1 Energy Savings Opprtunities Scheme ( Update)

2 Intrductin 1. explained 2. Phase 1 3. Our experience 4. Recmmendatins 5. Key findings 6. & Facilities Management

3 Explained Implementatin f the EU Energy Efficiency Directive Article 8 by UK Gvernment Scheme administratr is the Envirnment Agency Applies t all large enterprises in the UK wh have: Mre than 250 emplyees r Turnver > 50m/ 42.5m and Balance sheet > 43m/ 36.5m Rughly 10,000 rganisatins in the UK

4 Explained January st April st December st March th December 2015 Reference perid Qualificatin deadline Cmpliance deadline runs n a yearly cycle: Phase 1: 6 th Dec th Dec 2015 Phase 2: 6 th Dec th Dec 2019 Phase 1 dates: Qualificatin Deadline 31 st December 2014 Cmpliance Deadline 5 th December 2015 Cmpliance Deadline (extended) 29 th January 2016

5 Explained Appint an accredited Lead Assessr Review f a minimum f 90% f ttal energy use Identificatin f Energy Saving Opprtunities based n representative site surveys Reprting f Disclsure f the results t the Envirnment Agency by 5 th December 2015 Requires Directr level sign ff

6 Phase 1 Statistics 9,600 cmpanies captured by scheme 65% cmpliant as f 15 th April 2016 ISO cmpliance rute deadline is 30 th June 2016 Apprximately 3,000 cmpanies still t shw cmpliance r make ntificatin Envirnment agency issuing nn-cmpliance ntificatins frm 15 th April % average cst effective energy savings with less than 2-year payback

7 Our experience are lead assessr fr 17 cmpanies Ttal energy use audited: 722,325,033 kwh Transprt audits: 7 Energy audits fr 28 cmpanies t BS EN cvering the fllwing sectrs: Datacentres Cnstructin sites Emergency services Retail Farming Haulage (transprt audits) Offices Histric buildings Pharmaceuticals Manufacturing Energy prductin

8 Recmmendatins Type Number f audits Savings ( ) Savings (CO2) Savings (kwh) Estimated cst Datacentres 17 5,831,653 31,894 65,925,787 7,816,327 Offices 5 66, ,742 59,576 Cnstructin sites 9 55, ,980 Histric buildings 10 62, ,198, ,210 Emergency services 4 89, , ,110 Pharmaceuticals 3 425,973 2,110 4,267,533 1,650,266 Retail ,759 2, ,527,597 1,455,963 Manufacturing ,310 3, ,971,644 1,407,914 Farming 4 173, ,189, ,534 Energy prductin 1 110,466 1, ,209, ,500

9 Key findings Data centres Plicy bjectives Equipment schedules, life cycle, renewal spec. Data hall temperature set pints & cntrl strategies Lack f data n energy intensity, use & by main plant & equipment Autmatic cntrl & scheduling f plant & lighting, LED lighting Cmpartmentatin f cl and ht znes, free cling pprtunities Renewable energy pprtunities

10 kwh (HH) Key findings Offices MPAN 7933 Electricity HH Cnsumptin Prfile Week 13/10/ Mnday 13/10/14 Tuesday 14/10/14 Wednesday 15/10/14 Thursday 16/10/14 Friday 17/10/14 Saturday 18/10/14 Sunday 19/10/14 Submetering, especially n landlrd prvided energy Occupatin based energy use Cntrl f small pwer and IT equipment Understanding HVAC Lighting replacement prgrammes Ht water timing & cntrl

11 Key findings Cnstructin Sites Site energy mnitring Ventilatin heat lss t site cabins Lighting and heating cntrl (timer & ccupatin) Drying rm slutins Prcurement lead LED site lighting

12 Key findings Histric buildings Maintenance & repair Fabric imprvements Ventilatin cntrl Lighting imprvement & upgrading Occupancy cntrl Timed cntrl f ht water

13 Key findings Pharmaceuticals Fuel 100% Trigeneratin Plicy bjectives, mnitr energy use f key plan & equipment Energy use prfiling & baselad analysis Maintenance f cmpressed air equipment VSDs, upgrade lder plant Recvery f prcess heat CHP Electricity 30% Heat 55% Cntrl f lcalised air cnditining, HVAC & lighting services Heat lsses 13% Cling Line lsses 2% Lighting replacement prgrammes

14 Key findings Retail Submetering key plants Scheduling f services t meet peratinal hurs, implementatin f standard perating prcedures Cntrl f small pwer Fabric imprvements & thermal cntrl at display windws Seasnal cmmissining Lighting upgrade prgrammes Hliday shutdwn prcedures

15 Key findings Manufacturing Clser unin f services t prductivity & ccupatinal requirements Cmpressr maintenance & leak detectin Mtr cntrl Lighting review & replacement BMS review and cntrl strategies Understand energy & shut dwn prtcls Zning f services t suit activities CHP & renewables pprtunities Equipment maintenance & replacement

16 Key findings Farming Cntrl f lighting Anaerbic digestin pprtunities Cntrl f mtrs and cnveyrs Waste heat recvery Natural ventilatin Renewables pprtunities

17 & FM (Facilities Management) Measure Target The majrity f affrdable pprtunities wuld cme under an FM remit A bard directr shuld have signed ff the audit & understand the pprtunities Wh are they? Reprt Obtain cpies f lead assessr reprts & site energy audits Understand energy use Act cnsider measurement & verificatin prtcls, submetering & reprting

18 & FM (Facilities Management) Understanding hierarchy f energy efficiency effect in maintenance Cnsider cntract clauses fr energy savings Cnsider business case fr energy efficiency upgrades f plant & equipment understand energy efficiency ptential It s a lng term cmmitment requiring mnitring t ensure savings are maintained this suits yu & yur clients

19 Thank yu fr yur time. Wayne Ward Managing Directr 11 Pierrepnt Street Bath BA13 4HR