1 Bruce A and B 2018 Licence Renewal Cmmissin Hearing (Part 2) May 28-31, 2018 CNSC Staff Presentatin e-dc (PPT) e-dc (PDF) nuclearsafety.gc.ca

2 Presentatin Outline Backgrund Purpse f Hearing Peridic Safety Review Refurbishment Perfrmance assessments Regulatry fcus areas Other matters f regulatry interest Licence and Licence Cnditins Handbk Cnclusins and Recmmendatins nuclearsafety.gc.ca 2

3 Cmmissin Hearing Bruce Pwer Licence Renewal (Part 2) May 28-31, 2018, BACKGROUND nuclearsafety.gc.ca 3

4 Backgrund Part 1 Hearing ccurred n March 14, 2018 Part 1 presentatin (CMD 18-H4.A) prvided highlights frm CMD 18-H4, which prvided CNSC staff s cnclusins and recmmendatins n licence renewal This presentatin () prvides highlights frm supplemental CMD 18-H4.B, which prvides updated infrmatin since the Part 1 Hearing Part 1 infrmatin is available n CNSC s website (nuclearsafety.gc.ca): Transcript and all dcuments Vide f Part 1 Hearing nuclearsafety.gc.ca 4

5 Purpse f Hearing (1/2) Cnsideratin f the renewal f Bruce Pwer s Pwer Reactr Operating Licence (PROL 18.00/2020) Licence applicatin requests 10 year licence perid and refurbishment Licence applicatin includes a Peridic Safety Review (PSR) perfrmed in accrdance with REGDOC (Peridic Safety Reviews) nuclearsafety.gc.ca 5

6 Purpse f Hearing (2/2) Bruce Pwer s applicatin requests the Cmmissin t: apprve peratins f Bruce A and B up t a maximum f 300,000 Equivalent Full Pwer Hur (EFPH) accept the scpe f the refurbishment prject, as identified in the Integrated Implementatin Plan (IIP) cnslidate three existing Class II and Nuclear Substances licences int the Pwer Reactr Operating Licence: Irradiatr facility licence, fr instrument calibratin Cnslidated use f nuclear substances licence, fr labratries and radiatin devices Industrial radigraphy licence, fr nn-destructive testing nuclearsafety.gc.ca 6

7 Peridic Safety Review Fur phases f cnducting a PSR CNSC staff determined that Bruce Pwer s PSR met the requirements f REGDOC (Peridic Safety Reviews) Bruce Pwer has systematically reviewed mdern standards and practices Bruce Pwer has identified imprvements that will be made t Bruce A and B statins Bruce Pwer cmpleted a cmprehensive assessment t determine enhancements t the plant ver the next 10 year perid PSR Basis Dcument Safety Factr Reprts Glbal Assessment Reprt Integrated Implementatin Plan nuclearsafety.gc.ca 7

8 Refurbishment Refurbishment wuld begin in 2020, pending licensing decisin by the Cmmissin CNSC staff did nt identify factrs which wuld limit safe peratin CNSC staff will maintain versight f refurbishment activities Planned Refurbishment (Majr Cmpnent Replacement r MCR) Refurbished and returned t service A1 Refurbished in 2012 A2 Refurbished in 2012 A3 Refurb starts 2023 A4 Refurb starts A3 A4 B5 B6 B7 B8 B5 B6 B7 B8 Refurb starts 2026 Refurb starts 2020 Refurb starts 2028 Refurb starts 2030 Requested licence perid nuclearsafety.gc.ca 8

9 Refurbishment Return t Service Return t service is achieved thrugh milestnes which include 4 regulatry hld pints Pre-requisite cmmitments must be met prir t release f hld pints Recmmend the authrity t remve hld pints be delegated t Executive Vice-President (CNSC) Regulatry Hld Pints 1 Prir t fuel lad 2 Prir t remval f guaranteed shutdwn state Prir t exceeding 3 1% full pwer Prir t exceeding 4 35% full pwer nuclearsafety.gc.ca 9

10 Cmmissin Hearing Bruce Pwer Licence Renewal (Part 2) May 28-31, 2018, PERFORMANCE ASSESSMENT nuclearsafety.gc.ca 10

11 Perfrmance Assessments Cmpliance Verificatin Activities Cmpliance activities perfrmed Cmpliance activities effrt # f REGDOC Reprt Reviews # f Walkdwns # f Inspectins Persn-days f effrt at Bruce site 1358 days 1805 days 1716 days Ttal Persn-days f cmpliance effrt 5127 days 5050 days 4871 days nuclearsafety.gc.ca 11

