1 Craig E. Marlow Offering you the finest environmental contracting services, products & remedial technologies available 8248 Hidden Forest Drive, Holland, Ohio Office: Cell: Website: cesremediation.com

2 isoc TECHNOLOGY PERFORMANCE DATA In-Situ Subsurface Oxygen Curtain

3 isoc Installations Over 1 sites in United States Petroleum Hydrocarbons. Chlorinated Solvents. Perchlorate. Vinyl Chloride.

4 Gas infusion isoc Technology Microporous Hollow Fibre A patented method to: Effect rapid, no bubble gas transfer (infusion). Create DO concentrations of hundreds of PPM. isoc Allow long term retention of extremely high DO levels. Virtually eliminate DO losses to atmosphere. ALinear Valves Achieve gas transfer efficiencies 1X better than best conventional methods. Allow specifically designed mass transfer devices

5 isoc Dissolved Gas Concentrations in a Water Column Gas Type Water Column Depth (ft) Oxygen Methane Propane Hydrogen Ethane

6 Original isoc System Control & Installation Simple isoc system installation: Connect gas supply to isoc system panel. Connect isoc to system panel. Turn on gas. Adjust & set gas flow. Lower isoc into well. Adjust & set gas flow. isoc System - Triple Control Panel with 3 isoc s Monitor DO levels

7 Micro-sizing the isoc Control Panel

8 isoc Construction and Now Flood Resistant Constructed of high quality SS316 stainless steel, 1.62" (41 mm) in diameter and 12.65" (321 mm) long. Polyurethane tubing connects to.17" (4 mm) ID barb fitting. The pressure & flow control unit and the drain plug are made from nylon. A lifting ring for connecting a suspension line for insertion in 2" (5 mm) or larger monitoring wells.

9 Complete isoc System (demo kit) Two Stage Low Flow Regulator set at 5psi Distribution Header set for 1 isoc Oxygen Supply 1cf Usage Per Day Polyurethane Tubing Reusable Filter w. quick disconnect Nitrogen Bubble Release Every 1-7 Seconds Down Well Flood Resistant isoc Unit in 2 Well

10 Complete isoc System Video

11 isoc Month After Installation

12 isoc Well Schematic

13 isoc Well Box Installation Photos Utilizing (2) 8c.f. O2 cylinders, with pigtail to achieve one quarters (3 months) worth of oxygen supply.

14 isoc Installation Photos isoc Installation Photos MGP Site

15 isoc Installation Photos isoc Shed Type of Installation Photos Utilizing hard pipe type of pigtail to run (4) isocs

16 Super Market (isoc Injection Wells)

17 Ground Vault & Injection Wells: Public High School

18 Operation and Maintenance (O & M) No moving parts and no electricity. Check the DO levels & bubble rate (if possible) in the injection well. Gas cylinders last days: (At 1 atm uses about 1 cu ft of O 2 /per day). Labor time to switch tanks(15-3 minutes). Use Snoop to test for leaks (3-6 fittings). Check Ground vaults; Cages; Sheds; Cabinets. Check filter periodically.

19 Should flooding of the isoc occur, due to interrupted O 2 flow, remove plug with ¼ allen wrench and drain.

20 General idea of typical Oxygen Consumption Each isoc uses approximately 15cc per minute*: - 15 cc/min per isoc unit x 144min/day = 21,6 cc/day. - 1cubic foot of oxygen = 28, cc. - 1-iSOC will use.77 to 1 cubic feet of oxygen per day. General examples of cylinder usage*: - 4 cubic foot cylinder (7 x 18 inches) will last approximately 4-5 days/per isoc per atm. - 8 cubic foot cylinder (7 x 32 inches) will last approximately 8-1 days/per isoc per atm cubic foot cylinder (9 x 51 inches) will last approximately days/per isoc per atm. * Oxygen usage is very site specific and can be calculated better using the excel form.

