1 June 24, 2014 PUBLIC INFORMATION CENTRE MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B MUNICIPAL SERVICES FOR THE MARY LAKE ESTATES SUBDIVISION Buildings Municipal Infrastructure Transportation Industrial Energy Environment PROJECT DESCRIPTION & SITE 2 Mary Lake Estates Draft Plan of Subdivision was approved May 31, Subdivision consists of single family dwellings and open space (OPA 54) Subdivision is located on the south side of 15 th Sideroad west of Keele Street Site is divided into 3 areas: east, west and far west East portion (30 lots) and West portion (57 lots) consist of detached single family dwellings. West portion of the site requires evaluation of servicing options Far west portion proposes a future development block and servicing this block is not part of this Class EA Township of King and Mary Lake Estates Inc. are working on solutions for servicing the west portion of the Site.

2 MUNICIPAL CLASS EA PROCESS 3 Municipal Class EA Planning Process The Ontario Environmental Assessment Act, R.S.O., 1990 (the EA Act) requires that projects corresponding to a given class of undertakings (e.g. municipal road, transit, water and wastewater projects) follow an approved Class Environmental Assessment (Class EA) process. The Class EA planning process as documented in the MEA Municipal Class EA document (October 2000, amended in 2007 & 2011) includes the following five phases: Phase 1 Problem or Opportunity Phase 2 Alternative Solution Phase 3 Alternative Design Concepts for Preferred Solution Phase 4 Environmental Study Report Phase 5 - Implementation Municipal Class EA Schedule for this Study Depending on their environmental impact, municipal projects are classified in the Municipal Class EA in terms of schedules: Schedule A or A+ Schedule B Increasing Potential for Impacts Schedule C This study was designated as Schedule B under the MEA Class EA process which includes reviews with the public and relevant agencies prior to implementation. The Class EA will satisfy the requirements and procedures of Phases 1 and 2 of the Municipal Class Environmental Assessment Planning and Design Process as well as providing additional public consultation. A Schedule B Class EA concludes with the Notice of Completion and placing of the Project File in a location accessible to the public for a minimum 30-day review period to allow review by the public and agencies which may have an interest in this project. SCHEDULE B MUNICIPAL CLASS EA 4 Phase 1: Problem or Opportunity Identify and describe the problem(s) and opportunities Notice of Study Commencement & Public Information Centre Phase 2: Alternative Solutions Identify alternative solutions to the problem(s) Inventory of the natural, social, economic & cultural environments Identify the impact of the alternative solutions after mitigation Evaluate the alternative solutions with consideration of environmental and technical impacts Identify a recommended solution Confirm the preferred solution based on input from the Public Information Centre and Review Agencies Phase 4: Project File Report Complete a Project File Report (which sets out all of the activities undertaken to date through Phases 1 & 2) Place Project File Report on public record for 30 calendar days for review Notify the public and government agencies of completion of the Study and of the Part II Order provision in the EA Act Public Information Centre June 2014 Problem and Opportunities Planning Alternative Solutions Evaluation of Planning Alternative Solutions Recommended Solutions and Proposed Mitigation Measures Preliminary Design of Preferred Solutions We are here Notice of Study Completion & Filing the Project File Report Phase 5: Implementation Proceed to design and construction of the project

3 PURPOSE AND PROBLEM / OPPORTUNITY 5 PURPOSE Develop lands at 15th Sideroad and Keele Street in King City into Mary Lake Estates residential subdivision. Planning for this development was approved at the OMB but several servicing options exist. PROBLEM / OPPORTUNITY How to provide sanitary and water services to accommodate the proposed Mary Lake Estates subdivision. 6 KEY NATURAL ENVIRONMENT EXISTING CONDITIONS Aquatic Environment Two headwater tributaries of the East Humber River cross the Site. Tributary A (west of the western portion of the Site) flows through a well defined channel and provides permanent fish habitat for warmwater baitfish communities Tributary has low productivity due to lack of cover and depth and medium/low sensitivity. Tributary B flows SE through a shallow valley within a wetland in central portion of the Site. Separates east and west portions of the Site and provides very limited potential season fish use but is important contributing habitat as wetland provides water quality and quantity controls. Tributary B has low sensitivity.

