1 SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T) Dated: 21/11/2007 Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II) S.N. Condition Compliance as on 31 th March, No additional land in excess of 144 ha shall be acquired for any activity related to Phase-I & Phase-II. 2 Coal with ash content not exceeding 34% and Sulphur content not exceeding 0.5% shall be used. 3 A bi-flue stack of 220 m height with exit velocity of not less than 25 m/s shall be provided with continuous online monitoring system. 4 High efficiency Electrostatic Precipitator (ESP s) having efficiency of 99.9% shall be installed so as to ensure that particulate emissions do not exceed 50 mg/n m 3. 5 Fly ash shall be collected in dry form and utilized as per fly ash utilization notification, Water requirement shall not exceed 1892 m 3 /hr. 7 Closed cycle of Concentration (COC) of 5 shall be provided. 8 Waste water generated shall be recycled and reused within the plant premises. There shall be no discharge of waste water outside the plant boundary. No additional land is acquired in excess of 144 Hac. for any activity related to Phase-I &II. Compliance in progress. WCL & SECL mines coal being utilized having ash content <34% and Sulphur content not exceeding 0.5%. A bi-flue stack of 220 m has provided to each phase. 04 nos. of CEMS are in operation to measure the real time PM SO 2, NO X and CO content along with physical parameter s in flue gas. Compact ESP s (COEBP) with adequate (=99.9%) collection efficiency has been installed in each unit to keep the particulate emissions within stipulated standards. Bags of Unit# 4 replaced during August Stack emission details are attached as annexure-i The fly ash stored in dry form in silos with adequate capacities. 100% fly ash is being supplied to Cement plants as per fly ash notification come into force time to time. (Please see annex. II) Agreed and compliance in progress. Agreed and compliance in progress. Waste Water is being treated in ETP & STP and further utilized in process, green belt development and dust suppression activities. There is no discharge of waste water outside the plant premises. 1 Page Six monthly Compliance Status Report (October, 2017to March, 2018)

2 SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T) Dated: 21/11/ Regular monitoring of ground water quality including heavy metals shall be undertaken in the project area to ascertain the change, if any, in the water quality due to leaching of contaminants from the ash disposal area. 10 Noise levels shall be limited to 75 dba. For people working in the high noise area, protective devices such as earplugs etc. shall be provided. 11 A greenbelt shall be developed all around the plant boundary and ash pond area covering at least 1/3 rd of total project area of Phase-I & Phase-II. 12 Regular monitoring of the air quality shall be carried out in and around the power plant and records shall be maintained. The location of monitoring stations and frequency of monitoring shall be decided in consultation with State Pollution Control Board. Six monthly reports shall be submitted to this Ministry and its Regional Office at Bhopal. 13 For controlling fugitive dust, regular sprinkling of water in coal handling areas and other vulnerable areas of the plant shall be ensured. Ground water quality monitoring and analysis is being carry out in regular intervals in an around the project and waste disposal areas. Ground water Monitoring Report is enclosed herewith as Annexure III Noise levels are being regularly monitored in work place area as well as around project area. The monitoring results are within the prescribed limits. The turbine and generator are acoustically enclosed to restrict the noise levels at work zone within the permissible limits. However, protective devices have been provided to the workers working in the high noise areas. Green Belt developed in approx. 48 Hac area covering approx. 34% of total plant area.plantation is done all along the periphery of the plant premises as well as inside plant. Status of Greenbelt Development is enclosed as Annexure IV. Regular monitoring of ambient air quality is being carried out in the plant premises and in surrounding villages. Monitoring results are within the prescribed limits and submitted regularly to the MPC Board. Ambient Air Quality Monitoring Report is enclosed as Annexure-V For controlling fugitive dust emission, effective dust suppression system has been installed at coal storage yard, conveyor belt, along the sides of the internal roads and other vulnerable areas of AHP & CHP. 2 Page Six monthly Compliance Status Report (October, 2017to March, 2018)