21 Oxygen Consumption Chart isoc (APPROXIMATE) Oxygen Cylinder Life (Oxygen Flow) (courtesy of Jim Begley) Q1 = Indicated Flow (cc/min) X= Depth H 2 O to Unit (ft) Y= No isoc Units Input your data here: Cylinder Size (std cu ft) Cylinder Design Press Actual Fill Pressure Your Water Pressure (psig) 9 Total Pressure (atm) 1.6 Corrected Cylinder Contents (cu ft) 63.5 Oxygen Oxygen Cylinder Volume (ft 3 ) (pounds) Cylinder Life for 1 isoc at 1atm (Days) Actual Cylinder Life for Y isocs at X ft Below Water Table (Days) Dissolved Oxygen (ppm) 65 Pounds of xygen Delivered/year 37.3 Equivalent Flow (standard CCs per min) 18.9 Equivalent Flow (standard Cu.Ft per day) 1.

22 Piggy Backing Oxygen Source Systems Hard Pipe Piggy Back Pigtail Piggy Back

23 Teton National Park-O2 Piggy Back System

24 Radius of Influence Sandy Type Conditions 1-12 Radius of influence Molecular diffusion is the dominant force Clay Type Conditions GW Dominant Force

25 A Closer Look at Radius of Influence Utilizing isoc Technology Contaminant: BTEX Site conditions: Silty Sand down to a depth of about 6.5 with Clay below. H2O starts at approximately (5) isoc s installed: Feb. 1 th, 24 Developed patented gas infusion technology. Object of isoc s: Create an oxygen curtain to contain and accelerate biodegradation at the leading edge of the contamination plume. Conditions observed: o DO levels o Microbe Count

26 DO Levels in the Injection Wells MW Date 5 9 IW-1 IW-2 IW-3 IW-4 IW-5 DO mg/l Microbe Count CFU/ml 12/18/ /25/24 > /25/24 > /26/24 > /25/ /21/ /18/ /25/24 > /25/24 > /26/24 > /25/ /21/ /18/ /25/24 > /25/24 > /26/24 > /25/ /21/ /18/ , 2/25/24 > /25/24 > /26/24 > /25/ /21/ /18/ /25/24 > /25/24 > /26/24 > /25/ /21/

27 Radius of Influence in old SVE Wells MW Date DO mg/l Microbe Count CFU/ml 5 9 SVE-1 SVE-2 SVE-4 SVE-8 SVE-9 12/4/3.1 14,7 2/25/4.7 16, 3/25/4.1 9,8 4/26/ , 5/25/ ,4 6/21/ /4/ ,5 2/25/ , 3/25/4.1 64,9 4/26/ ,3 5/25/ ,3 6/21/ /4/ /25/ /25/ , 4/26/ ,6 5/25/ , 6/21/ /4/3.7 79, 2/25/ /25/ ,6 4/26/ ,9 5/25/4.1 93,6 6/21/ /4/3.36 2/25/4.7 2,25 3/4-6/4

28 Radius of Influence in Monitoring Wells 5 9 MW MW-14 MW-15 MW-21 MW-22 Date DO mg/l Microbe Count CFU/ml 12/4/ ,8 2/25/ , 3/25/ , 4/26/ , 5/25/4.5 12, 6/21/ /4/ ,9 2/25/ /25/4.7 61,6 4/26/ ,9 5/25/ , 6/21/ /4/23.2 9,65 2/25/ ,1 3/25/ ,2 4/26/ ,5 5/25/ ,6 6/21/ /3-2/4 Not Sampled 3/25/ , 4/26/ /25/ , 6/21/

29 Radius of Influence 3 Month % of Increase in Microbe Count 621% 2,13% 18% 125k m count 431% 5 46% 9 22% 63%

30 isoc Remediation Strategies Create O 2 curtain at leading edge of plume to stop off site migration. Plume treatment barriers (fences). Target Hot Spots. Polish off low level contaminates. Multiple O 2 curtains to treat the source area and stop off site migration.

31 Project Study: PEC/Speedway SuperAmerica, Peoria, Illinois

32 Project Study: PEC/Speedway SuperAmerica, Peoria, Illinois Release below dispensers (contamination, in red, has not been removed) Immediate concern, off site MW-8 (prop. line shown in purple) Clean up standards.25 PPM Soil conditions clay All analytical is for Benzene PPM 1/11/ - NA 7/26/ /1/ /8/ /17/ MW-8 Approximate Scale in Feet 1/11/ /26/ /1/ /8/ /17/ MW-4 MW-5 1/11/ - NA 7/26/ /1/ /8/ /17/ MW-7 1/11/ - NA 7/26/ /1/ /8/ /17/ IW-2

33 Project Study: PEC/Speedway SuperAmerica, Peoria, Illinois Release below dispensers (contamination, in red, has not been removed) Immediate concern, off site MW-8 (prop. line shown in purple) Clean up standards.25 PPM Soil conditions clay All analytical is for Benzene PPM MW-4 MW-8 IW-1 (2) isoc s installed 12/3 (IW-1&2) in approximately 13 column of H2O MW-5 MW-7 IW-2 DO levels consistently 4+ PPM.

