EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT

Size: px
Start display at page:

Download "EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT"

Transcription

1 EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION (STATE CLEARINGHOUSE NO ) FEBRUARY 6, 2009

2

3 REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION EXECUTIVE SUMMARY PROJECT DESCRIPTION The proposed Revelle College Apartments and Commons Dining Renovation project would be built on an approximately 3.8-acre site within the Revelle College neighborhood of the West Campus at UCSD, located along Scholars Drive South. The proposed project is comprised of a residential housing component as well as an existing dining renovation. The residential component would involve the construction of three linked apartment building wings totaling approximately 154,000-gross square feet (gsf). The building would vary in height from five to ten stories, and would be designed in a hinged C shape to create a central quad area east of the three linked wings. The residences would house approximately 500 second-year students in apartment-style suites, and also would include common areas, meeting/conference rooms, and administrative space. The central quad area between the buildings would link the new student apartments to the renovated Commons and existing Fleet housing. The Commons renovation would modernize the dining facility and expand the restaurant-style venue with the addition of a new market and café, in order to meet the demand associated with additional students. Renovation would be entirely within the footprint of the existing Revelle Commons building, with no anticipated change in the size of the building. The proposed project would include numerous sustainable design features to achieve the Leadership in Energy and Environmental Design (LEED) Silver Certification, such as enhanced window glazing, appropriate building orientation, daylighting, natural ventilation and water conserving plumbing. Exterior building materials, finishes, and colors would be consistent with the existing Revelle College, and would include concrete, cement plaster, fiberglass grating, or similar materials. The project is to provide for a minimum 40 foot setback from the future Housing and Dining Services Administration Building to the north and a 15 foot setback is to be maintained from Scholars Drive. Fire/service access would be provided via a new access road proposed through the existing parking lots P103 and P104 connecting to Scholars Drive. Irrigation and stormwater runoff from rooftops and paving would 1

4 be directed into the three bioswales that would be integrated between the proposed wings of the apartment building. Hardscape elements identified in the project design guidelines and proposed site plan include architectural features (e.g., building materials and color schemes), circulation/access system amenities (e.g., enhanced pavement and pedestrian walkways), and site furnishings (e.g., bicycle racks, trash and recycling receptacles, and seating areas). The project has been designed to achieve a high degree of sustainability through the use of high performance architecture, low energy systems, renewable power generation onsite, sustainable landscape, and water conservation. Site improvements and building construction are anticipated to begin in September 2009 and would take approximately 23 months to complete. The proposed project is anticipated to be occupied by September PROJECT OBJECTIVES The following project objectives have been identified for the proposed project (UCSD 2008): Provide an on-campus living environment within Revelle College for second year students consisting of residential apartment-style units with a minimum of 500 beds; Provide a safe, secure, and accessible environment that reflects the geography, landscape, and architecture of Revelle College; Promote the interaction among residents and active uses of exterior spaces, including an open space, or quad, to link the new apartments with the renovated Revelle Commons; Incorporate sustainable design principles into as many aspects of the new buildings and renovated spaces as possible to achieve Leadership in Energy and Environmental Design (LEED) Silver Certification for the Revelle College Apartments and LEED Certification for Commercial Interiors for the Revelle Commons Dining Renovation; and Renovate Revelle Commons to modernize the facility and meet the projected dining demand associated with additional student residents. 2

5 ENVIRONMENTAL ANALYSIS As a tiered CEQA document, the Initial Study (IS) and Mitigated Negative Declaration (MND) for the proposed project relies, in part, on the 2004 LRDP EIR, for: 1) A discussion of general background and setting information for environmental topic areas; 2) Overall growth-related issues, associated with continuing campus-wide development; 3) Issues that were evaluated in sufficient detail in the 2004 LRDP EIR, for which there are no significant new information or changes in circumstances that would require further analysis; 4) Analysis of long-term cumulative impacts. This Tiered IS/MND analyzes the potential site-specific and localized impacts of the project, as well as the adequacy of the environmental assessment and mitigation measures in the 2004 LRDP EIR, with regard to 17 environmental topics, listed below: Aesthetics Mineral resources Agricultural Resources Noise Air Quality Population and Housing Biological Resources Public Services Cultural Resources Recreation Geology and Soils Transportation and Traffic Hazards and Hazardous Materials Utilities and Service Systems Hydrology and Water Quality Cumulative Impacts Land Use and Planning 3

