1 ~ _ ~8 Noth East Region - Gafton Management Aea 1:1 oo.ooo Gatton 9438 Locality Map J,. Foesty 1:25,000 Buccaumbi N Compatments 601, 602, 603, 604 &606 J:.:. Copoation ln Map Sheets: Scale:1:100,000 Nymboida State Foest PojecUon: GDA_1994_MGA_Zone_ _ ~ ~~----~ ~ ~ ~~~ ~~~ Chamblgne NR 1 MARARA MAP FEATURES..., Helicopte Landing Aea + Safety Points ROADS --Sealed - All Weathe, Unsealed ~ Havest Aea Dy Weathe, Unsealed ~ State Foest Fou Wheel Dive National Paks Haulage Routes /{ GOA Dainage Ceal&d By: Kennedy Kujinga Date:

2 HARVEST PLAN No Nymboida SF, Compatments & 606 FORESTS NEW SOUTH WALES- NORTH EAST REGION HARVESTING PLAN No Nymboida State Foest - Compatments 601, 602, 603, 604 & Cetification This plan has been pepaed in accodance with the Integated Foesty Opeations Appoval issued unde the Foesty and National Pak Estate Act 1998 and addesses significant aspects and impacts in the planning pocess. The Standad Havest Plan Conditions fo Native Foest Opeations in Noth East Region apply to this opeation. pepaedb)y: Havest Planne Kennedy K Kujinga Endosed by: I ~:::~t Planning Team I ~ Date: 1q/1o /l3 IDate Endosed b : Regional Planning Mana e Date: ts(10/11 e Caig Busby Note: Appoval includes the Havest 2. Desciption of Poposal Selective havesting of egowth native foest stands, using Single Tee Selection. Othe poposed woks: Pqj:>osed Details Roadwoks Yes Roadwoks Plan (attachedj Post havest Buning Yes Plan to be pepaed sepaately Rehabilitation No

3 HARVEST PLAN No Nymboida SF, Compatments & Aea Identification andv'ielcl Estimates Region Management Aea State Foest Noth East Region Gafton Nymboida State Foest No. 758 Picing aea Othe Tenue Details Gafton State foest only Cpt 601 Cpt 602 Cpt 603 Cpt 604 Cpt 606 Total Goss Aea (ha) Net Havest Aea (ha) Estimated Yield (m3/ha) Volume (m3) All Poduct Poducts Total (m3) High Quality Lage 2037 High Quality Small 2037 Low Quality 1284 Poles 558 Total Foest Desciption Foest Type: (See Foest type map) Spotted Gum. Also contains ionbak, Gey Box, White Mahogany and Gey Gum. Havest Histoy: No ecods fo cpts Cpts 604 & 606 last havested 1997 Stand Desciption: Mixed aged Spotted Gum Sapling: 0-25cm dbhob egowth makes up 20% Pole/Matue 40-60cm dbhob component esulting fom pevious havest events 60% Matue/Senescent 60-1 OOcm 20% Site Quality Geneally modeate site quality with site height 35m Stand health Cown health is good thoughout the compatments Compatment 606 is BMAD affected 2

4 HARVEST PLAN No Nymboida SF, Compatments & 606.s.. F'es~~i>#<lfls Notwithstanding the pesciptions detailed below, all conditions of the IFOA, including Geneal and Species Specific conditions of the Theatened Species Licence and the Envionment Potection Licence ae to be applied, whee they ae descibed in this plan o in the espective licences. Objectives: Maximise the ecovey of mechantable timbe fom the matue age/size cohot within the constaints of the havest plan Ceate suitable conditions fo a egeneation event. Stand Pesciption Mixed age Spotted gum Teatment- cuent ops STS Est.% of NHA 95% Expected BA Removal (%) 35% Futue Ops yeas STS Single Tee Selection pesciption: Tee emoval and gound distubance must also maximise egeneation oppotunities. Single Tee Selection must emove no moe than 40% of the basal aea acoss the net havest aea. Tees with dbhob <20cm must not be selected fo havesting unde STS ( IFOA). BA emoval may exceed 40% in some localized aeas, but will be balanced by offset aeas, non havest aeas and tee etention acoss the tact. 6; SpeCial C:o!lditiofls 6.1 Seasonal Havesting and Buning Restictions No 6.2 Leases, Pemits, Plots Cown Leases Occupation Pemits (qazinq) Occupation Pemits (apiay) Occus Details Conditions No No Yes Havesting Foeste must contact pemittee pio to havesting commencing. Bee sites shown on HPOM must not be used as dumps. Havesting should aim to minimise impact on any occupied apiay site. If the pesence of hives is unduly constaining havesting, the Havesting Foeste must consult with the pemittee to ensue that the impact on havesting is minimised. Occupation Pemits No (othe) PGP's Yes Thee ae two PGPs in Cpts 604 & 606 at gid efeence E N & E N as indicated on the HPOM. The havesting contacto must collect all tags fom tees havested o destoyed and etun to NER Resouces Unit. Reseach Plots No Special Pupose Pemits No 3

