1 PRE-FEASIBILITY REPORT EXPANSION OF STEEL MANUFACTURING UNIT BY ADDITION OF INDUCTION FURNACE CAPACITY MS Billets- 3, 00,000TPA to 5, 25,000TPA r1 BY AMLOH-BHADSON ROAD, VILLAGE- AKALGARH, TEHSIL NABHA, DISTT. PATIALA, PUNJAB. ENVIRONMENTAL CONSULTANT Chandigarh Pollution Testing Laboratory - E I A Division (QCI/ NABET accredited) E-126, Phase- VII, Industrial Area, Mohali, Punjab Website: eia@cptl.co.in 1

2 INDEX 1.0 EXECUTIVE SUMMARY INTRODUCTION OF PROJECT & PROPONENT 8-11 Introduction 8 Partner background 9 Brief Description 9 Need of the project 10 Employment Generation PROJECT DESCRIPTION Category of project 12 Location of Project 13 Alternate site selection 17 Size & magnitude of operation 17 Manufacturing Process details 17 Raw material & product details 20 Resources optimization 20 Sources of water 21 Quantity of waste generation 22 Technical specification SITE ANALYSIS DESCRIPTION OF THE ENVIRONMENT ENVIRONMENT IMPACT & MANAGEMENT PLAN PROPOSED INFRASTRUCTURE REHABILITATION AND RESETTLEMENT (R&R) PLAN PROJECT SCHEDULE & COST ESTIMATES ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) MONITORING SCHEDULE FOR ENVIRONMENTAL CSR ACTIVITIES 43 2

3 LIST OF FIGURES: 1.0 Location of Project General Location Plan Location map goggle Layout plan Process Flow chart Layout showing Green Belt Area 36 LIST OF TABLES: 1.1 Details of area Project details Project co-ordinates Raw material & Product Primary data Description Environmental impact and management plan Monitoring schedule for environmental CSR activities 43 3

4 1.0 EXECUTIVE SUMMARY M/s MADHAV ALLOYS (P) LIMITED PRE-FEASIBILITY REPORT Village Akalgarh, Amloh-Bhadson Road, Tehsil Nabha, District Patiala Punjab. Location Co-ordinates: Latitude : 30 33'31.25"-30 33'31.84"N 30 33'25.09"-30 33'22.41"N Longitude: 76 14'16.83"-76 14'26.33"E 76 14'26.28"-76 14'17.51"E Elevation : 260 m Total project cost: - Rs Crores (after addition of proposed machinery) - The location of the project site is given in Figure 1.0 on map of India and other area details are given in Table 1.1 4

5 Figure 1.0 Location of the Project Site 5

6 TABLE 1.1 DETAILS OF THE AREA S. No. Particulars Details A. Location details 1. Location a Village/ Town/Plot No. b Tehsil c District d State 6 Akalgarh Nabha Patiala Punjab e Latitude 30 33'31.25"-30 33'31.84"N 30 33'25.09"-30 33'22.41"N f Longitude 76 14'16.83"-76 14'26.33"E 76 14'26.28"-76 14'17.51"E 2. Topo-sheet No. 53B/2 & 53B/6 3. Project Area Total Area acres or 8.93 hectare or m 2 C. Production Capacity Existing: MS Billets : 3,00,000TPA TMT Bars : 2,50,000TPA Proposed add on : MS Billets : 2,25,000 TPA TMT Bars : 2,75,000 TPA Total : MS Billets : 5,25,000 TPA TMT Bars : 5,25,000 TPA D. Environmental settings 1. Nearest Village Akalgarh 2. Nearest City Mandi Gobindgarh, approx. 13 km in North East direction from the project site 3. National Highway/State Highway/ Express Highway NH-44 Delhi -Ludhiana is approx 12.5 km in North East direction from the project site. 4. Nearest Railway Station Mandi Gobindgarh, approx km in North direction from the project site 5. Nearest Airport Chandigarh Airport approx. 54 km in east direction from the project site.