3 SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T) Dated: 21/11/2007 In addition, Two water tankers are being deployed at site for controlling of fugitive dust. 14 The project proponent should advertise in at least two local newspapers widely circulated in the region around the project, one of which should be in the vernacular language of the locality concerned within seven days of issue of this letter, informing that the project has been accorded environmental clearance and copies of clearance letters are available with the State Pollution Control Board/Committee and may also be seen in the Website of the Ministry of Environment and Forests in the 15 A separate environment monitoring cell with suitable qualified staff should be set up for implementation of the stipulated environmental safeguards. 16 Half yearly report on the status of implementation of the conditions and environmental safeguards shall be submitted to this Ministry, its Regional Office, CPCB and SPCB. 17 Regional Office of the Ministry of Environment & Forests located at Bhopal will monitor the implementation of the stipulated conditions. A complete set of documents including Environmental Impact Assessment Report, Environment Management Plan and other information The Public Notice of Environmental Clearance has been given in two newspapers namely, The Hitvada and Lokmat on (Phase-I) and (Phase-II) which are widely circulated in the region. A separate environmental management cell comprising the qualified personals is in place at site who is reporting to Unit Head/In-Charge. Further, Environmental Management department at head office coordinate with site environment management cell in all the activities. Half yearly reports are being sent to MoEF & RO, MPCB regularly. Half yearly report for the period of March 2017 to September 2017 has been submitted vide letter no. MoEF, NGP/SVVN/ /1150, Dt. 06/12/2017. A copy of the letter is attached for your ready reference as Annexure-VI A complete set of documents has been submitted to Regional Office of the Ministry vide ref MOEF, BHPL/AKM/ /910 dated Page Six monthly Compliance Status Report (October, 2017to March, 2018)

4 SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T) Dated: 21/11/2007 Submitted to MoEF should be forwarded to the Regional Office for their use during monitoring. 18 Separate funds should be allocated for implementation of environmental protection measures along with item-wise break-up. These cost should be included as part of the project cost. The funds earmarked for the environment protection measures should not be diverted for other purposes and year-wise expenditure should be reported to the Ministry. 19 Full cooperation should be extended to the Scientists/Officers from the Ministry and its Regional Office at Bhopal /the CPCB/the SPCB during monitoring of the project. Separate funds have been allocated for implementation of environmental protection measures. The funds earmarked for the environment protection measures shall be utilized only for environment protection. Noted, and is being complied. 4 Page Six monthly Compliance Status Report (October, 2017to March, 2018)

5 Stack Emission Monitoring Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Stack Emission Monitoring Stack Port Hole Date of Date of Start of Analysis Stack Details As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory PM, Hg: 1 X 1 No. Thimble SO 2 : 30 ml X 1No. PVC Bottle NO X : 25 ml X 1No. PVC Bottle CO: Bladder 2L X 1 No Stack Identity Unit No.3 - Stack attached to ESP - Material of construction RCC - Stack height above ground level 220 Meter Stack diameter 3.5 Meter Stack shape at top Round - Type of fuel Coal - *Limit Flue gas temperature o C IS:11255 (Part 3):2008 Flue gas velocity m/s IS:11255 (Part 3):2008 Total gas quantity Nm 3 /h IS:11255 (Part 3):2008 Total Particulate Matter (PM) mg/nm IS:11255 (Part 1):1985, RA 2003 Sulphur Dioxide (SO 2 ) mg/nm T/day IS (Part 2): 1985, RA 2003 Sulphur Dioxide (SO 2 ) kg/day IS (Part 2): 1985, RA 2003 Oxide of Nitrogen (NO X ) mg/nm IS (Part 7): RA 2005 Carbon Monoxide ppm IS 5182 (Part 10): 1999, RA 2003 Mercury (Hg) μg/nm 3 < mg/nm 3 USEPA Method 101a Remarks: * Limit as per Notification on Dt.: END Note: Page 1of 1

6 Stack Emission Monitoring Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Stack Emission Monitoring Stack Port Hole Date of Date of Start of Analysis Stack Details As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory PM, Hg: 1 X 1 No. Thimble SO 2 : 30 ml X 1No. PVC Bottle NO X : 25 ml X 1No. PVC Bottle CO: Bladder 2L X 1 No Stack Identity Unit No.4 - Stack attached to ESP - Material of construction RCC - Stack height above ground level 220 Meter Stack diameter 3.5 Meter Stack shape at top Round - Type of fuel Coal - *Limit Flue gas temperature o C IS:11255 (Part 3):2008 Flue gas velocity m/s IS:11255 (Part 3):2008 Total gas quantity Nm 3 /h IS:11255 (Part 3):2008 Total Particulate Matter (PM) mg/nm IS:11255 (Part 1):1985, RA 2003 Sulphur Dioxide (SO 2 ) mg/nm T/day IS (Part 2): 1985, RA 2003 Sulphur Dioxide (SO 2 ) kg/day IS (Part 2): 1985, RA 2003 Oxide of Nitrogen (NO X ) mg/nm IS (Part 7): RA 2005 Carbon Monoxide ppm IS 5182 (Part 10): 1999, RA 2003 Mercury (Hg) μg/nm 3 < mg/nm 3 USEPA Method 101a Remarks: * Limit as per Notification on Dt.: END Note: Page 1of 1

