1 Peace River Basin FY2012 Cooperative Applications

2

3 Coop By Basin For FY2012 Peace River Basin Project Project Name Project Cost B217 Ridge Lakes Stormwater Improvement $350,000 H050 PRMRWSA Reg Integ Loop Sys Phase 1 Interconnect $7,250,000 H051 PRMRWSA Reg Integ Loop Sys Phase 2 Interconnect $103,900,621 H052 PRMRWSA Reg Integ Loop Sys Phase 3A Interconnect $147,000,000 H069 PR/MRWSA Reg Loop System Ph 1A $20,000,000 H076 Southwest Polk County/Tampa Electric Reclaimed Water Project $68,186,800 H079 PRMRWSA Investigation of Brackish Groundwater Development $256,000,000 H084 Arcadia-DeSoto Interconnect $1,175,000 H085 Charlotte County Regional Reclaimed Water Expansion Phase 2 $2,800,000 H087 City of Punta Gorda Reverse Osmosis Facility $35,082,000 K280 Charlotte - Imp. BMPs Greater Port Charlotte $24,671,387 L215 Rotunda ASR Well Conversion for Reuse Water $3,000,000 L473 Highlands WMPlan Lake Placid $930,000 L900 LE/AD Polk County Watershed Education $107,554 L918 Lake Gwyn Surface Water Restoration and Flood Protection $1,858,178 N014 The Florida Aquarium Watershed Education Initiative $130,363 N024 Polk County NWRUSA Reclaimed Water Storage & Pumping Station $5,535,000 N064 City of Lakeland Flood Control Automation $1,602,640 N251 Lake Alfred - Watershed Management Plan $300,000 N304 Polk County Groundwater Recharge Investigation $755,498 N327 Riverwood CDD Reclaimed Water Interconnect with Charlotte County Utilities $777,523 N335 Lake Wales Country Club Reuse $750,000 N337 Lake Verona BMP Design & Construction $601,936 N338 Lake Clinch BMP Implementation Project $60,000 N339 Winter Haven #3 Reclaimed Water Interconnect, Storage &Pumping Project $3,500,000 N345 Lower Floridan Aquifer Test Well by Regional Cooperative $2,200,000 N346 Riverwood CDD Reclaimed Water Expansion $828,000 N347 Charlotte County Reuse Master Plan $395,100 N354 Church St. Flood Improvements $380,000 N362 Fort Meade Stormwater Utility Study $50,000 N363 Polk County-Wide Landscape and Irrigation Evaluation $420,000 N Rainwater Harvesting - SWFWMD $910,000 N403 Regional Integrated Loop Phase 1b Interconnect $3,800,000 N406 City of Avon Park Executive Airport Drainage Project $1,750,000 N407 Haines City Reclaimed Water Improvements, Phase 2 $9,466,000 N413 Winter Haven SMART Irrigation Controller Pilot Project $45,000 P606 Frog Listening Network - Hillsborough River Watershed Alliance $161,980 SB54 Polk Nature Discovery Center Education $203,296 W032 HCC Foundation Field Trip Program $842,305 W506 CHEC Charlotte Harbor/Lemon Bay SWIM Watershed Education $326,959 W507 CHEC Peace River Watershed Education $241,517 W513 Charlotte County Fourth-Grade Field Studies Program $367,070 W516 Charlotte Harbor Flatwoods Initiative $500,000 W798 Winter Haven Downtown Watershed Improvement Plan $250,000 Basin Total $709,461,727

4

5 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name Ridge Lakes Stormwater Improvement Project Number B217 Cooperator Avon Park Department Public Works Contact Person Julian Deleon Address 2301 Us Hwy 27 South City Sate Zip Avon Park, FL Phone # jdeleon@avonpark.cc Project Type: Water Supply X Water Quality Flood Protection Natural Systems Strategic Initiatives: X Water Quality Maintenance and Improvement Water Quality Monitoring Alternative Water Supply Conservation Reclaimed Water Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: Charlotte Citrus Desoto Hardee Hernando X Highlands Hillsborough Lake Levy Manatee Marion Pasco Pinellas Sarasota Sumter Polk Project Description: During the 2010/2011 budget cycle, the District and the city teamed up to design and permit the needed water quality improvements for Lake Isis runoff. The City is requesting funding assistance to get the project constructed as designed. We propose for SWFWMD to lead and project manage the project with local support from the City. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. Our public involvement plan includes the church camp. They are willing to provide the needed easements to build the needed drainage dry rentention areas and structures. Source Prior FY2011 FY2012 Future Total Applicant Share 87,500 87,500 Peace River 262, ,500 Total 350, ,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Advertise for Public Bid 10/03/2011 Start Construction 01/02/2012 Complete construction and certifications 07/31/2012 1

