Agenda for the 11 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR

Size: px
Start display at page:

Download "Agenda for the 11 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR"

Transcription

1 Agenda for the 11 th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR 1.0 Proposal for grant of connectivity to the applications received from Renewable Energy Sources CERC has notified the Detailed Procedure for Grant of connectivity to projects based on renewable sources to ISTS on in the Petition No. 145/MP/2017. As per the procedure, the connectivity applications shall be processed for grant of Connectivity in two stages i.e. Stage-I & Stage-II. Stage-I Connectivity shall be granted by indicating two locations- one Primary and other alternate location. Grant of Stage-I Connectivity shall not create any vested right in favour of the grantee on ISTS infrastructure including bays. The grantee shall be allocated bay in either primary or indicated alternate location which shall be specified at the time of grant of Stage-II Connectivity based on the then availability of bay. The Stage-I Connectivity grantee is required to apply for Stage-II Connectivity within 24 months from grant of Stage-I Connectivity for physical connectivity with the ISTS grid failing which the same shall be ceased. Large number of Connectivity applications in Northern Region have been received prior to the notification of the Detailed Procedure from the renewable energy sources. Grant of Stage-I Connectivity shall not create any right in the favour of grantee on ISTS infrastructure including bays. For the purpose of grant of connectivity, the applications have been grouped as per their locations and details of the applications and proposal for Stage-I Connectivity are as below: 1

2 Table-1.0 Sl. No Application No. Applicant Connectivity Applications at Bhadla Orange Jagat Wing Power Pvt. Ltd. (Kanasar Wind Kintech () Windpark Pvt. Ltd. (Akhadhana Wind Greenko Solar (Badla Solar Nandikeshwar Renewable (Shira Wind Solarpark Development Company Ltd. (Nokh Solar Park) Private Ltd. Private Ltd. Date of Application Location Connectivity Sought (MW) Nature of Applicant 250 Wind Jodhpur, 300 Wind Jodhpur, Jodhpur, 500 (Sought at 400kV) Jodhpur, Jodhpur, Solar 250 Wind Solar Park Developer 500 Solar 500 Solar Proposed Primary location for Connectivity/Tr. System under ISTS Bhadla Dedicated Tr. System Kanasar Wind Farm - Bhadla Akhadhana Wind Farm - Bhadla Badla Solar Farm - Station 400kV S/c Shira Wind Farm - Station 220kV S/c Nokh Solar Park - Station 220kV 2xD/c Station 220kV D/c Station 220kV D/c Proposed Alternative location for Connectivity / Tr. System under ISTS 400kV Pooling Station at (with a provision to include 220kV level) Installation of 1x500MVA, 400/220kV transformer at along with Bus Coupler and transformer bay - Bhadla765kV D/c to be operated at 400kV Dedicated Tr. System for alternative connectivity Kanasar Wind Farm - Pooling Station Akhadhana Wind Farm - Pooling Station Badla Solar Farm - Pooling Station 400kV S/c Shira Wind Farm - Pooling Station Nokh Solar Park - Pooling Station 220kV 2xD/c Pooling Station 220kV D/c Pooling Station 220kV D/c 2

3 Private Ltd. Connectivity Applications at : Distinguished Consultancy Solutions Pvt. Ltd. (Fathegarh Wind Greenko Solar (Parewar solar Maski Renewable (Madhopura Wind Adani Renewable Energy Park Ltd Jodhpur, Solar 250 (Applicant vide letter dated sought enhancement to 300MW) 500 (Sought at 400kV) Wind Solar 200 Wind 500 (Sought at 400kV) Solar Park Developer 400kV Pooling Station at (with a provision to include 220kV level) Installation of 1x500MVA, 400/220kV transformer at Pooling Station along with Bus Coupler and transformer bay - Bhadla765kV D/c to be operated at 400kV Station 220kV D/c Wind Farm - Parewar Solar Farm - 400kV S/c Madhopura Wind Farm - AREPL Solar Farm - 400kV S/c Bhadla Pooling Station 220kV D/c Wind Farm - Station Parewar Solar Farm - Bhadla 400kV S/c Madhopura Wind Farm - Station AREPL Solar Farm - Bhadla 400kV S/c Connectivity Applications at Bhinmal Pvt. Ltd. (Khanpur Solar Park) Jalore, 100 Solar Bhinmal Khanpur Solar Park Bhinmal Substation 220kV S/c Bhinmal Establishment of 400/220 kv, Khanpur Solar Park Bhinmal Substation 220kV S/c 3