4 7 KEY NATURAL ENVIRONMENT EXISTING CONDITIONS Terrestrial Environment Vegetation communities present are: Mixed Forest, Dry-Fresh Sugar Maple Hemlock Mixed Forest, Dry Moist Old Field Meadow, Willow Mineral Thicket Swamp, Cattail Mineral Shallow Marsh, Reed Canary Grass Mineral Meadow Marsh and Open Aquatic. Portion of Eaton Hall-Mary Hackett Lakes Wetland Complex (Provincially Significant Wetland) is located on Site. 30 m buffer has been applied to feature to mitigate impacts from development. KEY ENVIRONMENTAL FEATURES MAP 8

5 GROUNDWATER CONDITIONS Site lies in a groundwater recharge area Groundwater recharge rate very low The 25 Year Travel Zone of the Wellhead Protection Area for the King City Municipal Well overlays the Site EXISTING CONDITIONS 10 Social-Cultural / Land Use: Bounded on south and west by existing low density Kingscross Subdivision. Villanova College and Augustinian Monastery (designated under Ontario Heritage Act) are located across 15 th Sideroad to the north. Stage 1 and 2 Archaeological Assessments confirmed no known archaeological sites exist within 2 km of the Site and the property is clear from archaeological concern. Located in Settlement Areas of the Oak Ridges Moraine Planning Area. Site was mainly used for agricultural purposes and no specific environmental hazards were found. No municipal services or utilities are present on the Site.

6 11 EVALUATION CRITERIA SERVICING ALTERNATIVES Natural Environmental Impacts Wetlands Impacts to Surface Water Vegetation and woodland impacts Impacts to Groundwater/Subsurface Conditions Watercourse Crossings Socio Cultural Environments Traffic Disruption Number of Private Driveways Impacted Dust and Noise Issues Archaeological and Cultural Heritage Impacts to private properties/existing land uses Provincially significant wetlands or other wetlands located adjacent to or directly intersected Potential for impacts (e.g., erosion) during construction to surface water (e.g., ditches, watercourse, wetlands) Vegetation or Woodlands located adjacent to or directly intersected Proximity to areas of high aquifer vulnerability The number and complexity of watercourses that are crossed Potential for impacts to traffic as well as public and private properties (including Businesses) during construction The number of driveways impacted Potential for dust and noise issues stemming from construction activities within close proximity to nearby communities Construction activities within undisturbed areas with proximity to known heritage or archaeological sites Potential constructed related impacts to adjacent private properties and existing land uses Technical Considerations Ease of Construction Ability to Connect with Existing Infrastructure Soil/Groundwater Conditions Capacity and System Operation Financial Considerations Operation and Maintenance Efforts/ Costs Capital/Replacement Costs Land Acquisition/Easement Requirements Potential for encountering problems with construction of alternative (i.e. soil stability, ease of excavation) Relocation or special construction techniques required as a result of existing buried utilities Impacts existing soils or ground water may have on design. Ability to convey design flows and provide reliable service Total operation and maintenance efforts/costs Total capital costs determined by assumed construction method Potential for land acquisition or the need for easements for access if services cross private property. SANITARY SEWER EXISTING AND PROPOSED 12 Existing Sanitary Conditions: Site currently has no sanitary sewer services. Proposed sanitary sewer on Keele Street is not yet constructed and will connect to the King City Sanitary Sewer system. Need to evaluate alternatives to connect west portion of site to Keele St. sewer Proposed Sanitary Sewer Alternative Solutions: Alternative Layouts Alternative 1 Alternative 2 Alternative 3 Alternative 4 Description of Alternatives Gravity sewer connection to proposed sanitary sewer on Keele Street via Lockhart Lane and Kingscross Drive. Inverted siphon on 15 th Sideroad to connection to the proposed sewers on the eastern potion of the development. Pumping Station proposed at the west portion of the development and a forcemain to divert flows to the proposed sanitary sewer on the eastern portion of the development. Gravity Sewer on 15 th Sideroad crossing under the watercourse. Proposed sanitary sewer on Keele Street will require additional depth.

7 SANITARY SEWER - ALTERNATIVE LAYOUTS 13 SANITARY SEWER EVALUATION OF ALTERNATIVE SOLUTIONS 14 SANITARY Alternative 1 Alternative 2 Alternative 3 Alternative 4 Description of Alternatives Gravity sewer connection to proposed sanitary sewer on Keele Street via Lockhart Lane and Kingscross Drive. Inverted siphon on 15 th Sideroad to connection to the proposed sewers on the eastern potion of the development. Pumping Station proposed at the west portion of the development and a forcemain to divert flows to the proposed sanitary sewer on the eastern portion of the development. Gravity Sewer on 15 th Sideroad crossing under the watercourse. Proposed sanitary sewer on Keele Street will require additional depth. Natural Environment - One watercourse crossing but no impact to wetlands. Potential impact to groundwater through Wellhead Protection Area - Watercourse crossing is in close proximity to PSW - Potential impact to groundwater at the limit of the Wellhead Protection Area - Minimal impact with School and Monestary with sewer constructed within road allowance along 15 th Sideroad - Watercourse crossing is in close proximity to PSW - Pumping Station is within the Wellhead Protection Area - Watercourse crossing is in close proximity to PSW - Potential impact to groundwater at the limit of the Wellhead Protection Area - Minimal impact with School and Monestary with sewer constructed within road allowance along south side of 15 th Sideroad Social-Cultural Environment - Disruption during construction to existing Kingscross Subdivision - Minimal impact with School and Monestary with sewer constructed within road allowance along 15 th Sideroad Technical Environment - Deeper sewers through Kingscross subdivision will be required with potential dewatering. System works by gravity with minimal maintenance - Limited downstream capacity at pumping station for required flushing flows. Increased sewer depth internal to subdivision. - Pumping station will require the most maintenance of all options - System subject to power failure and breakdown - Deeper sewers on 15 th Sideroad and Keele Street requires with potential dewatering. System works with minimal maintenance Financial Environment - Additional sewer to maintain and higher capital/replacement costs - Easement requirements - Township maintenance department not set up to maintain siphon, low capital/replacement costs - Limited capacity downstream and ongoing maintenance concerns - High capital/replacement and maintenance costs - Least sewer to maintain and lower capital/replacement costs OVERALL RATING - Proposed alignment has higher initial costs and the greatest disturbance during construction - Potential for failure, high capital costs and high ongoing maintenance costs - Utilizes proposed alignment on Keele Street to minimize additional sewer maintenance and capital costs Rating: Preferred Less Preferred Least Preferred NOTE: Do Nothing was not evaluated further since it would not address problem statement