6 (This page intentionally left blank) 2

7 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name PRMRWSA Reg Integ Loop Sys Phase 1 Interconnect Project Number H050 Cooperator Peace River/Manasota Regional Water Supply Auth. Department Contact Person Mike Coates Address 6311 Atrium Dr. Suite 100 City Sate Zip Bradenton, FL Phone # mcoates@regionalwater.org Project Type: X Water Supply Water Quality Flood Protection Natural Systems Strategic Initiatives: Water Quality Maintenance and Improvement Water Quality Monitoring X Alternative Water Supply Conservation Reclaimed Water X Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: X Charlotte Citrus X Desoto Hardee Hernando Highlands Hillsborough Lake Levy X Manatee Marion Pasco Pinellas X Sarasota Sumter Polk Project Description: The Phase I Interconnect project will provide a critical regional interconnection with the City of Punta Gorda for resource sharing, increased system reliability and conjunctive use in both the City and the Authority water supply systems. This project could provide the City of Punta Gorda access to regional supplies during the dry season to meet water quality regulatory standards, aid the City in dealing with pending MFL's, and provide the Region with increased reliability and access to seasonally available supplies from the Shell Creek system. The Phase 1 project was previously considered for SWFWMD co-funding, but in the spring of 2007 it was suspended in favor of the Phase 1a pipeline project. The Phase 1 project is now being reconsidered due to the importance of a regional interconnection with the City of Punta Gorda and the fact that Phase 1, coupled with Phase 1a and 1b complete the total loop system interconnecting the Peace River Facility and the Shell Creek Facility. The Phase 1 project includes a total of six (6) miles of 24-inch diameter transmission main extending the Authority's 20-inch regional transmission line along U.S. 17 to the City of Punta Gorda Water Treatment Facility. The project also includes pumping, storage and chemica adjustment facilities. The estimated cost for the Phase I project is $11.5 million. The project design is complete and ready for bidding, with construction scheduled to begin as early as Spring 2011 and be completed approximately 12 months later. The Regional Integrated Loop System project provides a regional water transfer and delivery system for existing and future water sources within the Authority's service area. Development of this transmission system to will assist in achieving the regional resource management an water supply goals within the four county area including: maximizing use of surface water for public supply; provide rotational capacity and the ability to rest sources; providing reserve capacity for emergency transfers; limiting the development of groundwater in the Southern Wate Use Caution Area (SWUCA); and optimizing financial investments in water supply infrastructure on a regional basis. The use of alternative sources with the maximization of surface water for public supply in consistent with the District's Regional Water Supply Plan (SWFWMD 2006), the SWUCA recovery strategy, and the provisions of Senate Bill 444. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The Authority is a wholesale supplier of potable water to the Customer Utilities of Charlotte, DeSoto, Manatee, and Sarasota Counties and the City of North Port. These utilities are retail suppliers for their respective public water systems. The Authority cooperatively participates with Customer Utilities and the District in public awareness and education regarding water conservation including radio public service announcements, newspaper advertisements and inserts and public presentations. The Authority also sponsors workshops for information sharing, and to inform and educate local utilities on water saving programs. For the past two years (on April 3, 2009 and on June 24, 2010) the Authority conducted Water Conservation Policy Summits in Sarasota with Customer Utilities and other local governments involved in the Water Planning Alliance. The Summits have been very well attended and have included focus on; Conserve Florida Water, Florida Water Sta 3

8 Gold Certification, Century Commission for a Sustainable Florida, U.S. EPA WaterSense, local Conservation Programs as well as identifying local and regional priorities in water conservation. Source Prior FY2011 FY2012 Future Total Applicant Share 1,000,000 1,250,000 1,500,000 3,750,000 General Fund-District Wide 750, ,000 Manasota 547, ,500 Peace River 202, ,500 Private Partnership 2,000,000 2,000,000 Total 1,000,000 3,250,000 3,000,000 7,250,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Phase 1 Begin Construction 06/13/2011 Construction Substantial Completion 05/18/2012 4

