1 ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For 5100 m 3 /ANNUM OF COLOUR GRANITE PRODUCTION By M/s. MADHU GRANITES
2 1.0 INTRODUCTION SUMMARY OF THE PROJECT Project M/s. Madhu Granites, Colour Granite Mine Location of the project Sy. No. 52/3A (old) 52/2A2A, 52/2A1B1, 52/2A1A1 (New) of Peddavelagatur (V), Peddapanjani (M), Chittoor (Dist.),Andhra Pradesh. Registered Office Designation /Partner/ CEO) Period of mining lease Extent of Lease Area Present land use Annual Production (Owner Sri M.Ravindra Babu S/o. M.Jayarama Reddy, Melumoy, Mother Theresa Institutions, Gangavaram mandal, Melumoy, Pin , Chittoor District, Andhra Pradesh State, Mob: Sri M. Ravindra Babu, Mg.Partner 20 years Ha Patta. land 5100 m 3 /Annum Mineable reserves 1,06,549 m 3 Life of Mine Type of Activity Waste generation Conceptual land use Manpower Requirement Water requirement Total Project Cost Years. Say (21 years) Open cast Semi-Mechanized mining method is proposed. Waste generation from the mine is estimated to be about 1,44,500 m 3 during lease period of mine. Conceptually, mined out area will be backfilled with waste. About 16 persons will be employed in mine. Water Requirement of 15 KLD will be met from bore well. Rs. 25 lakhs (includes EMP cost of Rs 4.5 Lakhs)
3 INTRODUCTION. M/s Madhu Granites Colour Granite Mine. Extent of 5.18 Ha is located Sy. No. 52/3A (old) 52/2A2A, 52/2A1B1, 52/2A1A1 (New) of Peddavelagatur (V), Peddapanjani (M), Chittoor District, Andhra Pradesh. (Details of the mining lease are enclosed as (Annexure -1) ENVIRONMENTAL MANAGEMENT PLAN Environmental Management Measures specific to the above subject mine are detailed under the following heads Air Environment Noise Environment Water Environment Land Environment Socio Welfare Measures Occupation Safety and Health Measures Monitoring Programme Budget for Environmental Protection/management Measures 2.0 AIR ENVIRONMENT 2.1 SOURCES OF AIR POLLUTION Main pollutant from the subject Mine is Dust/Particulate Matter/Fugitive dust. The following are the identified sources of emission of dust during mining activity: Drilling Wire Saw cutting Excavation Dressing Loading and Transportation Dumping Production per annum : 5100 m 3 of Colour Granite Total Waste generation : 1,44,500 m 3 during the first five of the mine. (*Source: Approved Mining Plan).
4 2.2 AIR POLLUTION CONTROL MEASURES The measures proposed for implementation are listed below Water Sprinkling will be done for dust suppression using Water tankers having provision of sprinkling on dump yards and haul roads. Dust Masks will be provided for the workers based on work area. One DG set of 25 kva will be provided at site. Low noise DG set (with noise absorbing enclosures) will be considered. DG set will be operated based on the operation activity i.e wire saw cutting and is not continuous operation. 3.0 NOISE ENVIRONMENT 3.1 SOURCES OF NOISE Noise produced from mining operations is not continuous. The levels of noise are different based on the activity workers are exposed to. Identified sources of noise from the mine are listed below. Drilling Operations Wire saw Cutting Operations Dressing Operations Machinery operation i.e Excavator, tipper movement and DG Set. 3.2 NOISE PROTECTION MEASURES Hearing protection devices (Ear plugs and ear muffs) will be provided to the drill machine operators and dumper drivers. Green belt will be developed all along the periphery of mine covering width of 7.5 m to act as barrier between core and buffer zones.