7 Noise Level Monitoring Report (Inside Plant) Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Noise Level Monitoring Date of Collected by POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory IS 9876:1981 & manufacturer Manual Location (Industrial Area) Unit Results Time (h) Minimum Maximum Limit (For Industrial Zone) DM Plant dba 11: Circulating Pump House dba 11: Fuel Oil Pump House dba 11: Main Gate dba 10: Boiler Area dba 12: END Note: Page 1of 1

8 Noise Level Monitoring Report (Outside Plant) Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Noise Level Monitoring Date of Collected by POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory IS 9876:1981 & manufacturer Manual Location (Residential Area) Unit Results Time (h) Minimum Maximum Limit (For Residential Zone) Naideo Village dba 15: Mohabala Village dba 15: END Note: Page 1of 1

9

10

11

12

13 Water Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Ground Water Collected by Laboratory Well Water- Village Mohabala Date of Date of Start of Analysis Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt L X 1 No. PVC Can 500 ml X 1 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Sr. No. Acceptable Limit for Drinking Water (IS 10500:2012) 1. Colour Hazen <1 5 Max. 2. Odour - 3. Taste - Agree able Agree able Agreeable Agreeable 4. Turbidity NTU Max. 5. ph to Total Dissolved Solids Total Suspended Solids Alkalinity Total (as CaCO 3 ) Total Hardness (as CaCO 3 ) Ca-Hardness (as CaCO 3 ) mg/l Max. mg/l <5 - mg/l Max. mg/l Max. mg/l Magnesium (as Mg) mg/l Max. 12. Potassium (as K) mg/l Chloride (as Cl) mg/l Max. 14. Sulphate (as SO 4 ) mg/l Max. APHA 22 nd Ed. 2012, B, 2-6 IS 3025 (Part 5):1983, Reaffirmed 2006 IS 3025 (Part 7):1984, Reaffirmed 2006 APHA 22 nd Ed. 2012, B, 2-13 APHA 22 nd Ed. 2012, H + -B, 4-92 IS 3025 (Part 16):1984 Reaffirmed 2006 APHA 22 nd Ed. 2012, D, 2-66 IS 3025 (Part 23):1986 Reaffirmed 2009 APHA 22 nd Ed. 2012, C, 2-44,45 APHA 22 nd Ed. 2012, 3500-Ca-B, 3-67 APHA 22 nd Ed. 2012, Mg- B, 3-84 APHA 22 nd Ed. 2012, 3500-K- B, 3-87 APHA 22 nd Ed. 2012, Cl-B, 4-72 APHA 22 nd Ed. 2012, SO 4 -E, Page 1of 2

14 Report No cont Sr. No. Acceptable Limit for Drinking Water (IS 10500:2012) 15. Nitrate (as NO 3 ) mg/l Max. 16. Phosphate Total (as PO 4 ) mg/l Fluoride (as F) mg/l Max. 18. Copper (as Cu) mg/l N.D Max. 19. Manganese (as Mn) mg/l N.D. 0.1 Max. 20. Zinc (as Zn) mg/l Max. Remarks: N.D. Not Detected Continuation Sheet APHA 22 nd Ed. 2012, NO 3- E, APHA 22 nd Ed. 2012, P B, 4-151, E, APHA 22 nd Ed. 2012, F- B & D, 4-84, 4-87 APHA 22 nd Ed. 2012, B, 3-18 APHA 22 nd Ed. 2012, B, 3-18 APHA 22 nd Ed. 2012, B, END Page 2of 2

