1 Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private Limited Environment Consultant POLLUTION AND ECOLOGY CONTROL SERVICES 1 M/s Om Shivam Buildcon Pvt. Ltd.

2 1. INTRODUCTION: Environmental protection and sustainable development have been the cornerstones of the policies and procedures governing the industrial and other developmental activities in India. Ministry of Environment, Forests & Climate Change (MoEF & CC) has taken several policy initiatives and enacted environmental and pollution control legislations to prevent indiscriminate exploitation of natural resources and to promote integration of environmental concerns in developmental projects; one such initiative is the Notification on Environmental Impact Assessment (EIA) of developmental projects issued on under the provisions of Environment (Protection) Act, 1986, amended on & included for certain criteria s of construction projects including new townships, settlement colonies, commercial complexes, hospitals and office complexes to obtain environmental clearance. Further this notification was amended as Environmental Impact Assessment Notification S.O.1533 (E) of 14 th September 2006 as amended Notification S.O.3067 (E) dated 1 st December 2009 making mandatory for specified categories of developmental projects to obtain Environmental Clearance. As per the notification our project falls under 8(b) B1 category and hence applying to SEAC-1, Maharashtra for Environmental Clearance for proposed Construction Project. 2. DETAIS OF THE PROJECT PROPONENT: SR. NO. DESCRIPTION DETAILS 1. Name and Address of the Project Shiv Kailash At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. 2. Project Developers M/s. Om Shivam Buildcon Pvt. Ltd Mr. Ravindra Kisanrao Kapse (Chairman) 203/204 GokulKeshav Apartment, Deo Nagar, Khamla Road, Nagpur. 3. PROJECT DESCRIPTION: RESIDENTIAL & COMMERCIAL BUILDING PROJECT AREA STATEMENT Total Plot Area 1,52,000 Sq mt. Permissible Built up Area 3,04,000 Sq. mt. Permissible FSI 2.0 Built up Area, (IT-Blocks) 1,82,160 Sq mt. Built up Area, (Support Activities) 1,21,215 Sq. Mt EWS- Bldgs: 5 Nos. (G+15) Nos. of Blocks 3BHK Buildings: 5 Nos. (G+15) 2BHK Buildings: 4 Nos. (G+15) Club House : 1 Nos (G+2) 2 M/s Om Shivam Buildcon Pvt. Ltd.

3 Bungalow : 1 Nos (G + 4) Area for Landscape Sq.mt. STP capacity 2000 KLD (500 KLD x 4) 4. CONNECTIVITY : Roadway : Outer Ring Road & NH 7 Railway : Khapri Railway Station (2.5 Km- N) Airport : Dr. BabasahebAmbedkar Airport, Nagpur (6.5 Km - N) 5. ENVIRONMENT MANAGEMENT PLAN An environmental management plan (EMP) will be required to mitigate the predicted adverse environmental impacts during construction and operation phase of the proposed project and these are discussed in the later subsections. I) EMP for Air Environment A) Construction phase To mitigate the impacts of SPM (dust) during construction phase of the proposed project following measures are recommended for implementation. A dust control plan Procedural changes in construction activities Dust control plan The table below provides a dust control plan, specific to construction activities Dust Control Plan Fugitive Dust Source Dust Control Actions Cost Distribution Category Earth moving For any earth moving which is more than 30 m from all property associated pumping costs lines, water sprinklers is necessary to prevent visible dust emission from exceeding 100 m in length in any direction. Described surface areas Apply dust suppression and Chemical cost. (except completed grading frequency quantity frequency Associated pumping areas) to maintain a stabilized surface. Areas that cannot be stabilized, as evidenced by wind driven dust, must have an application of water at least twice daily of at least 80% of the unstabilized costs. 3 M/s Om Shivam Buildcon Pvt. Ltd.