5 4.0 WATER ENVIRONMENT The areas which can have effect on water environment are listed below: Water Consumption Ground water level 4.1 WATER CONSUMPTION Water consumption in the mine is estimated to be about 15 KLD as detailed below in table. Source of water is from bore well/local purchase. WATER BALANCE (m 3 /day) Requirement Loss Wastewater Dust suppression Greenbelt Drinking Water Total The only wastewater generation from the Mine is from domestic use. Septic tank followed by soak pit will be provided for treating the domestic wastewater. 4.2 GROUND WATER LEVEL As per estimated mineral reserves vide Mining plan, the depth of mining will be upto 190m RL. Based on information collected from nearby borewells, the water table is at 30-40m RL. It is noted that the mining depth is above ground water level. Hence mining will not intersect ground water table. 5.0 LAND ENVIRONMENT The identified aspects which can cause impact due to mining operations on land environment are listed below. Landuse Solid waste generation Transportation Greenbelt Development
6 Area put on use at the start of plan (Ha.) Additional requiremen t during the plan Total (in Ha.) Area considered fully reclaimed and Net area considered for calculation 5.1 LANDUSE The category of the mining lease area is Patta. land and is occupied by boulders. No habitation within the mine lease area. Mine will be operated for 21 years and the land use pattern for next five year is as below: Sl. No. Head LANDUSE PATTERN (Ha.) Area under mining Nil Storage for top soil Overburden dump Nil Mineral storage/ Nil Infrastructure Nil Roads Nil Railways Green belt Nil Tailing pond Others SUB- TOTAL Virgin Area TOTAL Conceptually during mine closure mined out area will be backfilled with the waste generated during mining activity. Phased plantation will be taken up in the 7.5 m buffer zone. 5.2 SOLID WASTE GENERATION Solid waste generation from the mine in the next five years and for the life of mine is given below: SOLID WASTE GENERATION (m 3 ) Annual First Five years Waste 28,900 1,44,500
7 5.2.1 NATURE OF SOLID WASTE Solid waste is mainly waste rock. Total waste generation from mine during first five years is 1,44,500 m 3. A temporary dump yard is proposed in South Eastern direction of the Quarry lease area to accommodate the waste generated during the first five years of mine operation. The remaining waste quantity will be concurrently backfilled. The dump will be having ground footage periphery of m for which garland drain with check dam will be provided. A garland drain of 490 m length and 0.7m width is proposed. Depth of the drain will be designed such that gravity flow following the ground gradient profile will be considered with maximum depth of 0.5m (490 L x 0.7 W x 0.5 D in meters). Garland drain will be provided with sedimentation pits along the length and check dam at discharge end. 5.3 TRANSPORTATION WITHIN THE MINE Transportation activity within the mining lease area is mainly for transportation of waste rock by trucks from the mine pit to the dump yard. The length of the haulage road is approximately m and varies with progress/increase of mine area. Total waste generation from the mine is estimated to be about 1,44,500 m 3 for first five years period. A total of 8 trips are required for transport of the same. No impact due to truck plying is anticipated as the truck movement within the mining lease area is minimal OUTSIDE THE MINING LEASE AREA Transportation of Colour granite from the mining lease area will be through trucks. Considering annual production of 5100 m 3 /Annum of Colour Granite, maximum 2 trucks /day will be transported and the impact due to this transportation will be minimal.
8 5.4 GREENBELT DEVELOPMENT As per the conservation of Mineral and Mines Act, it is required to leave a barrier of 7.5 m width all along the mining lease area. This area totaling to about Ha will be developed under greenbelt as per the following afforestation plan. AFFORESTATION PROGRAMME ALONG WITH SAPLINGS AND BUDGET Year Area Number of *Capital *Recurring/maintenance (Ha) saplings cost (Rs) cost per annum(rs) *capital cost at Rs 300 per sapling and recurring cost Rs 150/- per sapling SPECIES PROPOSED FOR AFFORESTATION CPCB recommended plant species for the region (CPCB document Guidelines for Developing Greenbelt vide PROBES/75/ ) are given below. As per CPCB, the area falls under region Zone XI, sub zone 2. i.e. Zone - East Coast plains and hills region, Sub Zone - North Coastal Andhra, District Chittoor for Sub Humid Climate with soil of Red loamy laterite, medium black, red sandy. S. No Species Name 1 Azadirachta indica A. Juss GREEN BELT SPECIES Family Name Common Name Habitat Meliaceae veppachettu Tree 2 Ficusreligiosa Linn Moraceae Raavichettu Tree 3 Madhuca longifolia (Koen) Sapotaceae Ippa Tree 4 Mangifera indica Linn Anacardiaceae Maamidichettu Tree 5 Tamarindus indica Linn Caesapinaceae Chintachettu Tree 6.0 SOCIAL WELFARE MEASURES The mine will provide employment to 16 persons and equal number of persons will be employed indirectly for transportation and other activities. Local persons will be given preference. The project is a small scale operation and proposed production is 5100 m 3 /Annum of Colour Granite.