7 6. National Parks/ Wild Life Sanctuaries/ Nil Biosphere Reserves within 10 km radius 7. Reserved / Protected Forest within 10 km radius (Boundary to boundary distance) No, Reserved Forests exists within 10 km radius. 8. Nearest water bodies Bhakhra Canal about 10 km east direction 9. Source of Water Ground water Existing tube-well 10. Seismic Zone Zone IV D. COST DETAILS 1. Capital Cost of the project Existing -Rs Cr Proposed -Rs Cr Total -Rs Total cost for Environmental Management Plan Rs Lacs (EMP) 7

8 2.0 INTRODUCTION OF THE PROJECT AND PROPONENT Madhav Alloys Private Limited, is a Registered Company under the Companies Act 1956, having registered office at GT Road, Sirhind Side, Mandi Gobindgarh. Punjab India. Madhav Alloys Pvt. Ltd., a flagship company of MadhavkrgGroup of Companies engaged in steel manufacturing through secondary route. It is having an integrated steel plant located at the borders of Districts of Patiala & Fatehgarh Sahib in Punjab. The said plant is spread in a total area of approximately Standard Acres falling under joint revenue boundaries of Village Akalgarh in District Patiala and Village Bhagwanpura in District Fatehgarh Sahib. This unit got the Grant of Special Package of incentives as Mega Projects by The Director of Industries & Commerce, Punjab vide its LOI No CC/JDP/MEGA/MADHAV/5998 dated and subsequently the Additional Secretary to Govt. of Punjab, Department of Industries & Commerce had duly approved the said project under Mega Projects vide its agreement dated The Company is known in market with the brand name Jyoti TMT and caters the needs of TMT Rebar s markets all across North India. The Company has established billets and TMT production from iron and steel scrap and DRI. It is an environmentally conscious ISO & ISO certified Company and its approach has always been sustainable development in an eco-friendly manner. This Steel Plant is having a capacity to manufacture 3.0 Lac Tons of MS Billets per annum and already got the Environmental Clearance for the said capacity from Ministry of Environment and Forests, New Delhi vide their letter No F. No. J-11011/406/2010-iA-ii (I) dated They now want to enhance the capacity of their unit by addition 1 no induction furnace of 25T capacity. The total project cost of the unit after expansion will be Rs Crore. The projects have already acres land. No additional land required for expansion. The present capacity of melting shop which is 300,000 tons per year shall increase to 5,25,000 tons per year with the addition of new induction melting furnace. As per G.O.I Notification dated 14/09/2006 any change in product/expansion required Environmental Clearance. Accordingly they have to submit Form-I along with Pre-Feasibility 8

9 Report and other relevant documents for getting Environmental Clearance. As per EIA notification, 2006 and its subsequent amendments, the project falls under Category-B and will be appraised by SEIAA, Patiala, Punjab. This Prefeasibility report has, therefore, been prepared to assess the likely impact of the proposed expansion on various factors which may be affected with the implementation of the programme and to suggest remedial / precautionary measures, if any. I. Partner s Background: M/s Madhav Alloys (Pvt.) Ltd is a Private Limited Company. The Directors of the company are as under: 1. Mr. Sudhir Goyal Mr. SudhirGoyal, the Managing Director of the company has almost 2 decades of experience in steel industry. After finishing his graduation in commerce graduate he is attached with the Madhav Group since its inception in year Being the Managing Director of the company he is responsible to take all the decisions along with the concern of other director. He looks after all the departments such as Production, Sales, Administration etcetera and exclusively the activities of Finance department. 2. Mr. Sanjeev Goyal Mr. Sanjeev Kumar Goyal, the Director of the company has more than 2 decades of experience in steel trading. A graduate aged about 49 years attached with the Madhav Group since its inception in year Being a Director of the company he is equally responsible to take decisions for the company. His expertise in Raw material procurement played an important role in the success of the company. He looks after the Raw Material procurement and other General Administration activities of the group company. II. Brief description of nature of the project. In view of the tremendous market potential of Iron & steel, promoters have decided to expand the capacity of the existing Steel Plant by addition of induction furnace of 25T capacity. 9

