1 Preparing Feasibility Studies that respond to Financing Organizations Requirements, example from the Mae Kha Canal Outline of Presentation Project Background Short-term Plan for Mae Kha Canal Rehabilitation Long-term Plan for Mae Kha Canal Rehabilitation WMA Activities Eco-Efficiency and GHG Emission

2 1. Project Background Chiangmai Wastewater Treatment Plant Chiangmai Municipality - In 1993, construction of wastewater collection system Budget 490 mil. baht - In 2002, rehabilitation of wastewater collection system Budget 269 mil. baht - covering area to the west of Ping River approx. 20 km2 (total area 40 km2) - Responsible party to oversee the wastewater treatment Subdivision of Sanitary Works, Office of Engineering Works Chiangmai Municipality and WMA - MOU signed for the operation of WWTP of Chiangmai Municipality 15 year period (25Jun Sept 2027) WMA - Repair of equipment and machineries of the wastewater treatment system Budget mil. baht on 28 Jun 2013 (First Contract) - Additional Repairs and Additional of monitoring system Budget mil. baht (Second Contract) - Management of WWTP since 25 Jun Operation started Oct. 2014

3 Aug 10, 2017 meeting between WMA and Mae Kha Canal Rehabilitation Committee at Chiangmai City Hall in which 8 local administrative organizations presented progress and operations.

4 5. Volunteer & Cooperation from Local residents Short-Term Plan for Mae Kha Canal Rehabilitation by WMA Project Duration Budget Status 1. Pipeline- Maintenance Dredging 9 pumping stations Jan Mar ,000 baht Completed 2. Repair Leaking Pipelines Behind P4 Jan ,000 baht Completed 3. Repair Leaking Pipelines Behind P6 Jan-Feb ,000 baht Completed 4. Onsite Treatment, Grease trap, Enzymatic Microorganism -EM water May-Jun (Grease traps) 360,000 baht (300x1200)

5 Long-Term Plan for Mae Kha Canal Rehabilitation by WMA Project Duration Budget Status 1. Budget Proposal to lay the wastewater sewerage pipelines from Pumping Station 10 to WWTP of 5 Km. using HDPE pipes 200 million baht In the Process 2.Budget Proposal to improve wastewater collection system and pipelines 40 million baht In the Process

6

7 WMA Activities Meeting with Local Administrative Committee in the National Legislative Assembly to discuss on problem solving of Mae Kha Canal Meeting with Local Administrative Organizations to solve pollution problem in Mae Kha Canal Joint Public-Government Participation to help Cleanup Mae Kha Canal Conduct Landscape Work of Mae Kha Canal Conduct Public Relations Campaign Boat Parade along Mae Kha Canal News Release on Mae Kha Canal Problem Solving by WMA, Chiangmai Municipality, Chiangmai Irrigation Project, Dept. of Public Works and Town & Country Planning Public Volunteer Activity to Clean-up Mae Kha Canal

8 Reuse of Treated Wastewater

9 Symbols In charged by WMA (Wastewater Management Authority) In charged by Local Authorities

10 Reuse of Treated Wastewater Eco-Efficiency Greenhouse Gas Emission 10

11 WMA Sustainability Report Thailand s Nationally Determined Contribution Roadmap on Mitigation Reduction in GHG Emissions in waste sector on wastewater management by 700 Kt-CO 2 eq by 2030 Response to SDG 6 (Clean Water and Sanitation) and SDG 13 (Climate Action) WMA managed WWTP in 25 Areas and 7 small scale WWTP Revenue from Operations 51,656,360 baht and electric consumption of 8,075,942 kilowatt-hour Eco-Efficiency =Revenue from Operations/Total electric Consumption = 6.40 Bht per kilowatt-hr WMA goal to improve Eco-Efficiency to 4 times Factor4 by year 2026 Water and Wastewater Companies for Climate Mitigation WaCCliM Project support from GIZ and IWA assessed GHG emission in 4 areas Chiangmai, Krabi, Sansuek, Hat Yai WWTPs using ECAM tool 11,970 tco2/year WMA cooperate with Asian Institute of Technology to assess GHG emission for 101 WWTPs.

12 Thank-you. Presented by Mr.Suchai Janepojanat Director of Organization Development Department Wastewater Management Authority