9 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name PRMRWSA Reg Integ Loop Sys Phase 2 Interconnect Project Number H051 Cooperator Peace River/Manasota Regional Water Supply Auth. Department Contact Person Mike Coates Address 6311 Atrium Dr. Suite 100 City Sate Zip Bradenton, FL Phone # mcoates@regionalwater.org Project Type: X Water Supply Water Quality Flood Protection Natural Systems Strategic Initiatives: Water Quality Maintenance and Improvement Water Quality Monitoring X Alternative Water Supply Conservation Reclaimed Water X Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: X Charlotte Citrus X Desoto Hardee Hernando Highlands Hillsborough Lake Levy X Manatee Marion Pasco Pinellas X Sarasota Sumter Polk Project Description: The Phase 2 interconnect (New delivery to the City of North Port) is the first segment of a regional southern pipeline loop that will ultimately interconnect the Peace River Facility, the Myakkahatchee Creek WTP, the Englewood Water District system and the Carlton WTP. Phase 2 (New Delivery to the City of North Port) will provide critical regional transmission capacity between the Peace River Facility and the City of North Port. The pipeline will be 42-inches in diameter and extend approximately seven miles from the Peace River Facility, southward along the existing 36-inch regional transmission main (36-inch RTM) corridor to Price Road and also to Serris Boulevard, where it will interconnect with the City of North Port water transmission system. In addition to serving regional supply to North Port. Phase 2 provides back-up capacit to the existing 36-inch RTM, now over 30 years old. Final design work on Phase 2 was initiated in October 2009 and is now 90% complete. The project is scheduled to be bid in early calendar year 2011, with completion in late summer The Phase 2 Project cost is estimated at $19.2 million. Future extensions of the Phase 2 Regional Interconnect Project (southern loop) include Phase 2b (beginning in 2017) which will extent from the Serris Blvd Interconnection west to Myakkahatchee Creek WTP and then to the Englewood Water District system, and Phase 2a (beginnign in 2021) which will be constructed from Myakkahatchee Creek WTP to Carlton WTP. In total Phases 2b and 2a comprise 37 miles of additional regional transmission main extending from the end of Phase 2 at Serris Boulevard to interconnect the facilities listed above with completion in 2024 at an estimated additional cost of approximately $91 million. The Regional Integrated loop System project provides a regional water transfer and delivery system for existing and future water sources within the Authority's service area. Development of this transmission system will support regional resource management and water supply goals within the 4-county area including: maximizing the use of surface water for public supply; providing rotational capacity and the ability to rest sources; providing reserve capacity for emergency transfers; limiting the development of Floridan Aquifer groundwater in the SWUCA; and optimizing financial investments in water supply infrastructure on a regional basis. The use of alternative sources with the maximization of surface water for public supply is consistent with the District's Regional Water Supply Plan (SWFWMD, December 2006), the SWUCA recovery strategy, and Senate Bill 444. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The Authority is a wholesale supplier of potable water to the Customer Utilities of Charlotte, DeSoto, Manatee, and Sarasota Counties and the City of North Port. These utilities are retail suppliers for their respective public water systems. The Authority cooperatively participates with Customer Utilities and the District in public awareness and education regarding water conservation including radio public service announcements, newspaper advertisements and inserts and public presentations. The Authority also sponsors workshops for information sharing, and to inform and educate local utilities on water saving programs. For the past two years (on April 3, 2009 and on June 24, 2010) the Authority conducted Water Conservation Policy Summits in Sarasota with Customer Utilities and other local governments involved in the Water Planning Alliance. The Summits have been very well attended and has included focus on; Conserve Florida Water, Florida Water Sta 5

10 Gold Certification, Century Commission for a Sustainable Florida, U.S. EPA WaterSense, local Conservation Programs as well as identifying local and regional priorities in water conservation. Source Prior FY2011 FY2012 Future Total Applicant Share 2,000,000 3,500,000 4,400,000 43,100,000 53,000,000 General Fund-District Wide 700,000 1,750, ,000 21,850,000 25,250,000 Manasota 504,000 1,260, ,500 15,732,000 18,189,500 Peace River 196, , ,121 6,118,000 7,461,121 Total 3,400,000 7,000,000 6,700,621 86,800, ,900,621 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Phase 2 Complete Final Design, Permitting, Property Acquisition 01/31/2011 Complete Bidding & Award Contract 04/06/2011 Construction Substantial Completion 05/31/2012 Phase 2a Begin Final Design, permitting, property acquisition 05/01/2021 Complete final design, permitting, property acquisition 09/01/2023 Begin Construction 12/01/2023 Construction Substantial Completion 12/01/2025 Phase 2b Begin Final Design & Permitting 10/02/2017 Complete final design, permitting, property acquisition 04/30/2019 Begin Construction 07/15/2019 Construction Substantial Completion 07/30/2022 6