15 Water Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Ground Water Collected by Laboratory Borewell - Mohabala Village Date of Date of Start of Analysis Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt L X 1 No. PVC Can 500 ml X 1 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Sr. No. Acceptable Limit for Drinking Water (IS 10500:2012) 1. Colour Hazen <1 5 Max. 2. Odour - 3. Taste - Agree Able Agree Able Agreeable Agreeable 4. Turbidity NTU Max. 5. ph to Total Dissolved Solids Total Suspended Solids Alkalinity Total (as CaCO 3 ) Total Hardness (as CaCO 3 ) Ca-Hardness (as CaCO 3 ) mg/l Max. mg/l <5 - mg/l Max. mg/l Max. mg/l Magnesium (as Mg) mg/l Max. 12. Potassium (as K) mg/l Chloride (as Cl) mg/l Max. 14. Sulphate (as SO 4 ) mg/l Max. APHA 22 nd Ed.2012,2120-B, 2-6 IS 3025 (Part 5):1983, Reaffirmed 2006 IS 3025 (Part 7):1984, Reaffirmed 2006 APHA 22 nd Ed. 2012, B, 2-13 APHA 22 nd Ed. 2012, H + -B, 4-92 IS 3025 (Part 16):1984 Reaffirmed 2006 APHA 22 nd Ed. 2012, D, 2-66 IS 3025 (Part 23):1986 Reaffirmed 2009 APHA 22 nd Ed. 2012, C, 2-44,45 APHA 22 nd Ed. 2012, Ca-B, 3-67 APHA 22 nd Ed. 2012, Mg- B, 3-84 APHA 22 nd Ed. 2012, K- B, 3-87 APHA 22 nd Ed. 2012, Cl-B, 4-72 APHA 22 nd Ed. 2012, SO 4 -E, Page 1of 2

16 Report No cont Sr. No. Acceptable Limit for Drinking Water (IS 10500:2012) 15. Nitrate (as NO 3 ) mg/l Max. 16. Phosphate Total (as PO 4 ) mg/l < Fluoride (as F) mg/l Max. 18. Copper (as Cu) mg/l N.D Max. 19. Manganese (as Mn) mg/l N.D. 0.1 Max. 20. Zinc (as Zn) mg/l Max. Remarks: N.D. Not Detected Continuation Sheet APHA 22 nd Ed. 2012, NO 3- E, APHA 22 nd Ed. 2012, 4500-P B, 4-151, E, APHA 22 nd Ed. 2012, F- B & D, 4-84, 4-87 APHA 22 nd Ed. 2012, B, 3-18 APHA 22 nd Ed. 2012, B, 3-18 APHA 22 nd Ed. 2012, B, END Note: Page 2of 2

17 Water Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Ground Water Collected by Laboratory Borewell - Village Naideo Date of Date of Start of Analysis Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt L X 1 No. PVC Can 500 ml X 1 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Sr. No. Acceptable Limit for Drinking Water (IS 10500:2012) 1. Colour Hazen <1 5 Max. 2. Odour - Agreeable Agreeable 3. Taste - Agreeable Agreeable 4. Turbidity NTU Max. 5. ph to Total Dissolved Solids Total Suspended Solids Alkalinity Total (as CaCO 3 ) Total Hardness (as CaCO 3 ) Ca-Hardness (as CaCO 3 ) mg/l Max. mg/l <5 - mg/l Max. mg/l Max. mg/l Magnesium (as Mg) mg/l Max. 12. Potassium (as K) mg/l Chloride (as Cl) mg/l Max. 14. Sulphate (as SO 4 ) mg/l Max. APHA 22 nd Ed.2012,2120- B, 2-6 IS 3025 (Part 5):1983, Reaffirmed 2006 IS 3025 (Part 7):1984, Reaffirmed 2006 APHA 22 nd Ed. 2012, 2130-B, 2-13 APHA 22 nd Ed. 2012, 4500-H + -B, 4-92 IS 3025 (Part 16):1984 Reaffirmed 2006 APHA 22 nd Ed. 2012, 2540-D, 2-66 IS 3025 (Part 23):1986 Reaffirmed 2009 APHA 22 nd Ed. 2012, 2340-C, 2-44,45 APHA 22 nd Ed. 2012, 3500-Ca-B, 3-67 APHA 22 nd Ed. 2012, 3500-Mg- B, 3-84 APHA 22 nd Ed. 2012, 3500-K- B, 3-87 APHA 22 nd Ed. 2012, 4500-Cl-B, 4-72 APHA 22 nd Ed. 2012, SO 4 -E, Page 1of 2