34 Project Study: PEC/Speedway SuperAmerica, Peoria, Illinois Release below dispensers (contamination, in red, has not been removed) Clean up standards.25 PPM Soil conditions clay All analytical is for Benzene PPM 1/11/ - NA 7/26/ /1/ /8/ /17/ /3 isoc install 2/16/ /13/ /21/4 -.6 Approximate Scale in Feet MW-8 1/11/ /26/ /1/ /8/ /17/ IW-1 MW-5 1/11/ - NA 7/26/ /1/ /8/ /17/ /3 isoc install 2/16/ /13/ /21/ MW-4 12/3 isoc install 2/16/ /13/ /21/ MW-7 1/11/ - NA 7/26/ /1/ /8/ /17/ % 12/3 isoc install 2/16/ /13/ /21/ IW-2

35 Project Study: PEC/Speedway SuperAmerica, Peoria, Illinois 1-YEAR UPDATE (1/1/5) Source contamination removed Nov. 4 Clean up standards.25 PPM All analytical is for Benzene PPM isoc 1 year actual operating expense $365. 7/17/ /3 isoc install 11/4 source rem. 12/29/ % Reduction MW-8 Approximate Scale in Feet 7/17/ /3 isoc install 11/4 source rem. 12/29/ % Reduction MW-4 IW-1 MW-5 MW-7 7/17/ /17/ /3 isoc install 12/3 isoc install 11/4 source rem. 11/4 source rem. 12/29/ /29/ % Reduction 6% Reduction IW-2

36 MGP SITE Enhanced Bioremediation Pilot Using Oxygen Diffusion Contactors Former Manufactured Gas Plant Dave Work, PE Christie Battenhouse, PG The RETEC Group, Inc.

37 Lithology

38 Pilot Test Layout Pilot Cell

39 Pilot Layout Treatment Shed Piezometers O2 Enhancement Well Monitoring Well MW-11 GW Flow Direction Limit of ISS

40 Pilot Layout

41 Concentration (ug/l) Dissolved Oxygen (mg/l) Pilot Cell Results Enhanced Bioremediation Pilot Test Results, MW-11 Area Former Manufactured Gas Plant Site 4, 3.5 3,5 3 3, 2.5 2,5 2 Dissolved Oxygen 2, Benzene 1.5 Naphthalene 1,5 1, 1 5 9/9/23 12/16/23 3/4/24 6/1/24 7/14/24 ^ isoc installed 8/11/24 9/8/24 1/1/24 Date 11/11/24 12/15/24 1/13/25 ^ Levels are at nondetect 2/16/25 3/14/25 5/24/25.5 ISOC OFFLINE FOR 2 DAYS

42 O&M Long term O&M is favorable versus ORC and air sparging Total 6-month pilot costs: Capital: $7,5, Analysis and Reporting:$7, Total oxygen costs for the 6-month pilot were $72 ($36 of which was in tank rental) Conclusions Diffusion contactors has been successful in stimulating enhanced bioremediation to control contamination levels in GW. One of the first MGP site in the nation to use diffusion O2 contactors. Combination of low O&M cost and effectiveness provides many benefits over other forms of O2 delivery.