11 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name PRMRWSA Reg Integ Loop Sys Phase 3A Interconnect Project Number H052 Cooperator Peace River/Manasota Regional Water Supply Auth. Department Contact Person Mike Coates Address 6311 Atrium Dr. Suite 100 City Sate Zip Bradenton, FL Phone # mcoates@regionalwater.org Project Type: X Water Supply Water Quality Flood Protection Natural Systems Strategic Initiatives: Water Quality Maintenance and Improvement Water Quality Monitoring X Alternative Water Supply Conservation Reclaimed Water X Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: X Charlotte Citrus X Desoto Hardee Hernando Highlands Hillsborough Lake Levy X Manatee Marion Pasco Pinellas X Sarasota Sumter Polk Project Description: The Phase 3a Interconnect (Carlton / SR 681) is the first segment of a regional northern pipeline loop that will ultimately interconnect the Peace River Facility, Carlton Water Treatment Plant (Carlton WTP), the University WTP and Manatee County's WTP. Phase 3a will provide needed pumping and transmission capacity for regional water supplies between the Carlton WTP and an interconnection with the Sarasota County transmission/distribution system near State Road 681. The Phase 3a pipeline project will include high-service pumping facilities and 10 million gallons of finished water storage at Carlton WTP, and nine miles of 48-inch diameter transmission main at a cost of approximately $33 million. is from Sarasota County ($19.6 Million) and the District ($13.5 Million). Project construction was initiated in April 2010 and projected substantial completion is spring Future extensions in the Phase 3 Regional Interconnect Program include Phase 3b (begining in 2015) from the 681 connection extending to the Sarasota - Manatee County line, Phase 4a (beginning in in 2020) from the county line west to Sarasota County's University WTP, and Phase 4b (beginning in 2024) from the terminus of 3b extending north to Manatee County's WTP. These phases (3b, 4a, and 4b) collectively provide 36 additional miles of pipeline (from SR 681) to be completed by 2029 at an estimated additional cost of $114 million. These later pipeline phases are included in the project budget and shown in the timeline. Development of this transmission system will support regional resource management and water supply goals within the 4-county area including maximizing the use of surface water for public supply; providing rotational capacity and the ability to rest sources; providing reserve capacity for emergency transfers; limiting the development of Floridan Aquifer groundwater in the SWUCA; and optimizing financial investments in water supply infrastructure on a regional basis. The use of alternative sources with the maximization of surface water for public supply is consistent with the District's Regional Water Supply Plan (December 2006), the SWUCA recovery strategy and Senate Bill 444. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The Authority is a wholesale supplier of potable water to the Customer Utilities of Charlotte, DeSoto, Manatee, and Sarasota Counties and the City of North Port. These utilities are retail suppliers for their respective public water systems. The Authority cooperatively participates with Customer Utilities and the District in public awareness and education regarding water conservation including radio public service announcements, newspaper advertisements and inserts and public presentations. The Authority also sponsors workshops for information sharing, and to inform and educate local utilities on water saving programs. For the past two years (on April 3, 2009 and on June 24, 2010) the Authority conducted Water Conservation Policy Summits in Sarasota with Customer Utilities and other local governments involved in the Water Planning Alliance. The Summits have been very well attended and has included focus on; Conserve Florida Water, Florida Water 7

12 Star Gold Certification, Century Commission for a Sustainable Florida, U.S. EPA WaterSense, local Conservation Programs as well as identifying local and regional priorities in water conservation. Source Prior FY2011 FY2012 Future Total Applicant Share 14,200,000 4,900, ,000 56,950,000 76,150,000 General Fund-District Wide 2,700,000 4,250,000 28,475,000 35,425,000 Manasota 1,944,000 3,060,000 20,502,000 25,506,000 Peace River 756,000 1,190,000 7,973,000 9,919,000 Total 19,600,000 13,400, , ,900, ,000,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Phase 3a Interconnect Construction Substantial Completion 05/31/2011 Phase 3b Interconnect Begin Final Design, Permittinng, Property Acquisition 01/05/2015 Complete Final Design, Permitting, Property Acquisition 01/05/2017 Begin Construction 04/04/2017 Complete Construction 01/05/2019 Phase 4a Interconnect Begin Final Design, Permitting, Property Acquisition 10/01/2020 Complete Final Design, Permitting, Property acquisition 01/03/2022 Begin Construction 03/31/2022 Construction Substantial Completion 09/29/2023 Phase 4b Interconnect Begin Final Design, Permitting, Property Acquisition 01/04/2024 Complete Final Design, Permitting, Property Acquisiton 01/15/2026 Begin Construction 04/06/2026 Construction Substantial Completion 04/03/2028 8

13 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name PR/MRWSA Reg Loop System Ph 1A Project Number H069 Cooperator Peace River/Manasota Regional Water Supply Auth. Department Contact Person Mike Coates Address 6311 Atrium Dr. Suite 100 City Sate Zip Bradenton, FL Phone # mcoates@regionalwater.org Project Type: X Water Supply Water Quality Flood Protection Natural Systems Strategic Initiatives: Water Quality Maintenance and Improvement Water Quality Monitoring X Alternative Water Supply Conservation Reclaimed Water X Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: X Charlotte Citrus X Desoto Hardee Hernando Highlands Hillsborough Lake Levy X Manatee Marion Pasco Pinellas X Sarasota Sumter Polk Project Description: The Phase 1a project will interconnect the Authority's regional water supply system with the City of Punta Gorda Water Transmission system providing City access to regional water as needed, regional access to surplus water from the City, and also include multiple connections with Charlotte County. This project together with Phase 1 and Phase 1b completes the total loop system interconnecting the Peace River Facility with the Shell Creek Facility. Phase 1a will inclue up to twelve (12) miles of pipeline with a design capacity of up to six (6) million gallons per day (mgd), above ground storage, high service pumping, chemical adjustment and associated facilities. A number of tie-in points for Charlotte County Utilities will be installed along the length of the project. The geographical endpoints are the Authority's RTS on Kings Highway at the Charlotte/DeSoto county line and the City of Punta Gorda's Shell Creek Water Treatment Facility on South Washington Loop Road in Charlotte County. The project budget is $19 million, however, available funds for the project total $20 million, including $8 million from Charlotte County and $12 million through the District. The project design is complete, all permits have been received, and a construction contract has been awarded. Construction activities are expected to begin by early Calendar Year 2011 and require approximately 15 months to complete. Development of this transmission system will support regional resource management and water supply goals within the 4-county area including maximizing the use of surface water for public supply; providing rotational capacity and the ability to rest sources; providing reserve capacity for emergency transfers; limiting the development of Floridan Aquifer groundwater in the SWUCA; and optimizing financial investments in water supply infrastructure on a regional basis. The use of alternative sources with the maximization of surface water for public supply is consistent with the District's Regional Water Supply Plan (December 2006), the SWUCA recovery strategy and Senate Bill 444. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The Authority is a wholesale supplier of potable water to the Customer Utilities of Charlotte, DeSoto, Manatee, and Sarasota Counties and the City of North Port. These utilities are retail suppliers for their respective public water systems. The Authority cooperatively participates with Customer Utilities and the District in public awareness and education regarding water conservation including radio public service announcements, newspaper advertisements and inserts and public presentations. The Authority also sponsors workshops for information sharing, and to inform and educate local utilities on water saving programs. For the past two years (April 3, 2009 and June 24, 2010) the Authority has conducted a Water Conservation Policy Summit in Sarasota with Customer Utilities and other local governments involved in the Water Planning Alliance. The Summits have been very well attended and have included focus on; Conserve Florida Water, Florida Water Star Gold Certification, Century Commission for a Sustainable Florida, U.S. EPA WaterSense, local Conservation Programs as well as identifying local and regional priorities in water conservation. 9

