1 APPENDIX "H" 4127 Roper Road, Edmonton, AB T6B 3S5 T: F: thurber.ca

2 TABLE OF CONTENTS 1. INTRODUCTION Project Details FIELD INVESTIGATIVE WORK Site Reconnaissance GEOTENICAL PROGRAM Field Drilling Program Laboratory Testing Surface Conditions Subsurface Conditions General Gravel Surfacing Material Topsoil Clay Groundwater Conditions GEOTENICAL EVALUATION AND RECOMMENDATIONS General Topsoil Stripping Grading and Subgrade Preparation Grade Widening Drainage Pavement Design STATEMENT OF CONDITIONS AND LIMITATIONS APPENDIX A Drawing No Site Plan Showing Test Hole Locations APPENDIX B Symbols & Terms Used on Test Hole Logs Modified Unified Classification System for Soils Test Hole Logs Sieve Analysis Results APPENDIX C Site Photographs

3 1. INTRODUCTION This report presents the results of a geotechnical investigation completed for the proposed widening and upgrading of Township Road 533A east of Range Road 274 in the County of Parkland, Alberta. The scope of work for the geotechnical investigation was outlined in our proposal letter to Mr. George Welsh, P.Eng. of ISL Engineering and Land Services Ltd. (ISL). Authorization to proceed with the investigation was received from Mr. George Welsh on July 18, It is a condition of the use of this report that Thurber s performance of its professional services is subject to the attached Statement of Limitations and Conditions. 1.2 Project Details It is understood that upgrading of Township Road 533A east of Range Road 274 is planned for an approximate length of 800 m. The upgrading will consist of the followings: 1) Widening of the roadway, 2) Reconstruction of the existing roadway and asphalt surfacing. 2. FIELD INVESTIGATIVE WORK 2.1 Site Reconnaissance A site reconnaissance was conducted on August 29, 2017 by Mr. Abdul Sadiq-Zadah, P.Eng. of Thurber to observe the condition of the existing roadway surfaces. A walking survey of the roadway to identify surficial distress was conducted along the alignment. The site observations made on the roadway are summarized below: Occasional wheel path and edge rutting of slight to moderate severity was observed along the roadway. Surficial topsoil was observed at the east end of the roadway, near cul-de-sac. The roadway surface was well crowned. The gravel on the surface appeared somewhat loose. Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 1 of 10 e-file: \\H\19958 rpt - Edm

4 3. GEOTENICAL PROGRAM 3.1 Field Drilling Program The field investigation was conducted on September 8, 2017 utilizing a truck-mounted auger drill rig operated by All Service Drilling Inc. on roadway. The drilling was conducted under the supervision of Mr. George Marenga of Thurber. A total of four (4) test holes were drilled (TH17-1 to 4) along the roadway alignment to depths of 4.3 m. All holes were located on the roadway surface. The test hole locations were verified clear of underground utilities by Alberta-One-Call. The test hole locations were selected by Thurber with consultations from ISL and the Parkland County. The approximate test hole locations are shown on Drawing No in Appendix A. Disturbed soil samples were obtained from the auger flights during drilling and Standard Penetration Tests (SPTs) were carried out at selected depths in the test holes. The undrained shear strength (C pen value) of cohesive samples was estimated using a pocket penetrometer. On completion of the drilling, 25 mm diameter standpipe piezometers were installed in two test holes for future water level readings, which were read after installation and again on September 25, All test holes were backfilled with drill cuttings and roadway test holes surfaced with cold mix and compacted. 3.2 Laboratory Testing Laboratory testing included a visual classification and the determination of the natural water content of all soil samples. In addition, Atterberg Limits tests and Sieve Analysis were carried out on selected representative soil samples. The results of the drilling and laboratory testing are summarized on the test hole logs in Appendix B. An explanation of the symbols and terms used to describe observations in the test hole logs and the Modified Unified Soil Classification are also provided in Appendix B. 3.3 Surface Conditions The right-of-way for the roadway was clear of vegetation and relatively level except for some accentuated ditches and occasional undulations. The roadway generally appeared to be well drained. Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 2 of 10 e-file: \\H\19958 rpt - Edm

5 Beyond the right-of-way, the area is vegetated with mature tree cover with occasional cleared areas and access roads to private properties. The embankments for the existing roadway are about 2 m to 3 m higher than the surrounding ground surface. 3.4 Subsurface Conditions General The subsurface conditions encountered in the test holes generally consisted of a surficial layer of gravel over topsoil or peat over high plastic clay. Further descriptions of the main soil layers are provided in the following sections. Detailed soil descriptions are presented on the attached test hole logs. In case of discrepancy with the following description, the information on the test hole logs governs Gravel Surfacing Material Surfacing gravel was encountered in TH17-1 through -4. The thickness of the gravel is summarized below in Table 4.1. TABLE 4.1 APPROXIMATE THICKNESSES OF SURFACING MATERIALS TEST HOLE NO. GRAVEL THICKNESS (mm) TH TH TH TH One grain size analysis was conducted on a composite sample of the granular base material which is presented in Appendix A. The gradation of the combined sample was slightly outside of the required specifications for granular base course based on the Parkland County specifications Topsoil Topsoil/peat was encountered, buried below the gravel layer, in all of the test holes. The thickness of the topsoil/peat varied between 300 mm and 1150 mm. The specific thickness of the topsoil/organic clay is provided in the attached test hole logs and summarized in Table 4.2 below: Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 3 of 10 e-file: \\H\19958 rpt - Edm

