1 DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION WOMEN IN GEOTHERMAL Click to edit Master subtitle style JAKARTA, 8 th OF MARCH

2 National Energy Policy (RE Target) Maximizing renewable energy utilization; PRIMARY ENERGY SUPPLY 2025 Gas NRE Governmental Regulation Coal Indirect Utilization Oil 1. Geothermal PP, 7,2 GW 2. Hydro PP, 17,9 GW 3. Small Hydro PP, 3 GW 4. Bioenergy PP, 5,5 GW 5. Solar PP, 6,5 GW 6. Wind PP, 1,8 GW 7. Others, 3,1 GW Direct Utilization 13/03/

3 GEOTHERMAL IN INDONESIA 29 GW NAD, 3 GWAs West Sumatera 3 GWAs North Sumatera, 5 GWAs Bengkulu 3 GWAs Lampung, 5 GWAs Jambi South Sumatera 3GWAs Banten, Central Java 6 GWAs East Java 7 GWAs Central Sulawesi Gorontalo 1 GWAs Southeast Sulawesi MW (Speculative + Hypothesis) MW Reserves North Sulawesi North Maluku 4 GWAs Maluku 1 GWAs West Java 11 GWAs Bali, 1 GWAs NTB, NTT 5 GWAs 70 GWAs Existing 19 GWAs New 51 GWAs 13/03/

4 GEOTHERMAL DEVELOPMENT Rencana Kapasitas (MW) Installed Capacity per 2017 : 1,808.5 MW Plan of additional installed capacity in 2018 is 250 MW including: 1. Karaha Power Plant Unit 1 (30 MW) (March 2018) 2. Sorik Marapi Modullar Power Plant Unit 1 (20 MW) (March 2018) 3. Sorik Marapi Marapi Modullar Power Plant Unit 2 (30 MW) (May 2018) 4. Sarulla Power Plant Unit 3 (110 MW) (May 2018) 5. Lumut Balai Power Plant Unit 1 (55 MW) (December 2018) 6. Sokoria Power Plant Unit 1 (5 MW) (December 2018) TARGET KAPASITAS Indonesia as the second rank ahead of the Philippine Indonesia as the first rank ahead of the USA Based on KEN and RUEN target Tambahan Kapasitas (MW) Installed Rencana Capacity Kapasitas Additional Tambahan Capacity Kapasitas Targeted Capacity *Assumption: Philippine (1,870 MW) and USA (3,450 MW) will not increase the capacity ebtke.esdm.go.id djebtke_kesdm Lintas 4

5 POWER PLANT MAP 10 GWAs (in 12 Geothermal Power Plants) Already Produced Electricity total installed capacity is MW 1. Sibayak, 12 MW 2. Sarulla, 220 MW Lahendong, 120 MW Site Sarulla : 9 Ladies, 33 Gentlemen Office Sarulla : 17 Ladies, 20 Gentlemen Ulubelu, 220 MW Dieng, 60 MW 1. Salak, 377 MW 2. Wayang Windu, 227 MW 3. Patuha, 55 MW 4. Kamojang, 235 MW 5. Darajat, 270 MW Darajat & Salak : 13 ladies in technical and 58 ladies in non technical 1. Ulumbu, 10 MW 2. Mataloko, 2.5 MW Ulumbu : 1 Lady, 102 Gentlemen Mataloko : 7 Gentlemen 1.808,5 MW Installed Capacity USD 0,61 Billion Investmenr 9,15 GWh Electricity Production 13/03/

6 WOMEN IN GEOTHERMAL (MEMR) 21% women in geothermal division in MEMR 21 Ladies out of 76 employees in Geothermal Directorate 8 Ladies out of 65 employees in Geological Agency THERE IS NO OBSTACLE FOR A WOMAN TO TAKE ACTION IN GEOTHERMAL BUSINESS 1 Director 1 head Section 7 Earth Scientist 18 Analyst 1 Planner 1 Engineer 13/03/

7 MEMR is a condusive environment for me as a women to improve myslef as a geothermal engineering Rina, Engineer In geothermal, We as a woman get the same chances to go study, to take lead and to go to the field. Mala, Analyst It s fun and interesting being in goothermal directorate family, I am so happy to be part of this renevwable energy industry. There is really no obstace to have a career in geothermal industry. Women is on the top. 13/03/ Indri, Planner Gustina, Head Section of Technical and Environment