10 Addition in the existing plant would improve the overall profitability of the project making it financially more viable. The production details of unit existing & proposed are as under: Product Name Existing Additional Total (TPA) (TPA) (TPA) MS Billets : 3,00,000 2,25,000 5, 25,000 TMT Bars : 2,50,000 2,75,000 5,25,000 III. Need for the project and its importance to the country and or region. The role of iron and steel industry is very important for the development of the country, which is one of the fastest growing sector. Iron and steel components are required for the infrastructure development in the country such as real estates, industries, transportation systems ship & aircraft industries. Considering the recent trends in production of steel globally and in India, the national steel policy has projected substantial growth in steel consumption during the next 10 years period. The economy of India is the seventh-largest economy in the world measured by nominal GDP and the third-largest by purchasing power parity (PPP). The country is classified as a newly industrialized country, one of the G-20 major economies, a member of BRICS and a developing economy with an average growth rate of approximately 7% over the last two decades. This growth rate has a great impact on domestic consumption of steel as well as export potential to other countries. As a result of this, the demand for iron & steel remains extremely good, this would continue for next 10 years if not less, since the per capita consumption of steel in India is still very low compared to other developed countries. For rapid development of economy and infrastructure of the country it is necessary to increase the production of steel within the country. National Steel Policy 2005 has the long term goal of having a modern and efficient steel industry of world standards in India. The focus is to achieve global competitiveness not only in terms of cost, quality and product-mix but also in terms of global benchmarks of efficiency and productivity. The Policy aims to achieve over 100 million Metric Tonnes of Steel per year 10

11 by from the level of 38 mt. This implies an annual growth of around 7.3% per year since The above strategic goal is justified on the ground that steel consumption in the world, around 1000 Million Metric tonnes in 2004, is expected to grow at 3.0 percent per annum to reach 1,395 Million Metric Tonnes in 2015, compared to 2 percent per annum in the past fifteen years. China will continue to have a dominant share of the world steel demand. At home, the Indian growth rate of steel production over the past fifteen years was 7.0 percent per annum. The projected growth rate of 7.3 percent per annum in India compares well with the projected national income growth rate of 7-8 percent per annum, given an income elasticity of steel consumption of around 1. IV. Employment Generation (Direct and Indirect) due to the project. Direct employment: - for expansion additional 104 Persons will be required. Total Number of manpower after expansion will be 858 Persons. 11

12 3.0 PROJECT DESCRIPTION: I. Category & type of project including interlinked and interdependent projects, if any. It is a Category B project under schedule 3(a) in EIA Notification, Details of project is given in Table-3.1 S. TABLE-3.1 DETAILS OF PROJECTS No. PARTICULARS EXISTING PROPOSED TOTAL A EXISTING & PROPOSED CAPACITY OF FURNACES & ROLLING MILLS 1 Induction Furnace 2X25T, LRF, 3X25TPH Induction furnace, LRF & Concast Concast 2 Rolling Mills 1 Rolling Mill Nil 1 Rolling Mills B PRODUCTS 1 MS Billets (TPA) 3,00,000 2,25,000 5,25,000 2 TMT Bars (TPA) 2,50,000 2,75,000 5,25,000 C 1 2 D RAW MATERIAL MS Scrap (TPA) 2,80, Ferro-alloys(TPA)& Sponge, 49, DRI GENERALS Project Cost (Crores) Land (Acres) NIL Power (MW) Manpower (nos) Working days 24 hrs 350 working days in year 12

13 II. Location (map showing general location- Figure-3.1, specific location- Figure-3.2, and project boundary & project site layout- Figure-3.3) with coordinates. LOCATION: The proposed project site for expansion is located at Village Akalgarh, Tehsil Nabha, Distt. Patiala (Punjab). The coordinate of project site is given in Table 3.2. Google location plan of project is given Figure-3.1 & general location plan is given 3.2. The layout plan of the project showing different activity is given in Figure 3.3. Table-3.2 CO-ORDINATE OF PROJECT LATITUDE 30 33'31.25"-30 33'31.84"N 30 33'25.09"-30 33'22.41"N LONGITUDE 76 14'16.83"-76 14'26.33"E 76 14'26.28"-76 14'17.51"E 13

14 Figure-3.1 Google Location map 14

15 Figure-3.2 Location map General Sirhind Bhadson PROJECT SITE NH-44 Mandi Gobindgarh Amloh LUDHIANA Location plan - NTS 15