9 The maximum revenue which will be generated by production of 5100 m 3 of granite is Rs 231 Lakhs considering average prevailing rate of Rs 8000 per m 3. The expenditure for production of the 1 m 3 of granite is estimated to be about Rs 5000 including royalty. Of the total profit of Rs 3000 per m 3, 1% of the profit which is about Rs 0.50 Lakhs /annum will be spent for welfare of the nearest villages which are located within 3 km of the project site. 7.0 OCCUPATIONAL HEALTH MEASURES Fugitive dust, noise and fines may affect the health of workers. Safety of employee during operation will be taken care as per mine regulations act To avoid any adverse effects on the health of workers due to dust & noise, the following measures will be implemented: Provision of rest shelters for mine workers with amenities like drinking water, fans, toilets etc. Provision of personal protection devices to the workers; Dust suppression of haul road. First-aid facilities within lease area. Height, slope and width of dump development as per the approved mining plan. Regular medical examination for the employees. The following Personnel protective equipment (PPE) based on the nature of job of the worker will be provided Eye & Face Protection Spectacles & Goggles Respiratory Protection Dust Masks Head Protection - Helmets Foot Protection Safety Shoes Hearing Protection Ear Muffs
10 8.0 ENVIRONMENTAL MONITORING PROGRAMME The following environmental monitoring program will be implemented during operation of the Mine ENVIRONMENTAL MONITORING PROGRAMME Location Parameters Frequency AIR QUALITY Core Zone at one PM10 and PM2.5 Once in location of the three activity area Months WATER QUALITY WATER LEVELS NOISE QUALITY Buffer Zone will be identified in Ground water From Borewell near to Mine Borewell at nearby village Core Zone Excavation Drilling Dressing Transportation As per IS Once in a year Water level Twice in a year Before and after monsoon Spot Noise levels will Once in a be checked for year conformance with OSHA work zone noise levels for exposure of eight hours LAND ENVIRONMENT OCCUPATIONA L HEALTH Buffer Zone Nearby Village 1: In transportation route Buffer zone values will be recorded for eight hour duration during the mining activity to compute equivalent values and the same will be checked with for conformation with residential day equivalent values specified by CPCB Density of Species developed under greenbelt will be monitored and gap filling will be taken up Regular medical examination for the employees. Once in a year Before monsoon External NABL approved laboratory services will be hired for carrying out Environmental Monitoring measures.
11 9.0 BUDGET FOR ENVIRONMENTAL MANAGEMENT PLAN Budget allocated for EMP is Rs.5.08 lakhs. BUDGET FOR ENVIRONMENTAL MANAGEMENT PLAN (Rs). Capital Cost Recurring Cost/annum 1 AIR POLLUTION CONTROL MEASURES Dust Masks & Cloth Air Pollution Monitoring - 40,000 Gunny bags for covering the surface of jackhammer holes Total (A) 3,380 43,380 2 NOISE POLLUTION CONTROL MEASURES Ear Plug Noise Pollution Monitoring - 2,500 Total (B) 640 3,140 3 WATER POLLUTION CONTROL MEASURES Septic tank followed by soak pit 30, Check dam 40,000 2,000 Garland drain 50,000 2,500 Monitoring of water samples along - 5,000 with ground water levels Total (C) 10,000 4 LAND MANAGEMENT MEASURES Retaining wall 50,000 - Formation of the Road 60,000 Greenbelt development 2,74,500 1,37,250 Total (D) 3,84, SOCIAL WELFARE MEASURES - 50,000 6 OCCUPATIONAL HEALTH AND SAFETY MEASURES Personnel protection - 32,000 Medical Checkup - 60,000 Total (E) - 92,000 Grand Total (A+B+C+D+E) 5,08,520 3,35,770
GRAVEL & ROUGH STONE QUARRY
ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760
More informationEnvironmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,
Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri
More informationEnvironmental Management Plan. For Mining of. Building Stone & Road Metal
Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s
More informationENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.
ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect
More informationEnvironmental Management Plan. For Mining of. Rough Stone & Road Metal
Environmental Management Plan For Mining of Rough Stone & Road Metal Over an extent of 6.53 Ha at Survey No.312/1 of Ramalingampalli (V), Bommalaramaram (M), Yadadri Bhuvangairi (D), Telangana State. Lessee
More informationWELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.
WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationTable 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.
1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra
More informationPRE-FEASIBILITY REPORT
M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.
More informationSRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH
SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey
More informationEXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD
EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months
More informationPRE-FEASIBILITY REPORT &
& ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF COLOUR GRANITE 1.983 HA SY.NO: 61/4A & 4B, POLAVARAM VILLAGE, SANKAVARAM MANDAL, EAST GODAVARI DISTRICT, ANDHRA PRADESH By M/s. SILICON ROCS, MANAGING PARTNER:
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For M/s. Shah Shah Mines & Minerals, SY. NO. 206/1, Gangireddipalli Village, Thamballapalli Mandal, Chittoor District, Andhra Pradesh. INDEX ITEM PAGE NO. 1. EXECUTIVE SUMMARY 3
More informationCluster Environmental Management Plan
1. INTRODUCTION Mining Environment and development have become complimentary to each other. As a result of developmental activities visible ill-effects of the environmental degradation are clear and give
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN For BUILDING STONE AND M SAND QUARRY Sri. N.C. Prasanna Kumar #663, Somanahalli Maddur Taluk Mandya District - 571429 Prepared by SMS ENVOCARE LIMTED # 301, 3 RD FLOOR, SHRESHTA
More informationTable 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha
1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT
More informationEMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh
EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS
More informationPre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)
Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,
More informationDHANWADA CRUSHER STONE QUARRY
ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN A. Attach a note on the status of baseline information with regard to the following: To identify with the interrelationship between the eco-friendly quarry operations and
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1. INTRODUCTION In a developmental activity like mining, all the exercises must co-exist satisfactorily with its surrounding condition so as to minimize the adverse impact on
More informationM/s. Bharat Clays Private Limited Pre-Feasibility Report
1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta
More informationINDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8
M/s. Nandini Mineral Industries (Mine Lease Area 4.120 Ha.) Sy. Nos. 105, 105/1, 2 & 113/1A Kolumulapali Village, Bethamcherla Mandal, Kurnool District, ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001:
More informationTable 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.
1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation
More informationChapter- V MANAGEMENT PLAN (EMP)
Chapter- V MANAGEMENT PLAN (EMP) The Environment Management Plan (EMP) for a development project prescribes the mitigation measures to be adopted to nullify or to minimize various anticipated environment
More informationProject Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005
Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,
More information1. PRE-FEASIBILITY REPORT
1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,
More informationFORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A
(I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process
More informationPRE-FEASIBILTY REPORT
Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationGurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions Capacity expansion of existing granite quarry (6.0 ha) is proposed, which is operational at village- Kathara, Tehsil- Lovekush Nagar & Dist.
More informationPiplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P
1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree
More informationHINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED
HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN Of M/s. JAISHREE GRANITES (P) LTD. 7.0 HA. COLOUR GRANITE MINING SY. NO. 13/P GUMMALAPADU (V), PAMURU (M) PRAKASAM (DT), ANDHRA PRADESH Prepared & Submitted by SV ENVIRO LABS
More informationENVIRONMENTAL MANAGEMENT
ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S
More informationINDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND
PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationScanned by CamScanner
Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021
More informationPeriod of Compliance Report : April, 2017 to September, 2017
Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :
More information(A govt. of Kerala Undertaking)
Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy
More informationStandard Template, Form-1, Prefeasibility Report Approved Mining Plan & Environmental Management Plan
Standard Template, Form-1, Prefeasibility Report Approved Mining Plan & Environmental Management Plan Of Colour Granite- 40,752 m3/annum Extent -7.00 Ha. Sy..371 Kothagattu village Shankarapatnam Mandal
More informationEIA-EMP REPORT GRAVEL QUARRY (Category-B2)
EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR
More informationPramod S. Kambli. Page 1
PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major
More informationPRE FEASIBILITY REPORT
Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT
More informationEIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS
More informationPROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.
PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.
More informationFORM I (OPENCAST LATERITE MINE ha)
SHAIK IMAM SURVEY. 172, 173 & 174, SIDDLOOR VILLAGE, VIKARABAD MANDAL AND DISTRICT, TELANGANA STATE FORM I (OPENCAST LATERITE MINE- 6.176 ha) SUBMITTED BY Sri Shaik Imam R/o 8-2-579/B, Road No. 8, Banjara
More informationENVIRONMENTAL STATEMENT REPORT (FORM-V)
ENVIRONMENTAL STATEMENT REPORT (FORM-V) YEAR 2017-18 Mine Lease for Shale (30,000 TPA Limestone Production) MY HOME INDUSTRIES PRIVATE LIMITED Mellacheruvu (Vil. & Mdl.) - 508 246 Suryapet District, Telangana
More informationMODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.
MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT
More informationENVIRONMENT MANAGMENT PLAN
ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE
More informationTHE RAMCO CEMENTS LIMITED
1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II
More informationEXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:
2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF
More informationEXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land
EXECUTIVE summary 11.1 PROJECT DESCRIPTION has been granted Mining lease over an extent of 8.09 Ha in village Tihai, District Satna, Madhya Pradesh for a period of 20 years with effect from 22.11.1995
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Metal Stone Area 2.000 Hectare, Khasra No. 1127/1 Village Tehsil District State AT KHILCHIPUR KHILCHIPUR RAJGARH MADHYA PRADESH Proponent SHRI ALTAF KHA S/O SHRI
More informationPRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore
More informationSEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land
SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental
More informationFORM 1 BASIC INFORMATION S.NO.
FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/
More informationLarsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN
` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the
More informationEnvironment Management Plan
Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded
More informationEXECUTIVE SUMMARY. 1.1 Executive Summary
1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over
More informationSri.T.N.Balasubramanya
Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As
More informationANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI
M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement
More informationSHRI.LAKSHMAN NAMDEV KOLI
PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS
More informationSalient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes.
EXECUTIVE SUMMARY INTRODUCTION Agaria Iron Ore mine is situated in village Agaria, Tehsil- Sihora, District Jabalpur of Madhya Pradesh State. The mining lease period was for 20 years w.e.f 06.03.1987 to
More informationProject Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006
Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The
More informationToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant
EXECUTIVE SUMMARY of Proposed Quartz Mine (30.667 Ha.) with a Production of 91,125 TPA at Sy. No. 410, D.Cherlopalli Village, Bathalapalli Mandal, Anantapur District, Andhra Pradesh. ToR Letter No. SEIAA/AP/ANT/2015-3568
More informationDeccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II
Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2 (73.93.11 Ha), as on September 2018 1. Compliance reports are
More information1. INTRODUCTION. EMP Report For Ha. of Dolomite Mine located in Chandana Village,Yadiki Mandal,Anantapur District, A.P. K.
1. INTRODUCTION 1.1 INTRODUCTION was granted a Dolamite mine Lease area over an extent of 24.290 hectares in Sy.No. 328/ P of Chandana village, Yadiki Mandal, Anantapur District of Andhra Pradesh for a
More informationRisk Assessment Nagla
Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps
More informationPRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location
1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease
More informationFORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))
FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item
More informationM/s. Krishna Stone Crusher Proprietor: K.M. Krishna Kampalapura, Huliyur Durga Hobli Kunigal Taluk Tumakuru District, Karnataka
PRE-FEASIBILITY REPORT FOR BUILDING STONE QUARRYING In 10-00 Acres of Govt. Land Survey Number: 82 (Part) P.H.Halli Village Kunigal Taluk Tumkur Dist. Karnataka By M/s. Krishna Stone Crusher Proprietor:
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to the mining
More informationM/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I
FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00
More informationENVIRONMENT MANAGEMENT PLAN
EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Hyderabad regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION AP/ANP/L.ST-27/ HYD (ii) Designation : (iii) Accompaning mine : Official
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to the mining
More informationPRE-FEASIBILTY REPORT
2017 PRE-FEASIBILTY REPORT (Towards Getting EC) Under violation OF SAI BABA-1 MANGANESE MINE (8.045 Ha & 0.611 Ha), Sy. No. 9 of Kothakarra (V) Sy. No. 117/2 of Budarayavalasa, Merakamudidam (M), VIZIANAGARAM
More informationEnvironmental Management Plan. For. Mining of Laterite
Environmental Management Plan For Mining of Laterite Over an extent of 12.5 Ha at Sy No. 176/P of Siddulur Payaga (V) & Sy.no. 90 of Siddulur Munagal (V), Vikarabad (M), Rangareddy (D), T.S. Proponent
More informationEXECUTIVE SUMMARY. Dec 2017 PREPARED BY
Dec 2017 OF M/S. SAINT GOBAIN GLASS INDIA LTD (Mining of silica sand) Sri SN. Eisenhower, Director, Plot 98, APIIC, Near Integrated Check Post, Karur Village, Tada 524401, Nellore District Site Address
More informationM/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh
M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/BLR/FE/12/BNG (ii) Designation : (iii) Accompaning mine : Official
More informationM/s. Sai Vikas Stone Crushing Industries, (Rough Stone and Road Metal Quarry) ENVIRONMENTAL MANAGEMETN PLAN
1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to the mining project. The EMP has been designed
More informationFORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju
FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION
More informationENVIRONMENT MANAGEMENT PLAN FOR STONE MINING
ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name
More information