18 Report No cont Sr. No. Acceptable Limit for Drinking Water (IS 10500:2012) 15. Nitrate (as NO 3 ) mg/l Max. 16. Phosphate Total (as PO 4 ) mg/l Fluoride (as F) mg/l Max. 18. Copper (as Cu) mg/l N.D Max. 19. Manganese (as Mn) mg/l < Max. 20. Zinc (as Zn) mg/l Max. Remarks: Continuation Sheet APHA 22 nd Ed. 2012, 4500-NO 3- E, APHA 22 nd Ed. 2012, 4500-P B, 4-151, E, APHA 22 nd Ed. 2012, 4500-F- B & D, 4-84, 4-87 APHA 22 nd Ed. 2012, 3111-B, 3-18 APHA 22 nd Ed. 2012, 3111-B, 3-18 APHA 22 nd Ed. 2012, 3111-B, END Note: Page 2of 2

19 Water Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Surface Water Collected by Laboratory Naideo Nallah Date of Date of Start of Analysis Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt L X 1 No. PVC Can 500 ml X 1 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Sr. No. 1. Colour Hazen <1 APHA 22 nd Ed.2012,2120-B, Odour - Agreeable IS 3025 (Part 5):1983, Reaffirmed Taste - N.A. IS 3025 (Part 7):1984, Reaffirmed Turbidity NTU 6.6 APHA 22 nd Ed. 2012, 2130-B, ph APHA 22 nd Ed. 2012, 4500-H + -B, Total Dissolved Solids mg/l 963 IS 3025 (Part 16):1984 Reaffirmed Total Suspended Solids mg/l 30 APHA 22 nd Ed. 2012, 2540-D, Alkalinity Total (as CaCO 3 ) mg/l 154 IS 3025 (Part 23):1986 Reaffirmed Total Hardness (as CaCO 3 ) mg/l 500 APHA 22 nd Ed. 2012, 2340-C, 2-44, Ca-Hardness (as CaCO 3 ) mg/l 264 APHA 22 nd Ed. 2012, 3500-Ca-B, Magnesium (as Mg) mg/l 57.3 APHA 22 nd Ed. 2012, 3500-Mg- B, Potassium (as K) mg/l 4.8 APHA 22 nd Ed. 2012, 3500-K- B, Chloride (as Cl) mg/l 164 APHA 22 nd Ed. 2012, 4500-Cl-B, Sulphate (as SO 4 ) mg/l 166 APHA 22 nd Ed. 2012, SO 4 -E, Page 1of 2

20 Report No.0752 cont Sr. No. Continuation Sheet 15. Nitrate (as NO 3 ) mg/l 2.97 APHA 22 nd Ed. 2012, 4500-NO 3- E, Phosphate Total (as PO 4 ) mg/l Fluoride (as F) mg/l 1.21 APHA 22 nd Ed. 2012, 4500-P B, 4-151, E, APHA 22 nd Ed. 2012, 4500-F- B & D, 4-84, Copper (as Cu) mg/l N.D APHA 22 nd Ed. 2012, 3111-B, Manganese (as Mn) mg/l 0.06 APHA 22 nd Ed. 2012, 3111-B, Zinc (as Zn) mg/l APHA 22 nd Ed. 2012, 3111-B, 3-18 Remarks: N.A.-Not Applicable; N.D. Not Detected END Note: Page 2of 2

21 Effluent Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Domestic Effluent STP Outlet Date of Date of Start of Analysis Sr. No. Collected by Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory 3 L X 1 No. PVC Can 100 ml X 1 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Limit as per MPCB Consent 1 ph Electrical Conductivity S/cm Total Dissolved Solids mg/l Max. 4 Total Suspended Solids mg/l Max. 5 6 Remarks: Biochemical Oxygen Demand (3 days 27 o C) Chemical Oxygen Demand mg/l Max. mg/l Max APHA 22 nd Ed. 2012, H + -B, 4-92 APHA 22 nd Ed. 2012, B, 2-54 IS 3025 (Part 16):1984 Reaffirmed 2006 APHA 22 nd Ed. 2012, D, 2-66 IS 3025 (Part 44): 1993, Reaffirmed 2003, Amds.1 APHA 22 nd Ed. 2012, B, END Note: Page 1of 1