5 HARVEST PLAN No Nymboida SF, Compatments & Citical Boundaies Pivate Popety: Westen bounday is fenced Southen bounday is fenced, howeve the fence is not stock poof. Glen Ceek Road This oad is excised fom the foest and compises the tack in use 20 metes wide. Othe citical boundaies: If thee is any doubt about the location of a citical bounday, claification must be sought fom the Havest Team Leade to detemine the equiements fo bounday mak-up. Havesting must not impact on pivate popety o any fence line. Any damage to a functional fence must be immediately epaied by the contacto. 6.4 Noise Whee thee ae esidences in close poximity to an opeation o haulage oute that ae likely to be affected by noise (as detemined by the SFO), mitigation measues to lessen the impact on those esidences will apply. These measues ae to be detemined on a site specific basis by the SFO and should be discussed with the Havesting Team Leade. 6.5 Undegound Cables Thee is a Telsta cable that uns adjacent to Glens Ceek Road and Melomys Road. Site plans fo the cable ae held on the Havest Plan Folde. Dial befoe you dig pocedue must be followed pio any excavation o oad maintenance woks in this aea to detemine cable locations. 6.6 Haulage Consideations Haulage via Old Glen Innes Rd Havest Team Leade to contact neighbou Simone McPhillips pio to using Melomys Road and 603/1 Road. Melomys Road is a naow oad used fo pivate popety access. Additional signage should be used on Glens Ceek Road to notify taffic of tuning tucks. 6.7 IFOA Requied Appoval Of Foesty Activities Nil appovals equied. NOTE: Any additional cossings of Rainfoest, HCVOG and Ripaian Potection Zones equie pio Regional Manage (o NPWS) appoval befoe can be undetaken. It is the esponsibility of the SFO to identify any additional aeas that need to be cossed, the location of any such cossings without appoval and to contact the Planning Unit to obtain the necessay appoval. 6.8 Unmapped Rainfoest Unmapped ainfoest is to be identified and maked fo etention in accodance with Foest Pactices Cicula 2005/ Fol'esfllilallagemellt iollfllg ConC:Iitions The following Foest Management Zones and conditions apply: FMZ Type Notes Zone4 Zone 8 Geneal Management Futhe Assessment Available fo havesting in accodance with the conditions of this havest plan. These aeas ae to be ezoned FMZ 4 with management by pesciption (Standad Havest Plan Conditions fo Native Foest Opeations in Noth East Region apply) 4

6 HARVEST PLAN No Nymboida SF, Compatments & 606 These aeas include Mapped dainage featues - identify in the field and apply EPL and TSL conditions based on actual field location, Modelled dainage featues - modelled steams ae to be inspected by the SFO. Appopiate pesciptions (Schedule 4 of the EPL) ae to be applied if equied and noted on the havesting opeational map. Aboiginal Cultual Heitage Yes- Recod of aboiginal isolated atifact campsite along Hae Road at GR Atefact not located duing suvey, no conditions apply. Non Aboiginal Cultual Heitage No special conditions apply 9.t:lc>~'aicff:ai.ii~.cQ'it"l!tiol"l's Refe to Technical Guidance Note A Mach 2005 fo conditions (TSL Booklet) Mak-up Conditions The SFO must seach fo theatened species and mak-up the block as pe Conditions 5.1 (Geneal), and 5.2 (Koala) of the TSL. The Tee Making code is shown in the Standad Havest Plan Conditions fo Native Foest Opeations in Noth East Region. Tee etention Conditions applying: Pesciption TSL Condition Hollow beainq and ecuit tees (Non-ReQowth Zone) 5.6 a,b Geate Glide density > 1 pe ha? No- 6.9 d does not apply Stag Retention 5.6e Significant Food Resouces 5.6f Potection of Retained Tees 5.6g Species Known o Likely to Occu Recent and eliable ecods exist within, o within close poximity of the compatments fo the following theatened species. These species equie species-specific o site-specific pesciptions if futhe ecods o habitat featues ae identified duing mak-up. SPECIES GROUP COMMON NAME SCIENTIFIC NAME Amphibians Giant Baed Fog Mixophyes iteatus Reptiles Pale-headed Snake Hoplocephalus bitoquatus Mammals Rufous BettonQ Aepypymnus ufescens Koala Phasco/actos cineeus Bids Rufous Scub-bid Atichonis ufescens Glossy-black Cockatoo Calyptohynchus /athami Poweful Owl Ninox stenua Masked Owl T yto novaehollandiae Sooty Owl T yto tenebicosa 5

