1 Page 1 of 28 WATER USER MANUAL FOR CUSTOMER AND WATER USER AMATA NAKORN & AMATA CITY INDUSTRIAL ESTATE BY: AMATA WATER CO.,LTD. 3 rd SEPTEMBER, 2012

2 Page 2 of 28 CONTENT Description Pages 1. Application for water supply and water meter installation Cancellation of water supply and return of deposit 3. Water rights transfer/change 4. Charge for water meter & related facilities damage 5. Meter reading and volume check 6. Water billing and infrastructure service payment 7. Steel Sleep Pipe model to protect central water meter pipe inside the Industrial Estate 8. Announcements & Regulations concerned APPENDEX 1. Application for use of water and meter installation 2. Meter Check Form 3. Application for cancellation of water use and deposit return 4. Application for Change of Water Right / User 5. Damage Claim Form 6. Water Meter Installation Price List Factory Connection Installation Price List Repair of Water Pipe Cost Water Meter Fixing Price & Service Fee 10. Water Meter Installation in Amata Nakorn and Amata City Industria Estate (General Zone) 11.Water Meter Installation in Amata Nakorn and Amata City Industrial Estate (Adjacent with Canal Zone) 12.Steel Sleeve Pipe Model at Entrance of Factory 13.Water Meter Monthly Maintenance Fee. 14.Water Supply Quality Standards in Amata Nakorn and Amata City Industrial Estate 15.Effluent from Factory to central wastewater treatment plant in Amata Nakorn and Amata City Industrial Estate 16. Announcement no.สน.อน.001/2555 for Amata Nakorn I.E. 17. Announcement no. สน.อต.001/2555 for Amata City I.E

3 Page 3 of 28 Water User Manual 1.Application for water supply and water meter installation 1.1 Obtain the application form and the service rate for water meter installation at Amata Water Co., Ltd. Amata Nakorn Industrial Estate at Amata Service Center Building 2 nd Floor, Tel ext 782 Fax: or download applications from Amata Nakorn Industrial Estate and Amata City Industrial Estate (General Zone) (See details as appendix no.1,page 7) Amata Nakorn Industrial Estate and Amata City Industrial Estate (Adjacent with Canal Zone) (See appendix no.1,pages 7) 1.2 Submit the application form to Co., Ltd together with the following documents: Power of Attorney Letter issued from the landlord of the premise Affidavit issued by the company s applicant Copies of identification card or passport of the authorizer and the authorized person Topographical map and master plan of the location and area of the user s premise in the industrial estate Site plan showing the spot on which the water meter will be installed. 1.3 Submit Application form at Amta Water Co.,Ltd.office.or Amata City office. Application fee and documents will be submitted on the application date. 1.4 Payment for water meter, pipes, related equipment and installation fee will be made on the application date.(see details in appendix 6, pages 12), if the payment was paid after the 25 th date of the month, the date in the receipt would change to the date of next month. 1.5 For contractors or plant operators (who is not a land owner), a deposit of 53,500 Baht for water use (VAT included) will be placed on the application date. Note: The deposit money for water use will be returned when the water meter is cancelled and the outstanding balance is fully paid. 1.6 After completing No , the installation will be arranged and completed within days.(depend on size of meter) 1.7 Examination & acceptance of the account and settling the starting value of the meter agreed by the company and the user (see details in appendix no.2, page8) 1.8 Ask for an application form as follows offices: Amata Nakorn I.E. at Amata Service Center Building Tel: ext 782 Amata City I.E. at Amata City Office Tel: Or download application form at Coordinating officers for installation and examination: Amata Nakorn Industrial Estate Tel , , , Amata City Industrial Estate Tel , ,

