1 CDM Executive Board page 1 Revised Monitoring Plan Project Title Hiriya Landfill Project CDM Project Nuber Date: 6 th Oct 2008 Version: 1 Ipleented by: Dan Region Associate of Town (DRAT)

2 CDM Executive Board page 2 SECTION 4. Application of a onitoring ethodology and plan D.1. Nae and reference of approved onitoring ethodology applied to the project activity: The project will use the approved consolidated onitoring ethodology ACM0001 Consolidated onitoring ethodology for landfill project activities D.2. Justification of the choice of the ethodology and why it is applicable to the project activity: The chosen ethodology is to be used in conjunction with baseline ethodology ACM0001. The proposed project activity eets all the applicability requireents requested for this ethodology.

3 CDM Executive Board page 3 Not applicable. D.2.1. Option 1: Monitoring of the eissions in the project scenario and the baseline scenario D Data to be collected in order to onitor eissions fro the project activity, and how this data will be archived: ID nuber (Please use nubers to ease cross-referencing to table D.3) Data variable Source of data Data unit Measured (), calculated (c), estiated (e), Recording frequency Proportion of data to be onitored How will the data be archived? (electronic/ paper) Coent

4 CDM Executive Board page 4 equ.) D Description of forulae used to estiate project eissions (for each gas, source, forulae/algorith, eissions units of CO 2 D Relevant data necessary for deterining the baseline of anthropogenic eissions by sources of GHGs within the project boundary and how such data will be collected and archived : ID nuber (Please use nubers to ease crossreferencing to table D.3) Data variable Source of data Data unit Measured (), calculated (c), estiated (e), Recording frequency Proportion of data to be onitored How will the data be archived? (electronic/ paper) Coent equ.) D Description of forulae used to estiate baseline eissions (for each gas, source, forulae/algorith, eissions units of CO 2 D Option 2: Direct onitoring of eission reductions fro the project activity (values should be consistent with those in section E). D Data to be collected in order to onitor eissions fro the project activity, and how this data will be archived:

5 CDM Executive Board page 5 ID nuber 1. LFG total,y 2. LFG flared,y 3. LFG theral,y 4. FE 5. w CH4,y 6. EG y Data variable Total aount of landfill gas captured Aount of landfill gas Flared Aount of landfill gas cobusted in boiler Flare/cobustion efficiency, deterined by the operation hours (1) and the ethane content in the exhaust gas (2) Methane fraction of the landfill gas Total aount of electricity and/or other energy carriers used in the project for gas puping. (not derived fro the gas) Source of Data Project Project Project Project Project proponent data Project Data unit N 3 N 3 N 3 Measured (), calculated (c), estiated (e), % /c N³ CH 4 / N³ LFG Recording frequency easured continuously, recorded weekly easured continuously, recorded weekly easured continuously, recorded weekly (1) continuously (2) quarterly, onthly if unstable Proportion of data to be onitored How will the data be archived? (electronic/ paper) 100% electronic 100% electronic 100% electronic n/a electronic Coent (Data on recorded variables will be archived during the crediting period and two years after). Measured by a flow eter that noralizes the reading to N 3 in a continuous anner. Data to be aggregated onthly and yearly. Measured by a flow eter that noralizes the reading to N 3 in a continuous anner. Data to be aggregated onthly and yearly. If any landfill gas is supplied to boilers in the future, this will have to be onitored according to ACM0001. Data will be aggregated onthly and yearly (1) Continuous easureent of operation tie of flare (e.g. with teperature) (2) Periodic easureent of ethane content of flare exhaust gas. Weekly 100% Electronic Measured by gas quality analyser MWh Continuously 100% electronic Only electricity will be used. Required to deterine CO 2 eissions fro use of electricity or other energy carriers to operate the project activity. Foratted: Superscript Deleted: M 3 Deleted: M Deleted: 6. T... [1]

6 CDM Executive Board page 6 7. CEF electricity,y 8. legal CO 2 eissions intensity of the electricity displaced during year Regulatory requireents relating to landfill gas projects National Electric Grid Project tco 2 e/mwh e Annually 100% electronic Text n/a Annually 100% electronic For conservativeness, the grid CEF is based on assuption of 100% heavy coal (conservative). The ake-up of the Israeli grid will be reassessed each year to ensure that the grid eissions factor does not exceed the highly conservative value chosen Required for any changes to the adjustent factor (AF) or directly MD reg,y. Monitoring will be ade through phone calls to the relevant authority. Deleted: 9 Deleted: 10 All data of the above table will be archived during the crediting period + two years. CO 2 equ.): D Description of forulae used to calculate project eissions (for each gas, source, forulae/algorith, eissions units of Project eissions in tco 2 e during a given year y (PE y ) are equal to the net aount of electricity used by the project (for the operation of pups and flares) in the year in MWh (EG y ), ultiplied by a carbon eissions factor (CEF electricity y ) for the grid fro which electricity is taken (tco 2 e/mwh): PE y = EG y * CEF electricity,y The CEF for this equation can be calculated using the equations for sall-scale electricity projects (Type 1.D). For conservativeness, however, this project will use the highest (ost conservative) CEF for a given country, which is tco 2 e/mwh (Orot Rabin Plant), as if the country s energy atrix was entirely based on heavy coal. Using this CEF is in fact highly conservative, since ost of the electricity used by the pups and flares is in fact likely to be supplied by an off-site biodigester (that is not part of the project but which provides zero-eissions renewable electricity).