8 SANITARY SEWER - RECOMMENDED SOLUTION (ALTERNATIVE 4) 15 WATERMAIN - EXISTING AND PROPOSED 16 Existing Water Conditions: Site currently has no water services. Existing and proposed watermains in the vicinity of the development capable of providing adequate flows and pressures for development. New watermains may be required to ensure consistent and reliable water supply to Mary Lake Estates Subdivision. Proposed Watermain Alternative Solutions: Alternative Layouts Alternative 1 Alternative 2 Alternative 3 Description of Alternatives Second Watermain feed via Lockhart Lane and Kingscross Drive Second Watermain feed on 15 th Sideroad A single connection from Keele Street. No Second Connection.

9 WATERMAIN - ALTERNATIVE LAYOUTS 17 WATERMAIN - EVALUATION OF ALTERNATIVE SOLUTIONS 18 WATER Alternative 1 Alternative 2 Alternative 3 Description of Alternatives Second Watermain feed via Lockhart Lane and Kingscross Drive Second Watermain feed on 15 th Sideroad A single connection from Keele Street. No Second Connection. Natural Environment - Two watercourse crossings and the potential disturbance of an existing stand of trees on the existing lot on Lockhart Lane Social-Cultural Environment - Construction impacts on Kingscross subdivision residents Technical Environment - System will provide the best water security and will provide fire protection to Kingscross Subdivision - Two watercourse crossings at 15 th Sideroad will be required - Minimal disruption to traffic and residents with construction on 15 th Sideroad - System will provide adequate flows and limited water security - Least disturbance to natural environment with only one watercourse crossing - Minimal traffic disruption - Minimal dust and noise impact on Kingscross residents - System will provide limited water security and quality. Financial Environment - Higher capital/replacement costs and an easement is required - Highest capital/replacement costs and potential impact by future planning initiatives - Lowest capital/replacement costs and no land requirements OVERALL RATING - Benefits from improved fire protection for existing Kingscross Subdivision and smaller quantity of watermain for the Township to maintain outweigh drawbacks of increased construction disturbance - Potential impact on future planning initiatives and lesser fire and water protection. - Lowest water security and quality Rating: Preferred Less Preferred Least Preferred NOTE: Do Nothing was not evaluated further since it would not address problem statement

10 19 WATERMAIN - RECOMMENDED SOLUTION (ALTERNATIVE 1) NEXT STEPS 20 Selection of Preferred Solutions

11 REMAIN INVOLVED IN THE STUDY 21 Your comments are important as they will be reviewed and considered as part of the Study. Please indicate your interest to remain involved with the Study by submitting your completed comment sheet or by contacting one of the following team members: Peter Slama, P.Eng. Project Manager Cole Engineering Group Ltd. 70 Valleywood Drive Markham, ON L3R 4T5 P: x 521 F: E: pslama@coleengineering.ca Pat Becker Environmental Planner P Becker Consulting 14 Lady Diana Court Gormley, ON L0H 1G0 P: F: E: PBecker@pathcom.com

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the

More information

Public Information Centre

Public Information Centre Vineland West Private Water System Municipal Class Environmental Assessment Public Information Centre Tuesday, July 12, 2016, 6 to 8 p.m. Vineland Research and Innovation Centre, Rittenhouse Hall Welcome!

More information

Please complete the sign-in sheet and review display materials.