4 Page 4 of The company will conduct the meter testing and calibration service as appropriate The company will charge for the water meter maintenance fee on a monthly basis (see appendix no.12 pages 22) Remarks: The company reserved the right to fix water meter specification and water meter installation including change of water meter price without prior notice. 2.Cancellation of water supply and return of deposit 2.1) The user can fill out the water supply cancellation and return of deposit form (see appendix no.3,page 9) 2.2) The company will proceed the closing of the valve, read the meter and record the value with the user as indicated in the form (see appendix no.2, page 8) and remove the meter to return to the user. 2.3) After the outstanding balance of the user s water bill and remaining debts to the company is fully paid, the deposit money will be returned (within 30 days after the cancellation of water supply as indicated in 2.2) 3.Water rights transfer/change 3.1) The user can fill out an application for change of water right form (see appendix no.4 ) 3.2) The company will conduct the check, reading and recording the number of the meter with the user as indicated in the form. (see appendix no.4,page 10) 3.3) The company will authorize the water right to the new user after completing the check of water bill receipt and outstanding balance. 4. Charge for water meter & related facilities damage 4.1) The company reserved the right to remedy/fix water meter and/or related facilities immediately. 4.2) Any expenses concerned from 5.1 shall be paid by the water user such as fixing pipe expense, water loss etc. 4.3) Details of fixing expenses as shown in appendix no.8,pages Meter reading and volume check 5.1) Meter reading and the amount of water use will be conducted on the 25 th of every month.. 5.2) Charges for the amount of water consumed each month are based on the number of units you use during a billing period starting from the 25 th of the previous month to the 24 th of the current month. For example, the water bill for November 2008 is based on the water use

5 Page 5 of 28 during October 25 th November 24 th, 2008, 31 days in total. The water bill for December 2008 is based on the water use during November 25 th -December 24 th, 2008, 3:0 days in total. 5.3) Water rates are separate in to 2 parts which are water rate for Customer and Contractor; 5.3.1) For Customer Water rate within quotas according to Land Purchase & Sales Agreement Water meter maintenance monthly fee (see rate of monthly fee as in appendix no.12,pages 22) Wastewater treatment charge shall be collected according to Announcement no.สน.อน.001/2555 for Amata Nakorn I.E. and Announcement no. สน.อต. 001/2555 for Amata City I.E. and related announcement stipulated by Industrial Estate Authority of Thailand (IEAT) (as if) 5.3.2) For Contractor Water rate at 40 baht/cu.m. (No wastewater treatment charge) 6.Water billing and infrastructure service payment 6.1) Meter reading and recording the number of the meter will be conducted on the 25 th of every month. 6.2) Invoices/tax invoices will be dated on 1 st -5 th of the next month 6.3) the issuance of authenticated invoices/tax invoices to customers will follow these conditions: 6.3.1) For the mailing addresses in Amata Nakorn and Amata City Industrial Estates, the invoice/tax invoice will be delivered within 5 working days from the date indicated on the invoice ) For the mailing addresses outside Amata Nakorn and Amata City Industrial Estates, the invoice/tax invoice will be delivered by post. 6.4) Service payment 6.4.1) Payment can be made in cash or by crossed check made payable to Co., Ltd with the following options: Pay in person at the office of Co., Ltd. on 2 nd Floor, Amata Service Center Building, Amata Nakorn Industrial Estate Money transfer to a bank account of Co., Ltd : o Kasikorn Bank Public Company Limited, New Petchburi Branch, Savings account o Kasikorn Bank Public Company Limited, Bangpakong Industrial Estate Branch, Savings account o Bangkok Bank Public Company Limited, Amata City Industrial Estate, Savings account The company will send you the receipt by post within 7 days after receiving the payment slip 6.4.2) The payment must be made within 20 days from the date indicated on the invoice. If the invoice is overdue, the company reserves the right to discontinue the water supply in compliance with the regulation of the Industrial Estate of Thailand. The company will resume the service as soon as the invoice is paid including 15% interest