7 CDM Executive Board page 7 project activity ID nuber D.2.3. Treatent of leakage in the onitoring plan D If applicable, please describe the data and inforation that will be collected in order to onitor leakage effects of the Data variable Not applicable. Source of data Data unit Measured (), calculated (c) or estiated (e) Recording frequency Proportion of data to be onitored How will the data be archived? (electronic/ paper) Coent D Description of forulae used to estiate leakage (for each gas, source, forulae/algorith, eissions units of CO 2 equ.) No leakage effects have to be accounted for under ACM0001. D.2.4. Description of forulae used to estiate eission reductions for the project activity (for each gas, source, forulae/algorith, eissions units of CO 2 equ.) The ain forula, as described in section B.2 is: Where: ER y = (MD project,y MD reg,y ) * GWP CH4 - PE y + BE y MD reg,y = MD project,y * AF PE y = EG y * CEF electricity,y and BE y =ET y * CEF theral,y MD project,y = MD flared,y + MD electricity,y + MD theral,y MD flared,y = LFG flared,y * w CH4, y * D CH4 * FE MD theral,y = LFG theral,y * w CH4, y * D CH4

8 CDM Executive Board page 8 Where: ER y : greenhouse gas eission reduction achieved by the project activity during a given year y (tco 2 e). MD project,y : aount of ethane actually destroyed/cobusted during the year y (tch 4 ). MD flared : quantity of ethane destroyed by flaring in year y (tch 4 ) MD theral : quantity of ethane destroyed by use in boilers for theral energy in year y (tch 4 ) MD electricity : quantity of ethane destroyed by use for electricity generation in year y (tch 4 ) (not applicable to this project) AF : Adjustent Factor (%). GWP CH4 : approved Global Waring Potential value for ethane (21 tco 2 e / tch 4 ). PE y : Project eissions of the landfill gas coponent fro electricity consued by the project during a given year y (t CO 2 e). BE y : is the baseline eissions of theral displaceent (not applicable to this project) (tco 2 e). EG y : net quantity of electricity used during the year y (MWh). CEF electricity,y : CO 2 eissions intensity of the electricity used during year y (tco 2 e/mwh). ET y : quantity of theral energy displaced during the year (not applicable to this project) (TJ). CEF theral,y : CO 2 eissions intensity of the theral energy displaced (not applicable to this project) (tco2e/tj). LFG theral,y : is the quantity of landfill gas fed for the generation of theral energy easured in noral cubic eters (N 3 ). LFG flared,y : the quantity of landfill gas flared during year y (N 3 ) w CH4,y : is the average ethane fraction of the landfill gas as easured during the year and expressed as a fraction (in N³ CH 4 / N³ LFG). D CH4 : is the ethane density expressed in tonnes of ethane per cubic eter of ethane (not applicable to this project)(tch4/ 3 CH 4 ) CV CH4 : is the calorific value of ethane (not applicable to this project) (TJ/t CH 4 ). CV fuel : is the calorific value of the fuel (not applicable to this project) (TJ/t fuel). EF fuel : CO 2 eissions intensity of the fuel (not applicable to this project) (tc/tj). OF fuel : Oxidizing fraction of the fuel (not applicable to this project) (%). Deleted: cubic eters Foratted: Font: Not Italic As described in the forula for ER y introduced in section B.2., the only project eissions associated with the landfill gas coponent are related to the electricity used for the operation of the flare pups and other auxiliary equipent. The project will calculate project eissions based on the following equation: PE y = EG y * CEF electricity,y Where: PE y : Project eissions fro electricity consued by the project during a given year y (t CO 2 e).