Please complete the sign-in sheet and review display materials. Municipal Class Environmental Assessment Please complete the sign-in sheet and review display materials. As you move through the information presented today, we encourage you to ask questions and provide

More information

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON TOWNSHIP OF KING TH 15 SIDEROAD RECONSTRUCTION From Highway 27 To Concession 8 Municipal Class Environmental Assessment Schedule B Project Information Session Date: Time: Location: Thursday, March 15,

More information

Georgetown Water Storage Class Environmental Assessment Study

Georgetown Water Storage Class Environmental Assessment Study Georgetown Water Storage Class Environmental Assessment Study Public Information Centre Cedarvale Community Centre 181-185 Main Street South Thursday, September 4th, 2008 6:30 p.m. 8:30 p.m. Why are we

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

Upper York Sewage Solutions Individual Environmental Assessment Project Update

Upper York Sewage Solutions Individual Environmental Assessment Project Update Upper York Sewage Solutions Individual Environmental Assessment Project Update Town of Georgina Committee of the Whole October 15, 2012 Daniel Kostopoulos Director, Capital Planning and Delivery Presentation

More information

TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2

TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2 TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2 Date: Wednesday, March 28, 2018. Time: 4:00 p.m. to 7:00 p.m. Location: Town Hall Community

More information

Replacement of Well No. 2 Schedule B Class Environmental Assessment Public Information Centre Information Handout

Replacement of Well No. 2 Schedule B Class Environmental Assessment Public Information Centre Information Handout Replacement of Well No. 2 Schedule B Class Environmental Assessment Public Information Centre Information Handout Overview The Region of Peel has identified the need to provide a new municipal well to

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

MASTER SERVICING STUDY. Tamarack (Queen Street) Corporation CARDINAL CREEK VILLAGE

MASTER SERVICING STUDY. Tamarack (Queen Street) Corporation CARDINAL CREEK VILLAGE FOR Tamarack (Queen Street) Corporation CITY OF OTTAWA PROJECT NO.: 11-513 FOURTH SUBMISSION for Tamarack (Queen Street) Corporation FOURTH SUBMISSION EXECUTIVE SUMMARY This Master Servicing Study (MSS)

More information

1 AMENDMENT NO. 637 TO THE VAUGHAN OFFICIAL PLAN (VAUGHAN 400 NORTH EMPLOYMENT AREA SECONDARY PLAN) ONTARIO MUNICIPAL BOARD HEARING SETTLEMENT

1 AMENDMENT NO. 637 TO THE VAUGHAN OFFICIAL PLAN (VAUGHAN 400 NORTH EMPLOYMENT AREA SECONDARY PLAN) ONTARIO MUNICIPAL BOARD HEARING SETTLEMENT Report No. 7 of the Planning and Economic Development Committee Regional Council Meeting of September 22, 2011 1 AMENDMENT NO. 637 TO THE VAUGHAN OFFICIAL PLAN (VAUGHAN 400 NORTH EMPLOYMENT AREA SECONDARY

More information

Public Information Centre No. 2

Public Information Centre No. 2 Public Information Centre No. 2 Wednesday April 20, 2011 4:00 pm to 7:00 pm City of Welland City Hall Area 2 Welland, Pelham, and Port Colborne Welcome to Public Information Centre No. 2 Please sign in

More information

GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT

GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Wednesday, November 1, 2017 6:00 PM 8:00 PM Grand Valley District Community Centre Grand

More information

Open House. Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study

Open House. Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study Open House Thursday, February 21, 2019 6:30 p.m. to 8:30 p.m. Aurora Town Hall 100 John West Way, Aurora,

More information

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre.

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre. Welcome South London Wastewater Servicing Study Municipal Class Environmental Assessment Master Plan Public Information Centre February 26, 2018 The purpose of this Public Information Centre (PIC) is to:

More information

GRAND NIAGARA Proposed Secondary Plan

GRAND NIAGARA Proposed Secondary Plan GRAND NIAGARA Proposed Secondary Plan Public Open House #3 January 17. 2017 scope + process BUILT Grand Niagara Secondary Plan The Grand Niagara Secondary Plan will establish a framework for the future

More information

Bowmanville Marsh. Enniskillen Conservation Area BOWMANVILLE/SOPER CREEK WATERSHED EXISTING CONDITIONS REPORT INTRODUCTION

Bowmanville Marsh. Enniskillen Conservation Area BOWMANVILLE/SOPER CREEK WATERSHED EXISTING CONDITIONS REPORT INTRODUCTION Bowmanville Marsh Enniskillen Conservation Area BOWMANVILLE/SOPER CREEK WATERSHED EXISTING CONDITIONS REPORT INTRODUCTION FINAL - December 2011 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 STUDY AREA AND

More information

Ballantrae Long-Term Water Supply Schedule B Class EA PROJECT FILE

Ballantrae Long-Term Water Supply Schedule B Class EA PROJECT FILE YR Project # 78270 Ballantrae Long-Term Water Supply FINAL REPORT JANUARY 2019 REPORT PREPARED FOR The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 REPORT PREPARED BY THE MUNICIPAL

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General

More information

Natural Systems Planning Primer

Natural Systems Planning Primer Natural Systems Planning Primer Lise.Guevremont@ottawa.ca Amy.Macpherson@ottawa.ca Land Use and Natural Systems Unit Planning and Growth Management November 2015 1 Welcome Policy Framework Development

More information

COLE ENGINEERING GROUP LTD.