6 Page 6 of 28 rate of the outstanding balance starting from the due date along with 10 % meter reactivation fee (incase of temporary water cut) of the re-installation fee of water supply based on the size of the meter ) As for the name of withholding tax agent, use Co., Ltd. 700/2 Moo 1, Klong Tumru, Amphur Muang, Chonburi 20000, tax identification number Note: Meter installation fee and deposit of water use can be paid during 1 st -24 th of every month only. 7. Steel Sleep Pipe model to protect central water meter pipe inside the Industrial Estate. 7.1 In case of frontage entrance of water user passing water meter pipe of the Industrial Estate. The water user has to use steel sleep pipe model according to design and size specification as shown in (appendix no.11,pages 20) 7.2 The company reserved the right to not allow water user construct frontage entrance passing manhole and/or changing position of central facilities such as factory connection or fire hydrant etc. 8. Announcements and Related Regulations 8.1 Announcement of the Industrial Estate of Thailand No.สน.อน.001/2555 for Amata Nakorn I.E. and Announcement of the Industrial Estate of Thailand No.สน.อต.001/2555 for Amata City I.E. "New formula rate of Wastewater Treatment Charged in Amata Nakorn I.E and Amata City I.E." 8.2 Announcement of the Industrial Estate of Thailand No. 64/2536 "Guidelines on land development in industrial estates" 8.3 Announcement of the Industrial Estate of Thailand No. 60/2538 "Guidelines, methods and requirements to determine wastewater volume" 8.4 Announcement of the Industrial Estate of Thailand No. 45/2541 "Guidelines on sewage from industrial plants in industrial estates" 8.5 Regulation of Industrial Estate of Thailand Central Utilities & related facilities and Service in Industrial Estate Other Related Laws -Industrial Estate Authority of Thailand Act B.E. 2522

7 Page 7 of 28 (Appendix 1) APPLICATION FOR USE OF WATER AND METER INSTALLATION Estate: Amata Nakorn Industrial Estate Amata City Industrial Estate General Zone Adjacent with Canal Zone 1.User's Information Customer Contractor Company's name Address Land Plot no. Project Manager Tel: Date of submitted application Remarks: the service will start within 15 days, and not less, after completing No. 2 regarding the application for water use and meter installation ( ) Wishes to apply for water use and meter installation; Meter size as followed: 2 inches with a complete set of devices 3 inches with a complete set of devices 4 inches with a complete set of devices 6 inches with a complete set of devices 8 inches with a complete set of devices 10 inches with a complete set of devices etc Note: The meter installation follows the standard & Price installation set by the company. 2.Water Rate Customer and or Land owner Contractor 3 Documents use to apply for water use and water meter installation; Power of Attorney Letter issued from the landlord of the premise and affidavit issued by the company's applicant Copies of identification card or passport of the authorizer and the authorized person. Topographical map and master plan of the location and area of the user's premise in the Industrial Estate. Site plan showing the spot on which the water meter will be installed. Signature Signature ( ) ( ) Date Date Applicant for water use (Customer) Authorizing person ()

8 Page 8 of 28 (Appendix 2) No. METER CHECK FORM Estate: Amata Nakorn Industrial Estate Amata City Industrial Estate Details: Company's Name: Customer Code:..Date Meter value. Pressure.. kg/cm2 Meter size inches Flow rate m3/hr Overall conditions of the meter Meter Valve Normal Abnormal... Front Water Gate Normal Abnormal. Back Water Gate Normal Abnormal. Pressure Gauge Normal Abnormal... Pipe & Relates Equipments Normal Abnormal Pipe,Valve & Factory Connection Normal Abnormal... Check summary and suggestions:... Inspector: () Co-Inspector... (Customer) (..) (..) Note: Photos must be taken and attached during the check

