1 (I) Basic Information FORM-1 Item Details 1 Name of the Project Residential Project under SRA Scheme 2 S. in the Schedule 8 (a) 3 Proposed capacity/area /length/tonnage to Description Area of be handled/command area/lease area/ Building number of wells to be drilled (Sq.mt.) 1 Area of Plot Total FSI n FSI Area Total Built Up Area New/Expansion/Modernization Expansion Project 5 Existing Capacity/Area etc. Nil 6 Category of Project i.e. A or B B 7 Does it attract the general condition? If, Please specify 8 Does it attract the specific condition? If yes, Please specify 9 Location Plot/Survey/Hissa Plot Bearing CTS 635, 637(pt) Village Nahur (W), Mumbai. Village Nahur Tehsil Kurla District Mumbai State 10 Nearest railway station/airport along with distance in kms. Maharashtra Nahur Railway Station ( m) 11 Nearest Town, City, District Headquarters along with distance in kms. Mumbai 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body Municipal Corporation of Greater Mumbai. (complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/s. Om Builders and Developers 14 Registered Address 102, Guru Ganesh C.H.S, Near C.D. Deshmukh Garden, Mulund (E), Mumbai Address for correspondence: As above Name Milind Yadav Designation(Owner/Partner/CEO) Address As above Pin Code milindayadav@gmail.com 1

2 Telephone Fax 16 Details of Alternative Sites examined, If t Applicable any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects ne 18 Whether separate application of t Applicable interlinked project has been submitted? 19 If yes, date of submission t Applicable 20 If no, reason t Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? The C.R.Z. tification, 1991? 22 Whether there is any Government t Applicable Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) ne 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Name of the Court Case Orders/directions of the Court, if any and its Relevance with the proposed project. t Applicable * Capacity corresponding to sartorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data It is a Residential commercial Project under SRA Scheme. After completion of the project the land would be used for Residential/commercial purpose. There shall be green area development plan to provide natural environment to the site. 2

3 Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 1.2 Clearance of existing It is SRA project. So present slums units are demolished. Also land, vegetation and project includes tree cutting for which PP applied for Tree NOC. building? 1.3 Creation of new land The land use is proposed for Residential purpose. uses: 1.4 Pre-construction investigations e.g. bore Pre Feasibility studies, Geo-Technical investigations will be carried out. houses, soil testing? 1.5 Construction Works? The project involves construction of a Residential & commercial complex, which proposed a maximum height of m thus having a visual impact on the physical environment. The total built up area will be m 2. Building Details: There are total 2 nos. of buildings. Configuration of Buildings: Description Composite Sale Total 1 Of Building of Wings in each building 3 Building Configuration Wing A = Gr.+ 20 & 21 (pt) Wing B & C = Gr.+7 Stilt + 23 floors ---- It is a Residential project. The construction activities will be confined within the project site; there will be no physical changes due to project development activities outside the project boundary. 1.6 Démolition Works? Demolition of 168slum units. The demolition management plan is as below: Material 168 Slums 1 Debris 6720 Tonnes Management / Disposal Debris to be disposed at authorised dumping sites as per Municipal construction & demolition & desilting waste (Management & 3

4 Details thereof (with approximate quantities/ rates, wherever possible) with source of information data disposal) Rules, Steel 39 Tonnes Sold by slum Dwellers. 3 Wood 10 Tonnes Sold by slum Dwellers. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? Dredging? Offshore structures? Production and - manufacturing Process? 4 Asbestos Sheets 3528s. To be handled as Hazardous material (Management,Handling and transboundry Movement rules 2007) 6 Plastic 840 Kg Will be sent for recycling During the construction phase about Laborers will be provided with housing facilities which will be purely on temporary basis. The site will have temporary store rooms and site office during construction phase, which will be demolished. The demolition waste will be used within the site to the best possible extent. The above ground structures will comprise of 2 Buildings. The maximum height of the proposed project will be m. Thus, there will be a visual impact on the surroundings. This will add to the change in the localized physical environment. In the post construction phase, tree plantation and landscaped area= sq.m. (19 %) will be provided which will enhance the aesthetic beauty of the area. The total quantity of the excavated soil will be used for land filling, and surplus will be sent to authorize dumping sites. underground works including mining / Tunneling is required except excavation of earth only for foundation, lay down of pipes, underground storage tank, electric cables, soak pits, septic tanks etc. 4