43 PA. Bedrock Site GROUWATER REMEDIATION OF A HIGHLY CONTAMINATED SOURCE AREA UTILIZING isoc TECHNOLOGY A PA BEDROCK SITE By: J. Morrow D. Side

44 PA. Bedrock Site Conditions Site Conditions and Characteristics Groundwater flow, north w/components west and south Hydraulic conductivity - highly variable: Source area, low Downgradient off-site area, high Initially high quantities of LNPL cleaned up with oil/water separator and vacuum

45 PA. Bedrock Site Timeline Remediation Timeline Late 98 Install pump/treat remediation w/bioreactor Early 2 Installed second bioreactor October 2 Installed pilot oxygen infusion system in source area using three isocs in existing monitoring wells October 3 Installed a full scale oxygen infusion, six additional isocs in six new infusion wells

46 BTEX Maps During O2 Infusion Phase August 22 BTEX Maps O2 Infusion Phase WSW-B MW-1 MW-14 5 MW-12 2, ppb MW-8 MW MW-7 MW MW WSW-A MW WSW-C MW-11 1, ppb August 23 9 months, 3 isocs MW-2 MW MW-6 MW January 25 5, ppb WSW-B MW-1 MW-12 August 22 MW-14 Baseline Zero isocs WSW-B 25 months, 3 isocs + 19 months, 6 isocs MW-14 MW-1 MW MW-8 MW-8

47 MW-3 MW-9 WSW-C 241 WSW-A MW MW-1 MW August 23 9 months, 3 isocs MW-5 BTEX Maps During O2 Infusion Phase August 23 MW-1 WSW-B MW-12 MW-14 WSW-B January 25 months, 19 months, 2, ppb MW-8 MW-8 MW MW IW-6 IW-5 MW-7 42 IW MW-3 IW-3 83 IW-2 MW-2 44 MW-1 IW MW MW WSW-A 633 MW WSW-C 4.4 MW-11 IW-6 IW-5 MW-7 IW MW-3 IW-3 IW-2 MW-2 8 MW-1 IW MW MW WSW-A , ppb MW-5 MW-5 5, ppb 1 August 23 9 months, 3 isocs

48 MW-6 MW-3 MW MW MW WSW-A 649 WSW-C 1, ppb MW-5 BTEX Maps During O2 Infusion January Phase 25 January 25 January 25 5, ppb MW-1 MW-14 MW-12 WSW-B MW-1 MW-14 MW-12 2, ppb MW-4 MW MW WSW-C 4.4 MW-11 IW-6 IW-5 MW-7 IW MW-3 IW-3 IW-2 MW-2 8 MW-1 IW MW MW WSW-A MW-13 WSW-C MW-11 1, ppb MW-5 5, ppb January months, 3 isocs + 19 months, 6 isocs

49 MTBE Maps During O2 Infusion Phase August 22 MTBE Maps O2 Infusion Phase WSW-B MW-1 NA MW-14 3, MW-12 12, ppb MW-8 MW ,5 8, ppb MW-7 August 23 9 months, 3 isocs WSW-B MW-6 4 MW-3 14,3 MW-2 3,77 MW-1 1,3 MW MW-14 MW-1 8 6,29 FORMER KIOSK MW-9 17,1 WSW-A 8,292 FORMER PUMP ISLAS FORMER DIESEL DISPENSER FORMER DIESEL UST MW-13 6,57 MW-12 August 22 WSW-C 1.38 WSW-B MW-11 January months, 3 isocs + 19 months, 6 isocs MW-14 MW , ppb MW-12 MW-8 MW IW-6 IW-5 MW IW MW-3 MW-9 IW WSW-A IW-2 MW MW WSW-C Baseline, zero isocs 18.5 MW-11 MW-3 IW MW IW-2 MW-2 MW IW-6 IW-5 MW-7 IW MW WSW-A MW WSW-C MW-11

50 6,57 MW-3 MW-9 WSW-C 14,3 17, WSW-A MW-2 8,292 MTBE Maps During O2 Infusion Phase August 23 3,77 MW-1 1,3 MW-6 August 23 9 months, 3 isocs WSW-B 4 MW MW MW-14 MW-1 8 MW-8 12,5 MW-7 6,29 FORMER KIOSK FORMER PUMP ISLAS FORMER DIESEL DISPENSER MW-12 FORMER DIESEL UST MW-13 WSW-B 12, ppb Baseline Zero isocs MW-11 January months, 3 isocs + 19 months, 6 isocs MW- MW MW-8 MW IW-6 IW-5 MW IW MW-3 MW-9 IW WSW-A IW-2 MW MW-1 IW MW MW WSW-C 18.5 MW-11 MW-8 MW , ppb 89.6 IW-6 IW-5 MW-7 IW MW-3 MW-9 IW WSW-A IW-2 2, ppb MW MW-1 IW MW MW WSW-C MW-5 19 MW-5 5 August 23 9 months, 3 isocs