COLE ENGINEERING GROUP LTD. CITY OF MARKHAM PROJECT FILE Stormwater Management Facilities Retrofit Municipal Class EA ES12-0316 COLE ENGINEERING GROUP LTD SEPTEMBER 2015 [ Month Year ] HEAD OFFICE 70 Valleywood Drive Markham, ON

More information

March 29, to the. Please sign in and take a Comment Sheet

March 29, to the. Please sign in and take a Comment Sheet elcome to the Public Information Centre for the River Street Pump Station Twin- Forcemain Extension and Ravensview Trunk Sewer Twinning Please sign in and take a Comment Sheet Utilities Kingston staff

More information

MOSLEY STREET URBANIZATION TH

MOSLEY STREET URBANIZATION TH Public Information Centre 1 (PIC 1) MOSLEY STREET URBANIZATION TH 45 BEACHWOOD ROAD TO STREET Class Environmental Assessment November 29, 2016 Welcome 2 This Public Information Centre will: establish channels

More information

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study Part A Study Components Background Information Review

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

Public Information Centre September 19 th, 2017

Public Information Centre September 19 th, 2017 Public Information Centre September 19 th, 2017 WELCOME! Public Information Centre for the Maple Hill Creek Rehabilitation Class Environmental Assessment Please take the time to sign our sign in sheet

More information

WELCOME! Please sign in so we can keep you updated on the study

WELCOME! Please sign in so we can keep you updated on the study The City of Peterborough Chemong Road/Reid Street Widening Class Environmental Assessment (Schedule C) Public Information Centre #2 March 20, 2012 Northminster United Church WELCOME! Please sign in so

More information

Torbram Road Improvements From Queen Street East to Bovaird Drive

Torbram Road Improvements From Queen Street East to Bovaird Drive Torbram Road Improvements From Queen Street East to Bovaird Drive Municipal Class EA Study Public Information Centre No. 1 November 16 2017 6:30 pm 8:30 pm Please sign in so we can keep you updated on

More information

BACKGROUND INFORMATION

BACKGROUND INFORMATION BACKGROUND INFORMATION Preliminary Design & Class Environmental Assessment Study G.W.P. 30-95-00 The following information was included in the Transportation Environmental Study Report (TESR) that was

More information

Meeting Agenda. City of Guelph Environmental Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4. Item 5. Next Meeting:

Meeting Agenda. City of Guelph Environmental Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4. Item 5. Next Meeting: Meeting Agenda City of Guelph Environmental Advisory Committee June 13, 2018 City Hall, Meeting Room C From 7:00 to 9:00 p.m. Meeting Chair: Colin Oaks Agenda Items Welcome to all Item 1, 2 and 3 Item

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE GUIDELINES FOR HYDROGEOLOGIC ASSESSMENT AND REPORTING REQUIREMENTS NEW DEVELOPMENTS ON MUNICIPAL SERVICES REVISED

More information

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY The Central Lake Ontario Conservation Authority (CLOCA) has recognized the need to prepare comprehensive management strategies for all of its watersheds.

More information

Roles of Conservation Authority Geoscientists in Ontario. Geoscientist s Day Donald Ford, P.Geo. Toronto and Region Conservation

Roles of Conservation Authority Geoscientists in Ontario. Geoscientist s Day Donald Ford, P.Geo. Toronto and Region Conservation Roles of Conservation Authority Geoscientists in Ontario Geoscientist s Day Donald Ford, P.Geo. Toronto and Region Conservation Points to Ponder What are Conservation Authorities? What purpose do they

More information

City of Mississauga Environmental Impact Studies Terms of Reference 2002

City of Mississauga Environmental Impact Studies Terms of Reference 2002 City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and

More information

Municipal Class EA Process

Municipal Class EA Process Purpose of Tonight s Meeting INTRODUCTION This is the first Public Information Centre (PIC) to present information on the Class Environmental Assessment (EA) Study for a new operations centre. The following

More information

5. RECORDS REVIEW RESULTS

5. RECORDS REVIEW RESULTS Dufferin Wind Power Inc. 5. RECORDS REVIEW RESULTS As stated in Section 3, the wind turbines are located entirely within the Township of Melancthon, approximately 14 kilometres from the Town of Shelburne

More information

Development Approval & Planning Policy Department

Development Approval & Planning Policy Department To: From: Mayor and Members of Council Development Approval & Planning Policy Department Meeting: 2014-06-24 Subject: Bolton Residential Expansion Study (BRES): Selection of Preferred Settlement Expansion

More information

BURKE WATER STATION TREATMENT, PUMPING AND STORAGE CLASS ENVIRONMENTAL ASSESSMENT

BURKE WATER STATION TREATMENT, PUMPING AND STORAGE CLASS ENVIRONMENTAL ASSESSMENT Welcome to the City of Guelph BURKE WATER STATION TREATMENT, PUMPING AND STORAGE CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE NO. 1 Wednesday, November 7, 2012 from 6:30 PM to 8:30 PM Please

