[ Form V] (See rule 14) PART - A. (iii) Production Capacity : 3.51 Lakh Tonnes.(Chrome Ore) Per Annum. PART B WATER & RAW MATERIAL CONSUMPTION
|
|
- Beverly Underwood
- 5 years ago
- Views:
Transcription
1 [ Form V] (See rule 14) ENVIRONMENTAL STATEMENT FOR THE FINANCIAL YEAR ENDING THE 31 st MARCH 2014, OF SUKIDNA MINES (CHROMITE ) PROJECT OF M/S. INDIAN METALS & FERRO ALLOYS LTD. PART - A (i) Name & address of the Owner/ : Mr.C R RAY Occupier of the industry, M/s Indian Metals & Ferro Alloys Ltd. operation or process. Rasulgarh,Bomikhal,Bhubaneswar PIn (ii) Industry category : Primary Primary (STC Code) Secondary (STC Code) (iii) Production Capacity : 3.51 Lakh Tonnes.(Chrome Ore) Per Annum. (iv) Year of establishment : 1999 (v) Date of the last environmental statement submitted : PART B WATER & RAW MATERIAL CONSUMPTION (1) Water consumption M 3 / Day Process Cooling Domestic KL/Day KL/Day KL/Day (2) Raw material consumption No raw material is consumed for mining Chrome Ore. Page 1 of 8
2 PART - C POLLUTION DISCHARGED TO ENVIRONMENT / UNIT OF OUTPUT A. Water Concentration of pollutants in discharge ph 7.67 TSS (mg/l) 24 Oil &Grease (mg/l) 0.1 Hexavalent Chromium (mg/l) B.Air Sl. No. Pollutants Core Zone Avg.µg/m 3 BDL Buffer Zone Avg.µg/m 3 i Particulate Matter (PM 10 ) ii ParticulateMatter (PM 2.5 ) iii Sulphur Dioxide (SO 2 ) iv Oxides of Nitrogen (NO x ) v CarbonMonoxide (CO) PART - D HAZARDOUS WASTES (as specified under Hazardous Wastes (Management & Handling) Rules, 1989) Hazardous Wastes Total Quantity During Financial Year ( ) ( ) a.from Used Oil 3829 Ltrs 3406 Ltrs process Waste Containing Oil MT NIL b. From Pollution Control facilities (ETP Sludge) 5 MT 5 MT Page 2 of 8
3 PART - E SOLID WASTES Solid Wastes a. From process (overburden) b. From Pollution Control facilities (i.e. Primary Process of Chrome Ore) c. Quantity recycled or re-utilised Total Quantity (cum) During Financial Year ( ) ( ) 7,33,609 CuM 6,81,050 CuM N/A N/A N/A N/A PART F Characteristics in terms of concentration and quantum of solid wastes and its mode of disposal practise adopted for both these categories of wastes. During the mining of Chrome Ore, over burden material as detailed below has to be excavated from the strata. Cutting and loading of these material is done mechanically and transported by dumpers to the over burden dump area for dumping. The characteristics as well as quantity of the over burden material which is the only solid waste excavated is given below. Total overburden dumps during the year ( ) : 6,81,050 CuM Characteristic of the overburden materials Sl. No. Parameters Results (%) 01 Cr 2O FeO CaO MgO SiO Al 2O Undetected 4.6 Page 3 of 8
4 PART G IMPACT OF THE POLLUTION ABATMENT MEASURES TAKEN ON CONSERVATION OF NATURAL RESOURCES AND ON THE COST OF PRODUCTION. The main pollution control measures taken at Sukinda Mines (Chromite) Project of M/s Indian Metals & Ferro Alloys Limited are as follows : 1.Measures for control of Air Pollution : Various air pollution control measures are taken follows. Drilling Operation The Drilling Machine has been provided with the wet drilling arrangement and it is being ensured that only wet drilling is done. Blasting The dust generation due to blasting is minimised by proper blast hole design, correct charge per delay and water spraying at faces before charging & after blasting. Loading & Transportation: By constructing haul road with proper compaction,maintaining & cleaning regularly. Regular water sprinkling is done on haul road, waste dump yard and stackyard to minimise the fugitive dust emission. By controlling vehicular emission with the help of proper preventive maintenance & monitoring regularly. Overloading of vehicles is avoided to reduce spillage. Main Haul road has been black topped. Air quality (ambient as well as work envionment) is monitored periodically through an approved external agency & is found within permissible limit. AC Cabin has been provided in all HEMM to prevent exposure to dust by the operators. Beside this other steps has been taken for control of Air Pollution those are a. Green belt development in the surrounding of the mine lease hold area. b. Green belt development at the over burden dump slope area. c. Avenue plantation inside mining lease hold area. 2. Utilisation of mines strata water At present, there is no strata water. We have not encountered ground water table. Page 4 of 8
