1 AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT COMPONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN RENOVATION OF PASTURES WATERING NETWORK IN GEGHHOVIT COMMUNITY OF THE RA GEGHARKUNIK MARZ November 2014

2 A. GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL AND ADMINISTRATIVE Country Name of the Project Republic of Armenia Community Agro Resource Management and Competitiveness Subproject Title Renovation of pastures watering network in Geghhovit community of Gegharkunik marz Institutional Arrangements (Name and contacts) Implementation Arrangements Project Team Leader (WB) Arusyak Alahverdyan Safeguard Supervision (WB) Project Management Gagik Khachatryan, Director Safeguard Supervision () Local Counterpart and/or Recipient Vardan Poghosyan Head of Geghhovit Community Contractor (Name and contacts) PROJECT NAME AND SITE DESCRIPTION Darejan Kapanadze Kamo Khachatryan Alice Savadyan.. Description of the Project byproject implementation area, community The main purpose of the sub-project is the improvement of pastures watering network in Geghhovit community providing sufficient water supply for 1957 bovine cattle and 996 small cattle directly in the pasture. The following construction activities will be implemented under the proposed sub-project: Construction of one spring collection point with metallic fence Installation of 3 water ways, which will be connected to drinking water pipeline, m length (PE 63x3,0 ) waterway 25,0 m length (PE 57x3,0) waterway, 12,0 m length (PE 57x3,0) waterway Construction of three 8,0 and 24, and 12,0 long metallic troughs- semi-pipes installed on concrete - cobblestone platform. 2 water collection chambers and pressure regulation chamber installation 46.2x24.0 m open cattle-pen construction 1020 m 2, from which 90 m x6.0m will have a roof Construction of 4.6x6.4, h=3.0 m shelter for herdsman The design for pastures watering network has been developed by the HGHSHN design company under the contract concluded with Agricultural Project Implementation Unit. Republic of Armenia, Gegharkunik marz, Geghhovit community 2

3 Project site location Land ownership Description of geographic, physical, biological, geological, hydrographic and socio-economic context Locations and distance for material sourcing, especially aggregates, water, stones LEGISLATION Indentify national and local legislation and permits that apply to project activity PUBLIC CONSULTATION Identify when/where the public consultation took place ATTACHMENTS Project implementation area is located at a distance of 126 km from Yerevan city, about 63 km from Martuni and in 3-4 km from Geghhovit community. Both waterways will be connected to drinking water pipeline, for which Geghhovit community obtained water use permits from MoNP. Land required for the project implementation belongs to community. Letter on land ownership from the Geghhovit community Head is attached. The sub-project site is located in Gegharkunik marz, in Geghhovit community near Martuni town area. Geghhovit is located on north- eastern part of Sevan lake, located on Gegahama mountain chain, m above sea level. Climatic conditions of the Geghhovit possesses is mild mountainous. The winter is cold, snowy. The summer is warm, few clouds, comparatively humid weather. The Sevan Lake mitigates the winter frost and summer heat. Because of the lake, the average temperature in January is almost the same as in Yerevan. Precipitation is not abundant, mm on the lake surface, up to 1000 in the mountains. Water for construction works will be provided by water cistern track. Aggregates and machinery will be obtained from the licensed providers within the project area. Contractor may choose to extract equipment himself, in which case contractor must obtain an extraction license prior to commencement of extraction. Metallic and PE pipes as well as all fittings will be purchased from an official supplier. Permits required for accomplishing the works envisaged by the project: Construction license to be possessed by Construction Contractor, Construction permit to be obtained by the Construction Contractor from Geghhovit municipality Water use permits obtained by Geghhovit community from RA MoNP Written consent for disposal of construction waste to be obtained by Construction Contractor from the Head of Geghhovit Community. Land ownership letter possessed by the Geghhovit Community. 1. Site plan 2. Letter from Geghhovit community head on the land plot ownership 3. Minutes of public consultation meeting 4. Construction permit Public consultations on the sub-project have been carried out in Geghhovit community. Minutes of meeting as well as list of participants are attached to the EMMP. 3

4 5. Agreement for construction waste disposal, obtained from Geghhovit community Head 4

