2 Key Facts Partners - 26 partners (13 research, 13 industrial) in 10 European countries - Total Budget: 7.2 Mio. Euro - FIThydro addresses decision support in commissioning and operating hydropower plants (HPP) by use of existing and innovative technologies. - The project investigates mitigation measures and strategies to develop costefficient environmental solutions for sustainable and fish friendly hydropower. - Case study regions: France/Belgium, Portugal/Spain, Scandinavia and the Alpine Region. Homepage: UNIVERSITY OF Hull International Fisheries Institute HIFI h idroerg PROJECTOS ENERGÉTICOS C H SALTO DE VADOCONDES SA

3 Project Overview FIThydro concentrates on hydropower and aims to increase both production and ecology of hydropower and to support development of self-sustainable fish populations. Bundle competences of the relevant disciplines of science to enhance protection of fish individuals and populations in a most cost-effective way and with maximum societal benefit. Employing high-end innovative technical solutions, methods, tools and devices (SMTDs)

4 Objectives 1. Bringing together all disciplines related to hydropower. 2. Assessing the response and resilience of fish populations in HPP affected rivers. 3. Environmental impact assessment and species protection. 4. Improving fish and fisheries impact mitigation strategies using conventional and innovative cost efficient measures. 5. Enhancing methods models and tools to cope with EU obligation. 6. Identifying bottlenecks of HPPs and deriving cost efficient mitigation strategies. 7. Risk based Decision Support System (DSS) for planning, commissioning and operating of HPPs. 8. Enhancing problem awareness and objectiveness of policy implementer, NGOs and the public

5 Management Structure The Coordinator (CO) General Assembly (GA) Steering Committee (SC) The Case Studies Management Board (CSMB) which is responsible for the management of the case studies. The External Expert Advisory Board (EEAB)

6 Work Packages

7 FIThydro Partners and Test Cases 7

8 Test Cases

9 1. Flow and habitat Lack of wetted area Test Case Challenges Lack of or distribution of spawning habitat Lack of or distribution of rearing habitat Downstream or attraction flow Environmental flow in bypassed reach Hydropeaking 2. Sediments Deficit of sediments Surplus of sediments Clogging of substrate

10 Test Case Challenges 3. Upstream migration Missing fish pass Hight drop Missing monitoring Fish pass discharge Missing fishway data Fish entrance Other 4. Downstream migration Missing fish pass Turbine passage Too wide trash rack Missing monitoring Missing fishway data Fish entrance

11 Rearing habitat Downstream flow Attraction flow for UP Attraction flow for DOWN Environmental flow in bypassed reach Operational strategy Habitat in bypassed reach Hydropeaking Habitat Maintenance Missing fish pass Hight drop Missing monitoring Fish pass discharge Missing fishway data Fish entrance Effect of cummulative dams Missing fish pass Turbine passage Too wide trash rack Missing monitoring Guidance device Fish entrance Maintenance Effect of cummulative dams Test Case Challenges Nature-like fishway Flow and habitat Upstream migration Downstream migration

12 Test Case Challenge Categories Flow and habitat Nature-like fishway Upstream migration Downstream migration

13 Test Cases Analysis Test cases analysis Analyzing challenges in ALL FIThydro regions Challenge Category FIThydro Flow and Habitat 104 Nature like Fishway 2 Upstream Migration 31 Downstream Migration 55 Sediments 4 Challenge Category Challenge Alpine Iberian Scandinavia France belgium total Upstream Migration Missing fish pass (UM) Upstream Migration Hight drop (UM) Upstream Migration Missing monitoring (UM) Upstream Migration Fish passage discharge (UM) Upstream Migration Missing fishway data (UM) Upstream Migration Fish entrance (UM) Upstream Migration Effect of cummulative dams (UM) Upstream Migration

14 Test Cases and WP SUBPROJECTS in test cases 14

15 Labs Solutions Numerical modelling Devices WP2 WP3 SMTDs Methods Test cases Tools Knowledge and ideas 11/06/2018 Source: António Pinheiro / IST-ID 15