6 IMPACTS AND MITIGATION MEASURES Based on the analysis presented in the Tiered IS/MND, it was determined that this project would not result in any significant impacts that cannot be mitigated to less than significant levels or are not sufficiently addressed by the 2004 LRDP EIR. As such, no project-specific mitigation measures are required to address the proposed project s direct impacts. One project-specific mitigation measure is required to reduce the project s contribution to cumulative air quality impacts resulting from 2004 LRDP implementation. ENVIRONMENTAL REVIEW PROCESS The Tiered IS/MND was prepared in conformance with the State CEQA Statutes and Guidelines and the University of California procedures for Implementation of CEQA. As noted earlier, the IS/MND was tiered from the 2004 LRDP Program EIR, pursuant to Section of the CEQA Guidelines. The IS/MND was circulated for agency and public review and comment, between October 20, 2008 and November 18, COMMENTS AND RESPONSES The Draft IS/MND was reviewed by various state, regional and local agencies, and by a number of interested individuals and organizations, on and off campus. A total of two comment letters were received from the Marine Corps Air Station (MCAS) Miramar and San Diego County Archaeological Society (SDCAS). The MCAS Miramar letter dated October 24, 2008 noted the location of the project site within the MCAS Miramar Air Installations Compatible Use Zones (AICUZ) and determined that the proposed project is compatible with AICUZ guidelines for noise and safety compatibility. It was also confirmed that the proposed building heights do not appear to exceed the airspace surface or have an impact on air navigation; however, MCAS Miramar indicated that official determination of the project design to be within Federal Aviation Administration (FAA) guidelines would have to be completed by the agency itself. UCSD submitted a Notice of Proposed Construction or Alteration to the FAA while the Tiered IS/MND was out for public review. In response, the FAA conducted an aeronautical study 4

7 of the project design to determine if the proposed building wings would penetrate any of the safety surfaces surround the airfield for MCAS Miramar. Based on their review, it was determined there would be no hazard to air navigation as a result of the proposed housing project. The FAA determination letter has been appended to the Tiered IS/MND (refer to Appendix C).UCSD also contacted staff at the Airport Land Use Commission (ALUC), who determined that the project site is not located within the Airport Influence Area (AIA) for MCAS Miramar, and therefore, no additional review by the ALUC is necessary. In its letter dated November 18, 2008, the SDCAS concurred with the University s conclusion that no significant adverse impacts to cultural resources would result from the project. The University acknowledges this conclusion. None of the comments received raise additional environmental issues that were not previously addressed in the Draft IS/MND or the 2004 LRDP EIR. Therefore, no changes to the Tiered IS/MND are required in order to address these comments. MINOR REVISIONS OR CLARIFICATIONS TO THE TIERED IS/MND Two minor text changes were made in the Transportation/Traffic section of the Tiered IS/MND (specifically, Items 13.a and 13. f) to make the IS checklist responses consistent with the Transportation/Traffic discussion that follows. Those text changes are described herein and are shown in strikeout/underline format to signify deletions and inserts. The Tiered IS/MND checklist has been modified in the final document for Items 13.a and 13.f to shift the checklist response from the Project Impact Adequately Addressed in LRDP EIR column to the Less Than Significant column. The Project Impact Adequately Addressed in LRDP EIR column applies where the potential impacts of the proposed project were adequately addressed in the 2004 LRDP EIR and LRDP Mitigation Measures are required to mitigate any impacts of the proposed project. As demonstrated in the IS discussion on pages 53 through 56, the proposed project would result in less than significant impacts because it would not cause an increase in traffic that is substantial in relation to the existing street system and would not result in inadequate parking capacity. As such, no LRDP Mitigation Measures are required to mitigate proposed project impacts 5