9 Page 9 of 28 (Appendix 3) APPLICATION FOR CANCELLATION OF WATER USE AND DEPOSIT RETURN Date Subject Cancellation of water use and deposit return To Managing Director, Co., Ltd. As I/we (the company).., hired contractor responsible for the plant construction of, have placed 53,500 baht deposit for water supply service and damage coverage to properties of Amata Nakorn and Amata City Industrial Estate, Upon project completion, I/we would like to apply for the deposit return and cancellation of water use starting from (date) onwards. Thank you for your consideration. Sincerely yours (..) Meter inspection prior to deposit return 1. Latest meter reading Date Inspected by (Operating team) 2. Accounting document Date Inspected by (Accounting) Deposit return approved Additional check needed Note After the inspection is completed, the valve will be closed and the meter will be removed immediately. Each step of the procedure will be photographed. Approved by Date

10 Page 10 of 28 (Appendix 4) No. APPLICATION FOR CHANGE OF WATER RIGHT/USER Date Subject Change of Water Right/User To Managing Director Co., Ltd I/We (the company) wish to apply for change of water user from the existing user to the new user. This change will be effective from onwards. Thank you for your consideration. Sincerely yours (..) Meter inspection 1. Latest meter reading Date Inspected by 1.. () Inspected by 2.. (Existing user) Inspected by 3.. (New user)

11 Page 11 of 28 (Appendix 5) No DAMAGED CLAIM FORM Estate: Amata Nakorn Industrial Estate Amata City Industrial Estate Date :../../.. 1. Details of Damage : Remedy/Fixing Details:.... Water Loss Quantity No 20% 40% 60% 80% 100% ( % Loss shall be considered base on condition of pipe damage) Period of water loss : minutes Water loss quantity.cu.m. Time of damaged occurred. Date /.../... Time of remedy/fixing finished Date /./. I/WE(The company). Position. On behalf of the company/authorizing person of the company.has/have acknowledged and agreed to allow to remedy/fixing water pipe to be able to use as normal condition immediately and shall responsible for all expenses occurred. (All expenses referred to standard price of the project) Signed by... ( ) Completed Full name Inspected By Date./../... Approved By Dated./../ Noted : Note: Photos must be taken and attached during the check shall inform all expenses to customer for acknowledgement by using standard price of the project.

12 Page 12 of 28 Standard price for water meter installation in Amata Nakorn & Amata City Industrial Estate (Appendix 6) WATER METER INSTALLATION PRICE (General Zone) Item Description Meter Size(Inch) Rev.01/ Pipe length 10m. 3,465 5,009 5,565 13,650 31,815 46,095 2 Meter + support +Accessories 8,925 13,965 19,005 34,020 71,400 84,000 3 Gate valve 2,678 10,500 12,012 19,950 30,030 51,188 4 Check Valve 1,890 2,835 3,623 5,985 13,335 17,220 5 Pressure Gauge SUS304 with Oil 1,575 1,575 1,890 2,100 2,625 3,150 6 Installation work 3,150 3,675 4,200 15,750 21,000 21,000 7 Overhead 2,100 3,675 4,620 9,135 16,800 22,050 8 Service charge 2,500 2,500 2,500 2,500 2,500 2,500 Total (baht) 26,283 43,734 53, , , ,203 WATER METER INSTALLATION PRICE ((Land plot of which adjacent Canal Zone) Item Description Meter Size(Inch) Pipe length 30m. 4,620 7,319 11,235 23,100 46,515 73,920 2 Pipe sleeves with concrete support 10 m. 4,200 5,775 9,450 13,650 19,950 24,150 3 Meter + support +Accessories 8,925 13,965 19,005 34,020 71,400 84,000 4 Gate valve 2,678 10,500 12,012 19,950 30,030 51,188 5 Check Valve 1,890 2,835 3,623 5,985 13,335 17,220 6 Pressure Gauge SUS304 with Oil 1,575 1,575 1,890 2,100 2,625 3,150 7 Installation work 3,150 3,675 4,200 15,750 21,000 21,000 8 Overhead 2,100 3,675 4,620 9,135 16,800 22,050 9 Service charge 2,500 2,500 2,500 2,500 2,500 2,500 Total (baht) 31,638 51,819 68, , , ,178 Period of water installation size 2 inches within 10 days,size 3,4 inches within 15 days, size 6,8,10 inches within 30 days The company have it s right to change price specification and equipments related base on site location without prior notice.