4 area. Disturbed surface areas (completed gardening areas) Inactive disturbed surface area Unpaved roads Apply water to at least 80% of all inactive accessible disturbed surface areas on a daily basis when there is evidence of wind driven fugitive dust. Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface or Utilize any combination of control actions 2c, 2d or such that, in total, they apply to all inactive disturbed surface areas. Watering of roads at least twice daily (roads with heavy traffics) or Watering of roads for any vehicular traffic, at least once daily with restricted speed limit of 15mph. Open storage piles Apply watering to at least 80% of the surface area of all open storage piles on a daily basis when there is evidence of wind driven fugitive dust or Install a three-sided enclosure with walls with not more than 50% porosity that extends to the top of the pile. Track- our control Downwash of trucks (especially tyres) prior to departure from site. Associated pumping costs. Chemical cost N A Associated pumping costs. Associated sprinkling costs. Associated pumping cost. Enclosure cost. Associated pumping costs. Procedure Changes in Construction Activities Idle time reduction: Construction equipment is commonly left idle while the operators are on break or waiting for the completion of another task. Emission from idle equipment tends to be high, since catalytic converters cools down, thus reducing the efficiency of hydrocarbon and carbon monoxide oxidation. Existing idle control technologies comprises of power 4 M/s Om Shivam Buildcon Pvt. Ltd.

5 saving mode, which automatically off the engine at present time and reduces emissions, without intervention from the operators. Improved Maintenance: Significant emission reductions can be achieved through regular equipment maintenance. Contractors will be asked to provide maintenance records for their fleet as part of the contract bid, and at regular intervals throughout the life of the contract. Incentive provisions will be established to encourage contractors to comply with regular maintenance requirements. Reduction of on-site Construction Time: Rapid on-site construction would reduce the duration of traffic interference and therefore, will reduce emissions from traffic delay. B) Occupancy phase To mitigate the impacts of pollutants from DG sets and vehicular traffic during the occupancy phase of the group housing, following measures are recommended for implementation: DG set emission control measures Vehicular emission controls and alternatives Greenbelt development Vehicle Emission Control and Alternatives Use of clean Fuel by vehicles on-site: Low sulphur diesel will be used (if available locally). This will reduce emission on-site and in areas from where these vehicles pass. Footpaths and Pedestrian ways: Adequate footpaths and pedestrian ways should be provided at the site to encourage non-polluting methods of transportation. II) Water Source Development Water source development shall be practiced by installation of scientifically designed rain water harvesting structures. Rainwater harvesting promotes self sufficiency and fosters an appreciation for water as a resource. Depth of groundwater table: About 3 m below ground level Excess runoff will be discharged into the storm water drain of 300 mm located at various points running along the 7.5 m wide internal Pathway. The rainwater collected from the rooftop and other paved areas within the project area will be conveyed into the rainwater harvesting system consisting of Desilting-cum-Filter Chamber, Oil & Grease Separators and Boreholes for recharge into the groundwater. 5 M/s Om Shivam Buildcon Pvt. Ltd.

6 It is proposed to collect rain water from roof area, Ground surface area and harvest the same for charging the underground water table. For this, all rain water with battery / network of catch basin is finally connected to rain harvest pit located at various points. As such RWH is mandatory to construct, to get the approval of Master Plans. Waste Water Treatment Scheme Proponent will treat the waste water of the proposed Residential and commercial housing in a well designed sewage treatment plant based on Phytorid Technology. Storm water Management Most of the storm produced on site will be harvested for ground water recharge. Thus proper management of these resources is a must to ensure that it is free from contamination. Contamination of Strom water is possible form the following sources: Diesel and oil spills in the diesel power generator and fuel storage area Waste spills in the solid/hazardous waste storage area Oil spills and leaks in vehicle parking lots Silts from soil erosion in gardens Spillage of sludge from sludge drying area of sewage treatment plant Hazardous waste Construction sites are sources for many toxic substances such as paints, solvents, wood preservatives, pesticides, adhesive and sealants. Hazardous waste generated during construction phase shall be stored in sealed containers and disposed off as per the Hazardous Waste Management and Handling Act, Amendment Rules (MoEF,2003). Some management practices to be developed are: Herbicides and pesticides will not be over applied (small-scale applications) and not applied prior to rain Paintbrushes and equipment for water and oil based paints shall be cleaned within a contained area and will not be allowed to contaminate site soils, water courses or drainage systems Provision of adequate hazardous waste storage facilities. Hazardous waste collection containers will be located as per safety norms and designated hazardous waste storage areas will be away from storm drains or watercourses Segregation of potentially hazardous waste from non-hazardous construction site debris Well labeled all hazardous waste containers with the waste being stored and the date of generation 6 M/s Om Shivam Buildcon Pvt. Ltd.