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Prepared By: Introduction The purpose of this report is to determine the feasibility

More information

Town of Lakeshore Water & Wastewater Master Plan

Town of Lakeshore Water & Wastewater Master Plan Town of Lakeshore Water & Wastewater Master Plan October 2008 WATER AND WASTEWATER MASTER PLAN STUDY Prepared for: Town of Lakeshore 419 Notre Dame St. P.O. Box 580 Belle River, Ontario N0R 1A0 Tel: (519)

More information

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B February 13, 2013 Municipal Class EA Process We are here Purpose and Objective of

More information

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Table of Contents. List of Tables. 11. Advantages and Disadvantages Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL150128 ONTARIO MUNICIPAL BOARD Eden Oak (Creditview Heights) Inc. has appealed to the Ontario Municipal Board under subsection 34(11) of the Planning Act, R.S.O. 1990, c. P.13, from the neglect or refusal

More information

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In WELCOME Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In PURPOSE OF THIS MEETING Rankin Construction Inc. (RCI) and their design consultant

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL150128 ONTARIO MUNICIPAL BOARD Eden Oak (Creditview Heights) Inc. has appealed to the Ontario Municipal Board under subsection 34(11) of the Planning Act, R.S.O. 1990, c. P.13, from the neglect or refusal

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Welcome to the Public Information Centre for: Lisgar District Basement Water Infiltration Class Environmental Assessment Study for Pumping Stations

Welcome to the Public Information Centre for: Lisgar District Basement Water Infiltration Class Environmental Assessment Study for Pumping Stations Welcome Welcome to the Public Information Centre for: Lisgar District Basement Water Infiltration Class Environmental Assessment Study for Pumping Stations The purpose of this Public Information Centre

More information

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies . Rural Living Areas Rural Lifestyle and Rural Residential.1 Issues, Objectives and Policies.1.1 Resource Management Issues Discussion of additional relevant issues is found in the following Parts of the

More information

Additional Water Storage Capacity for Caledon East Class Environmental Assessment Phase 1 and 2 Report Regional Municipality of Peel

Additional Water Storage Capacity for Caledon East Class Environmental Assessment Phase 1 and 2 Report Regional Municipality of Peel Additional Water Storage Capacity for Caledon East Class Environmental Assessment Phase 1 and 2 Report Regional Municipality of Peel Issue and Revision Record Rev Date Originator Checker Approver Description

More information

Draft for Discussion. Environmental Assessment Terms of Reference. Waste Management of Canada Corporation, Ottawa Waste Management Facility

Draft for Discussion. Environmental Assessment Terms of Reference. Waste Management of Canada Corporation, Ottawa Waste Management Facility Draft for Discussion Environmental Assessment Terms of Reference Waste Management of Canada Corporation, Ottawa Waste Management Facility January 12, 2006 Table of Contents Page 1. Introduction...1 2.

More information

APPENDIX C TECHNICAL MEMORANDUM NO.2 ALTERNATIVE DESIGN CONCEPTS FOR PROSPECT PARK WPP EXPANSION

APPENDIX C TECHNICAL MEMORANDUM NO.2 ALTERNATIVE DESIGN CONCEPTS FOR PROSPECT PARK WPP EXPANSION Prospect Park Well Field Re-rating and Water Purification Plant Expansion ESR APPENDICES APPENDIX C TECHNICAL MEMORANDUM NO.2 ALTERNATIVE DESIGN CONCEPTS FOR PROSPECT PARK WPP EXPANSION R030059505500101001_FINAL_FE2015

More information

The Norwich Street Bridge

The Norwich Street Bridge The Norwich Street Bridge Class Environmental Assessment Open House May 17, 2017 6:30-8 p.m. Guelph City Hall Phase 1 Phase 2 Project File Our Study Process: This study is being undertaken as a Schedule

More information

Town of Huntsville Official Plan Section 9 Rural Area Page 104

Town of Huntsville Official Plan Section 9 Rural Area Page 104 Section 9 Rural Area Page 104 9 RURAL AREA 9.1 Definition and Function Location Rural Settlements 9.1.1 The Rural Area includes those lands located outside any other land use designation identified in

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

CHAPTER 8: ENVIRONMENTAL MANAGEMENT POLICIES

CHAPTER 8: ENVIRONMENTAL MANAGEMENT POLICIES TOWNSHIP OF WELLESLEY OFFICIAL PLAN page 74 of 133 CHAPTER 8: ENVIRONMENTAL MANAGEMENT POLICIES Jurisdiction over environmental matters is divided among different levels of government. Effective environmental

More information

Join the Conversation!

Join the Conversation! Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Transit Project Assessment(TPA) Process Public Consultation Centre (PCC) No.1 November 18, 2015 November 19, 2015 Join the Conversation!