7 HARVEST PLAN No Nymboida SF, Compatments & 606 Site-Specific Conditions, Exclusion Zones & Modified Havest Aeas Table 1: Geneal Conditions TSL Condition Koala Mak-up Seaches TSL Condition Recod No. Details KOAL ecods in cpts G_602, 604 Tee Retention 5.6 (f) 12 GLBC feed tees in cpts Buning 5.16 Theatened species have been ecoded in these cpts. Pesciption Summay These compatments contain pefeed foest types, making-up must be conducted at least 300m in advance of havesting opeations. In the event that a koala o scats (as noted in 5.2.2(i)) ae found, a koala sta seach will be conducted to detemine koala use aea/s. Retain and potect glossy black cockatoo feed tees. The habitat equiement of theatened species must be taken into account when instigating hazad eduction buns to pomote and maintain an undestoey mosaic, significant aeas of dense undestoey vegetation and to minimise impact on lage fallen logs. Table 2: Species-specific Conditions TSL Condition Poweful Owl (Ninox stenua) Masked Owl (Tyto novaehollandiae) Koala (Phascolactos cineeus) TSL Condition Recod No. Details 6.9 1POWL ecod in cpt G_606 1 MOWL ecod in cpt G KOAL ecods in cpts G_602, 604 Pesciption Summay Landscape appoach as specified in will be used. Condition 5.13 may be applicable to potect any oosts o nests found. Seach gully lines and heads of gullies fo oost and nest sites. Evidence of koalas was found in the compatment, but pe-logging suveys did not detect intemediate o high use aeas. Compatment mak-up must be completed. Table 3: Default Species-specific Conditions in lieu of suvey TSL Condition Giant baed Fog (Mixophyes iteatus) Swift Paot (Lathamus discolo) Regent Honeyeate (Xanthomyza phygia) TSL Conditio n No. Recod Details 7. b) iii Nil ecods 7. b) X Nil ecods Pesciption Summay Exclusion zone of 30m on both sides of steams that occu within modelled habitat. No modeled habitat within o adjoining these compatment. Retain 10 eucalypt feed tees (which may include habitat and ecuitment feed tee species) within evey 2ha of NLA. All tees whee species wee obseved feeding must be etained. 6

8 HARVEST PLAN No Nymboida SF, Compatments & 606 Table 4: Othe Ecological Consideations Issue, Featue o Recod Endangeed ecological Communities Pesence The desktop eview and the pehavest suveys did not tigge o indicate the likely occuences of EEC's in the planning aea of cpts G_601, 602,603,604,606. Continue seach within NHA. Assessment and Management Recommendations Identify and mak in field to exclude specified foesty activities. Contact FCNSW ecology unit fo guidance if equied. In addition to Foest Management Zone Exclusions, the following exclusion zones occu and ae shown on the opeational map. Bounday making conditions fo each exclusion zone ae descibed on the HPOM and in the tee making code. Ripaian Potection (TSL Condition 5. 7) Ridge and Headwate Habitat (TSL Condition 5.8) Bounday making conditions fo each exclusion zone ae descibed on the HPOM and in the tee making code (see Standad Havest Plan Conditions fo Native Foest Havesting in Noth East Region). 11f F'lsl)eiesEfC'eo<:e>cotii:iitions Refe to Technical Guidance Note Mach 2005 (Fisheies Licence Booklet) Class 2 Aquatic Habitat (Easten Feshwate Cod) has been identified as occuing within these compatments. Conditions of the Fisheies Licence apply. Condition 7 of the Fisheies Licence applies Condition 7.9 of the Fisheies Licence apply to snig tack cossings of mapped and unmapped dainage lines. o Cossings must be appoved and maked in the field pio to use o Cossings may only be used whee it is not easonably pacticable to use anothe oute o site. o Conditions 8.3 and 8.4 of the Fisheies Licence apply to cossings. 7