14 Source Prior FY2011 FY2012 Future Total Applicant Share 1,275,412 6,724,588 8,000,000 General Fund-District Wide 243,190 1,756,810 1,500,000 3,500,000 Manasota 175,097 1,264,903 1,080,000 2,520,000 Peace River 68, , , ,000 WRAP 486,381 4,513,619 5,000,000 Total 2,248,173 14,751,827 3,000,000 20,000,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Regional Integrated Loop System Phase 1a Interconnect Issue Notice to Proceed to Contractor 01/14/2011 Substantial Completion 04/30/

15 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name Southwest Polk County/Tampa Electric Reclaimed Water Project Project Number H076 Cooperator Tampa Electric Company Department Contact Person David Lukcic Address 702 N Franklin St. City Sate Zip Tampa, FL Phone # dmlukcic@tecoenergy.com Project Type: X Water Supply X Water Quality Flood Protection Natural Systems Strategic Initiatives: X Water Quality Maintenance and Improvement Water Quality Monitoring X Alternative Water Supply Conservation Reclaimed Water Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: Charlotte Citrus Desoto Hardee Hernando Highlands X Hillsborough Lake Levy Manatee Marion Pasco Pinellas Sarasota Sumter X Polk Project Description: The Regional Reclaimed Water Partnership Initiative - PHASE I is a cooperative, public-private partnership involving the Southwest Florida Water Management District (DISTRICT), Tampa Electric Company (TECO) and the City of Lakeland. PHASE I (PROJECT) provides valuable water resource benefits to each participant as it utilizes an alternative water source not currently being used to its maximum benefit to meet the water demands of a large industrial user in a cost effective manner. TECO is expanding its Polk Power Station in southwest Polk County creating a need for additional cooling water. The City of Lakeland has a secondary treated wastewater source that after being utilized as cooling water in its McIntosh Power Plant is ultimately discharged into the Alafia River. This PROJECT provides for the transmission, treatment and use of Lakeland s wastewater discharge for utilization by TECO as a cooling water source and possibly for other potential uses, thereby reducing the need for ground water in the Southern Water Use Caution Area (SWUCA), and reducing nutrient loading to the Alafia River. The PROJECT is the initial phase of a regional reclaimed water partnership initiative and will utilize approximately 5.2 million gallons per day (mgd) annual average daily flow (AADF) of wastewater discharge from the City of Lakeland and 1 mgd from Polk County. Lakeland has two wastewater treatment plants with a combined treatment capacity of mgd. The Glendale Wastewater Treatment Plant (WWTP) has the capacity to treat 13.7 mgd of wastewater. The Northside WWTP has the capacity to treat 6.25 mgd of wastewater. In 2006, the WWTPs had an AADF of 7.13 mgd and 3.25 mgd, respectively. Of the mgd in combined flows, the McIntosh Power Plant used 5.11 mgd, and 1.85 mgd of blowdown water from the power plant was combined with the remaining 5.27 mgd of treated wastewater and discharged to Lakeland's wetland treatment system. (Source: FDEP Reuse Inventory, 2006) The 1400 acre Lakeland wetland treatment system is located east of Mulberry and north of State Road 60. The wetland system provides final treatment and storage of Lakelands wastewater effluent, prior to final discharge to the north prong of the Alafia River. The PROJECT will beneficially use the wastewater effluent currently discharged to the Alafia River from the Lakeland wetland treatment system. During the course of final design, the quality and quantity of the wastewater discharge from the wetlands will be determined for dry weather, wet weather and annual average scenarios. The PROJECT will include an intake structure and a reclaimed water high service pump station located at Lakeland's wetland treatment cell cluster. TECO estimates the flow will be approximately mgd dependant upon where it will be removed from the treatment cells to minimize water loss. The reclaimed water will be conveyed via transmission mains approximately 15 miles south to TECO's Polk Power Station. The preliminary plans are for a 20-inch transmission main from the wetlands to County Road 640 and a 30-inch transmission main from County Road 640 to the TECO Polk Power Station. In addition there 11