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

ADAMS COUNTY REGIONAL SEWER DISTRICT 2018 SANITARY SEWER IMPROVEMENTS ADAMS COUNTY, INDIANA

ADAMS COUNTY REGIONAL SEWER DISTRICT 2018 SANITARY SEWER IMPROVEMENTS ADAMS COUNTY, INDIANA ADAMS COUNTY REGIONAL SEWER DISTRICT 2018 SANITARY SEWER IMPROVEMENTS ADAMS COUNTY, INDIANA PROJECT SUMMARY PUBLIC HEARING November 9, 2018 @ 12:00 p.m. PROJECT PURPOSE: The primary purpose for the proposed

More information

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Municipal Class Environmental Assessment Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Date: Thursday, June 20, 2013 Time: 6:30 p.m. 8:30 p.m.

More information

DESCRIPTION OF THE PROJECT CHANGE

DESCRIPTION OF THE PROJECT CHANGE Stantec Consulting Ltd. 70 Southgate Drive, Unit 1 Guelph, Ontario N1G 4P5 September 19, 2012 Stantec File: 160960584 Ministry of the Environment Environmental Approvals Access & Service Integration Branch

More information

SemCAMS Area Project Description

SemCAMS Area Project Description REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory

More information

ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY. Town of Shelburne Long-Term Well for Additional Water Supply Project

ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY. Town of Shelburne Long-Term Well for Additional Water Supply Project ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY Town of Shelburne Long-Term Well for Additional Water Supply Project EXECUTIVE SUMMARY Introduction Project Summary In order to accommodate future growth

More information

Town of Perth Landfill Expansion Environmental Screening

Town of Perth Landfill Expansion Environmental Screening Town of Perth Landfill Expansion Environmental Screening Public Information Centre Thursday September 29, 2016 4:00 to 6:00 p.m. and 7:00 to 9:00 p.m. Perth Town Hall Main Floor Welcome to the Public Information

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2

More information

THE CORPORATION OF THE CITY OF BROCKVILLE By-Law Number

THE CORPORATION OF THE CITY OF BROCKVILLE By-Law Number THE CORPORATION OF THE CITY OF BROCKVILLE A By-law to Adopt Amendment Number 005 to the 2012 Official Plan for the City of Brockville (Employment Lands) WHEREAS on 9 February 2012, the City of Brockville

More information

Headwater Drainage Feature Assessment:

Headwater Drainage Feature Assessment: Prepared for: Jim Dougan, MSc Principal & Senior Ecologist DOUGAN & ASSOCIATES Ecological Consulting & Design 77 Wyndham Street South, Guelph, ON, N1E 5R3, Headwater Drainage Feature Assessment: In Support

More information

Facilities Environmental Protection Plan: Burnaby Terminal

Facilities Environmental Protection Plan: Burnaby Terminal Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation

More information

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Date: Wednesday, April 26, 2017 Time: 3:00 pm to 5:00 pm and 7:00 pm to 8:00 pm 1 Your input is appreciated. You are encouraged to review

More information

Redwood Heights Stage 2 Update. Citizen s Advisory Committee April 25, 2017

Redwood Heights Stage 2 Update. Citizen s Advisory Committee April 25, 2017 Redwood Heights Stage 2 Update Citizen s Advisory Committee April 25, 2017 Outline Transportation Study Utility Servicing Biodiversity Conservation Strategy Outstanding Items Timeline Water Servicing Limited

More information

REPORT. Region of Peel. East Brampton Trunk Sewer Twinning Environmental Assessment. Project File Report

REPORT. Region of Peel. East Brampton Trunk Sewer Twinning Environmental Assessment. Project File Report REPORT Region of Peel East Brampton Trunk Sewer Twinning Environmental Assessment Project File Report June 2014 CONFIDENTIALITY AND COPYRIGHT This document is for the sole use of the addressee and Associated

More information

Building Complete Communities. Supporting a Viable Agricultural Sector. Protecting Natural Heritage and Water

Building Complete Communities. Supporting a Viable Agricultural Sector. Protecting Natural Heritage and Water Building Complete Communities Supporting a Viable Agricultural Sector Protecting Natural Heritage and Water Responding to Climate Change Growing the Greenbelt Planning for Infrastructure Image: Neptis

More information

Mayfield West Phase Two Secondary Plan Water and Wastewater Servicing Study Part A Report Town of Caledon

Mayfield West Phase Two Secondary Plan Water and Wastewater Servicing Study Part A Report Town of Caledon Water and Wastewater Servicing Study Part A Report Town of Caledon Prepared by 170 Steelwell Road Suite 200 Brampton ON L6T 5T3 Canada File No: MTB 15608 The material in this report reflects best judgement