16 Figure-3.3 Layout Plan 16

17 III. Alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. Addition will be done within existing premises. So, consideration of alternate site was not applicable. IV. Size or magnitude of operation. Existing plant is having Induction furnace of 2X25T capacity, LRF, Concast and rolling mill. Now they are proposed to enhance the capacity of plant by addition of another induction furnace of 25T capacities. After expansion the production details will be as under: Product Name Existing Additional Total (TPA) (TPA) (TPA) -MS Billets 3, 00,000 2, 25,000 5, 25,000 -TMT Bars 2, 50,000 2, 75,000 5, 25,000 V. Manufacturing Process details (a schematic diagram flow chart showing the project layout, components of the project etc. should be given) A coreless induction furnace operates on a similar principle to a transformer, i.e., the induction coil acts as primary coil, having many turns, and the charge acts as a secondary coil, with only as single turn. When an alternating current is applied to the induction (primary) coil of a furnace, a significantly larger current is induced in the metallic charge materials. The resistance to the passage of induced current within the furnace charge causes the charge to heat up until it eventually melts. Once the metal is molten, the magnetic field generated creates a stirring action in the bath, producing both homogenization of the chemical composition and assimilation of any bath additions. Electrical energy at 11 kv (3-phase) is converted to 750 V, through a transformer. It is further subjected to a 3-phase rectifier and inverter system which converts the power to single phase, high voltage-high frequency. The frequency converter amplifies the frequency from 50 Hz to 500 Hz. This power is applied to 17

18 furnace coil to generate heat. The process flow chart of manufacturing process is given Figure 3.4 & material balance is given in Figure

19 FIGURE-3.4 PROCESS FLOW CHART 19

20 FIGURE-3.5 MATERIAL BALANCE BURNING LOSSES (11.5 TPD) BURNING LOSS 1 (8.0 TPD) RAW MATERIAL 1649 TPD MELTING & REFINING PROCESS (1649 TPD) CONCAST MACHINE (1550) SLAG 82.5 TPD) APCD DUST (5 TPD) BILLET (1542 TPD) BURNING LOSS TPD TMT FINISHED 1495 TPD SCARP GENRATE 15.4 TPD 20

21 VI. Raw material required along with estimated quantity, likely source, marketing area of final products, Mode of transport of raw Material and Finished Product. The details of product quantity and source of raw material required are given in the Table 3.3. TABLE-3.3 PRODUCTS EXISTING ADDITION TOTAL 1 MS Billets (TPA) 3,00,000 2,25,000 5,25,000 2 TMT Bars (TPA) 2,50,000 2,75,000 5,25,000 RAW MATERIAL MS Scrap (TPA) 2,80, Ferro-alloys(TPA) & 49, Sponge, DRi Source & Transport Local & International Markets & transport through covered Trucks. VII. Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined. Water: As this project is based on Zero Discharge, 100 % recycling of water will be done in the process. VIII. Availability of water its source, Energy/power requirement and source should be given. Water requirement met through existing tube well. The detail of water requirement existing & after expansion is given below:- DESCRIPTION EXISTING PROPOSED TOTAL Domestic 32 KLD 5 KLD 37 KLD Cooling (makeup water) 150 KLD 75 KLD 225 KLD Others 30 KLD 15 KLD 45 KLD Total 212 KLD 95 KLD 307 KLD Power requirement of existing & proposed along with source is given below:- 21

22 DESCRIPTION EXISTING PROPOSED TOTAL Power Requirement(MW) Source Punjab State Power Corporation Limited, Punjab IX. Quantity of wastes to be generated (liquid and solid) and scheme for their Management/ disposal. Liquid effluents- The water required for the coil cooling of induction furnace is soft water quality and is close loop water cooling system. So, there is no discharge of water cooling circuit. 75 KLD of fresh water used for cooling purposes. Effluent treatment plant has already been installed for treatment of waste water generated from softening plant process. The waste water generated from domestic & cooling tower is being treated through Sewage Treatment and ETP plant and is being used for plantation within premises. There is total add 20 KLD water disposal in which 15 KLD from blow down/softening plant from cooling tower and 5 KLD from domestic effluent. Existing /proposed Solid and Hazardous Waste - 25T of slag is being used in filling of Low lying area and in road making. Used oil from DG (100 liter/annum) sets is used as lubricants in the industry. 1.03TPD dust from APCD is being store in the impervious tank and same is sent to TSDF. Sludge generated (7 kg/annum) from ETP is being stored in impervious pit & disposed off as per norms of state pollution control board. The total quantity of slag after expansion will be 82.5 TPD and will be used for filling of low lying area. We will install one new DG set under expansion and after expansion the quantity of hazards waste will be 150 Liters/annum. APCD dust after expansion will be 5 TPD and will be sent to TSDF. ETP Sludge after expansion will be (7+5) = 12kg/Annum EFFLUENT TREATMENT PROCESS This effluent treatment plant has specifically been designed for the purpose of treatment of waste water discharge from softener and cooling towers blow down. Before its disposal to bring the characteristics of the same up to acceptable norms and standards. Effluent passes through a bar screen & oil and grease trap before collection in an equalization 22