5 3. For control of Sound and Vibration Pollution : Preventive maintenance of machineries is being carried out properly in order to control noise level below 85 db in the work environment. Blasting vibration study has been carried out through ISM,Dhanbad. As per their recommendations, the controlled blasting technique has been adopted to minimise noise & vibration. Workers engaged in blasting, drilling & HEMM operations are provided with ear plugs/ muffs. Noise level (ambient as well as work environment) is being monitored perodically through an approved external agency & is ensured within permissible limit. AC Cabin has been provided in all HEMM to prevent exposure to noise by the operators. Niose mapping is being carried out quarterly. 4. Measures for control Soil Erosion and Soil Contamination : As far as soil erosion is concerned, care has been taken to ensure the afforestation both the slopes and terraces for stabilisation. About nos of plants are already planted at dump slope, safety zone and other area within lease during the period from to Coir matting area of 2976 sq m at slope of the First stage OB dump and an area of 3890 sq m coir matting at the second stage O/B dump have been carried out for stabilisation and to avoid generation of suspended solids from the fresh dump slope during rainy season.during the finacial year out of 1565 nos sapling along dump slope, 840 nos of sapling have been planted over coir matting area of second stage OB dump. The barren areas, which are not being used for any purpose related to mining, are developed as green belt. To control soil erosion of the dump slopes inward slope at terraces has been made in each stages of dump. 5. Water pollution control measures: Surface Run-off There is no COB plant. Garland drains are provided around the quarry in order to prevent inrush of rain water into it. The dump yard & ore stack yard are also surrounded by the garland drain and the accumulated water is passed through check dam/settling tanks to allow the silt to be settled before final discharge to outside. The garland drain & settling tanks are cleaned regularly for de-siltation & maintenance properly. Water samples of rainwater passing through waste dump, ore & sub grade ore stack yard are taken and analysed regularly & the content of Cr +6 is found to be within the permissible limit i.e 0.1 mg/ltr. Provisions have been made to collect such water through garland drain, which can be channelized to ETP for treatment before final discharge to out side in case Cr +6 content is found beyond permissible limit. The up-graded ETP as per the conceptual plan of lit, Kharagpur for treatment of mine drainage water & surface run off etc. has been commissioned from 25 th June, Page 5 of 8
6 6. Green Belt Development-Plantation Programme : Afforestation for creating ecological balance constitutes an integral and essential part of environment management of any mining project. This programme of bringing ecological balance has been designed and implemented both inside and out side lease area under a long-term programme. Considering the prevailing situations a programme of afforestation is under way. A statistical figure of which is given below. The Statement showing the details in year wise plantation & survival rate from the beginning of the mines (i.e. September 1999 to ). Year of Plantatio n Area Planted in Ha. No. of Trees Planted No. of Trees Survived Survival Percentage Name of the Species Sisoo,Chakunda,Cashew & Bamboo Sisoo,Chakunda,Krushnachuda, Eucalyptus & Akashia Sisoo,Chakunda,Cashew,Neem, Teak, Asan & Jamun Teak,Alstonia,Debadaru,Amla,Bahada,Dalimba,Ca shew,neem,maha- Neem,Karanja,Mango,Krushnachuda,Chakunda, Arjuna & Babul Debadaru,Amla,Neem,Krushnachuda Saguan,Babul,Gamhari,Sisu& Chakunda. Neem,Bela,Chakunda,Krushnachuda, Akasia, Gamhari & Saguan. Chakunda,Krushnachuda,Akasia, Gamhari & Saguan Neem,Amla,Bahada & Chakunda Neem,Karanja,Gamhari,Chakunda, Mango, Jack fruit & Sirish Neem, Mango, Mirigichara, Gamhari,Jamu & Bambo. Gambhari, Neem, Chakunda, Mirigichara, Akasia, Cashew, Teak, Kadamba, Sisoo, Karanja, Salua. Muruga, Bahada, Arjun, Amala,Babool, Jamu, Krishnachuda, Bela,Mango Gambhari, Neem, Chakunda, Mirigichara,Karanja, Salua. Muruga, Bahada, Arjun, Gambhari, Neem, Chakunda, Mirigichara,Karanja, Salua. Muruga, Bahada, Arjun, Gambhari, Neem, Chakunda, Mirigichara, Akasia, Cashew, Teak, Kadamba, Sisoo, Karanja, Salua. Muruga, Bahada, Arjun, Amala,Babool, Jamu, Krishnachuda, Bela,Mango Gambhari, Neem, Chakunda, Mirigichara, Teak, Sisoo, Karanja, Sala. Bahada, Arjun, Amala,Babool, Krishnachuda,Mango- TOTAL Page 6 of 8