5 1.14 Facilities for storage of goods or materials? Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Separate raw material storage yard will be made, which will be temporary. Construction Phase: Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. Storage area for Manure and Sludge will be provided. Construction Phase : During the construction phase soak pits and septic tanks will be provided for disposal of waste water. Temporary sanitary toilets will be provided. Operation Phase: Particulars Sale Composite Total Kg/Day Total solid wastes Biodegradable waste (Waste) n- Biodegradable waste.(dry) Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? Treatment & Disposal : Dry waste: Will be managed through recyclers. Wet waste: Biodegradable waste will be processed in OWC and manure so obtained will be used for landscaping and replacement for dry manure in OWC. STP Sludge (Dry sludge): Will be used as manure in landscaping. 299 KLD wastewater will be treated in STP having capacity of 330 KLD.Treated water will be combined and utilized for greenbelt development and flushing. Quantity Flushing 107 KLD Landscaping 5 KLD Total 112 KLD Apart from residents, there will be maintenance team along with security. The impact due to this will be negligible. 5

6 1.17 New road, rail or sea traffic during construction of operation? Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The project site is having Nearest 9 m wide access road which is connected to m wide DP Road. During construction phase, traffic will increase due to inward movement of raw materials. In the post construction phase, there will be increase in the traffic levels due to proposed project. The increased traffic load due to the proposed project will be vehicles including the traffic load contributed by visitors parking. The parking of 4 wheelers details are as under: Parking Provided: 139 nos New road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? new Rail/road is required. The entire essential infrastructure is already available. There will be no diversion or closure of the existing transport routes and infrastructure. This is applicable for large projects only. There will be no shifting of electrical transmission line. But the project involves construction of new internal pipelines for fresh water, recycled water, rain water harvesting, internal power distribution lines. Detailed studies to be carried out if proposed Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? There is no stream passing through the site Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off Transport of personnel or materials for construction, operation or decommissioning? Water requirement in the construction phase will be supplied depending upon construction activity through tanker (20 KLD) Total water requirement of 320 KLD will be met from MCGM and recycled water. There will be no change in the drainage pattern. The project will not materially affect the drainage or run-off in the area which will be improved by well planned development. Construction: There will be movement of personnel s, materials and machineries during the construction phase. The impact due to the same will be negligible as local people will be deployed and the construction material and machinery required will be mobilized 6

7 Details thereof (with approximate quantities/ rates, wherever possible) with source of information data from the local area. Thus there will be contribution of marginal noise & vehicular emissions. The access to the plot is through 9 mtr wide access road which is connected to mtr wide DP road will be used for the transportation of material and personal Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Post Construction: During commissioning, there will be transportation of personnel s and materials in and out of the project regularly. There will be 139 s. of vehicles on road due to the project on completion of project with 100% occupancy. NA There is no decommissioning activity. Construction Phase: During the construction phase about Labors will be provided with housing facilities which will be purely in temporary basis and during peak hours remaining will be deployed from nearby places. Operation Phase: On completion of the project, there will be regular movement of residents, visitors, staff and related personals. Total population is expected to be 2370 s Introduction of alien Indigenous or Native species will be planted. species? 1.30 Loss of native species t applicable. or genetic diversity? 1.31 Any other actions? t applicable. 2. Use of Natural resources for construction or operation of project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply). Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 2.1 Land specially undeveloped or agricultural land (ha) The plot land is non-agricultural type. 7

8 2.2 Water (expected source & competing users) unit KLD Construction Phase: It is expected to house about labours at site. Operation Phase: The water requirement will be met by MCGM and Recycled water. Quantity KLD Total water 320 Requirement Domestic usage 213 Gardening 107 Flushing Minerals (MT) Construction material stone, aggregates, and/soil (expected source-mt) The construction materials, which will be used in the project site, will be procured from authorized local dealer. 2.5 Forests and timber (source- MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (KW) Certified wood to be used as mentioned below. Construction Phase: 100 KVA Source : MSEDCL Operation Phase : Source : MSEDCL Connected Load : 4276 KW Demand Load : 2706 KW DG Set: Number and capacity of the DG sets to be used: Sale : 300 KVA; Composite bldg : 250 KVA 2.7 Any other natural resources (use appropriate standard units) other natural resources will be used. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 8