13 Page 13 of 28 Appendix-7 Installation of Factory Connection Price List Bill Of Quantity (3-Way) Item Description Unit Qut'y Factory Size (mm.) 150/50 150/75 150/ / /50 200/75 200/ / /50 225/75 225/ / Way HDPE Ea 1 2,200 2,200 1,980 1,650 3,300 3,300 2,970 2,640 3,949 3,949 3,740 3,355 2 Stubend Ea 2 1,518 1,551 1,650 1,980 1,661 1,727 1,771 2,156 1,958 1,991 2,035 2,420 3 Backing Ring Ea 2 1,617 1,661 1,815 2,145 1,727 1,815 1,925 2,255 1,727 1,815 1,925 2,255 4 HDPE Pipe Ls Nut, Bolt and Rubber Seal Ls 1 1,485 1,485 1,870 2,200 1,485 1,485 1,870 2,200 1,485 1,485 1,870 2,200 6 Gate Valve Ea 1 2,640 4,180 4,620 7,700 2,640 4,180 4,620 7,700 2,640 4,180 4,620 7,700 7 Backhoe with Transportation D. 1 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 8 Accessories (Welding,Generator,other) Ls 1 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 9 Grass + Sidewlak Ls 1 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4, Installation work Ls 1 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13, Overhead Ls 1 4,312 4,477 4,587 5,022 4,444 4,620 4,708 5,148 4,543 4,730 4,813 5,247 Sum 47,443 49,324 50,457 55,237 48,928 50,897 51,799 56,639 49,973 51,920 52,938 57,717 The company have it s right to change price specification and equipments related base on site location without prior

14 Page 14 of 28 Appendix-7 Item Description Unit Qut'y Factory Size (mm.) 250/50 250/75 250/ / /50 300/75 300/ / / /50 350/75 350/ Way HDPE Ea 1 5,445 5,225 4,950 4,675 9,680 9,460 9,185 8,855 13,805 13,805 13,585 13,200 2 Stubend Ea 2 3,058 3,091 3,190 3,520 4,378 4,411 4,510 4,840 5,478 5,511 5,610 5,940 3 Backing Ring Ea 2 2,167 2,310 2,365 2,640 2,706 2,838 2,893 3,223 3,883 4,026 4,081 4,411 4 HDPE Pipe Ls Nut, Bolt and Rubber Seal Ls 1 1,485 1,485 1,870 2,200 1,485 1,485 1,870 2,200 1,485 1,485 1,870 2,200 6 Gate Valve Ea 1 2,640 4,180 4,620 7,700 2,640 4,180 4,620 7,700 2,640 4,180 4,620 7,700 7 Backhoe with Transportation D. 1 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 8 Accessories (Welding,Generator,other) Ls 1 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 9 Grass + Sidewlak Ls 1 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4, Installation work Ls 1 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 16,500 16,500 16,500 16, Overhead Ls 1 4,840 5,005 5,093 5,500 5,445 5,610 5,698 6,127 6,424 6,600 6,710 7,128 Sum 53,306 55,066 56,023 60,775 60,005 61,754 62,711 67,485 70,686 72,677 73,711 78,419 The company have it s right to change price specification and equipments related base on site location without prior