7 PART - H ADDITIONAL MEASURES/INVESTMENT PROPOSED FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION AND PREVENTION OF POLLUTION A. Future plantation programme year wise. Sl.No. Years Plants to be planted (Both O/B dump & other area) in Nos TOTAL 3770 B.Community plantation/training : Besides these steps also been taken for encouraging community plantation in the near by villages. During the year ,2000 nos of plants have been planted along with the school & villages to restore ecology of the surrounding environment as well as to improve the forestry and aesthetic value in and around the Mining lease area. Steps are also taken for providing training on afforestation, programme on health and hygienic aspects to the people in the nearby villages. World Environment day & MEMC Week are celebrated every year involving the local school children to create awareness among them. Sukinda Mines (Chromite), have developed a nursery within the leasehold area (capacity hectares), to produce 10,000 nos of sapling per year. The above programs will continue. This will help in developing new patch of green cover and restoring the damaged ones. Page 7 of 8
8 Additional Steps Taken to Maintain the Quality of Environment. 1. The company has prepared the Environmental Management Plan by identyfying all the environmental aspects and its mitigation has been done by preparing the operational control procedure, which will help in maintaing a good environment and safeguard for the future environmental hazards occur due to present mining operation. ISO (2004) has been implemented in the mine and well maintained. 2.A separate environmental management cell with suitable qualified personnel has been set-up under the control of a Senior Executive, who is reporting directly to the Head of the Organization. 3.The policy towards Corporate Environment Responsibility has been framed and submitted to Ministry of Environment and Forest on dated Surface run off water from Ist stage O/B dump has been chanelised through 630mm PVC pipe line along dump slope during rain to the settling pond for treatment at ETP before discharges to outside. 5.Rain water harvesting structure are provided at our colony premises and our adminstrative office building. 506 KL of rain water have been recharged at the rain water harvesting structure at adminstrative office building KL of rain water have been recharged at the rain water harvesting structure at residencial colony KL of rain water have been recharged through the bottom of the pit. 6.HSE(Health,Safety & Environment) department has been set up at site to take proactive measures for reducing the environmental hazards occur due to present mining operation. Signature Owner/Occupier of the Industry Date:20/09/2014 Page 8 of 8
[FORM-V] PART-A PART-B
[FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block
More information(See Rule 14) Environment Statement for the financial year ending the 31 st March PART-A
1 [FORM-V] (See Rule 14) Environment Statement for the ending the 31 st March 2012. PART-A (i) Name and address of the owner / occupier of the industry, operation or process: Guali Iron Ore Mines Shri
More informationFORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A
(I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationPeriod of Compliance Report : April, 2017 to September, 2017
Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :
More informationHINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED
HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY
More informationScanned by CamScanner
Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect
More informationHINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)
HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement
More informationADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V
/ ADITYA BIRLA EMil Ref. No. EMILIGEOLI '35, 12017-18 Date-07.09.2017 0V The Member Secretary, State Pollution Control Board, Odisha Department of Forests ft Environment, Govt. of Odisha, Paribesh Bhawan,
More informationProject Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006
Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur
More informationPKA/Gonua/MoEF/ Date:
PKA/Gonua/MoEF/ Date: -18.06.2018 To The Director, Ministry of Environment & Forests (Central) Eastern Regional Office A/3 - Chandrasekharpur Bhubaneswar-751023 Sub:- Sir, Half Yearly Progressive Compliance
More informationENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.
ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920
More information1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia
HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36
More informationEnvironment Management Plan
Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded
More informationPART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION
Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.
More informationNOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED
Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent
More informationMAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD.
MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD. Conditions of MoEF, Govt. of India, New Delhi vide MoEF letter No. J-11015/345/2007-IA.II(M) dated 10 th Dec. 2008 issued with Environmental
More informationEnvironmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,
Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri
More informationPART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan
Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10
More informationProject Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005
Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,
More informationvedanta HZLt fpj;l,r;tm,tl2!!1 ~JP.lL6ff~
vedanta HZLt fpj;l,r;tm,tl2!!1 ~JP.lL6ff~ September 22, 20 J 8. Member secretary Raj. Pollution Control, Board 4, Institutional Arca Jhalan Doongri,JAIPUR Sub: Environmcntal Statement of Rarnpura Agucha
More informationEnvironmental Management Plan. For Mining of. Building Stone & Road Metal
Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s
More informationSl. No. Conditions Compliance
Annexure-I CONDITIONS TO BE COMPLIED AS PER ENVIRONMENTAL CLEARANCE APPROVAL KATHAUTIA OPEN CAST COAL MINE, DALTONGANJ EC. No. J-11015 /61//2006-IA.II(M) dated 19 th June, 2006 A. SPECIFIC CONDITIONS Sl.
More informationENVIRONMENT MANAGMENT PLAN
ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE
More informationNMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.
NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),
More informationJaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)
Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located
More informationDeccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II
Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2(73.93.11 Ha), as on March 2017 1. Compliance reports are enclosed
More informationDHANWADA CRUSHER STONE QUARRY
ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-
More informationJ.K. Cement WORKS, NIMBAHERA (RAJ)
A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference
More informationEnvironmental statement for the financial year ending the 31 st March 2014
FORM V (See rule 14) Environmental statement for the ending the 31 st March 2014 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, 2.
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : ORI/IRON/KJR/MCDR-44/BBS (i) Name of the Inspecting : Officer and
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Hyderabad regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION AP/ANP/L.ST-27/ HYD (ii) Designation : (iii) Accompaning mine : Official
More informationENVIRONMENTAL STATEMENT
ENVIRONMENTAL STATEMENT 2015-16 MAGADH OPENCAST PROJECT M-A AREA, DAKRA SEPTEMBER 15 CENTRAL COALFIELDS LIMITED ENVIRONMENT DIVISION Ranchi EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has
More informationMining is being carried out keeping safe distance from seasonal nallah/ stream.
Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter
More informationMAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.
MAJHIGAWAN LIMESTONE MINE Mine Lease area 362.68 ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement
More informationTHE RAMCO CEMENTS LIMITED
1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II
More informationName of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)
Panchagavi Laterite Mine, Village- Panchagavi, Taluka-Ramdurg, District- Belgaum, Karnataka Ref: - MoEF Letter No. SEIAA 107 MIN 2014 dtd. 24th December 2014 Compliance Report for the period from October
More informationEnvironmental statement for the financial year ending the 31 st March 2012
FORM V (See rule 14) Environmental statement for the ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, VILLAGE:
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &
More informationEIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &
More informationENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE
ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For
More informationDeccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II
Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2 (73.93.11 Ha), as on September 2018 1. Compliance reports are
More informationEnvironmental Management Plan. For Mining of. Rough Stone & Road Metal
Environmental Management Plan For Mining of Rough Stone & Road Metal Over an extent of 6.53 Ha at Survey No.312/1 of Ramalingampalli (V), Bommalaramaram (M), Yadadri Bhuvangairi (D), Telangana State. Lessee
More informationThe project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land.