12 Perfrmance Assessments Overall Plant Ratings FS = Fully Satisfactry SA = Satisfactry SAFETY AND CONTROL AREA Bruce Bruce Bruce A B A B A B Management System SA SA SA SA SA SA Human Perfrmance Management SA SA SA SA SA SA Operating Perfrmance FS FS FS FS FS FS Safety Analysis SA SA FS FS FS FS Physical Design SA SA SA SA SA SA Fitness fr Service SA SA SA SA SA SA Radiatin Prtectin SA SA FS FS FS FS Cnventinal Health and Safety FS FS FS SA FS SA Envirnmental Prtectin SA SA SA SA SA SA Emergency Management and Fire Prtectin SA SA SA SA SA SA Waste Management FS FS FS FS FS FS Security FS FS SA SA SA SA Safeguards and Nn-Prliferatin SA SA SA SA SA SA Packaging and Transprt SA SA SA SA SA SA nuclearsafety.gc.ca 12

13 Perfrmance Assessments Summary fr current licensing perid Bruce Pwer meets regulatry requirements in all SCAs Radiatin dses are well belw regulatry limits Releases f nuclear and hazardus substances are assessed, cntrlled and mnitred Licensee prgrams are effectively implemented and maintained Safety enhancements and imprvements cntinued t be made Envirnment, health and safety f wrkers and the public are prtected nuclearsafety.gc.ca 13

14 Regulatry Fcus Areas All 14 Safety and Cntrl Areas were assessed, including ther matters f regulatry interest Updates since Part 1 Hearing: Fitness fr Duty: Managing Alchl and Drug Use Prbabilistic Safety Analysis: Large Release Frequency Results Envirnmental Prtectin Emergency Management: Prvincial Nuclear Emergency Respnse Plan (PNERP) Waste Management Fisheries Act Authrizatin applicatin Fitness fr Service: Fracture Tughness f Pressure Tubes nuclearsafety.gc.ca 14

15 Fitness fr Duty: Managing Alchl and Drug Use In March 2018, Bruce Pwer submitted an implementatin plan fr REGDOC Vl. II (Fitness fr Duty: Managing Alchl and Drug Use) implement by July 2019 (except fr randm testing) randm testing requirements implemented by December 2019 CNSC staff are currently reviewing the implementatin plan Bruce Pwer t prvide update n implementatin in Fall 2018 Implementatin f Alchl and Drug use is separate frm relicensing and is nt an impediment t licence renewal nuclearsafety.gc.ca 15

16 Prbabilistic Safety Analysis: Large Release Frequency (LRF) Ntes: PSA has been frmally submitted and was accepted by CNSC staff. 2. Estimated data with planned imprvements shwed imprved LRF results. nuclearsafety.gc.ca 16

17 Envirnmental Prtectin Risk frm Bruce A and B is Lw t Negligible Bruce Pwer has an effective envirnmental prtectin prgram CNSC cnducted an Envirnmental Assessment (EA) under NSCA cnsidered current peratins and future activities Risks t the envirnment r human health fr the cntinued peratin and refurbishment f Bruce A and B are lw t negligible Uncertainties d nt affect cnclusin: there is sufficient margin Cntinue t have discussins with Indigenus grups n envirnmental risks Risk t the envirnment and human health frm Bruce A and B is lw t negligible Unreasnable Risk EA Cnclusin: Lw t Negligible Risk N Risk Margin Uncertainty nuclearsafety.gc.ca 17

18 Independent Envirnmental Mnitring Prgram (IEMP) CNSC s Independent Envirnmental Mnitring Prgram: independent f Bruce Pwer s envirnmental mnitring prgram verifies t ensure n adverse effects arund regulated facilities cmplements nging CNSC cmpliance activities Verificatin is achieved thrugh independent sampling and analysis by the CNSC Results cnfirm that Bruce Pwer has adequately prtected the public and envirnment arund Bruce site Independent Envirnmental Mnitring Prgram (IEMP) CNSC staff perfrm independent envirnmental mnitring arund the Bruce site (tp). An air sampler is setup n the shres f Lake Hurn (bttm). nuclearsafety.gc.ca 18

19 Emergency Management: PNERP Implementatin In April 2018, the Office f the Fire Marshall and Emergency Management prvided update t Cmmissin (CMD 18-M21) n the 2017 Prvincial Nuclear Emergency Respnse Plan (PNERP) Master Plan and Implementing Plan apprved Plans available n Ontari Ministry f Cmmunity Safety and Crrectin Services website Bruce Pwer meets all the requirements f the new PNERP: Master Plan and Implementing Plan Current plans fr Municipalities are effective Incremental imprvements will be made by the Municipalities t address Implementing Plan The Prvince f Ontari will maintain versight f the Municipalities incremental imprvements Bruce Pwer s Emergency Management and Fire Prtectin Prgrams meet CNSC regulatry requirements nuclearsafety.gc.ca 19