22 Effluent Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Industrial Effluent/Grab DM Plant Effluent Date of Date of Start of Analysis Sr. No. Collected by Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory 3 L X 1 No. PVC Can 100 ml X 1 No. PVC Can 1 L X 1 No. Glass Bottle IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Limit as per MPCB Consent 1 ph Total Dissolved Solids mg/l Max Total Suspended Solids Biochemical Oxygen Demand (3 days 27 o C) Chemical Oxygen Demand mg/l Max. mg/l Max. mg/l Max. 6 Oil and Grease mg/l N.D. 10 Max. Remarks: N.D. Not Detected APHA 22 nd Ed. 2012, 4500-H + -B, 4-92 IS 3025 (Part 16):1984 Reaffirmed 2006 APHA 22 nd Ed. 2012, 2540-D, 2-66 IS 3025 (Part 44): 1993, Reaffirmed 2003, Amds.1 APHA 22 nd Ed. 2012, 5220-B, 5-17 IS 3025 (Part 39): 1991, Reaffirmed 2003, Ed END Note: Page 1of 1

23 Effluent Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Industrial Effluent/Grab Boiler Blow Down Date of Date of Start of Analysis Sr. No. 1 Collected by Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory 3 L X 1 No. PVC Can 500 ml X 1 No. PVC Can 1 L X 1 No. Glass Bottle IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Total Suspended Solids Date of Completion Limit as per MPCB Consent mg/l <5 100 Max. 2 Oil and Grease mg/l N.D. 20 Max. 3 Copper (as Cu) mg/l < Max. 4 Iron (as Fe) mg/l Max. Remarks: N.D. Not Detected APHA 22 nd Ed. 2012, 2540-D, 2-66 IS 3025 (Part 39): 1991, Reaffirmed 2003, Ed. 2.1 APHA 22 nd Ed. 2012, 3111-B, 3-18 APHA 22 nd Ed. 2012, 3111-B, END Note: Page 1of 1

24 Effluent Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Industrial Effluent/Grab Cooling Tower Blow Down Date of Date of Start of Analysis Collected by Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory 3 L X 1 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Sr. No. 1 2 Total Free Chlorine (Residual) Phosphate Total (as PO 4 ) Limit as per MPCB Consent mg/l < Max. mg/l Max. 3 Chromium Total (as Cr) mg/l < Max. 4 Zinc (as Zn) mg/l Max. Remarks: APHA 22 nd Ed. 2012, 4500-Cl G, 4-69 APHA 22 nd Ed. 2012, 4500-P B, 4-151, E, APHA 22 nd Ed. 2012, 3111-B, 3-18 APHA 22 nd Ed. 2012, 3111-B, END Note: Page 1of 1

25 Effluent Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Industrial Effluent/Grab Condensate Cooling Tower Water Date of Date of Start of Analysis Collected by Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory 3 L X 1 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Sr. No. 1 Temperature o C 28 Limit as per MPCB Consent Not to exceed 5 0 C higher than the intake water APHA 22 nd Ed. 2012, 2550-B, ph to 8.5 APHA 22 nd Ed. 2012, 4500-H + -B, Total Free Chlorine (Residual) mg/l < Max. APHA 22 nd Ed. 2012, 4500-Cl G, 4-69 Remarks: N.D. Not Detected END Note: Page 1of 1

26 Effluent Analysis Report Report No.: ME-CN SA-SWPGL-WARORA Date: Description/Type Location Industrial Effluent/Grab ETP Outlet Date of Date of Start of Analysis Sr. No. Collected by Quantity/Packing Date of Receipt of POMS 41601/HYD/GEN/OM/ REV/ Dt Laboratory 2 L X 1 No. PVC Can 1 L X 1 No. Glass Bottle 100mL X 2 No. PVC Can IS:3025(Part I): 1987 RA2003, APHA 22 nd Ed. 2012, 1060-B, Date of Completion Limit as per E(P)A for Inland Surface Water Disposal ph to 9.0 APHA 22 nd Ed. 2012,4500-H + -B, Total Dissolved Solids mg/l IS 3025 (Part 16):1984 RA Total Suspended Solids mg/l Max. APHA 22 nd Ed. 2012,2540-D Chloride (as Cl) mg/l APHA 22 nd Ed. 2012,4500-Cl-B, Sulphate (as SO 4 ) mg/l APHA 22 nd Ed.2012,4500-SO 4 -E, Phosphate Total (as PO 4 ) Biochemical Oxygen Demand (3 days 27 o C) Chemical Oxygen Demand mg/l Max. APHA 22 nd Ed.2012,4500-P B,4-151,E, mg/l Max. IS3025(Part 44):1993,RA2003,Amds.1 mg/l Max. APHA 22 nd Ed.2012, 5220-B, Oil and Grease mg/l N.D. 10 Max. IS 3025(Part39):1991,RA2003 Ed Iron (as Fe) mg/l Max. APHA 22 nd Ed. 2012,3111-B, Chromium Total (as Cr) mg/l N.D. 2.0 Max. APHA 22 nd Ed. 2012,3111-B, Copper (as Cu) mg/l N.D. 3.0 Max. APHA 22 nd Ed B, Zinc (as Zn) mg/l Max. APHA 22 nd Ed. 2012,3111-B, 3-18 Remarks: N.D. Not Detected END Note: Page 1of 1