9 HARVEST PLAN No Nymboida SF, Compatments & Soils and Wate Potection Conditions Refe to Technical Guidance Note C (Envionment Potection Licence Booklet) & Standad Havest Plan Conditions fo Native Foest Havesting in Noth East Region Site-specific EPL conditions Elements Unmapped Dainage Lines Dainage Featue Potection Inheent Hazad Class 1 Dispesible Soils Mass Movement Log Dumps Snig Tacks Roads Non-Haulage Roads Conditions EPL applies- UDL havesting not pemitted. See HPOM fo widths NO NO Refe elevant conditions fo I HL Refe elevant conditions fo I HL See schedule 5 of EPL Booklet May be used fo extaction, EPL applies. Remove debis on completion of opeations. '12 Legal Conditions This opeation must comply with: Standad Havest Plan Condition fo Native Foest Opeations in Noth East Region. Licence Conditions issued by Foesty Copoation of NSW unde the Foesty Act (2012). State Foests of NSW Foest Pactices Code - Pat 2 Timbe Havesting in Native Foests Febuay 1999 and Foest Pactices Code Pat 4 Foest Roads and Fie Tails (Febuay 1999). Integated Foesty Opeations Appoval issued unde pat 5B of the Foesty Act 2012 (I FOA) including the associated licences: Theatened Species Consevation Licence (TSL) issued unde the Theatened Species Consevation Act (1995). Licence issued unde section 220Z)J\/ of the Fisheies Management Act 1994 (FL). This opeation is a non-scheduled opeation unde the Envionment Potection Licence issued unde section 55 of the Potection of the Envionment Opeations Act Roading and havesting opeations ae not licenced. All EPL conditions will apply to havesting and oading opeations. 13 Attachments Attachment 1 : Locality map Attachment 2: Havest Plan Opeational Map Attachment 3: Foest Type Map Attachment 4: Site Safety Plan pescibes descibes safety equiements and Medical Emegency Evacuation Plan fo this havesting opeation. Attachment 5: Roading plan pescibes oading equiements fo this havesting opeation. 8

10 HARVEST PLAN No Nymboida SF, Compatments & Opeational Contol Contacto Team Leade to sign hee I acknowledge that I have eceived a copy of the plan documents and that I have been biefed on the conditions of the Plan. I undestand the opeational contol equiements as outlined in the plan and take esponsibility fo the implementation of plan conditions as the pinciple contolle of the opeation. I will bief any othe opeatos not pesent at this biefing pio to them stating any wok on site and ensue that isk assessment fo the Safety Management Plan is completed fo this aea pio to opeations commencing. Name Signatue Position Company Date Fom To Pincipal SFO to sign hee (handoves between pincipal SFOs also to be ecoded) I acknowledge that I have eceived a copy of the plan documents and that I have been biefed on the conditions of the Plan. I undestand the opeational contol equiements as outlined in the plan and take esponsibility as the pinciple SFO. Name Signatue Position Company Date Fom To Name Signatue Position Company Date Fom To Name Signatue Position Company Date Fom To Name Signatue Position Company Date Fom To 9

11 HARVEST PLAN No Nymboida SF, Compatments & Handove Biefing I acknowledge that I have eceived a copy of the plan documents and that I have been biefed on the conditions of the Plan. I undestand the opeational contol equiements as outlined in the plan. Company Name Signatue Date Induction Questionnaie

