1 By Mrs. Suthimol Kessomboon Deputy Director General of Department of Drainage and Sewerage Bangkok Metropolitan Administration

2 NONTHABURI SAMUT SONGKRAM BANGKOK PATHUMTHANI SAMUT PRAKAN THAILAND BANGKOK MAP Bangkok : Area 1, km 2 (Inner , Middle , Outer ) Population : Register Population 5.69 million (2015) Surface Water: Canal 1,682 canals Length 2,604 km Chao Praya River 372 km (Total Length) Bangkok 35 km Source of Water Supply to Bangkok and vicinity: Upstream of Chao Praya River at Sam Lae,Pathum Thani Water Consumption (2015) : 2.54 mil.m3/day Water Quality Monitoring Program in Bangkok Major Sources of Wastewater 5% 1. Domestic 75% 20% 2. Industry 20% 75% 3. Agriculture 5% 300 Sampling Points in 165 major canals and 9 Sampling Points in Chao Praya River 300 Sampling Points

3 BOD (2016) BOD in major canals (mg/l) 0-4 mg/l (5 points) >4-10 mg/l (69 points) mg/l (93 points) mg/l (133 points) Most of Biochemical Oxygen Demanded (BOD) in major canals are around mg/l (133 sampling points). That s effect to the purposes of water use in Bangkok. DO (2016) DO in major canals (mg/l) Most of Dissolved Oxygen (DO) in major canals are very low (< 1 mg/l 121 sampling points). That s effect to the living organism in the canals >3 mg/l (70 points) 2-<3 mg/l (50 points) 1-<2 mg/l (59 points) <1 mg/l (121 points)

4 Year WWTPs under O&M Bangsue EECC 1. Year of operation : August Service Area: 20.7km 2 3. Population 223, Capacity120,000m 3 /d 4 WWTPs Implementation Year 2022 Year WWTPs in Future Plan Wastewater 2.54 mil m 3 /d Capacity mil m 3 /d 45% of WW generation Construction Cost 26,578 mil B O&M Cost 612 mil. Baht/year (~17.22 mil. USD) Wastewater 2.54 mil m 3 /d Capacity mil m 3 /d (Total Capacity mil m 3 /d) 71% of WW generation Construction Cost 34,170 mil B O&M Cost 485 mil. Baht/year (~13.65 mil. USD) Future Wastewater 3.55 mil m 3 /d Capacity mil m 3 /d (Total Capacity mil m 3 /d) 96% of WW generation Construction Cost 71,033 mil B O&M Cost 1,190 mil. Baht/year (~33.48 mil. USD) Remark : Exchange rate Bath = 1 USD (November 2016)

5 Wastewater mil. m 3 /day (55%) Water Body (2.544 mil. m 3 /day) 100% 746,117 m 3 /day (94.00%) Water Body Water Supply Actual Flow 792,707 m 3 /day (69.73%) Full Capacity Wastewater Treatment Plant mil. m 3 /day (45%) Reused Water 46,590 m 3 /day (6.00%) Year 2015

6 Improving water quality in the canals to reach the surface water standard Increasing recycling and sanitized reused water from 6% to be 10% for agricultural and industrial use Wastewater treatment project implementation by Public Private Partnership Saving energy equipment is installed to the wastewater treatment system Raising people participation Wastewater User Charge is the first priority for Bangkok

7 Improving water quality in the Canals by people in their communities Brain Storm Output Presentation

8 Education Events/Activities World Environmental Day 2016

9 Principle of Wastewater User Charge in Bangkok Polluter-Pay-Principle Revision of the wastewater user charge regulation in 2004 by the BMA council Preparation of the fee collection The wastewater user charge system should be acceptable Managem ent 13.93% Maintenance 25.00% Material 1.88% Water Supply 0.18% Office Material 4.44% Wage 21.38% Electricity 33.19% No. of District 21 Area Coverage (m 2 ) Tung Kru Bangsue Chatuchak 8 7 Huai Khwang DusitPhaya Thai Dindaeng 2 6Ratchathewi Phra Nakhon Pom Prap Sattru Phai Samphanthawong Pathum Wan 1 Phasi Charoen Bang Rak 4Bang Khae 3 Nong Khaem Bang Kho Laem Sathon Rat BuranaYannawa Chom Thong 1. Si Phraya WWTP 2. Rattanakosin WWTP 3. Chong Non Si WWTP 4. Nong Khaem WWTP 5. Tung Kru WWTP 6. Din Daeng WWTP 7. Chatu Chak WWTP 8. Bangsue EECC

10 Master Plan of Sewerage system should be studied and applied Treated wastewater and sludge can be applied in various purposes Selected wastewater treatment technology that is most applicable to the city Not only central treatment but also any kind of solutions People participation in every steps of the project development is the KEY point of success