6 TABLE 4.2 TOPSOIL AND PEAT THICKNESS TEST HOLE TOPSOIL THICKNESS (mm) TEST HOLE TH TH TH TH The thickness of topsoil/organic and buried topsoil layers may vary between test holes and those summarized in Table 4.2 and may be thicker or thinner at other locations within the project limits. If volume quantities of topsoil for stripping or other purposes are required, additional closely spaced shallow test holes should be undertaken Clay Clay was encountered in all the test holes beneath the topsoil or peat at depths ranging between 0.5 m and 1.4 m. The test holes were generally terminated in the clay. The clay was high plastic and contained traces of silt and sand. Natural moisture contents in the clay ranged from 21 percent to 51.2 percent. SPT N values ranged from 6 to 15 blows per 300 mm penetration indicating firm to stiff consistency. Two (2) Atterberg Limit tests were conducted on representative samples of clay. The results of these tests are presented in Table 4.3: DEPTH (m) MOISTURE CONTENT (%) TABLE 4.3 SUMMARY OF ATTERBERG LIMIT TEST RESULTS LIQUID LIMIT (%) PLASTIC LIMIT (%) PLASTICITY INDEX (%) ESTIMATED THEORETICAL OPTIMUM MOISTURE CONT. (%) MOISTURE CONTENT ABOVE OPTIMUM (%) MODIFIED USC TH TH The estimated theoretical optimum moisture contents (OMC) are presented in Table 4.3 which are based on correlations with Atterberg Limits provided by Alberta Transportation (AT). The estimated OMC is a general indicator and may differ from the actual values obtained from a Standard Proctor test. Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 4 of 10 e-file: \\H\19958 rpt - Edm

7 3.5 Groundwater Conditions Groundwater measurements, taken in the standpipe piezometers upon completion of drilling and on September 25, 2017, are presented in Table 4.4. It should be noted that the water level measurements taken during this field investigation program are short term and may not represent stabilized groundwater conditions. In addition, groundwater levels may vary between test hole locations. Groundwater levels are expected to vary in response to seasonal factors and precipitation, hence the actual groundwater conditions at the time of construction could vary from those recorded during this investigation. TABLE 4.4 SHORT TERM GROUNDWATER OBSERVATIONS AND SLOUGHING CONDITIONS TEST HOLE DRILL DEPTH *B.G.S. (m) LEVEL BELOW GROUND SURFACE AT END OF DRILLING *B.G.S. (m) SLOUGH LEVEL WATER LEVEL WATER LEVEL IN STANDPIPE PIEZOMETER *B.G.S. (m) SEPT 25, 2017 TH No slough No water 1.20 TH No slough No water 1.31 *Below ground surface. 4. GEOTENICAL EVALUATION AND RECOMMENDATIONS 4.1 General The test holes indicate varying thicknesses of gravel over buried organic topsoil or peat. Removal of the buried topsoil/peat will be required to achieve adequate subgrades. The existing gravel is unlikely to be suitable for use as granular base material, however the gravel may be reused as granular fill in the embankment. We understand that some of the material required to widen the road surface will be obtained from existing inorganic material from the roadway shoulders. The remaining material will be obtained from borrow sources. The soil conditions along the proposed roadway widening typically consist of high plastic clay soils. The inorganic clay is generally suitable for roadway construction subject to proper moisture conditioning at the time of construction. Comparison of the natural moisture content and the estimated optimum moisture content indicates that the moisture content of the cohesive soils (within the upper one metre) is variable Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 5 of 10 e-file: \\H\19958 rpt - Edm

8 and ranged from about 2 percent below to 26 percent above the optimum moisture content. This variation will also be accentuated by weather conditions at the time of construction. All work should be carried out in accordance with the requirements outlined in the latest edition of Parkland County Design and Construction Standards. 4.2 Topsoil Stripping All topsoil, organics, peat and soil containing significant organic content should be removed from the roadway and widening areas. Based on the available test holes, the depth of material containing organics is expected to range from about 0.45 m to 1.20 m below the existing ground surface. It should be noted that thinner or greater thickness of topsoil and organic soils may exist between test holes and the depths of stripping may vary. Additional probe holes or test pits should be conducted if an accurate estimate of the topsoil quantity is required. If the topsoil and organic soils are to be used for reclamation in the future, they should be stockpiled for re-use. Care should be taken to minimize mixing of these materials with the underlying inorganic soils during removal. 4.3 Grading and Subgrade Preparation It is expected that the exposed soils, after removal of the gravel materials and any organic soils, will consist mainly of medium to high plastic clay. Natural moisture contents of the clay typically ranged between 21 percent and 51 percent. Comparison of the natural moisture content and the estimated optimum moisture content indicates that the moisture content on the clay ranged from about -2 percent to 26 percent above the estimated Optimum Moisture Content (OMC) determined using AT correlations with soil index properties. These variations will also be accentuated by weather conditions at the time of construction. The subgrade will require moisture conditioning to achieve the required compaction. The subgrade should be prepared in accordance with the following recommendations: 1 The exposed surfaces should be proof rolled and inspected by qualified geotechnical personnel to confirm that all deleterious material have been removed, and to identify wet or weak areas which should be replaced with well compacted clay. Wet or weak areas should be subcut to a maximum depth of 1 m below the design subgrade elevation. If weak soils are present on the excavation base, a woven geotextile should be placed on the base. Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 6 of 10 e-file: \\H\19958 rpt - Edm