16 will be a line to Polk County that will originate at the Delivery Point identified initially on US 37 south of Carter Road and terminate at the pipeline connecting Polk Power Station in conjunction with the delivery of the Lakeland water source. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. N/A Source Prior FY2011 FY2012 Future Total Alafia River 4,290,390 1,458,297 1,178,998 1,178,998 8,106,683 Applicant Share 19,181,440 5,010,588 4,117,353 4,117,353 32,426,734 General Fund-District Wide 13,631,154 2,582,214 16,213,368 Peace River 1,259, ,077 2,938,355 2,938,355 8,106,683 Wrap 3,333,332 3,333,332 Total 41,696,212 10,021,176 8,234,706 8,234,706 68,186,800 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Project Complete 01/31/

17 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name PRMRWSA Investigation of Brackish Groundwater Development Project Number H079 Cooperator Peace River/Manasota Regional Water Supply Auth. Department Contact Person Mike Coates Address 6311 Atrium Dr. Suite 100 City Sate Zip Bradenton, FL Phone # mcoates@regionalwater.org Project Type: X Water Supply Water Quality Flood Protection Natural Systems Strategic Initiatives: Water Quality Maintenance and Improvement Water Quality Monitoring X Alternative Water Supply Conservation Reclaimed Water X Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: X Charlotte Citrus X Desoto Hardee Hernando Highlands Hillsborough Lake Levy X Manatee Marion Pasco Pinellas X Sarasota Sumter Polk Project Description: This feasibility study is the first project in a Regional Resource Development Program (RRDP) that will ultimately develop a minimum of 14 mgd in new average daily water supply capacity in stages by The brackish groundwater development feasibility study at the Peace River Facility will evaluate the brackish groundwater resources (quantity and quality available), investigate concentrate disposal options, and evaluate multiple brackish water treatment technologies for use at the site. The result of these investigations will be estimated yield, recommended conceptual design and probable capital and O&M costs for a brackish groundwater supply at the Peace River Facility. Consultant selection has been completed, work is scheduled to begin on this feasibility study in early Calendar Year 2011, and be complete near the end of The Feasibility Study project budget is $1.8 million. Current demand projections show that 14 mgd in new supply capacity is needed by Supplies are envisioned to be developed in up to three (3) stages including up a minimum of 3 mgd by 2018, an additional 3 mgd by 2021 and an additional 8 mgd by The first 6 mgd of supply development is envisioned to include brackish water development at existing facilities such as the Peace River Facility. The final 8 mgd of development is, at this time, presumed to be a new alternative surface water supply. Total program cost for development of 14 mgd in new supply capacity is estimated at $256 million. Development costs are based on analysis from the Authority's 2009 Source Water Feasibility Study which estimated captal costs for new capacity at $12/gallon for brackish groundwater development and $23/gallon for new surface water supplies. The RRDP will objectives include: 1) Maximize conjunctive use of water supply resources to improve system reliability and resource protection; 2) Provide rotational and reserve capacity enabling improved resource management opportunities such as source resting; 3) Optimize the regional financial investment in water supply and transmission capacity. The use of alternative sources and improved conjunctive use for public supply is consistent with the District's Regional Water Supply Plan (December 2006), the SWUCA recovery strategy and Senate Bill 444. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The Authority is a wholesale supplier of potable water to the Customer Utilities of Charlotte, DeSoto, Manatee, and Sarasota Counties and the City of North Port. These utilities are retail suppliers for their respective public water systems. The Authority cooperatively participates with Customer Utilities and the District in public awareness and education regarding water conservation including radio public service announcements, newspaper advertisements and inserts and public presentations. The Authority also sponsors workshops for information sharing, and to inform and educate local utilities on water saving programs. For the past two years (on April 3, 2009 and on June 24, 2010) the Authority conducted Water Conservation Policy Summits in Sarasota with Customer Utilities and other local 13

18 governments involved in the Water Planning Alliance. The Summits have been very well attended and have included focus on; Conserve Florida Water, Florida Water Star Gold Certification, Century Commission for a Sustainable Florida, U.S. EPA WaterSense, local Conservation Programs as well as identifying local and regional priorities in water conservation. Source Prior FY2011 FY2012 Future Total Applicant Share 167, , ,400, ,000,000 General Fund-District Wide 150, ,000 63,400,000 63,700,000 Manasota 109, ,500 45,648,000 45,867,000 Peace River 40,500 40,500 17,752,000 17,833,000 WRAP 600, ,000 Total 600, , , ,200, ,000,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Brackish Groundwater Development Feasibility Study Hire Consultant 12/16/2010 Commence Tasks 1-3 (resource and concentrate disposal evaluation) 01/31/2011 Complete Tasks /30/2011 Begin Task 4 (exploratory well construction) 10/31/2011 Complete Task 4 (exploratory well construction) 03/30/2012 Begin Task 5 (conceptual design of facilities) 04/02/2012 Complete Task 5 and Feasibility Study 09/28/