12 ROAD lng PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 FORESTS NEW SOUTH WALES - NORTH EAST REGION ROAD WORKS PLAN State Foest Nymboida; Compatments 601, 602, 603, 604 & 606 Pepaed By: Havest Planne Signatue Kennedy K Kujinga Appoved By: Regional Manage Caig Busby ~ Signatue CJ~L, ' 7 " \. Date!J<~nl!<: Date?~(If 'K Roadwoks ae equied to sevice native foests havesting opeations within the above compatments. These compatments ae scheduled fo havest in The opeational map shows the location of the poposed woks. Attachments: Financial Analysis Speadsheet gives full details of costs, benefits, mateial & plant equiements This opeation must comply with: Standad Havest Plan Conditions fo Native Foest Opeations in Noth East Region. Licence Conditions issued by Foesty Copoation of NSW unde the Foesty Act (2012). State Foests of NSW Foest Pactices Code - Pat 2 Timbe Havesting in Native Foests Febuay 1999 and Foest Pactices Code Pat 4 Foest Roads and Fie Tails (Febuay 1999). Integated Foesty Opeations Appoval issued unde pat 5B of the Foesty Act 2012 (I FOA) including the associated licences: Theatened Species Consevation Licence (TSCL) issued unde the Theatened Species Consevation Act (1995). Licence issued unde section 220ZW of the Fisheies Management Act 1994 (FL). This opeation is a non-scheduled opeation unde the Envionment Potection Licence issued unde section 55 of the Potection of the Envionment Opeations Act Roading and havesting opeations ae not licensed. All EPL conditions will apply to havesting and oading opeations. Technical Guidance Notes fo Roadwoks. - 1

13 ROAD lng PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 Featue Cultual Heitage Theatened Species Dispesible Soils Hazad Mass Movement Hazad Seasonality Engineeing Design Envionmental impacts ie Dust, Noise, Wate, Visual Haulage Standads National Pak Conditions Yes Aboiginal isolated atifact along Hae Road on Roadwoks will not impact the site. See havesting plan. Minimise distubance within potection zones. No No No No No No No Pivate Popety No Pemit To Ente equied Yes - PTE eceived fo access though PP along Melomys Road. Quaies and Gavel Pits Undegound/Ovehead Utilities Safety Issues (includes hazads, public use of oads) No Yes- Undegound Telsta lines un paallel to Glen Ceek Road and Melomys Road. Caution should be used when excavating nea these oads. Section of Melonys Rd between dumps 4 & 8 is naow and used fo pivate popety access. 3.1 Shot Tem Haulage Roads Shot Tem haulage Roads ae shown on the opeational map. They ae cuently vegetated and stable. These oads may be used fo haulage, subject to the following conditions: o o o o o o o Roads must be left vegetated until immediately pio to use dainage is installed to EPL specifications within 5 days of completion of haulage opeations (cossbanks) olloves o othe EPL compliant dainage ae installed whee oad gade is less than 3 degees EPL compliant dainage is installed 5-30m eithe side of any dainage line cossing Minimise distubance to vegetated, woking table dains Tempoay dainage is installed in the event of ongoing ainfall o cessation of opeations fo moe than 2 days. Road Dainage spacings may exceed those specified in Schedule 5 of the EPL whee: o mite dains cannot be constucted ( eg side cut oad); - 2

14 ROAD lng PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 oad gade exceeds 3 degees Consideation to be given to implementation of additional site specific conditions as appopiate such as: Utilising outfall and othe foms of dainage (modified olloves) Installing enegy dissipates in table dains ; and Installing silt mesh /tapping on dain outlets if native vegetation filteing is inadequate 4. Gellel"alConditions Remove tees in accodance with FCNSW Safety Standad 1.3.9; and Remove vegetation within 3m of the oad pism only whee equied to maintain safe sight distance and passage of tucks. Note: Cleaing is geneally pemitted within 3m of the oad pism fo all oads. Gound distubance and tee debis may impact outside this 3m eithe side of the oad pism as is equied to effect cleaing within 3m of the oad pism. Conditions 5, 6 and 47 Schedule 5 of the EPL must apply. - 3

15 ROADING PLAN- Nymboida State Foest, Compatments 601,602,603,604 & E -u; -c E > a_ en - ~ m clj ""0 "iii ""0 0 a: C) c a; ~ c 5. Woks Schedule ROAD MAINTENANCE I UPGRADE Road Name: Melomys Road Categoy: Pemanent Road Length 2400m WORKS Woks on >30' slopes Mass movement conditions Dispesible Soils Conditions Widening Mino Realignment Re-opening Remove vegetation I debis Repai suface Cown I Cossfall Gavel Remove tees >20 em dbhob Remove tees <20 em dbhob Repai/upgade of Battes REQUIRED.. 17 f.1 f.1 f.1, w. INSTRUCTIONS/SITE SPECIFIC CONDITIONS Remove Dangeous tees/stags only Culvets w Clean inlet/outlets Mite Dains f.1 ' ROD I Spoon f.1 Belts/Channels, Dop Downs Silt Tapping In accodance with geneal condition 4. Stat Date: Finish Date: Date Event Initial - 4