9 2 Subgrade areas that become softened as a result of construction traffic or weather conditions should also be subexcavated and replaced with inorganic low to medium plastic clay or clean granular fill. 3 Fill should be placed at suitable moisture contents and should be free of organics, rubble, snow, ice, frozen lumps and stones greater than 150 mm in diameter. All fill material shall be compacted in accordance with Parkland County grading specifications to a minimum of 97 percent of Standard Proctor maximum dry density (SPMDD), with the exception of the top 300 mm, which should be compacted to a minimum of 100 percent of SPMDD. 4 The feasibility of achieving the required moisture content of the material will depend on the construction time available, time of year and weather conditions. Other construction techniques to improve the natural moisture content such as the application of cement or lime to the fill during placement may be required to improve the moisture condition of the material prior to compaction. The required percentage of lime or cement should be confirmed by trial sections at the time of construction. The finished top of subgrade should be trimmed smooth and provided with a minimum cross fall of 2 percent to shed surface water towards the side ditches prior to placing surfacing gravel. The final compacted subgrade surface should be proof-rolled to confirm that surface deflections are minimal under the influence of construction traffic. 4.4 Grade Widening After removal of organics, the exposed soils at the base of the excavation should be scarified, moisture conditioned as necessary and compacted to 95 percent SPMDD prior to placement of fill materials. The sub excavation should be backfilled in accordance with the recommendations provided below for fill placement Prior to placement of the embankment fill, the stripped surface should be proof rolled. There is a possibility that local areas of poor quality fill or soft clays could be encountered which should be sub-excavated to suitable soils or to a maximum depth of 1 m, and replaced with good quality material. The sub-excavated depths should be decided in the field by a geotechnical engineer at the time of grading. Where ground conditions at the base of the excavation are soft and wet, a woven geotextile (Nilex 2004) should be placed over the base of the excavation. Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 7 of 10 e-file: \\H\19958 rpt - Edm

10 Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 8 of 10 e-file: \\H\19958 rpt - Edm

11 The side slopes should be benched as shown schematically in Figure 4.1, to promote bonding between the new roadway widening and the existing roadway section. Some of the material that is removed to construct the benches may be used as the initial lower lift for the roadway widening. Additional material will be obtained from borrow pits. The excavated material from the roadway shoulder will typically consist of high plastic clay with moisture contents of varying from -2 percent to 26 percent above optimum moisture content (OMC) for the material. Therefore, discing and drying or mixing with drier material will be required to obtain the required compaction levels. Fill should be placed at suitable moisture contents and should be free of organics, rubble, snow, ice, frozen lumps and stones greater than 150 mm in diameter. All fill material shall be compacted in accordance with Parkland County grading specifications to a minimum of 97 percent of Standard Proctor maximum dry density (SPMDD), with the exception of the top 300 mm, which should be compacted to a minimum of 100 percent of SPMDD. The feasibility of achieving the required moisture content of the material will depend on the construction time available, time of year and weather conditions. Other construction techniques to improve the natural moisture content such as the application of lime or cement to the fill during placement may be required to improve the moisture condition of the material prior to compaction. A thorough mechanical mixing of about 5 percent of lime into the clay fill should be considered initially. However, the required percentage of lime should be confirmed by trial sections at the time of construction. The final compacted subgrade surface should be proof-rolled to confirm that surface deflections are minimal under the influence of construction traffic. Assuming that topsoil and soft subsoil is removed below the widening and that total fill heights do not exceed about 2 m, fill side slopes for the widening may be constructed at 4H:1V or flatter. 4.5 Drainage Adequate performance of the proposed road is largely dependent on the efficiency of surface and subgrade drainage measures. Hence, the design of the road should incorporate an adequate drainage system capable of collecting and directing surface run-offs away from the road embankments. As the roadway will have a rural cross section, the design of the drainage system should be undertaken in accordance with the Alberta Transportation Design and Construction Standards To Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 9 of 10 e-file: \\H\19958 rpt - Edm

12 protect the subgrade from wetting and softening and frost action, it is recommended to maintain the bottom of ditches a minimum of 1 m below the top of subgrade. For improved road performance, the separation height from top of subgrade to ditch bottom should be increased to 1.5 m in poorly drained areas and locations where the groundwater levels are expected to be close to (i.e. within about 1 m) subgrade elevation. Positive side ditch drainage is required on both sides of the road throughout the alignment to prevent ponding of water, which could lead to softening of the road subgrade. Roadside ditches should be sized adequately to accommodate the anticipated flows and should be graded towards low-lying discharge points The final subgrade surface should be adequately crowned to provide positive subgrade drainage. The purpose of this is to drain any subsurface water from the subgrade and thereby prevent ponding of water on the pavement subgrade which could result in swelling, softening and/or possible frost heaving of the clay. 4.6 Pavement Design We understand that the Twp. Road 533A has been classified as a rural minor collector. A soaked California Bearing Ratio (CBR) value of 3 is considered applicable to the types of subgrade materials recommended for this site, and for design of the pavement structure. The design of pavement thickness will depend on the magnitude, frequency and distribution of traffic loading anticipated in the areas. For design purposes, an assumed traffic volumes of 2.5 x10 5 Equivalent Single Axle Loads (ESALs) wasused for the design of the roadway, subjected to cars and pickups (over 20 years). It is understood that during construction of the residential houses that Twp. Road 533A will service, the roadway would be subjected to heavy truck traffic associated with the construction.. Based on the above parameters and information, the following pavement structure is recommended for Twp. Road 533A: TABLE 4.1 PAVEMENT STRUCTURES Pavement Type Twp. Road 533A Rural Minor Collector Pavement Structure 100 mm Asphalt Concrete Pavement over 300 mm Crushed Granular Base Course over 300 mm Prepared subgrade. The pavement materials should be supplied and constructed in accordance with the latest edition of the Parkland Engineering Standards. Client: ISL Engineering and Land Services Date: November 3, 2017 File: Page: 10 of 10 e-file: \\H\19958 rpt - Edm