23 sump. Here effluent is mixed thoroughly with the help of an air blower for formation of a uniform stream. After this water is pumped to flash mixer through raw effluent lift pump where chemicals from dosing tanks dosed & mixed with effluent for ph correction. The dosing tanks are fitted with mixing arrangement. Flocculation then takes place at a flocculator cum reaction tank provided for this purpose. Then effluent fed to highly efficient tube settler by gravity, where suspended impurities is settled down and dumped to sludge drying beds. Further, a filtration unit has been included in the treatment process. The treated water from tube settler is stored in pre-filtration tank. Then water is fed to pressure sand filter through filtration pump. It is, basically, in the nature of polishing filter, and besides removing any traces of toxicity, colour and fine particles. Flue Gas Management: Fume Extraction System- Emissions from induction furnace solely depend on nature of the of the charge material. There are two major categories of emissions. The first category relates to the cleanliness of the charge, i.e. rust, dirt, paint, oil, foundry dust, all of which give rise to emissions of dust and fumes, namely organic and metallic. The second category is related to the chemical reactions at the high temperatures which give rise to the metallurgical fumes due to oxidation. Primary Fume Extraction System The furnace fumes will be captured by suction hood above the furnace. It will be used to capture the process fumes during charging and melting operations. The system is user friendly and effective for maximum capture of fumes. The proposed system will be able to capture fumes generated during the melting operations. The fumes collected through the fumes generated during the melting operations. The fumes collected through the hoods will first pass spark arrestor to ensure the sparks lose all their energy and are completely extinguished. It also removes coarse dust along with spark and all the collected dust is discharged through bottom rotary valve. The fumes after spark arrestor go to the fully automatic pulsejet bag filter for filtration of fumes. Bag filter will clean the gases by removing the dust content and clean gases are exhausted by I.D. fans to the chimney. The bag filters are 23

24 cleaned by air pulse jet system. The gaseous emissions will comprise of vapours/fumes, suspended particles, and some gases. The vapours are, primarily, of metals (iron) and metal oxides (in very low quantities). Dust and metal particles also contribute to the suspended particulates. Gaseous pollutants are, mainly, carbon di-oxide, carbon mono-oxide, and nitrogen oxides, though in very low amounts. The suspended particulate matter (SPM) concentration will be about mg/nm 3. Most of the particulates (about 75%) are expected to have size in the range of 1-5 microns. The emissions (after dilution) will have temperature of <100 C. As per the applicable statutory norms by SPCB, the SPM level in the gas emission, at discharge point, shall not exceed 50 mg/nm 3. Additionally, the stack height requirements for discharge of process emissions are also to be complied with. Technical specification of System For efficient operation of system described above, necessary instrumentation will be provided, with dilution damper and bag house cleaning system DESCRIPTION UNIT SPECIFICATIONS DESIGN DATA Application To clean the fume from Induction Furnace Gas volume Am 3 / h r 1,50,000 Gas inlet temperature C 300 C Type of cyclone Centrifuge Pressure drop at bag house mmwc < 5 0 DISCHARGE MECHANISM BELOW CYCLONE Equipment Rotary valve Type Drop through Construction CI/MS 24