9 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes other causes identified. Each DG set shall be provided with proper acoustic enclosure. Oil spillage from construction machinery & vehicles, discarded containers of paints solvents etc, tarpaulins, etc. Detailed Debris management plan and Standard Operating procedures shall be provided. Hazardous waste will be managed as per the rules. During the entire construction phase adequate precaution will be taken to avoid stagnation of water giving rise to mosquito breeding. Further, storm water network will be well designed to leave no stagnant water pockets, at any point of time. The storm water line will not cross wastewater line. Proper housekeeping practices will be adopted. Positive impact due to enhanced and hygienic living conditions. Aesthetic value of area will be improved. It will provide employment opportunities to the local people in terms of skilled and unskilled labour during construction and service personnel during operational phase. ise and vibrations from the construction activities will be mitigated by adopting suitable measures. 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes. 4.2 Municipal waste (domestic and commercial wastes) There is no activity which may generate spoil, overburden & mine waste. Operation Phase: There would be biodegradable and non biodegradable solid waste produced during the operational phase, which will be around 1186 Kg /day Bio degradable waste: 712 Kg/day n biodegradable waste: 474 Kg/day Sewage Sludge:16.0 Kg/day Treatment & Disposal : Dry waste: Will be managed through recyclers. Wet waste: Will be composted in organic waste converters. STP Sludge (Dry sludge): Will be used as manure in landscaping. 9

10 4.3 Hazardous wastes (as per hazardous waste management rules) 4.4 Other industrial process wastes. 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment plant. 4.7 Construction or demolition wastes Used oil from DG set will be stored carefully at separate location duly marked and will be sold to CPCB authorized recyclers. The mercury containing lamps will not be used in the post construction phase. However, the other hazardous waste such as waste tube lights, CFL s, batteries (inverters), will be generated and will be sold to the registered actual users. t Applicable Dewatered / dried sludge from STP will be used as manure for gardening/landscaping. The construction waste management is as below: Sr Particulars Quantity Management no 1 Steel 45 Tonnes 100 % will be sold for recycling 2 Cement 2274 Kg Cement waste will be used for bunding purpose, temporary plaster concrete works. 3 Sand 19 Cum Waste sand will be used for bedding for flooring purpose. It will also be used as filler material for toilets water proofing 4 Aggregates 1026 Cum It will be used as a layer for internal roads and building boundary wall. 5 Wood 96 Sqmt Will be sold for recycling 6 Tiles 2565 Sqmt Waste tiles will be used as china mosaic water proofing for terraces.. Also it will be used for skirting purpose. 7 Empty 799 s Will be sold for reuse Paint cans (20 lit per can) 4.8 Redundant machinery or All equipment s used for construction will be of standard equipment quality and maintained on regular basis. 4.9 Contaminated soils or other During painting, spillage of oil, diesel, leakage from STP. materials 4.10 Agricultural wastes Other solid wastes - 10

11 5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources. 5.2 Emission from production processes. 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment. 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Exhaust emission generated from Auto mobiles will be checked by proper PUC certificate. Emissions from DG set when it is operated in case of emergency. Emissions from Automated Construction Machinery and Heavy vehicles during Construction Phase. There is no production as the proposed project is Residential. Fugitive emissions will be generated, while handling and transportation of materials to site, this will be temporary in nature. The project may cause rise in dust levels during construction phase. Precautions will be taken to reduce dust generation during construction phase. RMC use will eliminate the handling of cement, sand and concrete thus dust emission will be minimized. RMC use will also reduce the trucks trips. Tarpaulins will be used to cover trucks carrying debris. Water sprinkling will be done at regular intervals to reduce control of dust generation. Construction Phase: Dust is likely to be generated during construction, this will be water sprinkled and Tarpaulin covers will be provided over stored raw material to reduce dust emission. Operation Phase: During Operation Phase, emissions will be generated from Operation of DG sets. Minimal emissions will be generated from movement of vehicles as dust, as the roads will be paved roads. Odour can be from STP. However, the STP will be working on appropriate technology, so as to minimize odour problems, and it will be strategically located so that no adverse impact is caused. t Applicable. such practices shall be entertained. t Applicable. 6. Generation of ise and vibration, and emissions of Light and heat Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 11