13 STATEMENT OF LIMITATIONS AND CONDITIONS 1. STANDARD OF CARE This Report has been prepared in accordance with generally accepted engineering or environmental consulting practices in the applicable jurisdiction. No other warranty, expressed or implied, is intended or made. 2. COMPLETE REPORT All documents, records, data and files, whether electronic or otherwise, generated as part of this assignment are a part of the Report, which is of a summary nature and is not intended to stand alone without reference to the instructions given to Thurber by the Client, communications between Thurber and the Client, and any other reports, proposals or documents prepared by Thurber for the Client relative to the specific site described herein, all of which together constitute the Report. IN ORDER TO PROPERLY UNDERSTAND THE SUGGESTIONS, RECOMMENDATIONS AND OPINIONS EXPRESSED HEREIN, REFERENCE MUST BE MADE TO THE WHOLE OF THE REPORT. THURBER IS NOT RESPONSIBLE FOR USE BY ANY PARTY OF PORTIONS OF THE REPORT WITHOUT REFERENCE TO THE WHOLE REPORT. 3. BASIS OF REPORT The Report has been prepared for the specific site, development, design objectives and purposes that were described to Thurber by the Client. The applicability and reliability of any of the findings, recommendations, suggestions, or opinions expressed in the Report, subject to the limitations provided herein, are only valid to the extent that the Report expressly addresses proposed development, design objectives and purposes, and then only to the extent that there has been no material alteration to or variation from any of the said descriptions provided to Thurber, unless Thurber is specifically requested by the Client to review and revise the Report in light of such alteration or variation. 4. USE OF THE REPORT The information and opinions expressed in the Report, or any document forming part of the Report, are for the sole benefit of the Client. NO OTHER PARTY MAY USE OR RELY UPON THE REPORT OR ANY PORTION THEREOF WITHOUT THURBER S WRITTEN CONSENT AND SU USE SHALL BE ON SU TERMS AND CONDITIONS AS THURBER MAY EXPRESSLY APPROVE. Ownership in and copyright for the contents of the Report belong to Thurber. Any use which a third party makes of the Report, is the sole responsibility of such third party. Thurber accepts no responsibility whatsoever for damages suffered by any third party resulting from use of the Report without Thurber s express written permission. 5. INTERPRETATION OF THE REPORT a) Nature and Exactness of Soil and Contaminant Description: Classification and identification of soils, rocks, geological units, contaminant materials and quantities have been based on investigations performed in accordance with the standards set out in Paragraph 1. Classification and identification of these factors are judgmental in nature. Comprehensive sampling and testing programs implemented with the appropriate equipment by experienced personnel may fail to locate some conditions. All investigations utilizing the standards of Paragraph 1 will involve an inherent risk that some conditions will not be detected and all documents or records summarizing such investigations will be based on assumptions of what exists between the actual points sampled. Actual conditions may vary significantly between the points investigated and the Client and all other persons making use of such documents or records with our express written consent should be aware of this risk and the Report is delivered subject to the express condition that such risk is accepted by the Client and such other persons. Some conditions are subject to change over time and those making use of the Report should be aware of this possibility and understand that the Report only presents the conditions at the sampled points at the time of sampling. If special concerns exist, or the Client has special considerations or requirements, the Client should disclose them so that additional or special investigations may be undertaken which would not otherwise be within the scope of investigations made for the purposes of the Report. b) Reliance on Provided Information: The evaluation and conclusions contained in the Report have been prepared on the basis of conditions in evidence at the time of site inspections and on the basis of information provided to Thurber. Thurber has relied in good faith upon representations, information and instructions provided by the Client and others concerning the site. Accordingly, Thurber does not accept responsibility for any deficiency, misstatement or inaccuracy contained in the Report as a result of misstatements, omissions, misrepresentations, or fraudulent acts of the Client or other persons providing information relied on by Thurber. Thurber is entitled to rely on such representations, information and instructions and is not required to carry out investigations to determine the truth or accuracy of such representations, information and instructions. c) Design Services: The Report may form part of design and construction documents for information purposes even though it may have been issued prior to final design being completed. Thurber should be retained to review final design, project plans and related documents prior to construction to confirm that they are consistent with the intent of the Report. Any differences that may exist between the Report s recommendations and the final design detailed in the contract documents should be reported to Thurber immediately so that Thurber can address potential conflicts. d) Construction Services: During construction Thurber should be retained to provide field reviews. Field reviews consist of performing sufficient and timely observations of encountered conditions in order to confirm and document that the site conditions do not materially differ from those interpreted conditions considered in the preparation of the report. Adequate field reviews are necessary for Thurber to provide letters of assurance, in accordance with the requirements of many regulatory authorities. 6. RELEASE OF POLLUTANTS OR HAZARDOUS SUBSTANCES Geotechnical engineering and environmental consulting projects often have the potential to encounter pollutants or hazardous substances and the potential to cause the escape, release or dispersal of those substances. Thurber shall have no liability to the Client under any circumstances, for the escape, release or dispersal of pollutants or hazardous substances, unless such pollutants or hazardous substances have been specifically and accurately identified to Thurber by the Client prior to the commencement of Thurber s professional services. 7. INDEPENDENT JUDGEMENTS OF CLIENT The information, interpretations and conclusions in the Report are based on Thurber s interpretation of conditions revealed through limited investigation conducted within a defined scope of services. Thurber does not accept responsibility for independent conclusions, interpretations, interpolations and/or decisions of the Client, or others who may come into possession of the Report, or any part thereof, which may be based on information contained in the Report. This restriction of liability includes but is not limited to decisions made to develop, purchase or sell land. HKH/LG_Dec 2014

14 APPENDIX A Drawing No Site Plan Showing Test Hole Locations

15 W E S RANGE ROAD 274 H:\19000\19958 Twp 533A East of RR 274 Geotechnical Investigation\Drafting\ dwg Aug. 29, 2017 N TH17-3 TH17-1 TOWNSHIP ROAD 533 TH17-4 TH17-2 LEGEND APPROXIMATE TEST HOLE LOCATION m SCALE 1:4000 AIR PHOTO FROM ESRI WORLD IMAGERY TWP 533A EAST OF RR 274 GEOTENICAL INVESTIGATION DRAWN BY DESIGNED BY APPROVED BY SITE PLAN SHOWING APPROXIMATE TEST HOLE LOCATIONS DWG No SCALE DATE FILE No. ML ASZ DWS 1:4000 AUGUST TE