5 B. SAFEGUARDS INFORMATION ENVIRONMENTAL/SOCIAL SCREENING Will the site activity include any of the following? Activity/Issue Status Triggered Actions A. Infrastructure rehabilitation [x] Yes [ ] No Section C Part A B. New construction [x] Yes [ ] No Section C Part A C. Individual wastewater treatment system [ ] Yes [x] No Section C Part B D. Historic building(s) and districts [ ] Yes [x] No Section C Part C E. Acquisition of land [ ] Yes [x] No Section C Part D F. Hazardous or toxic materials [ ] Yes [x] No Section C Part E G. Impacts on forests and/or protected areas [ ] Yes [x] No Section C Part F H. Handling/management of medical waste [ ] Yes [x] No Section C Part G I. Traffic and Pedestrian Safety [ ] Yes [x] No Section C Part H 5

6 C.MITIGATION MEASURES ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST 0. General conditions Notification and Worker Safety (a) The local construction and environment inspectorates and communities have been notified of upcoming activities (b) The public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works) (c) All legally required permits have been acquired for construction and/or rehabilitation (d) The Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment. (e) Workers PPE will comply with international good practice (hardhats, as needed masks and safety glasses, harnesses and safety boots). (f) Appropriate signposting of the sites will inform workers of key rules and regulations to follow. A. General Rehabilitation and / or Construction Activities Air Quality Noise Waste management (a) The surrounding environment shall be kept free of debris (b) There will be no open burning of construction / waste material at the site (c) There will be no excessive idling of construction vehicles at sites (a) Construction noise will be limited to day-time hours (b) During operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible (a) Waste collection and disposal pathways and sites will be identified for all major waste types expected from construction activities. (b) Construction waste will be collected and disposed at the agreed site (c) Whenever feasible the contractor will reuse and recycle appropriate and viable materials (except asbestos) 6

7 D. MONITORING PLAN Activity What Where How When Why Who (is the parameter to be monitored?) (is the parameter to be monitored?) (is the parameter to be monitored?) (define the frequency or continuous?) (is the parameter to be monitored?) (is responsible for monitoring?) CONSTRUCTION PHASE Community notification Community has been notified on upcoming activities Geghhovit settlement Interviews with local residents First month of construction works Ensure community awareness and consent Clearly established grievance redress mechanism is in place and accessible for local community Geghhovit settlement Interviews with municipal authorities and local residents Monthly Ensure that local community can voice concerns and ask questions Legal compliance All required permits and agreements are acquired Geghhovit municipality and Contractor s administration Review of files Before and during first month of construction works Comply with legal requirements Provision of workers health and safety Personal safety gear is provided to and used by workers Construction site Inspection monthly Prevent trauma and casualty among workers Operation of construction machinery The surrounding environment is kept free of debris to minimize dust Construction site Inspection monthly visits during construction Minimize dust emission There is no open burning of construction / waste material at the site Construction site Inspection monthly visits during construction Prevent air pollution with hazardous emissions There is no excessive idling of construction vehicles at site Construction site Inspection monthly visits during construction Minimize exhaust 7

8 Noise generation Construction noise is limited to day-time hours Construction site Inspection Monthly during construction Minimize nuisance to local community Waste generation Temporary storage of waste within demarcated and fenced work site, at a designated location Construction site Inspection Monthly during construction Prevent pollution of work site and nuisance to local community Construction waste is regularly collected and disposed at an agreed site Construction site Waste disposal site Inspection Monthly during construction Prevent environment pollution Servicing machinery Construction vehicles and machinery are serviced and fueled away from water body or at a service center. Construction site Inspection Monthly during construction Prevent pollution of surface and ground water Earth works Separation and stockpiling of excavated material and topsoil for backfilling and site reinstatement purposes. Construction site Inspection Monthly during construction Ensure successful reinstatement of site Suspension of earth works and contacting national authority for cultural heritage preservation in case of chance finds; resumption of works upon formal consent from the authority for preservation of cultural heritage. Geghhovit municipality office Construction Contractor s administration Review of communication and archaeological reports In case of chance finds Prevent loss of physical cultural resources Ministry of Culture OPERATION PHASE Maintenance of watering system Regular maintenance and operational repair works are undertaken as required to keep sources collection point, pipeline, pumping station and trough in good technical condition. Geghhovit municipality Inspection Recurrent Keep watering system in good operational condition Geghhovit municipality 8

9 1. Site Plan Watering places marked by red lines 9

10 2. Letter from Geghhovit community head on the land plot ownership (non-official translation attached) 10

11 Is given to HGHSHN LLC certifying that pipe-lines and watering points in the pastures of Geghhovit village community of the RA Gegharkunik Marz are under construction in the lands possessed by the community. Mayor of Geghhovit Village V. Poghosyan 11

