for mining, processing and remediation projects Planning of mining projects including processing and infrastructure Best international practice in mining legislation, mine-taxation and financial guarantees Environmental consultancy Environmental Impact Assessments and Evaluations Development of mine closure and clean-up concepts Evaluation and geotechnical planning of underground storage of liquid and gaseous substances for the energy-industry (CO 2, oil and gas, steam and water) Environment Due Diligence and Bankable Feasibility Studies Economic evaluations, Cash-Flow-Calculations, Cost-Benefit Analyses Monitoring of technical, environmental and economic processes Slide 5

6 Cape Preston Iron Ore, Western Australia Harbor, Airfield, Power Station, Camp Facilities, seawater Desalination, Plant for Process and Potable Water Slide 6

7 Cupper province, Coloso, Chile Planning of new Desalination Plant Slide 7

8 Systematic Cross section Tailings Pond Slide 8

9 Tailings Ponds, Wismut, former East Germany Typical for Eastern European Tailings Pond Technology Slide 9

10 Bor Copper Mine, Serbia Slurried Tailings Pond with Cyclone (in Background) Slide 10

11 Systematic Cross section Tailings Pond Slide 11

12 Bor Copper Mine, Serbia Surface Water blown over Dam Crest Slide 12

13 Systematic Cross section Tailings Pond Slide 13

14 Cu Mine Baia de Aries, Romania Construction of a Water impermeable Cover and of a Drainage Channel Slide 14

15 Systematic Cross section Tailings Pond Slide 15

16 Covering / Capsulation of a Tailings Pond Schematic diagram of an interim cover placemat Slide 16

17 Cu Mine Baia de Arieş, Romania Construction of circular dewatering channels Slide 17

18 Systematic Cross section Tailings Pond Slide 18

19 Uranium Mine, Pöhla Wetland, Germany Wetland for the conditioning of the seepage water Slide 19

20 Uranium Mine Pöhla, Germany Settling ponds with before planting the vegetation Slide 20

21 Cu Mine Bor, Serbia Waste Heaps with Acid Mine Drainage Slide 21

22 Uranium / Gold Tailings, South Afrika Re processed former tailings and waste dumps Slide 22

23 Systematic Cross section Tailings Pond Slide 23

24 Coal Processing Plant, Mongolia Ponds covered with Mattresses to avoid evaporation Slide 24

25 Comparison of dry and wet Tailings Pond Remediation Techniques Slide 25

26 Shimkent Uranium District, Kazakhstan In Situ Leaching (ISL) of Uranium mineralization Slide 26

27 Contact Nikolaus Linder Head of Mining & Raw Materials Office Essen (Competent Person) Phone: Tobias Gehrke Director Business Development Americas Fichtner GmbH & Co. KG Phone: Robert Perkuhn Geologist Oil and Gas, Energy Resources Phone: Armin Hunke Mine Engineer and Mine Surveyor Geotechnical and Environmental Issues Phone: David Niggemann Resource Geologist Geological Modelling Phone: Dr. Bernd Vels Senior Consultant (Competent Person) Phone: Slide 27