J.K. Cement WORKS, MANGROL (RAJ) Dated 29.05.2018 Compliance report of Environment Clearance for Mangrol Lime Stone Mine (For the Period from October 2017 to March 2018) Reference Letter from MOEF, New
More informationA. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed
Status of compliance as on 1 st March, 2015 (Period :, 2014 March 2015) to the conditions stipulated in Environmental clearance granted by MoEF vide letter No:- J- 11015/42/2005-IA-II(M) Dated 18 th May
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &
More informationAgreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.
Compliance Report for the period June 2012 - November 2012, to the conditions specified in the Environmental Clearance (EC), granted by MOEF, vide letter No. J-11015/889/2007 - IA.II (M) dated 22nd Feb,
More informationSr.No Condition Status A. SPECIFIC CONDITIONS:
J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &
More informationGRAVEL & ROUGH STONE QUARRY
ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760
More informationFORM V (See rule 14) Environmental Statement for the financial year ending the 31 st March 2017
FORM V (See rule 14) Environmental Statement for the ending the 31 st March 2017 1. Name and address of the Owner/Occupier of the Industry, operation or process 2. Industry Category: Primary (STC Code);
More informationNaubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited
Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in
More informationWELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.
WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey
More informationNORTH NORTH NAUBASTA LIMESTONE MINE (ML-II) ML area ha. (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.
NORTH NORTH NAUBASTA LIMESTONE MINE (ML-II) ML area- 183.937 ha. (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.) 2014 2015 SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) North
More informationEnvironmental Policy Statement:
1 Environmental Policy Statement: Coal India Limited (CIL) is committed to protect the environment through prevention, mitigation of pollution, proper disposal and recycling of wastes, conservation of
More informationCompliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine
Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine Tata Steel Ltd. 1 A. Specific Conditions (i) No mining operations shall be undertaken in the forestland until clearance has
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR
More informationMCDR INSPECTION REPORT IBM/4800/2011
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details Name of the inspecting officer J.S. Hada, AMG Date of Inspection 13.9.2017 Accompanying mine official Shri Sunil Pal, Chief Geologist 1 Name of
More informationENVIRONMENT MANAGEMENT PLAN FOR STONE MINING
ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/BLR/FE/12/BNG (ii) Designation : (iii) Accompaning mine : Official
More informationEMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh
EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS
More informationINDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8
M/s. Nandini Mineral Industries (Mine Lease Area 4.120 Ha.) Sy. Nos. 105, 105/1, 2 & 113/1A Kolumulapali Village, Bethamcherla Mandal, Kurnool District, ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001:
More informationEXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land
EXECUTIVE summary 11.1 PROJECT DESCRIPTION has been granted Mining lease over an extent of 8.09 Ha in village Tihai, District Satna, Madhya Pradesh for a period of 20 years with effect from 22.11.1995
More informationEXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD
EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining
More informationS.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)
Six Monthly Status of Compliance for Environmental Clearance No J-11015/108/2005- IA.II (M) dated 28.07.2006 for 2.2 MTPA Coal Mining from Utkal B-2 Coal Block by M/s. Monnet Ispat & Energy Limited S.N.
More informationENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A
ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry
More informationSl. No PRESENT STATUS SPECIFIC CONDITIONS
Compliance Status of Environmental Clearance Conditions Balda Block Iron Ore Mining Project of M/s Serajuddin and Co. located in village(s) Balda, Bada Kalimati and Nayagarh, Sub-division Champua, District
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey
More informationENVIRONMENTAL MONITORING REPORT
ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2014 SEPTEMBER 2014 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT
More informationWORKSHOP ON THRESHOLD VALUE OF CHROMITE
WORKSHOP ON THRESHOLD VALUE OF CHROMITE INDIAN METALS & FERRO ALLOYS LIMITED ODISHA 23.08.2017 BHUBANESWAR Presented by Indian Metals & Ferro Alloys Limited INDIAN METALS & FERRO ALLOYS LIMITED Established
More informationImplementation of the Conservation Plan for Schedule I species report in the study area namely Pavo cristatus (Indian peafowl).