19 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name Arcadia-DeSoto Interconnect Project Number H084 Cooperator City of Arcadia Department Contact Person Julie Karleskint Address 2201 Cantu Court, Suite 109 City Sate Zip Sarasota, FL Phone # jkarleskint@hazenandsawyer.com Project Type: X Water Supply Water Quality Flood Protection Natural Systems Strategic Initiatives: Water Quality Maintenance and Improvement Water Quality Monitoring Alternative Water Supply X Conservation Reclaimed Water Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: Charlotte Citrus X Desoto Hardee Hernando Highlands Hillsborough Lake Levy Manatee Marion Pasco Pinellas Sarasota Sumter Polk Project Description: This project is for the construction of a ground storage tank and high service pump station for the City of Arcadia to accept and blend potable water from the new interconnect between DeSoto County and the City of Arcadia with the new proposed Arcadia Water Treatment Plant. This will allow the City to assist DeSoto County by accepting all unallocated water that they have reserved from the PRMRWSA and continue to provide flow through the DeSoto County pipelines which will eliminate flushing of large quantities which is required by DeSoto County to maintain water quality. The City currently has an interlocal agreement with DeSoto county to accept approximately 200,000 gpd of flush water from the County which is required to in order to increase proper utilization of the water resources within the District s jurisdiction by conserving approximately 200,000 gpd of water which is currently being flushed for water quality purposes. The project consist of construction of a new 250,000 ground storage tank which will be utilized for blending ion exchange treated groundwater from the City of Arcadia and DeSoto County water purchased from the PRMRWSA. Chemical feed facilities will be included for corrosion control and disinfection adjustment in order to maintain water quality within the distribution system. With the new storage tank and pumping facilities, the City will have the ability to accept the balance of the County s PRMWSA allocation until growth in the County is sufficient so that large flushing quantities is not required. This project will also offset water withdrawn from the Intermediate Aquifer until sufficient demands occur in DeSoto County which eliminate there need to flush large quantities of water. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The city of Arcadia reuses 100% of its treated wastewater effluent and only discharges during wet weather periods. It also promotes conservation with information included in customer billings and newspaper advertisements. Source Prior FY2011 FY2012 Future Total Applicant Share 37, , ,500 General Fund-District Wide 56, , ,250 Peace River 56, , ,250 Total 150,000 1,025,000 1,175,000 Matching Fund Reduction X Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Complete Engineering Design 03/01/

20 Update agreement with County 06/01/2011 Advertise for Bids 09/01/2011 Begin Construction 01/01/2012 Complete Construction 03/30/2013 Submit letter of completion to District 06/30/

21 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name Charlotte County Regional Reclaimed Water Expansion Phase 2 Project Number H085 Cooperator Charlotte County Utilities Department Engineering Contact Person Julia Granger Address Harbor View Road Suite 1 City Sate Zip Port Charlotte, FL Phone # julia.granger@charlottefl.com Project Type: X Water Supply Water Quality Flood Protection Natural Systems Strategic Initiatives: Water Quality Maintenance and Improvement Water Quality Monitoring Alternative Water Supply Conservation X Reclaimed Water Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: X Charlotte Citrus Desoto Hardee Hernando Highlands Hillsborough Lake Levy Manatee Marion Pasco Pinellas Sarasota Sumter Polk Project Description: This is an ongoing project where Phase 2 of the Regional Reclaimed Water Expansion involves construction of a 12 inch transmission main from the end of the pipeline constructed in Central county under Cooperative Project Number H027 to an existing pipe located on the bridge that crosses the Myakka River and from the existing pipeline on the bridge to reclaimed water storage and pumping facilities located on the site of the West Port WRF in West County. The project also involves an increase in the reclaimed water pumping capacity and storage at the West Port site which is necessary to consistently meet the reclaimed water demand of existing customers and to take full advantage of the storage capacity of the reclaimed water ASR well which is to be constructed on the site of the Rotonda WRF as part of Cooperative Project Number L215. Construction of Phase 2 completes the trunk line that will permit transmission of public access reclaimed water from the East Port WRF located in Central County to the Rotonda WRF located on the Cape Haze peninsula which is connected to the West Port WRF via an existing transmission main. The estimated total project cost is $2.8 million of which $2.5 million is for construction and $300,000 is for engineering. All costs are considered eligible for SWFWMD funding. The project is to be construction in three stages: Stage 1 construction will complete the transmission main to the West Port WRF; Stage 2 will increase the pumping capacity at West Port from the current 425 gpm to approximately 1,500 gpm and will also provide piping and metering to permit pumping of reclaimed water back across the Myakka River to users located in Central County on SR 776 whenever necessary; Stage 3 construction of the 5 MG reclaimed water storage pond will increase the storage capacity at West Port from 10 MG to 15 MG. Initially the project will provide the reliability needed to consistently supply reclaimed water to three existing 18 hole golf courses in West County that currently receive reclaimed water from either the West Port or Rotonda WRF's and utilize 774,000 gpd of reclaimed water and offset 579,000 of traditional supply from the intermediate aquifer. The estimated cost/benefit ratio for delivery of reclaimed water to the three golf courses calculated at an 8% annual interest rate over 30 years is $1.17 per thousand gallons (Kgal) offset. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. The Code of Laws and Ordinances for Charlotte County, Chapter 3.8, Article III, sets forth the application, declaration and enforcement responsibilities should a water shortage emergency occur. CCU staff is empowered to enforce existing watering restrictions to its customers through written warnings and Unauthorized Water Usage Charges, which appear on the customer's utility bill. Documentation of the violation and water conservation educational materials for customers are also part of this program. CCUs current Rate Resolution, approved by the Board of County Commissioners in 2006, includes a five-tiered conservation-based rate structure for residential and multi-family customers. Additionally, the Rate Resolution includes Emergency Water Conservation Rates, which increases the amount of the second through fifth rate tiers and may be enacted by the Board of County Commissioners in the event of a water shortage. Emergency Conservation Rates have been in effect since January 2007 in response to ongoing drought conditions in our region. In 2006, CCU selected a consultant to complete written Water Conservation plans for its main water distribution system and its Burnt Store 17