9 CDM Executive Board page 9 EG y : quantity of electricity consued by the gas collecting syste during the year y (MWh). CEF electricity,y : CO 2 eissions intensity of the electricity displaced during year y (tco 2 e/mwh). The CEF for this equation could be calculated using the equations for sall-scale electricity projects Type 1.D. For conservativeness and also to reduce the need of onitoring large aounts of data fro the grid, this project will use the ost conservative CEF for the country, which is tco 2 e/mwh (Orot Rabin Plant), as if the country s energy atrix was entirely based on heavy coal. D.3. Quality control (QC) and quality assurance (QA) procedures are being undertaken for data onitored: Data Uncertainty level of data Explain QA/QC procedures planned for these data, or why such procedures are not necessary. (Indicate table and ID nuber e.g. D.4-1; D.4-2.) (High/Mediu/Low) Table.2.2.1; (1) LFG total,y Low Flow eters will be subject to a regular aintenance and testing regie to ensure accuracy. Table.2.2.1; (2) LFG flared,y Low Flow eters will be subject to a regular aintenance and testing regie to ensure accuracy. Table.2.2.1; (3) LFG theral,y Low Flow eters will be subject to a regular aintenance and testing regie to ensure accuracy. Table.2.2.1; (4) FE Mediu Regular aintenance will ensure optial operation of flares. Flare efficiency should be checked quarterly, with onthly checks if the efficiency shows significant deviations fro previous values. Table.2.2.1; (5) w CH4,y Low The gas analyser should be subject to a regular aintenance and testing regie to ensure accuracy. Table.2.2.1; (6) EGy Low Meter will be subject to regular aintenance. Table.2.2.1; (7) CEF electricity,y Low A conservative estiate will be used (please refer to section D.2.4 above) Table.2.2.1; (8) legal Low Monitoring will be ade through phone calls to the relevant authority. Deleted: Table.2.2.1; (6) T... [2] Deleted: 8 Deleted: 9 Deleted: 10

10 CDM Executive Board page 10 D.4 Please describe the operational and anageent structure that the project operator will ipleent in order to onitor eission reductions and any leakage effects, generated by the project activity The project onitoring will be conducted by the designated site engineer. The onitoring protocol follows internationally recognized standards. See Annex 4 for details of the operational and anageent structure. D.5 Nae of person/entity deterining the onitoring ethodology: The onitoring study was concluded in Noveber The entities deterining the onitoring and participating in the project as the Carbon Advisors are EcoSecurities Ltd., UK, and EcoTraders Ltd, Israel, listed in Annex 1 of this docuent.

11 CDM Executive Board page 11 Annex 4 MONITORING PLAN This section details the steps taken to onitor on a regular basis the GHG eissions reductions fro the Hiriya Landfill Project in Israel. The ain coponents covered within the onitoring plan are: 1. Paraeters to be onitored, and how the data will be collected 2. The equipent to be used in order to carry out onitoring 3. Operational procedures and quality assurance responsibilities The requireents of this MP are in line with the kind of inforation routinely collected by copanies anaging landfill gas collection and destruction systes, so internalising the procedures should be siple and straightforward. If necessary, the MP can be updated and adjusted to eet operational requireents, provided that such odifications are approved by a Designated Operational Entity during the process of verification. As the Hiriya Landfill project is currently already operating, onitoring has been undertaken since January The onitoring plan details the actions necessary to record all the variables and factors required by the ethodology ACM0001, as detailed in section D of the PDD. All data will be archived electronically, and data will be kept for the full crediting period, plus two years. This teplate shall not be altered. It shall be copleted without odifying/adding headings or logo, forat or font.

12 CDM Executive Board page 12 Table 4a Data to be collected or used to onitor eissions reductions fro the project activity. ID Nuber 1. LFG total,y 2. LFG flared,y Data Variable Total aount of landfill gas captured Aount of landfill gas Flared Aount of landfill 3. LFG theral,y gas cobusted in boiler 4. FE Flare/cobustion efficiency, deterined by the operation hours (1) and the ethane content in the exhaust gas (2) Data Unit N 3 N 3 N 3 Measured (), calculated (c) or estiated (e) % /c Monitoring Frequency and Method Data easured continuously by flow eter that autoatically noralizes the reading to N 3 in a continuous anner. Data recorded weekly by site operator. Data easured continuously by flow eter that autoatically noralizes the reading to N 3 in a continuous anner. Data recorded weekly by site operator. Data easured continuously by flow eter that autoatically noralizes the reading to N 3 in a continuous anner. Data recorded weekly by site operator (1) Continuously by designated engineer (2) quarterly, onthly if unstable; saples will be sent to a lab for analysis Proportion of data to be Monitored 100% 100% 100% n/a Responsible Parties/ Individuals For Monitoring Monitoring Equipent Flow eter Flow eter Flow eter (1) n/a (2) Lab Coents Data will be aggregated onthly and yearly, as of January Data will be aggregated onthly and yearly, as of January If any landfill gas is supplied to boilers in the future, this will have to be onitored according to ACM0001. Data will be aggregated onthly and yearly FE is critical to ensuring coplete cobustion of the ethane. Saples of the exhaust gas will be taken quarterly to easure volatile organic copounds, which will provide a easure of the flare s efficiency. Saples will be taken onthly if readings are unstable. Foratted: Font: 9 pt 5. W CH4,y Methane fraction in the LFG N 3 CH 4 / N 3 LFG Weekly, using a gas analyser 100% Gas analyser Data will be aggregated onthly and yearly, as of January Deleted: 6. T... [3]