25 Technical specifications - bag house DESCRIPTION UNIT SPECIFICATION DESIGN DATA Application To clean the fume from induction furnace Gas volume Am 3 / hr 1,50,000 approx. Inlet temperature C >100 Dust load g m / N m 3 <3 Dust particle content at outlet mg/nm3 < 50 Moisture % Nil Product Free flowing Bag filter type Temperature resistance fiber Number of bags Nos 540 Size of bag mm 160 X6000 No. of chambers Nos 3 BAG CLEANING MECHANISM Valve type Solenoid type Sequential timer Master controller Compressed Air Nm 3 /h r 4-6 Kg/cm2 (g) DISCHARGE MECHANISM Equipment Rotary Valve Type Drop Through Construction CI/MS Transfer system Rotary conveyor 25

26 Technical specifications - Centrifugal Fan DESCRIPTION UNIT SPECIFICATION DESIGN DATA Application Exhaust bag house Gas volume Am3/hr 1,50,000 Operating Temperature C C TECHNICAL DETAILS Type Centrifugal Duty Continuous Electric Motor (LT) kw/rpm 200 / 1000 Drive Arrangement Direct Coupled Technical specification of chimney: DESCRIPTION UNIT SPECIFICATION DESIGN DATA Bottom Dia m 2 Top Dia m 1 Height m 40 Material MS Approach By staircase with testing point platform 26

27 4.0 SITE ANALYSIS I. Connectivity: NH-12 Nabha - Amloh road is adjoining with project and NH-44 Delhi to Ludhiana is well connected with the project.(12km) Mandi Gobindgarh Railway Station (13 Km) The regional road network comprises of Sirhind-Ludhiana G.T. Road (NH-44) and forms the major spine. In fact the entire road network gravitates along this major spine. II. Land Form, Land use and Land ownership: Industrial Land is registered in name of project proponent. The land is already use for industrial purposes. III. Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of sanctuary, eco from the HFL industrial area, be given. It is situated in approved Industrial land for industrial purposes. There is no sanctuary, river present within 10 km radius of the project. IV. Existing Infrastructure: The infrastructure amenities available in the area denote the economic wellbeing of the region. The project area is connected with local road and NH-12 & NH-44. Educational facilities up to Senior School, College, Hospital & Banking facilities are available at Bhadson & Amloh is 6 km away from the project site. The existing building comprise of Induction Furnaces, rolling mill shed, Workshop shed & Competitive administrative block along with office quarters at the V. Soil classification: The texture of soil is sandy loam. VI. Social Infrastructure available. 27

28 Social infrastructure constitutes various facilities pertaining to education, health, recreational, cultural and other public amenities/ facilities available in urban areas at various levels whose availability and accessibility determines the quality of life of an urban centre. 28

29 5.0 DESCRIPTION OF THE ENVIRONMENT INTRODUCTION: The main objectives of describing the environment, which may be potentially affected, are (i) to assess present environmental quality and the environmental impacts and (ii) to identify environmentally significant factors that could preclude project development. This chapter contains information on existing environmental scenario for the following parameters. 1. Land Environment 2. Meteorology 3. Air Environment 4. Noise Environment 5. Water Environment 6. Soil Environment 7. Biological Environment 8. Socio-economic Environment ENVIRONMENTAL BASELINE DATA COLLECTION: Baseline data for the proposed plant will collected immediately after monsoon season. Primary data will be collected by monitoring & surveying of various environmental components/ parameters in the core zone during the study period, details of which are given in Table TABLE-5.1 PRIMARY DATA S. PARAMETERS DESCRIPTION NO. 1 Meteorology Meteorological parameters on hourly basis at project site. Parameters: Temperature, Relative humidity, Wind Speed & Wind Direction. 2 Air Ambient air quality monitoring (24 hourly), twice a 29

30 week. Parameters are PM10, PM2.5, SO2, NO2 & CO. No. of Locations: 8 locations in core and buffer zone. 3 Noise Noise level monitoring (Day & Night time), once in a season. No. of Locations: 8 locations in core and buffer zone. 4 Water Ground water sampling, once in a season. No. of Locations: 8 locations in core and buffer zone. Tested for physical and chemical parameters. 5 Soil Soil sampling, once in a season. No. of Locations: 6 locations in core and buffer zone. 6 Biological Factors Biodiversity survey, once in a season. Location: Core and buffer zone. 7 Socio-economic Environment Socio-economic survey, once in a season. Location: Core and buffer zone. 30