51 MW MW-8 12,5 MW-7 Baseline Zero isocs 12, ppb 6,29 MW-13 MW-11 6,57 8, ppb MW-3 MW-9 WSW-C 14,3 17, WSW-A MW-2 8,292 MTBE Maps 3,77 MW-1 During O2 Infusion Phase January 25 1,3 MW-6 FORMER DIESEL DISPENSER FORMER FORMER DIESEL UST KIOSK 4 2, ppb s MW MW-1 8 MW-14 FORMER PUMP ISLAS MW-12 WSW-B January months, 3 isocs + 19 months, 6 isocs MW-14 MW MW-12 12, ppb MW-8 MW A MW WSW-C 18.5 MW IW-6 IW-5 MW-7 IW MW-3 IW IW-2 MW MW-1 IW MW MW WSW-A MW WSW-C MW-11 8, ppb 2, ppb MW-5 5 January months, 3 isocs + 19 months, 6 isocs

52 PA. Bedrock Site Conclusions Conclusions Oxygen infusion has proven effective: In groundwater remediation of high level source area contamination Recalcitrant areas when pump and treat was ineffective due to selective areas of the site where low porosity conditions exist and, Biobarrier applications to manage plume migration toward sensitive receptors and, migration to on-site sensitive receptors from off-site contaminant sources

53 isoc Advantages Plug & Play technology. Has no moving parts. Will infuse any gas into a liquid. Supersaturates GW w/high DO. Powered by compressed gas. DO stimulates micro-organisms 24/7. Works in 2 well or larger. Installation is extremely simple. Easily moved to new injection wells. Very low annual O&M cost.

54 isoc Pricing Each isoc unit with the flow control contained within is: $425. plus shipping. The tubing manifold is included, which allows you to run 1-8 isoc s off one regulator. Items Supplied with isoc System: 1. isoc unit. 2. isoc flow-control valve (spare). 3. Distribution header complete with regulator connector, bleed valve and isoc valve connections. 4. Snoop Leak Detection Liquid filters (1 spare). 6. Six black hose clamps used at filter and isoc barb connections (3 spare). 7. Nylon collar with stainless steel hose clamp used at distribution header barb connection. 8. isoc tool for use when opening drain plug.

55 Accessory Pricing Oxygen Regulator: You will need a two-stage low flow oxygen regulator that reads from 2-1 PSI. The two-stage low flow regulator is needed to maintain constant pressure flow. Retail prices range from $2.-$3.. There are numerous web site listings or consult your industrial gas supply company. Polyurethane Tubing: You will need (.25 OD x 17 ID OR 6mm OD x 4mm ID) clear polyurethane tubing to connect the oxygen regulator (and oxygen cylinder) to the isoc unit. This material sells for about $.32/per foot and is readily available at major hardware stores. (Note: use Teflon tubing when infusing other gases). Oxygen Cylinder: For each installation, you will need one or more oxygen cylinders depending on setup design. Industrial gas supply companies rent the cylinders in varying sizes from $7.-$1. per month. Storage for the Oxygen Cylinder & Control Panel: Depending on your site conditions, you may want to place the oxygen cylinder and control panel inside a secure building or shed. Other options include ground vaults or manholes. (isoc has no moving parts and does not require electricity).

56 isoc Summary isoc is Versatile. Treat Source, Polish or stop off-site migration. Infuse any gas into a liquid. Site compatibility: Aerobic; Anaerobic; Cometabolic. isoc is Portable. No moving parts. No electricity. Easy to move to other injection wells. isoc is Affordable. Low annual O&M. Will last for several years and multiple sites. isoc is Effective. Delivers high DO 24/7. Oxygen transfer efficiency nearly 1%. isoc is User Friendly. Simple design, installation and operation. System failures almost non-existent. Maximum flexibility to remediate trouble spots.

57 isoc Website: Case Studies. Chlorinated Bio-Remediation. Petroleum Bio-Remediation. Installation Manuals. Operation & Maintenance. Remedial Action Plans And more.

58 Craig E. Marlow Offering you the finest environmental contracting services, products & remedial technologies available 8248 Hidden Forest Drive, Holland, Ohio Office: Cell: Website: cesremediation.com