1 PRE-FEASIBILITY REPORT FOR STONE QUARRY ha VILLAGE - MARSUL T. SENDURSENA, TALUKA VASMAT DISTRICT HINGOLI MR. ASHISH ASHOK KASAT ENVIRO TECHNO CONSULT PVT.LTD. 68, MAHAKALI NAGAR MANEWADA HINGOLI

2 PRE-FEASIBILITY REPORT EXECUTIVE SUMMARY Mr. Ashish Ashok Kasat proposes to extract stone metal from 3.40 ha from their Marsul T. Sendursena site at Marsul T. Sendursena village, Taluka Vasmat of Hingoli district. This lease is being worked for aggregate /stone metal as building construction material. There is a crusher unit over the lease area to ensure beneficiation of extracted stone for desired uses. Validity of lease is 5 years. Khasra nos. covering mineable deposits are 135 P & 136 P and are shown in Figure 1. Talathi Map Mr. Ashish Ashok Kasat is environmentally conscious and thus is aware of latest rules & regulations of MOEF, New Delhi. Accordingly, it has started environmental monitoring in & around the lease area.

3 CHAPTER 1 INTRODUCTION This chapter contains brief information on the proposed project and its relevance to the region and the proponent. The project: Mr. Ashish Ashok Kasat proposes to extract stone metal from an 3.40 ha lease area. Mining will be mechanical with drilling, blasting, loading and transportation within mine to the crushers equipped with screens, conveyors. Extracted basalt rocks will be properly beneficiated to products which will be aggregate of stones / stone metal gitti of different sizes (12-20; 6-12 & 0-6 mm) and manufactured sand. Proposed total production is 15 brass/day which will need 16 brass/day (Inclusive of overburden & weathered rock). Location: Lease is located at village boundary of Marsul T. Sendursena in Vasmat taluka of Hingoli district. This site has been selected and approved by Director Mining Geology, Maharashtra. This area is covered by Deccan traps and consists of basalt. Please see Plate 1.

4 Figure -1: Location Map

5 Justification of the project Demand for building material, road metal will be perpetual in Vasmat, around the selected site and for road. Site is located at 1 km distance from Marsul T. Sendursena and 17 km close to Vasmat. Proposed project for production of material (sized stone metal) which is the basic raw material -input to road and building construction activities. Economics of these both activities depends on the lead to the user agency. Also, demand for manufactured sand is growing as observed during market search. Extraction of basalt and its crushing will be compatible with environmental setting and transportation of the produce from the site will be economical. This project ensures employment to almost 13 local persons. Many have been already employed and have adequate experience.in addition indirect in trades related to mining e.g. transportation, work shop will be available. Proponent: Name of Proponent Address Lease Details Lease Period Production (Village-S.No.) Brass/day Mr. Ashish Ashok Kasat Mauze Marsul T. Sendursena 135 P & 136 P 5 years 15 brass/day

6 CHAPTER 2 PROJECT DETAILS It has been mentioned earlier that this project is for mining of stone metal from Khasra numbers 135 P & 136 P. These are parts of an 3.40 ha lease located near village Marsul T. Sendursena in Vasmat taluka of Hingoli district. This site is shown in Figure 1. Alternate sites Deposits in existing area were worked earlier by another agency. This area has been ear marked for quarrying stone metal. Mining has been permitted by Director, Geology & Mining. Lease is possession of proponent. There are no sensitive receptors around the lease. Proposed operations Dominant activities will be 1. Mechanical mining of 16 brass/day. 2. Production of marketable materials/ aggregate (0-6, 6-12 & mm) along with manufactured sand. 1. Mining: Mining will involve drilling, blasting, loading of mined materials into tippers, unloading the tipper into a jaw crusher, screening and segregation of materials of different sizes and transportation to destination. ROM will 16 brass/day. 2. The process It is estimated that brass/day.rom will yield 15 brass/day.of finished product- per month. Flow sheet of these operations is given below. Mine pit transport on internal road beneficiation plant-to sale Mine pit Hopper Vibratory Jaw crusher Vibratory feed secondary crusher Vibratory screen Tertiary 0-6mm 6-12mm 12-20mm

7 Sr. No. Input to Sizes, mm 1. ROM to hopper Secondary crusher Vibratory screen Tertiary crusher 40 FIGURE 4 Process is shown in Figure 4

8 Probable environment concerns during are schematically shown below: Drilling Blasting MINING Fugitive PM Controlled blasting as per DGMS norms Water sprinkling Macadamized roads Material handling Hopper Crushers Vibratory screens Conveyors Water sprinkling in hopper & crusher Closed vibratory screens Closed conveyor All sources will be fugitive. These will be located over 3.40 ha area. Blasting & drilling will be below ground level.

9 CHAPTER 3 SITE ANALYSIS 3.0 The site is near village Marsul T. Sendursena. It is about 17 km from Vasmat. It is near by Vasmat DMR. Name of Village Taluka, District And State Longitude Lattitude Marsul T. Sendursena Vasmat, Hingoli, Maharastra N E Altitude Any Forest, River, Water body etc

10 CHAPTER 4 CONCLUSIONS 4.0 It has been stated that Mr. Ashish Ashok Kasat are already operating a composite project involving basalt rock mining with opencast highly mechanized mine working. It has established a regular infrastructure with adequate capacity. 4.1 Present production cost is about Rs. 300 per/ MT on an average. Capital investment is Rs lacs. It is expected that some additional investment may be necessary as per the requirement in near future. Present working is for single shift. 4.2 Mr. Ashish Ashok Kasat project has provided employment to 13 persons at present. 4.3 It can thus be concluded that the project is environmentally compatible, financially viable and would be in the interest of construction industry thereby indirectly benefiting the masses. Moreover employment to local people will be an additional advantage.

11 CHAPTER 5 Environmental impacts due to existing & proposed activities 5.0 Maharshtra State Environment Appraisal Committee has desired estimation of environmental impacts due to existing and also the proposed activities during a project. Main activity at the site at Marsul T. Sendursena has been stone quarrying and crushing. This report includes information on impacts on land, ambient air, noise levels,water and partly socio-economic status. 5.1 Environmental setting : This lease area of 3.40 ha is part of rugged topography. Area is a part of Deccan traps. Soil & murrum layer is m and are underlain by hard basalt up to 10-20m. Tree cover is scanty and there are habitations within 1.0 km from the site. Sensitive ecosystems do not exist