20 Waste Management CNSC staff determined that Bruce Pwer s applicatin is cmplete and met the requirements f General Nuclear Safety and Cntrl Regulatins On-site and ff-site transfer f radiactive waste is adequately managed per regulatry requirements Waste resulting frm refurbishment activities cnsidered in EA Waste is minimized and vlume reduced Western Waste Management Facility (WWMF) has sufficient capacity fr interim strage f waste Design f prpsed OPG Deep Gelgical Repsitry included waste vlumes frm refurbishment f Bruce units Bruce Pwer s Waste Management Prgram meets regulatry requirements The remved pressure tubes and calandria tubes (~600 cm in length) will be crushed int 5cm x 5cm cupns and stred in cntainers at the WWMF. Surce: OPG nuclearsafety.gc.ca 20

21 Fisheries Act Authrizatin Fisheries Act authrizatin is separate frm CNSC s licence renewal prcess Bruce Pwer t submit applicatin in May 2018 fr CNSC s review prir t submissin t Department f Fisheries and Oceans (DFO) Next Steps: cntinued cnsultatin with Indigenus grups Bruce Pwer applicatin t DFO expected late 2018 Fisheries Act authrizatin is separate frm relicensing and is nt an impediment t licence renewal nuclearsafety.gc.ca 21

22 Fracture Tughness fr Pressure Tubes Mdel Develpment Bruce Pwer has requested Cmmissin s apprval t perate up t 300,000 Equivalent Full Pwer Hur (EFPH) current licensed limit is 247,000 EFPH and Hydrgen Equivalent Cncentratin (HEQ) levels f 120 ppm peratin up t 300,000 EFPH may reach HEQ f apprximately 150 ppm Bruce Pwer is currently wrking with Canadian nuclear industry t develp a fracture tughness mdel f HEQ up t 160 ppm CNSC staff is satisfied with the scpe and schedule f activities required t update fracture tughness mdel Bruce Pwer plans t include new mdels in update t CSA standards Fracture tughness wrk perfrmed by Bruce Pwer nuclearsafety.gc.ca 22

23 * Inlet and Outlet HEQ as f January 1, Fracture Tughness fr Pressure Tubes Predicted HEQ and EFPH Units 1 and 2 were refurbished in 2012; HEQ fr thse units are belw 70 ppm (inlet) and 100 ppm (utlet). Unit Estimated Year t reach HEQ level f 120 ppm Refurb Outage Year Estimated EFPH at Refurb Estimated HEQ ppm at Refurb Inlet* HEQ, ppm Outlet* HEQ, ppm 6 Dec ,000 ~ (will nt reach 120) ,000 ~ (will nt reach 120) ,000 ~ ,000 ~ ,000 ~ ,000 ~ nuclearsafety.gc.ca 23

24 Fracture Tughness fr Pressure Tubes CNSC Regulatry Oversight (1/3) In January 2018, CNSC staff presented in CMD 18-M4 n fuel channel evaluatins fr Canadian Nuclear Pwer Plants rigrus regulatry prcess is applied t ensure fitness-fr-service requirements have been met prcess is applied cnsistently with ALL licensees CNSC staff perfrm assessments t ensure Structures, Systems and Cmpnents (SSCs) required fr safe peratin cntinue t meet structural integrity requirements (such as thse fund in CSA standards) key requirements are prvided in CMD 18-H4 nuclearsafety.gc.ca 24

25 Fracture Tughness fr Pressure Tubes CNSC Regulatry Oversight (2/3) HEQ f 70 ppm (inlet) and 100 ppm (utlet) defined in CSA standards are nt hard limits CSA standards allw fr peratin beynd 70 and 100 ppm limits, subject t fitness-fr-service evaluatins Bruce Pwer and the Canadian nuclear industry cntinue t evaluate the impact f hydrides n pressure tube integrity CNSC staff cntinue t perfrm reviews f the findings CNSC staff applies the same rigur in the evaluatin f fitness-frservice f pressure tubes fr ALL licensees nuclearsafety.gc.ca 25

26 Fracture Tughness fr Pressure Tubes CNSC Regulatry Oversight (3/3) During Part 1 Hearing, the Cmmissin requested CNSC staff t strengthen the licence cnditin n fracture tughness mdel fr HEQ in excess f 120 ppm: Updated: Befre hydrgen equivalent cncentratins exceed 120 ppm, the licensee shall demnstrate that pressure tube fracture tughness will be sufficient fr safe peratin beynd 120 ppm. Cmpliance verificatin criteria fr the Licence Cnditin are defined in the Licence Cnditins Handbk CNSC staff will reprt t the Cmmissin n status f the pressure tubes thrugh the annual Regulatry Oversight Reprt (ROR) fr Canadian Nuclear Pwer Generating Sites Bruce Pwer will nt be allwed t perate beynd 120 ppm HEQ until the fracture tughness mdels have been accepted by CNSC staff nuclearsafety.gc.ca 26