16 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 ROAD MAINTENANCE I UPGRADE Road Name: Jaspe Rd Categoy: Tempoay Road Length 2000m ';~g~~~;,'<;;,......,:;.... ;' > Woks on >30' slopes. 0-s::: C!l -c;; -s::: C!l E C!l > D..!!? C!l - Ill all C!l "C u; "C 0 a: C!l 0 s::: c;; Mass movement conditions Dispesible Soils Conditions Widening ~~~~~~' \';..;,......, ,. ;;' "01' '.. v ~~. Mino Realignment. Re-opening Remove vegetation I debis Repai suface p, Cown I Cossfall p, Gavel. Remove tees >20 em dbhob p. Remove tees <20 em dbhob 17 Repai/upgade of Battes. Culvets p, Clean inlet/outlets Mite Dains p. ROD I Spoon p. Belts/Channels 1 Dop Downs Silt Tapping Stat Date: p Remove Dangeous tees/stags only In accodance with geneal condition 4. Finish Date: Date Event Initial. - 5

17 ROAD lng PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & <::., -i:i5 -<::., Ẹ, > a_., ~ :::: l!l o!s., C u; C 0 0::., <:: c;; ~ c ROAD MAINTENANCE I UPGRADE Road Name: Hae Road Categoy: Tempoay Road Length 1800m WORKS >... REQUIRED Woks on >30' slopes, Mass movement conditions J Dispesible Soils Conditions j, Widening Mino Realignment Re-opening Remove vegetation I debis '' Repai suface f.7 Cown I Cossfall Gavel Remove tees >20 em dbhob Remove tees <20 em dbhob Repai/upgade of Battes.; 1;1 '.;;, Culvets f.7 Clean inlevoutlets Mite Dains ROD I Spoon Belts/Channels Dop Downs Silt Tapping Stat Date: p, '' INSTRUCTIONS/SITE SPECIFIC CONDITIONS..... Remove Dangeous tees/stags only In accodance with geneal condition 4. Finish Date: Date Event Initial - 6

18 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 ROAD MAINTENANCE I UPGRADE Road Name: Pademelon Road Categoy: Tempoay Road Length 970m.!i i> f < 0-<:: Cl) -iii -<:: Cl) E Cl) > co a.!!! :!!! co Ill ell Cl).,., 'iii co 0 a: Cl) "" co <:: '(5 c ~ IJ':.,.,..,.,.. :~>.. >. REQUiaeb INSTR!JCJ'R~i5ts,fe58~~~~,R~~Nq'no.N~.....i:... Woks on >30' slopes Mass movement conditions Dispesible Soils Conditions. Widening Mino Realignment Re-opening Remove vegetation I debis 17 Repai suface 17 Cown I Cossfall 17 Gavel Remove tees >20 em dbhob 17 Remove tees <20 em dbhob p. Repai/upgade of Battes. Culvets 17 Clean inlet/outlets Mite Dains 17 ROD I Spoon 17 Belts/Channels. Dop Downs. Silt Tapping. Stat Date: Remove Dangeous tees/stags only In accodance with geneal condition 4. Finish Date: Date Event Initial - 7

19 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & <:::., -i:ii -<:::., Ẹ, > a_.,!!! :::: Ill GIS., "C 'iii "C 0 a:., "" <::: a; ~ c ROAD MAINTENANCE I UPGRADE Road Name: Pollis Road Categoy: Tempoay Road Length 450m WORKS '.. ' ' Woks on >30' slopes Mass movement conditions Dispesible Soils Conditions Widening Mino Realignment REQUIRED Re-opening Remove vegetation I debis p. Repai suface p, Cown I Cossfall p, Gavel Remove tees >20 em dbhob Remove tees <20 em dbhob Repai/upgade of Battes Culvets Mite Dains ROD I Spoon Belts/Channels Dop Downs Silt Tapping Stat Date: p p. p. p. p.. INSTRUCTIONS/SITE SPECIFIC CONDITIONS '. ' ' Remove Dangeous tees/stags only In accodance with geneal condition 4. Clean inlet/outlets Finish Date: Date Event Initial ' - 8