12 3. Minutes of public consultation meeting 4. Construction permit with non-official translation 12

13 5. Water Use Permits provided to Geghhovit community from Mo NP with non official translation 13

14 Annex N 1 of the RA Government s Decision N 218-N of March 7, 2003 MINISTRY OF NATURE PROTECTION OF THE REPUBLIC OF ARMENIA WATER RECOURCES MANAGEMENT AGENCY OF THE REPUBLIC OF ARMENIA WATER USE PERMIT N W-S-N GEGHHOVIT VILLAGE MAYOR S OFFICE (Name of water user) RA GEGHARKUNIK MARZ A. HARUTYUNYAN A. AVETISYAN (Head of water resources management RA MINISTER OF NATURE PROTECTION and protection body) signature, name, surname (Name, surname GEGHHOVIT VILLAGE MAYOR position, signature of water use permit applicant) Issued Effective up to Effective period is prolonged up to 20. (Head of water resources management and protection body) (Position, signature, name, surname of water use permit applicant) of the water user (Name (surname), address and telephone number of v. Geghhovit, RA Gegharkunik Marz water use permit applicant) Address of water use RA Gegharkunik Marz Administrative District of Geghhovit Community Location of water extraction RA Gegharkunik Marz Administrative District of Geghhovit Community Location 14

15 Papoy, Hajani and Ditvan natural springs located in the pasture area Water use purpose watering Quantity of water used, including a) Surface water resources b) Underground water resources 8,6 thousand m 3 /year, 47.8 m 3 /day, 0,55 l/sec Time period and regime of water use 365 days annually with 24-hour regime Control mechanisms to support compliance with water use permit requirements 1. Control over quantity of water use and registration 2. Purposeful use of water 3. Meeting additional conditions being integral part of the present WP *Contract on the use of earth interior is required for underground water use in cases as prescribed by Interior Code of the RA. 12. Special measures to be taken to promote efficient water use, improve water quality, conserve wetlands and significant coastal natural habitats and related biodiversity Develop and implement program of activities on effective use of normative water quantity and reduction of water losses 13. Adequate requirements for recording, monitoring, reporting and verifying water use 1. To provide water extraction point with water metering observation point and seal it as prescribed by law. 2. Carry out water use recording works and submit 2 y. (water economy) annual report to the RA Ministry of Nature Protection as prescribed by law Adequate security in case of harm to water resources In case of violating requirements of the RA Water Code compensate the damage as prescribed by the RA legislation. 15. Associated water use permit fees and payment schedule 1. State duty receipt N Apply the rate defined by the RA legislation for water use quantities mentioned in the present WP, make payments. 15

16 16. Water use permit is subject to registration in the State Water Cadastre during 10 days The present water use permit consists of two copies. N ADDITIONAL CONDITIONS AS INTEGRAL PART OF WATER USE PERMIT The present conditions elaborated according to the requirements of Article 32 of Water Code of the RA are subject to mandatory fulfilment. 1. Geghhovit village office is obliged to: a/ meet requirements of the RA law conditioned by water use permit N and water use implementation. b/ in case of emergencies, water deficit and drought meet the requirements of Water resources management agency of the RA Ministry of Nature Protection, which are directed at public interest and protection of environment. c/ with its activities not reduce the rights of water use of traditional water users already existing before the water use permit N was issued. d/ ensure conditions for the official of the Water resources management agency of the Staff of the RA Ministry of Nature Protection to supervise performance of water use conditions. e/carry out spring regime observations by the qualified hydrogeological organization as prescribed by law and submit the results once a year to the WRMA to be registered in the State Water Cadastre. 2. The conditions of the present WP are subject to review at the request of WRMA during development of the given water basin management plan. 3. Coordinate point of water extraction is: X = 44º Y = 40º RA Minister of Nature Protection Geghhovit Village Mayor A. Grigoryan V. Poghosyan

17 6. Agreement for construction waste disposal, obtained from Geghhovit community Head with non-official translation 17

18 GEGHHOVIT VILLAGE COMMUNITY OF GEGHARKUNIK MARZ OF THE REPUBLIC OF ARMENIA 4 June 2014 v. Geghhovit Dispose the waste and remaining soil, generated during construction of watering system in the pastures of Geghhovit village community of the RA Gegharkunik Marz in the community unused land at a distance of 3 km. Mayor of Geghhovit Village V. Poghosyan 18