7 III) Plantation and landscaping Selection of the plant species should be done on the basis of their adaptability to the existing geographical conditions and the vegetation composition of the forest type of the region earlier found or currently observed. Green Belt Development Plan The plantation matrix adopted for the green belt development includes pit of 0.3m 0.3m size with a spacing of 2m 2m. In addition, earth filling and manure may also be required for the proper nutritional balance and nourishment of the sapling. It is also recommended that the plantation has to be taken up randomly and the landscaping aspects could be taken into consideration. Multi- layered plantation comprising of medium height trees (7m to 10m) and shrubs (5m height) are proposed for the green belt. In addition creepers will be planted along the boundary wall to enhance its insulation capacity. Selection of Plant Species for Green Belt Development The selection of plant species for the development depends on various factors such as climate, elevation and soil. The plants should exhibit the following desirable characteristics in order to be selected for plantation 1. The species should be fast growing and providing optimum penetrability 2. The species should be wind firm and deep rooted 3. The species should form a dense canopy 4. As far as possible, the species should be indigenous and locally available 5. Species tolerance to air pollutants like SPM, SO2, and NOx should be preferred 6. The species should be no large gaps for the air turbulence and mixing within the belt 7. There should be no large gaps for the air spill through 8. Trees with high foliage density, leaves with larger leaf area and hairy on both the surfaces 9. Ability to withstand conditions like inundation and drought 10. Soil improving plants (Nitrogen fixing rapidly decomposable leaf litter) 11. Attractive appearance with good flowering and fruit bearing 12. Bird and insect attracting trees species 13. Sustainable green cover with minimal maintenance. Parks and Avenue Plantation Parks and gardens maintained for recreational and ornamental purposes will not only improve the quality of existing ecology at the proposed project site but also will improve the aesthetic value. 7 M/s Om Shivam Buildcon Pvt. Ltd.

8 Avenue Plantation 1. Trees with colonial canopy with attractive flowering 2. Trees with branching at 7 feet and above 3. Trees with medium spreading branches to avoid obstruction to the traffic 4. Fruit trees to be avoided because children may obstruct traffic and general movement of public IV) EMP for Socio-Economic Environment The social management plan has been designed to take proactive steps and adopt best practices, which are sensitive to the socio-cultural setting of the region. The social Management Plan for proposed complex focuses on the following components: Income Generation Opportunity during Construction and Occupancy Phase. The proposed project would provide employment opportunities during construction and occupancy phase. There would also be a wide economic impact in terms of generating secondary occupation opportunities within and around the complex. The main principles considered for employment and income generation opportunities are out lined below: Employment strategy will provide for preferential employment of local people Conditions of employment should address issues like minimum wages and medical care for the workers. Contractors would be required to abide to employment priority towards locals and abide by labour laws regarding standards on employee terms and conditions. The proposed project would provide safe and improved working conditions for the workers employed at the facility during construction and operation phase. With the proposed ambience and facilities provided, the complex will provide new experiences in terms of living and recreations. Following measures should be taken to improve the working environment of the area: Less used of chemicals and biological agents with hazard potential Developing a proper interface between the work and the human resource through a system of skill improvement Provision of facilities for nature care and recreation e.g. indoor games facilities Measures to reduce the incidence of work related injuries, facilities and diseases Maintenance and beautifications of the complex and the surrounding roads 8 M/s Om Shivam Buildcon Pvt. Ltd.

9 Shiv Kailash Google Image 6. ANALYSIS OF THE PROJECT DESCRIPTION: The project will provide all basic facility including safety and scurity in affordable price. This is one of the basic necessities of the common man. It will generate direct and indirect income source. 9 M/s Om Shivam Buildcon Pvt. Ltd.

10 Proposed Site Layout plan : PROJECT COST: The estimated project cost is approximately Rs. 745 crores. 10 M/s Om Shivam Buildcon Pvt. Ltd.