16 APPENDIX B Symbols & Terms Used on Test Hole Logs Modified Unified Classification System for Soils Test Hole Logs Sieve Analysis Results

17

18

19 CLIENT: ISL Engineering and Land Services Ltd. DRILLING COMPANY: All Service Drilling Inc. DRILL/METHOD: Solid Stem Augers PROJECT: Twp 533A East of RR 274 Geo. Inv. DATE DRILLED: September 8, 2017 LOCATION: See Drawing # SAMPLE TYPE GRAB SAMPLE SPT BACKFILL TYPE GROUT BENTONITE DRILL CUTTINGS BOREHOLE NO: TH17-1 PROJECT NO: ELEVATION: DEPTH (m) SAMPLE TYPE SPT (N) CPEN (kpa) SPT Blows/300 mm PLASTIC W.C. LIQUID REMARKS SLOTTED PIEZOMETER USC GM -OH SOIL SYMBOL SOIL DESCRIPTION GRAVEL (150mm) TOPSOIL (300mm), mixture of topsoil and clay CLAY stiff, brown to black, silty, some topsoil laminations -some sand lenses DEPTH (m) 0 1 -some sandstone layers dark grey, trace oxides END OF TEST HOLE AT 4.3m UPON COMPLETION: -No slough -No water Standpipe piezometer installed WATER LEVEL BELOW GROUND SURFACE: -September 25, 2017 = 1.2m BOREHOLE LOG GPJ THRBR_AB.GDT 10/10/17- LIBRARY-NEW LOGO.GLB TE FIELD LOGGED BY: GM PREPARED BY: ASZ REVIEWED BY: COMPLETION DEPTH: 4.3 m COMPLETION DATE: 9/8/ Page 1 of 1

20 CLIENT: ISL Engineering and Land Services Ltd. DRILLING COMPANY: All Service Drilling Inc. DRILL/METHOD: Solid Stem Augers SAMPLE TYPE GRAB SAMPLE PROJECT: Twp 533A East of RR 274 Geo. Inv. DATE DRILLED: September 8, 2017 LOCATION: See Drawing # SPT BOREHOLE NO: TH17-2 PROJECT NO: ELEVATION: DEPTH (m) SAMPLE TYPE SPT (N) CPEN (kpa) SPT Blows/300 mm PLASTIC W.C. LIQUID REMARKS USC SOIL SYMBOL GC -OH OL-PEAT -OH SOIL DESCRIPTION GRAVEL (200mm), 20mm crushed TOPSOIL (250mm), black, some clay PEAT (900mm) brown to black, fine fibrous, some rootlets -grey to black, some very silty clay and topsoil DEPTH (m) 0 1 CLAY firm, dark grey, silty, some white deposits grey 3 -dark grey END OF TEST HOLE AT 4.3m UPON COMPLETION: -No slough -No water Backfilled with drill cuttings BOREHOLE LOG GPJ THRBR_AB.GDT 10/10/17- LIBRARY-NEW LOGO.GLB TE FIELD LOGGED BY: GM PREPARED BY: ASZ REVIEWED BY: COMPLETION DEPTH: 4.3 m COMPLETION DATE: 9/8/ Page 1 of 1

21 CLIENT: ISL Engineering and Land Services Ltd. DRILLING COMPANY: All Service Drilling Inc. DRILL/METHOD: Solid Stem Augers SAMPLE TYPE GRAB SAMPLE PROJECT: Twp 533A East of RR 274 Geo. Inv. DATE DRILLED: September 8, 2017 LOCATION: See Drawing # SPT BOREHOLE NO: TH17-3 PROJECT NO: ELEVATION: DEPTH (m) SAMPLE TYPE 0 SPT (N) CPEN (kpa) SPT Blows/300 mm PLASTIC W.C. LIQUID REMARKS USC SOIL SYMBOL GC OL-PEAT SOIL DESCRIPTION GRAVEL (225mm), 20mm crushed PEAT (525mm) brown, fine fibrous, some clay, trace rootlets DEPTH (m) CLAY stiff. grey to black, silty, some peat, trace topsoil grey trace oxides END OF TEST HOLE AT 4.3m UPON COMPLETION: -No slough -No water Backfilled with drill cuttings BOREHOLE LOG GPJ THRBR_AB.GDT 10/10/17- LIBRARY-NEW LOGO.GLB TE FIELD LOGGED BY: GM PREPARED BY: ASZ REVIEWED BY: COMPLETION DEPTH: 4.3 m COMPLETION DATE: 9/8/ Page 1 of 1

22 CLIENT: ISL Engineering and Land Services Ltd. DRILLING COMPANY: All Service Drilling Inc. DRILL/METHOD: Solid Stem Augers PROJECT: Twp 533A East of RR 274 Geo. Inv. DATE DRILLED: September 8, 2017 LOCATION: See Drawing # SAMPLE TYPE GRAB SAMPLE SPT BACKFILL TYPE GROUT DRILL CUTTINGS BOREHOLE NO: TH17-4 PROJECT NO: ELEVATION: DEPTH (m) SAMPLE TYPE 0 SPT (N) CPEN (kpa) SPT Blows/300 mm PLASTIC W.C. LIQUID REMARKS SLOTTED PIEZOMETER USC CI-OL CI-OL SOIL SYMBOL SOIL DESCRIPTION GRAVEL (200mm), 20mm size, some clay PEAT (1000mm) grey to black, fine fibrous, some rootlets DEPTH (m) light grey to black CLAY stiff. grey, silty, some oxides dark grey firm 4 5 END OF TEST HOLE AT 4.3m UPON COMPLETION: -No slough -No water Standpipe piezometer installed WATER LEVEL BELOW GROUND SURFACE: -September 27, 2017 = 1.3m BOREHOLE LOG GPJ THRBR_AB.GDT 10/10/17- LIBRARY-NEW LOGO.GLB TE FIELD LOGGED BY: GM PREPARED BY: ASZ REVIEWED BY: COMPLETION DEPTH: 4.3 m COMPLETION DATE: 9/8/ Page 1 of 1