4 Orange Saundatti Wind Power Pvt. Ltd. Pvt. Ltd. (Khanpur Solar Park) Connectivity Applications at Jaisalmer Clean Wind Power (Jaisalmer) Pvt. Ltd. (Sadrasar Wind Jalore, Jalore, 300 Wind 50 Solar 300 Wind Establishme nt of 400/220 kv, 1x 500 MVA Pooling Station at Bhinmal LILO of Kankroli Zerda 400kV S/c atbhinmal Orange Saundatti GS Bhinmal Substation 220kV S/c Khanpur Solar Park Bhinmal Substation 220kV S/c Sadrasar Wind Farm.- 400kV S/c 1x 500 MVA at Bhinmal LILO of Kankroli Zerda 400kV S/c at Bhinmal Parewar Establishment of 400/220 kv, 1x 500 MVA at Parewar - Parewar 765 kv D/c(Initally charged at 400 kv) Orange Saundatti GS Bhinmal Substation 220kV S/c Khanpur Solar Park Bhinmal Substation 220kV S/c Sadrasar Wind Farm - Parewar 220 kv S/c Connectivity Applications at Jallandhar Pvt. Ltd. Connectivity Applications at Kankroli Kartarpur, Punjab 100 Solar Jallandhar Azure Power GS Jallandhar S/s 220kV S/c Amritsar Azure Power GS Amritsar 220 kv S/c Private Limited (Solar Park) Kankroli, 100 Solar Kankroli Azure Power GS Kankroli S/s 220kV S/c Chittorgarh(PG) Installation of 1x500MVA, 400/220kV ICT at Chittorgarh (PG) Azure Power GS Chittorgarh(PG) S/s 220kV S/c 4

5 2.0 Stage-I grantee may update the quarterly progress of development of their generation project and associated transmission infrastructure as per format RCON-I-M. As per the Clause (6) of Regulation 8 of Connectivity Regulations, the Grant of Connectivity shall not entitle an applicant to inter-change any power with the grid unless it obtains LTA, MTOA or STOA. Further, since MTOA & STOA are granted on the margins available in the grid and transfer of power on long term basis is granted only with the LTA, therefore, the applicants are advised to apply for the LTA to ensure power evacuation & transfer to its beneficiaries under LTA. Also as per the prevailing Transmission Planning Criteria of CEA, the N-1 criteria may not be applied to the immediate connectivity of wind / solar farms with the ISTS / Intra-STS grid i.e. the connecting the farm to the grid and the step-up transformers at the grid station. 3.0 As per the Clause of the Detailed procedure for Grant of Connectivity to projects based on Renewable Sources, the dedicated transmission including bays at generation pooling station shall be under the scope of the applicant and the terminal end bays at the ISTS substation shall be under the scope of ISTS licensee owning the substation subject to compliance of relevant provision of tariff policy. 4.0 The new substation/location for grant of Stage-I connectivity, if needed, shall be planned in consultation with CEA, MNRE and other stakeholders. Further, the proposed alternative locations for connectivity are yet to be discussed and shall be firmed up, if needed, in consultation with CEA and other stakeholders. Members may deliberate. 5.0 New LTA Application received by CTU from projects based on Renewable Energy Sources (RES) One LTA Application has been received by CTU from solar generation project with proposed power injection at Bhadla (PG) Pooling station and NR as target region. Details of application are as below: 5

6 Table-2.0 Sl. No Application No. Applicant Location LTA Sought (MW) Date of Application Nature of Applicant Solarpark Development Company Ltd. (Nokh Solar Park) 980 (NR) Solar Park Developer As per the Detailed Procedure for Grant of connectivity to projects based on renewable sources to ISTS notified by CERC on , LTA shall be granted along with grant of Stage-II connectivity or after the grant of Stage-II connectivity. Accordingly, the above LTA applications shall be processed after receipt of stage-ii connectivity application. Members may deliberate. 6