20 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606!.\~'j., 0-<::: C1> -i:ii -<::: C1> E C1> > D.. ~ :!!! IJJ ~ C1> "C 'iii "C 0 a: ROAD MAINTENANCE I UPGRADE Road Name: 601/1 Road Categoy: Tempoay Road Length 880m \?i,,'i Z',f\. Woks on >30' slopes Mass movement conditions Dispesible Soils Conditions ~eolllijeo Widening. Mino Realignment. Re-opening Remove vegetation I debis Repai suface p. Cown I Cossfall Gavel p I" Remove tees >20 em dbhob p. Remove tees <20 em dbhob p, Repai/upgade of Battes Culvets p, Clean inlet/outlets ' in$aucfionsjsffeskeciflc\'conoltlons.. '. ' '... '.... ' ' Remove Dangeous tees/stags only In accodance with geneal condition 4. C1> Cl) <::: '(;; ~ 0 Mite Dains p,. ROD I Spoon p, Belts/Channels Dop Downs Silt Tapping Stat Date: ' Finish Date: Date Event Initial - 9

21 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & <:::., -ii5 -<:::., Ẹ, > o._., l!! :::: ID ~., "C -u; "C 0 a:., <::: c;; ~ 0 ROAD MAINTENANCE I UPGRADE Road Name: 602/1 Road Categoy: Tempoay Road Length 1130m WORKS... REQUIRED Woks on >30' slopes. Mass movement conditions Dispesible Soils Conditions, Widening Mino Realignment Re-opening Remove vegetation I debis p, Repai suface p, Cown I Cossfall p, Gavel INSTRUCTIONS/SITE SPECIFIC CONDITIONS Remove tees >20 em Remove Dangeous tees/stags only dbhob p. Remove tees <20 em In accodance with geneal condition 4. dbhob Repai/upgade of Battes p. Culvets p, Clean inlet/outlets Mite Dains p, ROD I Spoon p, Belts/Channels, Dop Downs. Silt Tapping Stat Date: Finish Date: Date Event Initial. - 10

22 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 ROAD MAINTENANCE I UPGRADE Road Name: 603/1Road Categoy: Tempoay Road Length 1750m :,-,,,,,:,:';:,;''>'<'''>,.,, v: ~ fj;quireo' ;I~~ i~~ticl.~~~~~l~ ~~~~~ffl~~~~~~t!gns~j:.,.. :.. Woks on >30 slopes 0 - Mass movement.e conditions ' u; Dispesible Soils Conditions. -<: E Widening Mino Realignment Re-opening ' ' Remove vegetation I debis p. > Repai suface p a_ Cown I Cossfall Gavel p ' ' Vl ~ Remove tees >20 em Remove Dangeous tees/stags only :1::: dbhob IIl o!s 17 Remove tees <20 em In accodance with geneal condition 4. C dbhob 17 ' 'iii C Repai/upgade of 0 a: Battes ' <: Culvets Mite Dains en ROD I Spoon p 'iii 0 ~ Belts/Channels Dop Downs Silt Tapping Stat Date: 17 p. ' ' Clean inlet/outlets Finish Date: Date Event Initial - 11

23 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 ROAD MAINTENANCE I UPGRADE Road Name: Road Categoy: Tempoay Road Length 1150m I WORKS REQUIRED INSTRUCTIONS/SITE SPECIFIC CONDITIONS Woks on >30' slopes, 0 Mass movement -<:: conditions, c;; - -<:: E > o._ ~ :::: ID cis ""C ;;; ""C 0 Dispesible Soils Conditions Widening, Mino Realignment Re-opening, Remove vegetation I debis Repai suface Cown I Cossfall Gavel Remove tees >20 em dbhob ' p, ' ' Remove Dangeous tees/stags only Remove tees <20 em In accodance with geneal condition 4. dbhob p, Repai/upgade of a: Battes Culvets Mite Dains p, ' ROD I Spoon p, <:: ;a Belts/Channels c. ~ Dop Downs. Silt Tapping Stat Date: Clean inlet/outlets Finish Date: Date Event Initial - 12