15 Page 15 of 28 Appendix-7 ภาคผนวก-7 Item Description Unit Qut'y Factory Size (mm.) 400/50 400/75 400/ / /50 450/75 450/ / /50 500/75 500/ / Way HDPE Ea 1 20,680 20,680 20,460 20,130 31,515 31,515 31,350 30,910 43,615 43,615 43,450 42,900 2 Stubend Ea 2 8,558 8,591 8,690 9,020 13,618 13,651 13,750 14,080 26,598 26,631 26,730 27,060 3 Backing Ring Ea 2 2,937 3,080 3,135 3,465 5,687 5,830 5,885 6,215 8,987 9,130 9,185 9,515 4 HDPE Pipe Ls Nut, Bolt and Rubber Seal Ls 1 3,685 3,850 4,070 4,400 4,235 4,400 4,620 4,950 4,785 4,950 5,170 5,500 6 Gate Valve Ea 1 2,640 4,180 4,620 7,700 2,640 4,180 4,620 7,700 2,640 4,180 4,620 7,700 7 Backhoe with Transportation D. 1 11,000 11,000 11,000 11,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 8 Accessories (Welding,Generator,other) Ls 1 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 9 Grass + Sidewlak Ls 1 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4, Installation work Ls 1 16,500 16,500 16,500 16,500 22,000 22,000 22,000 22,000 27,500 27,500 27,500 27, Overhead Ls 1 7,546 7,744 7,810 8,250 11,110 11,308 11,396 11,814 14,520 14,740 14,839 15,246 Sum 83,017 85,195 86,020 90, , , , , , , , ,761 The company have it s right to change price specification and equipments related base on site location without prior

16 Page 16 of 28 Appendix-8 Repair of Water Pipe Cost Bill Of Quantity (Stubend) Item Description Unit Qut'y Pipe Size(mm.) Stubend Ea ,650 2,090 2,750 4,180 6,710 13,200 22,000 2 Backing Ring Ea ,210 2,200 2,750 3,520 4,400 9,900 3 Nut, Bolt and Rubber Seal Ls ,100 1,320 1,320 1,650 1,980 2,420 2,750 3,300 3,850 4,400 5,500 4 Backhoe With Trainsport D. 1 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 16,500 16,500 27,500 5 Accessories (Welding,Generator,other) Ls 1 4,400 4,400 4,400 4,400 4,400 4,400 4,400 4,400 6,600 8,800 8,800 11,000 11,000 6 Grass+Sidewalk Ls 1 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 5,500 5,500 5,500 5,500 5,500 7 Installation work Ls 1 4,400 6,600 8,800 8,800 8,800 8,800 11,000 11,000 16,500 16,500 16,500 22,000 33,000 8 Overhead Ls 1 2,448 2,734 3,053 3,080 3,102 3,152 3,487 3,597 4,730 4,983 5,918 7,260 11,440 Sum 26,929 30,069 33,578 33,913 34,122 34,667 38,357 39,567 52,030 57,013 67,298 84, ,840 The company have it s right to change price specification and equipments related base on site location without prior

17 Page 17 of 28 Appendix-8 Water Meter Fixing Price & Service Fee Spec : Stubend Note : Rev.01/ Size Fixing price (HDPE) Service Fee Total (mm.) (Baht/set) (Baht/ Set) (Baht) 63 26,929 2,500 29, ,069 2,500 32, ,578 2,500 36, ,913 3,000 36, ,122 3,000 37, ,667 3,000 37, ,357 3,000 41, ,567 4,000 43, ,030 4,000 56, ,013 4,000 61, ,298 5,000 72, ,260 5,000 89, ,840 5, , The above fixing rate is estimated cost by using Stubend Backing Ring type. 2. Details as per model below and has it right to change fixing price according to actual condition of fixing work. The company have it s right to change price specification and equipments related base on site location without prior notice.