27 Fracture Tughness fr Pressure Tubes CNSC staff recmmendatin CNSC staff recmmend that the Cmmissin apprve peratin up t a maximum f 300,000 EFPH and add a new Licence Cnditin n HEQ in excess n 120 ppm Staff recmmendatin is based n: 1. Adequate safety margins will always be maintained 2. Strng knwledge f degradatin mechanisms f pressure tubes 3. Bruce Pwer has an effective pressure tube inspectin and mnitring prgram 4. A rbust regulatry versight prcess is in place fr CNSC staff t ensure Bruce Pwer will meet its cmmitment nuclearsafety.gc.ca 27

28 Abriginal Cnsultatin and Engagement CNSC cmmitted t building lng-term relatinships with Indigenus grups Bruce site lies within traditinal Indigenus territry Extensive cnsultatin and engagement with the fllwing grups n Bruce Pwer issues, including the current licence applicatin and refurbishment: Saugeen Ojibway Natin (SON) Métis Natin f Ontari (MNO) Histric Saugeen Métis (HSM) CNSC staff will cntinue its cllabratin with all Indigenus grups nuclearsafety.gc.ca 28

29 Cllabratin with Indigenus Grups CMD 18-H4.B prvides details n SON s cncerns and CNSC staff prpsed actins: develping a study and analysis prgram t reduce uncertainties n ptential envirnmental impacts SON participatin in envirnmental mnitring prgram study f available mitigatin measures additinal cllabratin such as utreach, sharing f CNSC inspectin results, meetings with the Crwn CNSC staff will wrk with all Indigenus grups n cncerns nuclearsafety.gc.ca 29

30 CONCLUSIONS AND RECOMMENDATIONS nuclearsafety.gc.ca 30

31 Prpsed Licence Perid CNSC staff are recmmending a 10 year licence perid based n: Safety Perfrmance f Bruce Pwer Cntinuus mnitring and safety reviews thrugh inspectins and PSR Regular reprting t Cmmissin n status f pwer reactrs Annual reprting t the Cmmissin at the ROR public prceedings, with participatin frm interested parties Internatinal practice n Nuclear Pwer Plant licence perid: Lifetime Licence Perid: Belgium, Czech Republic, France, Germany, Hungary, Japan, Netherlands, Suth Krea, Sweden, Switzerland, United Kingdm Other Licence Perids: Mexic 30 yrs, Finland yrs, Spain 5-10 yrs, USA 40 yrs nuclearsafety.gc.ca 31

32 Cnclusins and Recmmendatins Overall Cnclusins CNSC staff cnclude that as per sectin 24(4) f the NSCA: Bruce Pwer is qualified t carry n the activities authrized by the licence; and In carrying n the licensed activities, Bruce Pwer has made, and will cntinue t make adequate prvisin fr the prtectin f the envirnment, the health and safety f persns and the maintenance f natinal security and measures required t implement internatinal bligatins t which Canada has agreed nuclearsafety.gc.ca 32

33 Cnclusins and Recmmendatins Recmmendatins (1/3) CNSC staff recmmend that the Cmmissin: 1. Renew the PROL t authrize Bruce Pwer t cntinue t perate Bruce A and B fr a perid f 10 years, pursuant t sectin 24 f the NSCA 2. Cnslidate the three specified licences (Class II and Nuclear Substances) int the PROL 3. Authrize Bruce Pwer t perate Bruce A and B up t 300,000 EFPH nuclearsafety.gc.ca 33

34 Cnclusins and Recmmendatins Recmmendatins (2/3) CNSC staff recmmend that the Cmmissin: 4. Accept the fllwing licence cnditins: implement the IIP resulting frm the current PSR demnstrate that pressure tube fracture tughness will be sufficient fr safe peratin beynd 120 ppm HEQ implement a return t service plan fr refurbishment activities btain the apprval f the Cmmissin, r cnsent f a persn authrized by the Cmmissin, prir t the remval f established regulatry hld pints during return t service cnduct and implement a PSR prir t next licence renewal applicatin direct CNSC staff and Bruce Pwer t wrk with Indigenus grups t address their areas f cncern nuclearsafety.gc.ca 34

35 Cnclusins and Recmmendatins Recmmendatins (3/3) CNSC staff recmmend that the Cmmissin: 5. Authrize the delegatin f authrity fr a persn authrized by the Cmmissin fr return t service fllwing refurbishment Licence Cnditin 3.2, Restart after a serius prcess failure Licence Cnditin 15.5, Remval f regulatry hld pints (related t return t service) nuclearsafety.gc.ca 35