16 Modelling fish behaviour downstream of HPPs CFD modelling to find most efficient attraction flow solutions Develop structural improvement measures Solutions Guma HPP Fish guidance and fish protection for downstream migration 11/06/2018 Source: António Pinheiro / IST-ID 16

17 SMTDs highlights Hydropeaking impact assessment Eflows assessment Methods Sediment management (spawning) Behaviour of fish 11/06/2018 Source: António Pinheiro / IST-ID 17

18 SMTDs highlights Hydropeaking impact assessment Tools Develop an agent based model in CASiMiR Turbine fish mortality model BioPA 11/06/2018 Source: António Pinheiro / IST-ID 18

19 SMTDs highlights Lateral Line Probe Sensor less 3D ultrasound tracking Devices System for 3D optical fishtracking Barotrauma Detection System 11/06/2018 Source: António Pinheiro / IST-ID 19

20 Achieved Milestones Number Name Lead Beneficiary Delivery Date (Annex I) 1 Kick-off Meeting TUM 1-Dec-16 2 Corporate Identity TUM 1-Mar-17 3 CSMB Kick-off Meeting CNRS 1-May-17 4 Baseline Case Studies is set up and confirmed of the CSMB SER 1-Jun-17 5 Beta-Version of the online plat-form is implemented TUM 1-Nov-17 20

21 Deliverables WP No Del No Title Lead Beneficiary Delivery Date Receipt Date WP8 D8.1 NEC - Requirement No. 1 TUM 30-Nov-16 WP7 D7.1 Project Management Plan TUM 31-Dec-16 WP6 D6.2 Website TUM 28-Feb-17 WP6 D6.1 Development of a Corporate identity TUM 30-Apr-17 WP6 D6.3 Communication & Dissemination Strategy TUM 30-Apr-17 WP7 D7.2 Communication Strategy among the partners TUM 30-Apr-17 WP7 D7.7 Planning and organization of the different board meetings TUM 30-Apr-17 WP1 D1.1 Metadata overview on fish response to hydropower EV INBO 31-Oct-17 WP5 D5.1 WP5 D5.2 Review of policy requirements & financing instruments Stakeholder feedback on tools and products of FIThydro EI EI 31-Oct Oct Nov Dec Feb Apr Apr Apr Apr Oct Oct-17 21

22 FIThydro and AMBER AMBER: Adaptive Management of Barriers in European Rivers More effective ecosystem restoration in the EU FIThydro: Fishfriendly Innovative Technologies for Hydropower Developing the next generation technologies of renewable electricity and heating/cooling

23 Cooperation: FIThydro and AMBER Technical Cooperation: The EU barrier atlas on hydroelectric dams Effect of hydropower plants/barriers on the upstream and downstream reach Habitat Assessment (Telemtry, Drones) Dissemination: 1. Website visibility as related Project 2. Exchange user networks and subscribe to newsletters to maximize reach and impact. 23

24 Cooperation: FIThydro and AMBER Scientific Cooperation Workshop following the review meeting of FIThydro Substrate and Sediment Management Environmental Flow Guidelines for data akquisition at the Test Cases with focus on hydromorphology and habitat data Cooperation in developing tools like the decision support systen, the cumulative impact analysis or the agent base fish motion modeling Follower project on cost efficiency comparison of removing barriers instead of HP mitigation measures 24

25 Contact Information Technical University Munich Department of Civil, Geo and Environmental Engineering Chair of Hydraulic and Water Resources Engineering Arcisstr München Coordinator: Prof. Peter Rutschmann Tel Fax Project manager: Hany Abo El Wafa Tel Fax Please subscribe to FIThydro s newsletter See also:

26 Thank you This project is Funded by the Horizon 2020 Framework Programme of the European Union Grant Agreement number

27 Solutions Devices WP3 SMDTS Methods Tools 11/06/2018 Source: António Pinheiro / IST-ID 27