31 6.0 ENVIRONMENTAL IMPACT AND MANAGEMENT PLAN PARTICULARS Impact on Air Construction/ Operational Phase Air Quality Management: Emissions Management DETAILS Air emissions both gaseous and fugitive from proposed plant will be on account of process emissions from stacks of existing Induction furnace & proposed Furnace as well as DG. Sets. The mitigation measure adopted as under: The main raw material and product will be brought in and dispatched by road through covered enclosures. All the vehicle owners will have valid PUC Certificate All vehicles are loaded up-to prescribed limit during transportation. Dust suppression on haul roads will be done at regular intervals. Latest technology pollution control equipments like Multicyclone/bag filter is/will be provided. A stack of 40mt height equipped with Bag filter is/will installed with the Induction furnace to control the particulate and gaseous emissions due to combustion of fuel. All the roads are asphalted to control the fugitive dust emissions Proper servicing & maintenance of vehicles is/will be carried out. Green Belt around the periphery and within premises is/will be provided. 31

32 Monitoring Management Impact on water Construction/ Operational phase Water Management Ambient air quality and stack emission will be regularly monitored to ensure that ambient air quality standards and suggested limits on stack emission loads would be met honestly at all the time. Water requirement of the plant will be meeting from existing tube well. Roof top rain water will be recharged to compensate ground water. Impact on Noise Construction/ Operational Phase Fresh water requirement of the project will be met by existing tube well. Domestic waste water generated from the plant is/will be treated in Sewage treatment Plant and treated water is/will be used in green belt development. The cooling water will be re-circulated and cooling blow down will be dispose off through Effluent Treatment Plant. Effluent Treatment Plant is already installed for treatment of trade effluent generated from cleaning process. The expected noise levels of some of the proposed equipment like Pumps (82-95 db (A), Induction furnace ( db (A), DG sets ( db (A). The above noise levels worked out are without mitigation measures. With the mitigation measures the noise levels will be further restricted within very short distance from the source point. The operators/personnel working near the noise sources in the Plant will be provided with earmuffs and earplugs Green belt will be developed around the plant premises which 32

33 Noise Management will act as noise abatement measures. There will be no danger of noise pollution from plant. The green belt (plantation of dense trees across the boundary) helps in reducing noise levels in steel plant as a result of attenuation of noise generated due to plant operations and transportation. Earmuffs will be used while running the equipments of the plant. D.G sets will be provided with acoustic to control the noise level within the prescribed limit. A high standard of maintenance will be practiced for plant machinery and equipments, which helps to avert potential noise problems. Personal Protective Equipment like earplugs and earmuffs will be provided to the workers exposed to high noise level. Regular monitoring of noise level will be carried out. Solid Waste Management Management APCD dust is being sent to TSDF. and slag from process is/will send to low lying area for final disposal. Green belt Management Management Green belt development in and around the plant site helps to attenuate the pollution level. Out of the total plant area approx. 25% land is already developed as green belt and it will be maintained in future also. Green belt has been developed as per Central Pollution 33

34 Control Board (CPCB) guidelines. Native species have been planted in consultation with the local DFO. 34

35 7.0 PROPOSED INFRASTRUCTURE I. Industrial Area (Processing Area):- The site already having administrative and site control office with latest equipment like computers, walkie-talkie & computerized weighbridge, printers, fax, Xerox machine, etc. Sufficient power load exists to meet the current requirement. Water for construction and domestic purpose as well industrial purposes will be drawn from bore-well. II. Residential Area (Non Processing Area):- Labour hut / rest room, toilet, drinking water facility is already provided. III. Green Belt. The main objective of the green belt is to provide a barrier between the plant and surroundings areas. Green belt will be developed according to CPCB guidelines as shown in Fig IV. Social Infrastructure. There is sufficient number of educational facilities but health facilities are not up to the mark. The sports and recreational facilities are also not adequate as there is no national or state level sports complex; however an indoor / outdoor stadium of lower hierarchy is available within the town. One cinema and two clubs also exist in town. V. Connectivity (Traffic and Rail/Metro/Water ways etc) The regional road network comprises of Sirhind-Ludhiana G.T. Road (NH-44) and forms the major spine. In fact the entire road network gravitates along this major spine. 35