13 CDM Executive Board page Total aount of electricity and/or other energy carriers used in the project for gas puping and heat transport (not derived fro the gas) CO 2 eission intensity of the electricity in ID 6 Regulatory requireents relating to LFG projects MWh T CO 2 / MWh Continuously, using an electricity eter 100% Electricity Meter e Annually 100% EcoTraders n/a Test N/a Annually 100% EcoTraders n/a It will be assued for conservativeness that all electricity used in the project will be supplied fro the grid. Electricity bills we be used to record electricity consuption. Data will be aggregated onthly and yearly, January Grid CEF is based on assuption of 100% heavy coal (conservative). The ake-up of the Israeli grid will be reassessed each year to ensure that the grid eissions factor does not exceed the highly conservative value chosen (see section D) Israeli legislation relating to LFG flaring and/or usage will be assessed each year to deterine whether any changes need to be ade to the adjustent factor (AF) or MD reg,y Deleted: 9 Deleted: 9 Deleted: 10

14 CDM Executive Board page 14 Table 4b Equipent used to onitor eissions reductions fro the project activity Equipent Flow eter Variables Monitored 1. LFG total,y 2. LFG flared,y 3. LFG theral,y Gas Analyser 5. W CH4,y Electricity eter 6. Operational range Calibration procedures Equipent will be calibrated annually by the equipent supplier on site Equipent will be calibrated annually by the equipent supplier on site Equipent will be checked onthly by the DRAT Lead Parties responsible for operating equipent Site Operator Site Operator Site Operator Procedure in case of failure Failure reported to equipent supplier and repairs carried out. If repair is not possible, equipent will be replaced by equivalent ite. Failure events will be recorded in the site events log book. Failure reported to equipent supplier and repairs carried out. If repair is not possible, equipent will be replaced by equivalent ite. Failure events will be recorded in the site events log book. Failure reported to equipent supplier and repairs carried out. If repair is not possible, equipent will be replaced by equivalent ite. Failure events will be recorded in the site events log book. Default value to use in case of failure Previous reading inus 5% previous reading inus 5% Previous reading plus 5% Coents Foratted: English (U.S.) Deleted: Teperature Sensor... [4] Deleted: 8

15 CDM Executive Board page 15 Table 4c Operational procedures and responsibilities for onitoring and quality assurance of eissions reductions fro the project activity (E = responsible for executing data collection, R = responsible for overseeing and assuring quality, I = to be infored) Task DRAT Lead Equipent Supplier EcoTraders EcoSecurities Collect Data R E Enter data into Spreadsheet R E R Make onthly and annual reports R E R I Archive data & reports R E R I Calibration/Maintenance, rectify faults I R E I I

16 Page 5: [1] Deleted ron 05/10/ :48:00 6. Teperature of the Project T landfill gas ºC Weekly 100% elec 7. Pressure of the landfill Project P gas Pa Weekly 100% elec 86. EG y Total aount of electricity and/or other energy carriers used in the project for gas puping. (not derived fro the gas) Project MWh Continuously 100% electronic Only electricity will be used. Required to deterine CO 2 eissions fro use of electricity or other energy carriers to operate the project activity. Page 9: [2] Deleted ron 05/10/ :56:00 Table.2.2.1; (6) T Low The equipent should be subject to a regular aintenance an Table.2.2.1; (7) p Low The equipent should be subject to a regular aintenance an Page 12: [3] Deleted ron 05/10/ :02:00 6. T Teperature of the LFG C Weekly, using a teperature sensor 100% Teperature sensor. 7. p Pressure of the LFG Pa Weekly, using a pressure eter 100% Pressure eter 86. Total aount of electricity and/or other energy carriers used in the project for gas puping and heat transport (not derived fro the gas) MWh Continuously, using an electricity eter 100% Electricity Mete Page 14: [4] Deleted ron 05/10/ :07:00 Teperature Sensor 6. T Equipent will be calibrated annually by the equipent supplier on site Site Operator Failure reported to equipent supplier and repairs carried out. If repair is not possible, equipent will be replaced by equivalent ite. Failure events will be recorded in the site events log book. Previou in

17 Pressure eter 7. p Equipent will be calibrated annually by the equipent supplier on site Site Operator Failure reported to equipent supplier and repairs carried out. If repair is not possible, equipent will be replaced by equivalent ite. Failure events will be recorded in the site events log book. Previou in