24 ROADING PLAN - Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 CROSSING WORKS Cossing Name: A Hae Road, 1370m south fom the junction of Jaspe Rd Cossing Type Existing Futue of Cossing Dainage Featue Type Gully Stutte Existing Pemanent 3d ode dainage line Cossing Steam Pemanency Intemittent Appoaches & Road Dainage Reshaping Bed &Banks Nil Appoach Woks Nil Pavement/stuctue Nil 5-30m Upsteam left Install 5-30m Disposal of spoil NA 5-30m Upsteamight Install 5-30m Inlet/Outlet Amou with ock on outlet Pactices whee no 5-30m NA Soil Stabilisation within 20m Soil eosion/sediment contol Seed/Mulch distubed soil Outlet contol Rock amouing 2 loads lage ock Natual Vegetation Table dain silt contol Natual Vegetation 3d ode DL A Install od/f m Install 5-30m Existing gavel & ocky suface Stat Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial - 13

25 ROADlNG PLAN - Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 CROSSING WORKS Cossing Name: B601/1 Road, 390m fom the junction of Glen Ck Rd along 601/1 Rd Cossing Type Existing Futue of Cossing Dainage Featue Type Causeway Existing Pemanent 1st ode Dainage Line Cossing Steam Pemanency Intemittent Appoaches & Road Dainage Reshaping Bed &Banks Nil Appoach Woks Nil Pavement/stuctue Nil 5-30m Upsteam left Existing cest Disposal of spoil NA 5-30m Upsteam ight Existing cest Inlet/Outlet Amou with ock on outlet Pactices whee no 5-30m NA Soil Stabilisation within 20m Soil eosion/sediment contol Seed/Mulch distubed soil Outlet contol Natual Vegetation Natual Vegetation Table dain silt contol Natual Vegetation B Existing cest Existing cest 2 loads lage ock Existing natual suface Stat Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial - 14

26 ROADlNG PLAN - Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 CROSSING WORKS Cossing Name: A1 601 /1 Road, 280m fom the junction of Glen Ck Rd along 601 /1 Rd Cossing Type Existing Futue of Dainage Featue Steam Cossing Type Pemanency Causeway Existing Pemanent U Dainage Line Intemittent Cossing Appoaches & Road Dainage Reshaping Bed & Banks Nil Appoach Woks Nil Pavement/stuctue Nil 5-30m Upsteam left Install Rollove back Disposal of spoil NA 5-30m Upsteam ight Install Rollove Inlet/Outlet Amou with ock on outlet Pactices whee no 5-30m NA Soil Stabilisation within 20m Soil eosion/sediment contol Seed/Mulch distubed soil Outlet contol Natual Vegetation Natual Vegetation Table dain silt contol Natual Vegetation AI \ \ Install 5-30m Install 5-30m \ \ \ \ \ lload small ock 4 loads lage ock Stat Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial - 15

27 ROADING PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 CROSSING WORKS Cossing Name: C 601 /1 Road, 740m fom the junction of Glen Ck Rd along 601 /1 Rd Cossing Type Existing I New Futue of Cossing Dainage Featue Type Causeway Existing Pemanent 2nd ode Dainage Line Cossing Steam Pemanency Intemittent Appoaches & Road Dainage Reshaping Bed &Banks Nil Appoach Woks Nil Pavement/stuctue Nil 5-30m Upsteam left Install Rollove Disposal of spoil NA 5-30m Upsteam ight Install Rollove Inlet/Outlet Amou with ock on Pactices whee no 5-30m NA _l)_avement Soil Stabilisation within Seed/Mulch distubed soil Outlet contol Natual Vegetation 20m Soil eosion/sediment Natual Vegetation Table dain silt contol Natual Vegetation contol \ c \.. \ Install 5-30m 5-3 Om \... \ \ \ \.. \...} \ Amou with small ock and gavel 3 loads Stat Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial - 16

28 ROAD lng PLAN- Nymboida State Foest, Compatments 601, 602, 603, 604 & 606 :6, Pe-Opeational Biefing I acknowledge that I have eceived a copy of the Roadwoks/Havesting Plan fo Compatments 601, 602, 603, 604 and 606 in Nymboida State Foest and that I have been biefed on the conditions of the Plan. I undestand the supevision and opeational contol equiements as outlined in the plan.. Name... " > <._....Poj;;ition pate..... Signatue. - 17