23 4127 Roper Road Edmonton, Alberta T6B 3S5 P: F: Client: ISL Engineering and Land Services Ltd. Project No.: Project: Twp. Rd. 532A East of RR 274 Date: 29-Sep-17 Sample Source: Compsite of Samples TH17-1 to TH ". Date Tested: Material Type: Sampled by: Specification: Parkland County Des Date Sampled: Unified Class: Sieve Sizes (mm) Test Method: 28-Sep-17 N/A N/A ASTM C Percent Passing Grain Sizes (mm) Sieve Opening Percent Gradation Limits No. (mm) Passing Max Min Total Sample Proportions Gravel: 42.5 % Sand: 38.3 % Fines: 19.2 % Comments: Silt and Clay Silt Clay Total Fines: Moisture Content As Received: 4.6% Percent Crush: Faces Counted: Computer File : TH17-(1-3) B1 Series No.: N/A Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of the test results is provided only on written request. Checked By: JDR

24 APPENDIX C Site Photographs

25 Roadway General View Roadway Edge Rutting \\H\19958 rpt - Edm

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com

More information

GEOTECHNICAL INVESTIGATION. Proposed Highway 892 Reconstruction Within Portions of E ½ W4M and W ½ W4M North of Ardmore, Alberta

GEOTECHNICAL INVESTIGATION. Proposed Highway 892 Reconstruction Within Portions of E ½ W4M and W ½ W4M North of Ardmore, Alberta SolidEarth Geotechnical Inc. www.solidearth.ca GEOTECHNICAL INVESTIGATION Prepared for: Municipal District of Bonnyville c/o SE Design and Consulting Inc. Date: October 0 Project File #: PG- Edmonton :

More information

2. BACKGROUND INFORMATION

2. BACKGROUND INFORMATION May 30, 2017 WSP Reference No: 171-05352-00 City of Surrey Engineering Department / Operations Division 6651 148 Street Surrey, BC V3S 3C7 Attention: Mr. Matthew Brown Subject: Geotechnical Review of Large

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

Foundations, Excavation & Shoring Specialists

Foundations, Excavation & Shoring Specialists Foundations, Excavation & Shoring Specialists July 8, 017 Reference: 17-7 McElhanney Consulting Services Ltd. Suite 00 Central City Tower 10 10 nd Avenue Surrey, BC VT X Via email: mflorendo@mcelhanney.com

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

April 18, 2016 File:

April 18, 2016 File: April 18, 2016 File: 2016-2179 QuantumPlace Developments Ltd. Suite 203, 1026 16 th Avenue NW Calgary, Alberta T2M 0K6 Attention: Mr. Mitch Braun Re: Geotechnical Investigation Hamptons Golf Course Redevelopment

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION 1 08 Railway Avenue South Milo, AB Prepared for: 108 Railway Avenue South Milo, Alberta TOL 1LO Date: File: 216-2883-001 GEOTECHNICAL INVESTIGATION 108 Railway Avenue South,

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

GEOTECHNICAL INVESTIGATION PREPARED FOR PREPARED BY PROPOSED MCLEVIN INDUSTRIAL PARK SUBDIVISION NW W4M LACOMBE COUNTY, ALBERTA

GEOTECHNICAL INVESTIGATION PREPARED FOR PREPARED BY PROPOSED MCLEVIN INDUSTRIAL PARK SUBDIVISION NW W4M LACOMBE COUNTY, ALBERTA GEOTECHNICAL INVESTIGATION PROPOSED MCLEVIN INDUSTRIAL PARK SUBDIVISION NW 21-39-27-W4M LACOMBE COUNTY, ALBERTA PREPARED FOR PIDHERNEY S TRUCKING LTD. C/O STANTEC CONSULTING LTD. 600 4808 50 STREET RED

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

APPENDIX A Reports & Permits

APPENDIX A Reports & Permits APPENDIX A Reports & Permits BOREHOLE GEOTECHNICAL SERVICES 2016 CAPITAL WORKS PENTICTON, BRITISH COLUMBIA PRESENTED TO THE CITY OF PENTICTON JANUARY 25, 2016 ISSUED FOR USE FILE: ENG.KGEO03005-01 Tetra

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

Appendix B: Temporary Construction Access Road Geotechnical and Slope Stability Assessment (Thurber Engineering 2014) See compact disc

Appendix B: Temporary Construction Access Road Geotechnical and Slope Stability Assessment (Thurber Engineering 2014) See compact disc Spencer Environmental Appendix B: Temporary Construction Access Road Geotechnical and Slope Stability Assessment (Thurber Engineering 2014) See compact disc February 2015 Valley Line-Stage 1 LRT EISA Update

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Addendum # 3 August 3, 2018

Addendum # 3 August 3, 2018 Addendum # 3 August 3, 2018 Richards Consulting & Associates Limited R.R.3 Red Deer, Alberta T4N 5E3 Phone: 403-886-2919 Fax: 403-886-2733 PROJECT: Connector Building Phase 2, Lac La Biche, Alberta THIS