22 water distribution system. These plans were completed in early 2008 and submitted to both the Southwest Florida Water Management District and South Florida Water Management District. Additionally, CCU continues to emphasize water conservation education in the community through media outreach, proclamations, bill inserts, customer newsletters and educational outreach programs. Source Prior FY2011 FY2012 Future Total Applicant Share 400, , ,000 1,400,000 General Fund-District Wide 250, , ,000 Peace River 400, , , ,000 Total 800,000 1,000,000 1,000,000 2,800,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Stage 1 Complete Design 02/01/2011 Stage 1 Commence Construction 06/01/2011 Stage 2 Complete Design 08/01/2011 Stage 3 Complete Design 08/01/2011 Stage 3 Commence Construction 11/01/2011 Stage 2 Commence Construction 11/01/2011 Stage 1 Complete Construction 12/01/2011 Stage 2 Complete Construction 12/31/2012 Stage 3 Complete construction 12/31/2012 Contract Closeout 12/31/

23 SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT FY2012 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM Project Name City of Punta Gorda Reverse Osmosis Facility Project Number H087 Cooperator City of Punta Gorda Department Utilities Contact Person Thomas Jackson Address 326 W. Marion Avenue City Sate Zip Punta Gorda, FL Phone # tjackson@ci.punta-gorda.fl.us Project Type: X Water Supply X Water Quality Flood Protection X Natural Systems Strategic Initiatives: X Water Quality Maintenance and Improvement Water Quality Monitoring X Alternative Water Supply Conservation Reclaimed Water Regional Water Supply Planning Emergency Flood Response Floodplain Management Minimum Flows and Level Establishment and Monitoring X Minimum Flows and Levels Recovery Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring Indicate All Counties to Benefit From Project: X Charlotte Citrus X Desoto Hardee Hernando Highlands Hillsborough Lake Levy X Manatee Marion Pasco Pinellas X Sarasota Sumter Polk Project Description: The District is seeking to adopt MFL regulations for Shell Creek which will reduce water supply obtained from Shell Creek by the Shell Creek WTP. A 3 MGD Reverse Osmosis (RO) facility is proposed to offset Shell Creek withdrawal reductions to meet proposed MFL regulations and to also to reduce TDS concentration of surface water by blended with RO treated groundwater. A new groundwater source treated with reverse osmosis and blended with treated Shell Creek surface water is proposed to meet the Total Dissolved Solids (TDS) maximum contamination level requirement specified in Florida Administrative Code Rule The groundwater source will provide a conjunctive use for periods of high TDS in the surface water or during periods of low flow withdrawal restrictions. The improved water supply will be available to the regional system through two proposed interconnects. Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection ordinances. Through the efforts of our community outreach and enforcement activities the City has experienced an estimated 15 to 20 percent reduction in outside water usage. The City has adopted an inclining tiered rate structure approved by the District to promote conservation. The Utilities Department will continue to investigate the feasibility of reuse to offset demand of potable supply and will continue to seek regional partnership opportunities for future water supply planning and development. Source Prior FY2011 FY2012 Future Total Applicant Share 850,000 5,694,000 13,844,000 20,388,000 General Fund-District Wide 1,000,000 3,500,000 2,847,000 7,347,000 Peace River 270, ,000 2,847,000 4,030,000 7,347,000 Total 2,120,000 3,700,000 11,388,000 17,874,000 35,082,000 Matching Fund Reduction Check here if requesting a reduction in matching funds requirement pursuant to s , F.S. Timelines Task 1 Preliminary Design Report 06/30/2011 Task 2 19