27

28 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air Ash Handling Area As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 3.35 km/h E Location : Ash Handling Area Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

29 Report No.0688 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

30 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air Near Switch Yard As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 3.35 km/h E Location : Near Switch Yard Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

31 Report No.0689 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

32 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air Ash Handling Area As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 2.56 km/h E Location : Ash Handling Area Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

33 Report No.0690 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

34 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air Near Switch Yard As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 2.56 km/h E Location : Near Switch Yard Sulphur Dioxide (SO 2 ) µg/m Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours 80 IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

35 Report No.0691 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

36 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air CT Pump House As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 2.38 km/h SE Location : CT Pump House Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

37 Report No.0701 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

38 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air Near Switch Yard As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 2.38 km/h SE Location : Near Switch Yard Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

39 Report No.0702 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

40 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air CT Pump House As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 3.24 km/h SE Location : CT Pump House Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

41 Report No.0703 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

42 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air Near Switch Yard As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 3.24 km/h SE Location : Near Switch Yard Sulphur Dioxide (SO 2 ) µg/m Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours 80 IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

43 Report No.0704 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

44 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air CT Pump House As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 1.55 km/h E Location : CT Pump House Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

45 Report No.0753 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

46 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air Near Switch Yard As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 1.55 km/h E Location : Near Switch Yard Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2

47 Report No.0754 cont Continuation Sheet Carbon Monoxide (CO) mg/m IS 5182 ( Part 10): 1999 RA 2003 Ammonia (NH 3 ) µg/m 3 < pollutants Volume 1, Page Benzene (C 6 H 6 ) µg/m IS 5182 (Part 11): 2006 Benzo (a) Pyrene (BaP) - particulate phase only, ng/m 3 < Arsenic (As) ng/m 3 < Nickel (Ni) ng/m pollutants Volume 1, Page Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM 10, PM 2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel END Note: Page 2of 2 Plot No. F-7, Road No. 21, MIDC, Thane West , Maharashtra (600 m from bal.com

48 Ambient Air Quality Monitoring Report (Inside Plant) Report No. : ME-CN SA-SWPGL-WARORA Date: Description/Type Location Date of Date of Start of Analysis Ambient Air CT Pump House As per Collected by Quantity/Packing Date of Receipt of Date of Completion POMS 41601/HYD/GEN/OM/REV/ Dt Laboratory PM 10,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No. PM 2.5 : Filter Paper 1 X 1 No. SO 2 :50 ml X 1 No. Plastic Bottle NO 2 :30 ml X 1 No. Plastic Bottle NH 3 :30 ml X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O 3 :10 ml X 6 No. Plastic Bottle Benzene:Charcoal Tube:12 X 1 No Meteorological Data Average Wind velocity Prominent Wind Direction 1.30 km/h E Location : CT Pump House Relative Humidity % Temperature o C Max. Min. Max. Min Duration of Survey : 24 hours Sulphur Dioxide (SO 2 ) µg/m IS 5182 ( Part 2): 2001, RA 2006 Nitrogen Dioxide (NO 2 ) µg/m IS 5182 (Part 6): 2006 than 10µm) or PM 10 µg/m IS 5182 ( Part 23): 2006 than 2.5µm) or PM 2.5 µg/m Ozone (O 3 ) µg/m 3 < Lead (Pb) µg/m 3 < pollutants Volume 1, Page Page No Page No Page 1of 2