12 6.1 From operation of equipment e.g. engines, ventilation plant, crushers 6.2 From industrial or similar processes 6.3 From construction or demolition 6.4 From blasting or piling t Applicable. 6.5 From construction or operational traffic 6.6 From lighting or cooling systems. 6.7 From any other sources. t Applicable. ise generation from construction equipment s used for drilling, cutting operations. During Operation Phase, ise will be generated due to operation of DG sets. For control of noise following measures shall be adopted: Properly maintained equipment s with mufflers will be used. High noise generating construction activities would be carried out only during day time. Workers working near high noise construction machinery would be provided with ear muffs/ear plugs. t Applicable. The construction noise will be localized, intermittent in nature. The construction activities will include the following noise generating activities: 1. Excavation activities etc. 2. Concreting and mixing. 3. Heavy vehicle movement. 4. Operation of D.G. sets. Following precautions shall be taken to control noise pollution: -High noise generating construction activities would be carried out only during day time. -Installation, use and maintenance of mufflers on equipment. -Workers working near high noise construction machinery would be supplied with ear plugs. Construction phase : There will be transport of materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase : The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. Local native plants will be used in plantation which will help to reduce the impact of air and noise pollution. t Applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 12

13 7.1 From handling, storage, use or spillage of hazardous materials. 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Partially 7.4 From any other sources Is there a risk of long term - buildup of pollutants in the environment from these sources? Details thereof (with approximate quantities/ rates, wherever possible) with source of information data t Applicable. The total wastewater generated (299 KLD) from the buildings will be treated in STP (330 KLD) will be utilized for landscaping and flushing purpose. Excess treated water will be send to existing municipal drain. Dust will be generated during construction phase from earthworks and movement of vehicles. Appropriate dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG exhaust will be discharged at stipulated height by providing adequate stack height to the DG sets. 8. Risk of accidents during construction or operation of the project, which could affect human health or the environment. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 8.1 From explosions, spillages, Each DG set shall be provided with proper acoustic fires etc from storage, enclosure. Fire Fighting System will be provided. handling, use or production of hazardous substances. 8.2 From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, could burst etc)? The project falls under seismic zone-iii as per IS1893 (Part-1):2002. Hence, no risk due to natural hazards is envisaged. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Details there of (with approximate quantities/ rates, wherever possible) with source of information data Lead to development of supporting, utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g. Supporting and ancillary development will take place. -Supporting infrastructure (roads, power Internal Roads, Rainwater Harvesting, STP 13

14 Details there of (with approximate quantities/ rates, wherever possible) with source of information data. supply, waste or waste water treatment, etc) -Housing development etc. will be provided. The project provides a well designed residential housing area for the occupants. -Extractive industries -Supply industries -Other 9.2 Lead to after use of the site, which could have an impact on the environment significant impact envisaged. The vehicular traffic is likely to increase. 9.3 Set a precedent for later developments. This project will be establishing state of art system leading to set precedent in environment management. 9.4 Have cumulative effects due to t Envisaged. proximity to other existing or planned projects with similar effects. (iii) Environmental Sensitivity Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2 Areas which are important or Sensitive of ecological reasons wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. Name/ Identit y Aerial distance (with 15-km) Proposed project location boundary Nil Nil Nil 4 Inland, coastal, marine or underground Nil waters 5 State, national boundaries The project is located within Municipal limits. 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas The project site is having 9 mtr wide access road which is connected to mtr wide DP road. 7 Defense installations defense installation in the neighborhood. 8 Densely populated or built-up area Residential, Commercial and Industrial area all around the site. 14

15 Areas Name/ Identit y Aerial distance (with 15-km) Proposed project location boundary 9 Areas occupied by sensitive man made land uses (hospitals, schools, places of worship, community facilities) Site Name Distance From The Proposed Project Nearest Road Nearest Highwa y / Express Highwa y Nearest Railwa y Station Nearest Bus Station Nearest Hospita l Nearest School Nearest college Nearest Market Nahur Road Eastern Express Highway Joined to Property Directi on From The Propos ed Project rth 2 Kms South Nahur 500 Mts. South Sarvoday Bus Station Fortis Hospital St Pious English High School Vani Vidyalay Jalaram Market 200Mts West 1 Kms West 500Mts rth 1 Kms rth 1.25 Kms rth 10 Areas containing important, high quality or scarce resources (ground water resource, surface resources, forestry, agriculture, fisheries, tourism, mineral. The project will meet water from MCGM for its use after proper permissions are obtained. 15

16 Areas 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Name/ Identit y Aerial distance (with 15-km) Proposed project location boundary All parameters of Air, Water and ise etc. will be maintained within the permissible limit. This area is generally plain& come under seismic zone III according to Indian Standard Seismic zoning map. I hereby give an undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place: Signature of the applicant With Name and Full Address (Project Proponent/Authorised Signatory) 16