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

Humber Bridge Trail Bowstring Arch Bridge Class Environmental Assessment

Humber Bridge Trail Bowstring Arch Bridge Class Environmental Assessment Environment City of Vaughan Humber Bridge Trail Bowstring Arch Bridge Class Environmental Assessment Prepared by: AECOM 300 300 Town Centre Boulevard 905 477 8400 tel Markham, ON, Canada L3R 5Z6 905 477

More information

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Purpose of this Public Information Centre Provide you with an update on Hydro One s infrastructure

More information

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Project Identification Project Name: Elyria East Side Relief Sewer Phase 1B South (CS390337-0018), Phase 1C (CS390337-0014), Phase 1D (CS390337-0017) Applicant: The Honorable Holly

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

March 7, Background

March 7, Background March 7, 2018 Protecting Water Ministry of Municipal Affairs and Housing Local Government and Planning Policy Division Provincial Planning Policy Branch 777 Bay Street, Floor 13 Toronto, ON M5G 2E5 RE:

More information

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Your comments are encouraged and appreciated, as this will provide us an opportunity to address project issues and

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga

More information

Director of Planning and Development Services. Manager of Planning. Kevin Tryon, CET Manager of Engineering Development Approvals

Director of Planning and Development Services. Manager of Planning. Kevin Tryon, CET Manager of Engineering Development Approvals TOWN OF AJAX REPORT REPORT TO: SUBMITTED BY: PREPARED BY: General Government Committee Paul Allore, MCIP, RPP Director of Planning and Development Services Gary Muller, MCIP, RPP Manager of Planning Kevin

More information

19 Lady Bianca Court, Maple

19 Lady Bianca Court, Maple File: A326/14 Item # 26 Ward #4 Applicant: 1275620 ONTARIO INC. Address: Agent: 19 Lady Bianca Court, Maple LEO ARIEMMA Adjournment Status: Comments/Conditions: Commenting Department Comment Condition

More information

3.0 Natural Resource Management Policies. 3.4 Resource Extraction Policies

3.0 Natural Resource Management Policies. 3.4 Resource Extraction Policies 3.0 Natural Resource Management Policies 3.4.1 Mineral Aggregates INTRODUCTION Oxford County is characterized by significant reserves of mineral aggregates, including bedrock-derived crushed stone and

More information

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN Report No. 3 of the Transportation Services Committee Regional Council Meeting of March 24, 2011 5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN The Transportation Services Committee

More information

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project Mohawk College Hamilton, ON Fennell Campus Wind Project H336493-0000-07-124-0001 Rev. C September 24, 2010 Project Report Mohawk College Fennell Campus Wind Project September 24, 2010 Table of Contents

More information

PUBLIC OPEN HOUSE #2 GRAND NIAGARA SECONDARY PLAN. Date: Time: Place:

PUBLIC OPEN HOUSE #2 GRAND NIAGARA SECONDARY PLAN. Date: Time: Place: GRAND NIAGARA SECONDARY PLAN PUBLIC OPEN OUSE #2 WELLAND RIVER GRASSY BROOK ROAD MONTROSE ROAD CROWLAND ROAD QUEEN ELIZABET WAY BIGGAR ROAD (Source: Google Maps 2015) Date: Time: Place: June 15, 2016 4:00

More information

Hospital Re-location Analysis

Hospital Re-location Analysis Hospital Re-location Analysis Background Collingwood General and Marine Hospital is in the early stages of a capital hospital facility redevelopment with the Ministry of Health and Long Term Care. The

More information

Caledon East Water Supply Class Environmental Assessment Schedule B. Public Information Centre May 1, 2007

Caledon East Water Supply Class Environmental Assessment Schedule B. Public Information Centre May 1, 2007 Caledon East Water Supply Class Environmental Assessment Schedule B Public Information Centre May 1, 2007 Terms and Abbreviations average day demand (ADD) the total volume of water used during the year

More information

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE Water and Wastewater Servicing Alternatives Public Information Meeting No. 2 March 20, 2018 1 MSP Update Objectives Develop water and wastewater

More information

City of Guelph Southwest Quadrant Municipal Class Environmental Assessment

City of Guelph Southwest Quadrant Municipal Class Environmental Assessment City of Guelph Southwest Quadrant Municipal Class Environmental Assessment Tuesday April 15 th, 2008 Agenda TIME 6:00 pm 7:00 pm Open House Registration DESCRIPTION Opportunity for participants to view

More information

CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS)

CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS) CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS) 1 PROBLEM/OPPORTUNITY STATEMENT Problem The City of Guelph is undertaking the Clair-Maltby Secondary

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

City of Maple Ridge. Employment Land Use Suitability Assessment (West and East of the Kwantlen First Nation)

City of Maple Ridge. Employment Land Use Suitability Assessment (West and East of the Kwantlen First Nation) City of Maple Ridge TO: Her Worship Mayor Nicole Read MEETING DATE: October 17, 2016 and Members of Council FILE NO: FROM: Chief Administrative Officer MEETING: C of W SUBJECT: Employment Land Use Suitability

More information