J.K. Cement WORKS, MANGROL (RAJ) Compliance report of Environment Clearance for Mangrol Tilakhera Lime Stone Mine Reference Letter from MOEF, New Delhi - J-11015/25/2011-1A. II (M) dated 23.01.2014 (For
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN A. Attach a note on the status of baseline information with regard to the following: To identify with the interrelationship between the eco-friendly quarry operations and
More informationENVIRONMENTAL STATEMENT
ENVIRONMENTAL STATEMENT OF FERRO ALLOYS PLANT (TATA STEEL LIMITED) BAMNIPAL, KEONJHAR FOR THE YEAR 2017-2018 PREPARED BY THE DEPARTMENT OF SAFETY & ENVIRONMENT FERRO ALLOYS PLANT TATA STEEL LIMITED BAMNIPAL,
More information(A govt. of Kerala Undertaking)
Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : ORI/IRON/SNG/MCDR-11/BBS (i) Name of the Inspecting : Officer and
More informationEnvironmental statement for the financial year ending the 31 st March 2012
FORM V (See rule 14) Environmental statement for the financial ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A 2. Industry category
More informationENVIRONMENT MANAGEMENT PLAN
EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/
More informationScanned by CamScanner
Scanned by CamScanner Six Monthly COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS (Grant Order no. J-11015/236/2006-IA (M) dated 11.01.2007 to prior allottee, M/s Electrosteel Castings Limited
More information. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b
CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free: 18001806003/6004 Fax: 0146222811'71228119 E-Mail: shreebwr@shreecementltd.com Website : www.shreecement.in,-:,0 900, ~s}.s18(),9>01400,
More informationState Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests
State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us
More informationGurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions Capacity expansion of existing granite quarry (6.0 ha) is proposed, which is operational at village- Kathara, Tehsil- Lovekush Nagar & Dist.
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN For BUILDING STONE AND M SAND QUARRY Sri. N.C. Prasanna Kumar #663, Somanahalli Maddur Taluk Mandya District - 571429 Prepared by SMS ENVOCARE LIMTED # 301, 3 RD FLOOR, SHRESHTA
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT
More informationSix Monthly EC Compliance Report
Six Monthly EC Compliance Report Period: October, 2016 to March, 2017 JORURI IRON & MN MINES (54.754 HA) M/s. KALINGA MINING CORPORATION At Joruri, PO Jajnag, Dist. Keonjhar, Odisha 758 052 A. SPECIFIC
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : ORI/IRON/KJR/MCDR-65/BBS (i) Name of the Inspecting : Officer and
More informationENVIRONMENTAL STATEMENT REPORT (FORM-V)
ENVIRONMENTAL STATEMENT REPORT (FORM-V) YEAR 2017-18 Mine Lease for Shale (30,000 TPA Limestone Production) MY HOME INDUSTRIES PRIVATE LIMITED Mellacheruvu (Vil. & Mdl.) - 508 246 Suryapet District, Telangana
More informationSalient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes.
EXECUTIVE SUMMARY INTRODUCTION Agaria Iron Ore mine is situated in village Agaria, Tehsil- Sihora, District Jabalpur of Madhya Pradesh State. The mining lease period was for 20 years w.e.f 06.03.1987 to
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office Mine file No : KNT/GLB/LST/7/BNG (i) Name of the Inspecting : Officer and ID No. (ii)
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationSHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66
CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free : 18001806003/6004 Fax: 01462228117/228119 E-Mail: shreebwr@shreecementltd.com (I." Website : www.shreecement.in SHREE CEMENT LTD..~..~..~
More informationENVIRONMENTAL STATEMENT FOR THE YEAR
ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,
More informationEnvironmental clearance is subject to obtaining clearance under the Wild life (Protection) Act, 1972 from the competent authority.
Compliance Status of Environmental Clearance Conditions Balda Block Iron Ore Mining Project of M/s Serajuddin and Co. located in village(s) Balda, Bada kalimati and Nayagarh, Sub-division Champua, District
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)
ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationPRE-FEASIBILITY REPORT
M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,