36 FIGURE-6.1 Layout showing Green Belt Area 36

37 SITE PHOTOGRAPHS SHOWING GREEN BELT Left Side of Project Site Right Side of Project Site 37

38 Back Side of Project Site Administration Block of Project Site 38

39 Boundary of Project Site 39

40 8.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN:- R & R Plan is not applicable, as it is an expansion of existing plant. 9.0 PROJECT SCHEDULE & COST ESTIMATES:- I. Likely date of start of construction and likely date of completion (Time schedule for the project to be given):- Within one year after receipt of NOC & Environmental Clearance II. Estimated project cost along with analysis in terms of economic viability of the project:- Total proposed project cost is estimated to be around Rs Crs III. Cost toward Environment Protection: - Rs lacs 40

41 10.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) I. Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. Financial Benefits: Benefits and advantages of expansion of existing plant: a) It will full fill the Demand Supply Gap. b) It is help in increment of Life style of Local People By providing Jobs. Social Benefits: Greater employment for local populations Environmental benefits: a) Low emission of air pollutant (proper APCD will be installed). b) It is a Brown field project. c) Proposed project is based on ZERO discharge. 41

42 11.0 MONITORING SCHEDULE FOR ENVIRONMENTAL Sr. Particulars No. 1 Water Quality Water quality in the area Frequency of Monitoring Once in a month 2 Air quality a Stack monitoring Once in a month b Ambient air Twice a quality week c Fugitive Once in a emissions month 3. Metallurgical data Metallurgical Daily data to be monitored at the plant 4 Noise level monitoring Ambient Noise Twice in a level year Duration Sampling of Composite sampling 24 hourly Parameters required to be monitor As per IS SPM, SO2 and NOx 24 hours RPM SPM SO2, NOx continuously and CO 8 hourly SPM Continuous monitoring Continuous for 24 hours, with one-hour interval Temperature Relative humidity Rainfall, wind direction and wind speed 42

43 12.0 CSR ACTIVITIES Proposed expansion will result in growth of the surrounding areas by increased direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure. Special emphasis on Financial and Social benefits will be given to the local people including tribal population, if any, in the area. Development of social amenities will be in the form of medical facilities, education to underprivileged and creation of self help groups. Company has planted over fruiting trees in surrounding villages, have around 6000 trees in our plant, trained over 8000 women in various skills and trained over 1500 youths in soft skills. In next two years, company plans to spend more than 1.25 Crores on our CSR Activities and plan to plant over Fruiting Trees, Laxmi Taru (Medical Plant) Trees and Train over Women and 2000 Youth in various Skills. The company will also propose to take up more activity on account of social corporate activity after expansion. These activities are as under: 43

44 S.No Activity Head 1 Skill developme nts Activity Sub- Head Vocational skills CSR ACTIVITIES Activities details Opening of various vocational skills like sewing centres for women, promoting short vocational skills development programs like electricians, ETT, solar etc for rural youth Soft skills Organising Various Programs for Rural Youth to Development Soft Skills like Confidence, Commitment, Communication Skills, Personality Developments Etc No of Pax Spendin g No of Pax Spendin g No of Pax Spending No of Pax Spendin g Educational developme nts Basic educations Providing Infrastructure in Govt Schools like Furniture, Mats, Electricals, Painting, Building Repairs & Scholarships to

45 Value based education Needy Students & Teachers for Sports and Music Etc. Organising Various Programs in Govt Schools & Villages to Provide Value Based Eductaion to become Useful Citizens for Soceity Hygiene & health and environmen tal awareness developme nts Hygiene health & Organising Awarness Camps of Swach Bharat, Cleaning Drives, Nukad Plays, Medical Camps, Blood/Organ Donation Camps, Yoga Camps, Health is Wealth Camps Etc Environment Tree Plantations, Water Conservation Programs, Chemical Free Farming, Importance of Fruiting Trees, Village Pond Cleaning Drives,

46 Solid Waste Mangement Programs Etc. 4 Administrative expenses on CSR activities Total No adverse effect on environment is envisaged as proper mitigation measures will be taken up for the same. 46

47 CSR ACTIVITIES BY M/s MADHAV ALLOYS 47