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION PROPOSED HOME FARM RESIDENTIAL DEVELOPMENT TOWN OF THE BLUE MOUNTAINS,

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

patersongroup 1.0 Field Investigation Consulting Engineers December 14, 2015 PG3700-LET.01

patersongroup 1.0 Field Investigation Consulting Engineers December 14, 2015 PG3700-LET.01 December 14, 2015 1828486 Ontario Limited 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 Attention: Subject: Mr. Rolf Bauman Geotechnical Investigation Proposed Residential Buildings 890 Greenbriar Avenue -

More information

REPORT OF GEOTECHNICAL CONSULTING SERVICES

REPORT OF GEOTECHNICAL CONSULTING SERVICES REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297

More information

SECTION EMBANKMENT

SECTION EMBANKMENT 02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT 58.6 ROAD (KIMBALL CREEK) 58.9 ROAD TO 58.7 ROAD MESA COUNTY, COLORADO February 9, 2018 Prepared By: Prepared For: Mr. Eric Krch, P.E. SGM, Inc. 744 Horizon Court, Suite

More information

REPORT AECOM. December 24, Submitted to: AECOM 300 Water Street Whitby, ON L1N 9B6

REPORT AECOM. December 24, Submitted to: AECOM 300 Water Street Whitby, ON L1N 9B6 December 24, 2009 AECOM PRELIMINARY PAVEMENT ENGINEERING REPORT INVESTIGATION FOR THE CLASS ENVIRONMENTAL ASSESSMENT STUDY OF BURNHAMTHORPE ROAD AT NEYAGAWA BLVD AND NINTH LINE, PROJECT #08-0005 Submitted

More information

Based on conversations with WSP personnel, the following items require Paterson s review:

Based on conversations with WSP personnel, the following items require Paterson s review: consulting engineers memorandum to: 2015-2017 RR Ltd - Mr. Jonah Bonn - jbonn@firstbay.ca to: WSP - Mr. James Johnston - james.johnston@wsp.com re: Parking Lot Rehabilitation Pavement Structure Recommendations

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. City of Casper Baler Building / MRF Expansion DOCUMENT 9113 ADDENDUM.1 ADDENDUM NUMBER: 1.2 PROJECT INFORMATION A. Project Name: Baler Building / MRF Expansion B. Owner: City of Casper C. Architect: Hein

More information

COMPACTED CLAY LINERS

COMPACTED CLAY LINERS Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement

More information

SHALLOW SUBSOIL AND GROUNDWATER SITE INVESTIGATION. Fairways at Delacour. Prepared for: Canal at Delacour Golf Club. December,

SHALLOW SUBSOIL AND GROUNDWATER SITE INVESTIGATION. Fairways at Delacour. Prepared for: Canal at Delacour Golf Club. December, SHALLOW SUBSOIL AND GROUNDWATER SITE INVESTIGATION Fairways at Delacour Prepared for: Canal at Delacour Golf Club December, 16 099-105-16 Almor Testing Services Ltd. 7505 40 Street SE Calgary, Alberta

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

RE: HWY 63:02 HIGHWAY EMBANKMENT REPAIR NORTH OF LABICHE RIVER BRIDGE COMPLETION REPORT

RE: HWY 63:02 HIGHWAY EMBANKMENT REPAIR NORTH OF LABICHE RIVER BRIDGE COMPLETION REPORT THURBER ENGINEERING LTD. Suite 200, 9636-51st Avenue EDMONTON, Alberta T6E 6A5 Phone (780) 438-1460 Fax [780) 437-7125 I \ DO THURBER February 2, 1999 File: 15-16-101 Alberta Transportation & Utilities

More information

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

Klohn Crippen Berger Ltd Virtual Way Vancouver BC V5M 4X6 CANADA t f

Klohn Crippen Berger Ltd Virtual Way Vancouver BC V5M 4X6 CANADA t f Klohn Crippen Berger Ltd. 500-2955 Virtual Way Vancouver BC V5M 4X6 CANADA 604.669.3800 t 604.669.3835 f www.klohn.com TABLE OF CONTENTS 1 INTRODUCTION... 1 2 BACKGROUND... 2 3 PAVEMENT DESIGN AND RECOMMENDATIONS...

More information

Landfill Expansion Geotechnical Report

Landfill Expansion Geotechnical Report Environment City of Sault Ste. Marie Landfill Expansion Geotechnical Report Prepared by: AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax www.aecom.com Project Number:

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

Revised Price Form - May 26, 2017 (Addendum 4)

Revised Price Form - May 26, 2017 (Addendum 4) of Revised Price Form - May, 0 (Addendum ) For the complete supply and installation of five () Static Sign Support Structures; removal of four () existing overhead sign supports, and one () temporary side

More information

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

February 12, 2013 Calibre File No.: J

February 12, 2013 Calibre File No.: J February 12, 2013 Calibre File No.: J13-01795 260 Lake Avenue Kelowna, B.C. V1Y 5W7 Attention: Subject: Marianne Hill Geotechnical Assessment for a Proposed Residential Home Lot 5, Block D, DL 14, Plan

More information

Geotechnical Investigation And Slope Stability Assessment 3455 Milton Road Navan, Ontario

Geotechnical Investigation And Slope Stability Assessment 3455 Milton Road Navan, Ontario Geotechnical Investigation And Slope Stability Assessment 3455 Milton Road Navan, Ontario Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 www.hceng.ca Submitted to: 3223701 Canada

More information

Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235

Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235 Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235 Ministry of Transportation and Infrastructure 213, 1011-4 th Avenue, Prince George, BC, V2L 3H9 McElhanney

More information

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two. Design Manual Chapter 6 - Geotechnical 6C - Pavement Systems 6C-1 Pavement Systems A. General Information This section addresses the importance of pavement foundations and the potential for pavement problems

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

patersongroup 1.0 Field Observations Consulting Engineers June 9, 2010 File: PG2122-LET.01 Mar Gard Builders 92 Bentley Avenue Ottawa, Ontario K2E 6T9

patersongroup 1.0 Field Observations Consulting Engineers June 9, 2010 File: PG2122-LET.01 Mar Gard Builders 92 Bentley Avenue Ottawa, Ontario K2E 6T9 patersongroup June 9, 2010 Mar Gard Builders 92 Bentley Avenue Ottawa, Ontario K2E 6T9 Attention: Subject: Mr. Tony Miriani Geotechnical Investigation Proposed Commercial Development 4471 to 4487 Innes

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

The majority of the site is covered with buildings. The site is relatively sloped towards 33 Ave. SW, located on the south side of the site.