18 Page 18 of 28 Appendix-9 Water Meter Installation in Amata Nakorn and Amata City Industrial Estate (General Zone)

19 Page 19 of 28 Appendix-10 Water Meter Installation in Amata Nakorn and Amata City Industrial Estate (Adjacent with Canal Zone)

20 Page 20 of 28 Steel Sleeve Pipe Model at Entrance of Factory Appendix-11

21 Page 21 of 28 Appendix-12 Water Meter Monthly Maintenance Fee Size of Meter (Inches) Service Fee / Month(Baht) , , ,000 Remarks: Referred to Provincial Water Work Authority of Thailand (PWA)

22 Water Supply Quality Standards Amata Nakorn and Amata City Industrial Estate Properties Parameters Units Physical Chemical Toxic elements Bacterial 1. Colour Platinum-Cobalt (Pt-Co) Maximum Acceptable Concentration Standards Page 22 of 28 Appendix-13 Maximum*** Allowable Concentration Taste - Non Objectionable Non Objectionable 3. Odour - Non Objectionable Non Objectionable 4. Turbidity NTU ph Total Solids mg/l 500 1, Iron (Fe) mg/l Manganese (Mn) mg/l Iron & Manganese mg/l (Fe&Mn) 10.Copper (Cu) mg/l Zinc (Zn) mg/l Calcium (Ca) mg/l 75* Magnesium (Mg) mg/l Sulphate (SO4) mg/l ** 15.Chloride (Cl) mg/l Fluroride (F) mg/l Nitrate (NO 3 ) mg/l Alkylbenzyl Sulfonates mg/l (ABS) 19.Phenolic substance (as phenol) mg/l Mercury (Hg) mg/l Lead (Pb) mg/l Arsenic (As) mg/l Selenium (Se) mg/l Chromium mg/l (Cr hexavalent) 25.Cyanide (CN) mg/l Cadmium (Cd) mg/l Barium (Ba) mg/l Standard plate count Colonies/cm Total coliform MPN/100 cm 3 < E.coli - None - Remark *If the calcium concentration is higher than the standard and magnesium concentration is lower than the standard, calcium and magnesium will be identified in terms of total hardness with a standard value of less than 300 mg/l (as CaCO 3 ) **If a sulphate concentration of 250 mg/l is reached, magnesium concentration must not be more than 30 mg/l. *** Maximum allowable concentration permits tap water or deep well water for temporary consumption as necessary. Source Notification of the Ministry of Industry, No. 322, B.E (1978), issued under the Industrial Products Standards Act B.E (1968), published in the Royal Gazette, Vol. 95, Part 68, dated July 4, B.E (1978).

23 Page 23 of 28 Effluent from Factory To Central Waste Water Treatment Plant Amata Nakorn & Amata City Industrial Estate Items Unit Standard values 1. Biochemical Oxygen Demand (BOD5) mg/l not more than Chemical Oxygen Demand (COD) mg/l not more than Suspended Solid (SS) mg/l not more than Total Dissolve Solid (TDS) mg/l not more than Total Kjeldahl Nitrogen (TKN) mg/l not more than ph Heavy Metal - Mercury (Hg) mg/l not more than Selenium (Se) mg/l not more than Cadmium (Cd) mg/l not more than Lead (Pb) mg/l not more than Arsenic (As) mg/l not more than Chromium (Cr 3+ ) mg/l not more than Chromium (Cr 6+ ) mg/l not more than Barium (Ba) mg/l not more than Nickel (Ni) mg/l not more than Copper (Cu) mg/l not more than Zinc (Zn) mg/l not more than Manganese (Mn) mg/l not more than Silver (Ag) mg/l not more than Total iron mg/l not more than Fluoride (F) mg/l not more than Sulfide mg/l not more than Cyanide as HCN mg/l not more than Formaldehyde mg/l not more than Phenols Compound mg/l not more than Chloride ascl 2 mg/l not more than Free Chlorine mg/l not more than Pesticide - not allowed 17. Temperature o C not more than Color - Non Objectionable 19. Odor - Non Objectionable 20. Oil & Grease mg/l not more than Radioactive - not allowed 22. Surfactant (Synthetic Detergent) mg/l not more than 30.0 Sources Appendix-14 Announcement of the Industrial Estate Authority of Thailand No. 78/2554 dated November 23, 2011 (Amata Nakorn & Amata City Industrial Estate)