The majority of the site is covered with buildings. The site is relatively sloped towards 33 Ave. SW, located on the south side of the site. Celebrating 10 Years of Engineering Excellence! April 6, 2018 File: 2017-2630 BMP Construction 118 East Lake Boulevard SE Airdrie, AB T4A 2G2 Re: Geotechnical Investigation - Revised 2232, 2236 & 2240

More information

B M CIVIL ENGINEERS 17/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment.

B M CIVIL ENGINEERS 17/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment. B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

Section Fill Placement Tender No. [ ] Page 1

Section Fill Placement Tender No. [ ] Page 1 Tender No. [ ] Page 1 1.0 GENERAL 1.1 GENERAL.1 This section specifies placement requirements for fill materials specified in Section 02330 Earthwork Materials, except for [Waste Fill, Gravel Armour, Riprap,

More information

Introduction to Road Soil

Introduction to Road Soil Introduction to Road Soil Characterization By: Dr. Curtis F. Berthelot P.Eng. Department of Civil and Geological Engineering Centre of Excellence for Transportation ti and Infrastructure t Road Soil Introduction

More information

March 10, 2017 SITE AND PROJECT INFORMATION

March 10, 2017 SITE AND PROJECT INFORMATION March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

Geotechnical Investigation Proposed Commercial Development 571 Lacolle Way Ottawa, Ontario

Geotechnical Investigation Proposed Commercial Development 571 Lacolle Way Ottawa, Ontario Geotechnical Investigation Proposed Commercial Development 571 Lacolle Way Ottawa, Ontario Prepared for: Morley Hoppner Limited 1818 Bradley Side Road Ottawa, ON K0A 1L0 Attention: Brian Morley Vice President

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

SECTION 6. ROAD CONSTRUCTION STANDARDS

SECTION 6. ROAD CONSTRUCTION STANDARDS SECTION 6. ROAD CONSTRUCTION STANDARDS Construction of new roads or reconstruction of existing roads proposed for dedication to the County shall conform to the standards set forth in this section. Roads

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED LIGHT INDUSTRIAL BUILDING 6834 HIRAM DRIVE OSGOODE WARD, GREELY CITY OF OTTAWA, ONTARIO.

REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED LIGHT INDUSTRIAL BUILDING 6834 HIRAM DRIVE OSGOODE WARD, GREELY CITY OF OTTAWA, ONTARIO. Civil Geotechnical Structural Environmental Hydrogeology 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

WINDSOR PARK LIBRARY GEOTECHNICAL INVESTIGATION 1201 ARCHIBALD STREET WINNIPEG, MANITOBA

WINDSOR PARK LIBRARY GEOTECHNICAL INVESTIGATION 1201 ARCHIBALD STREET WINNIPEG, MANITOBA WINDSOR PARK LIBRARY GEOTECHNICAL INVESTIGATION 1201 ARCHIBALD STREET WINNIPEG, MANITOBA Prepared for: City of Winnipeg Winnipeg, Manitoba December 2015 File #153919 Table of Contents 1.0 INTRODUCTION...

More information

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G Geotechnical Investigation Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No. 40-3264G Laboratory CBR Tests Laboratory CBR tests were performed on samples

More information

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984 1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE

More information

REPORT. Preliminary Geotechnical Investigation Proposed Residential Subdivision Seabrook Development - First Line Road Ottawa, Ontario REPORT ON

REPORT. Preliminary Geotechnical Investigation Proposed Residential Subdivision Seabrook Development - First Line Road Ottawa, Ontario REPORT ON REPORT December 2012 REPORT ON Preliminary Geotechnical Investigation Proposed Residential Subdivision Seabrook Development - First Line Road Ottawa, Ontario Submitted to: William J. Seabrook P.O. Box

More information

Geotechnical Investigation Report Recreation Centre Building Braeside, Ontario

Geotechnical Investigation Report Recreation Centre Building Braeside, Ontario Geotechnical Investigation Report Recreation Centre Building Braeside, Ontario Cambium Reference No.: 6031-001 Prepared for: Greenview Environmental Management Cambium Inc. P.O. Box 325 52 Hunter Street

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No.

REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No. REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No. 1583-12-129 Prepared for: City of Winston-Salem Engineering 100

More information

GEOTECHNICAL SITE ASSESSMENT ROSENTHAL ROAD SMITHERS, BC

GEOTECHNICAL SITE ASSESSMENT ROSENTHAL ROAD SMITHERS, BC GEOTECHNICAL SITE ASSESSMENT ROSENTHAL ROAD SMITHERS, BC Submitted to: Town of Smithers Attention: Mark F. Allen, P.Eng. 1027 Aldous Street PO Box 879 Smithers, British Columbia, V0J 2N0 Submitted by:

More information

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California August 13, 2008 003-09176-17 Douglas Horner, AIA Chabot Las Positas Community College District 25555 Hesperian Boulevard Hayward, California 94545 Subject: Geotechnical Recommendations, New Physical Education

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information