8 and the Less Than Significant column has been checked. Page 15 of the Tiered IS/MND contains a description of the column headings identified in the checklist. This minor checklist modification would simply shift the locations of the two checklist boxes and not change the conclusions reached in the Tiered IS/MND. In addition, while the Tiered IS/MND was out for public review, the FAA conducted an aeronautical study of the project design to determine if the proposed building wings would penetrate any of the safety surfaces surround the airfield for MCAS Miramar. Based on their review, it was determined there would be no hazard to air navigation as a result of the proposed housing project. The FAA determination letter has been appended to the Tiered IS/MND (refer to Appendix C). 6

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT I. APPROVAL OF THE MITIGATED NEGATIVE DECLARATION Pursuant to Title 14, California

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION In accordance

More information

CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY

CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY ATTACHMENT 4 CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY I. CONSIDERATION OF THE 2006 LRDP EIR AND INTEGRATIVE GENOMICS

More information

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SCIENCES LABORATORY BUILDING AND LECTURE HALL, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

More information

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW 1.0 INTRODUCTION This Environmental Impact Report (EIR) evaluates the potential for the San Joaquin Apartments and Precinct Improvements Project (the project or San Joaquin Apartments project to result

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

SUMMARY University of California San Francisco Institute for Regeneration Medicine

SUMMARY University of California San Francisco Institute for Regeneration Medicine SUMMARY University of California San Francisco Institute for Regeneration Medicine Final Initial Study and Mitigated Negative Declaration (State Clearinghouse No. 2008022027) March 2008 INSTITUTE FOR REGENERATION

More information

ADDENDUM TO THE ENVIRONMENTAL IMPACT REPORT FOR THE NEW CENTURY PLAN. I. Introduction. II. CEQA Authority for Addendum

ADDENDUM TO THE ENVIRONMENTAL IMPACT REPORT FOR THE NEW CENTURY PLAN. I. Introduction. II. CEQA Authority for Addendum ADDENDUM TO THE ENVIRONMENTAL IMPACT REPORT FOR THE NEW CENTURY PLAN I. Introduction This document is an Addendum to the Environmental Impact Report (EIR) prepared for the New Century Plan Project (State

More information

101 B. COMMITTEE ON GROUNDS AND BUILDINGS January 18, 2001

101 B. COMMITTEE ON GROUNDS AND BUILDINGS January 18, 2001 COMMITTEE ON 101 B B. CERTIFICATION OF ENVIRONMENTAL IMPACT REPORT AND APPROVAL OF DESIGN, SOUTHWEST CAMPUS HOUSING AND PARKING PHASE 1, LOS ANGELES CAMPUS The President recommends that upon review and

More information

I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #8 1

I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #8 1 ATTACHMENT 5 CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF AMENDMENT #2 TO THE 2020 LONG RANGE DEVELOPMENT PLAN -- CAMPUS SPACE AND INFRASTRUCTURE CHAPTER, AND APPROVAL

More information

Health Sciences Graduate Student Housing Project Tiered Environmental Impact Report (SCH No ) EXECUTIVE SUMMARY

Health Sciences Graduate Student Housing Project Tiered Environmental Impact Report (SCH No ) EXECUTIVE SUMMARY EXECUTIVE SUMMARY This section is an executive summary of the Environmental Impact Report (EIR) for the proposed University of California, San Diego (UCSD) Health Sciences Graduate Student Housing project,

More information

UC Davis Medical Center Education Building Project Phase 2 Telemedicine Resource Center and Rural PRIME Facility January CEQA Findings

UC Davis Medical Center Education Building Project Phase 2 Telemedicine Resource Center and Rural PRIME Facility January CEQA Findings CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EDUCATION BUILDING PROJECT, PHASE 2 (TELEMEDICINE RESOURCE CENTER AND RURAL PRIME FACILTY PROJECT) DAVIS MEDICAL CENTER

More information

PUBLIC HEARINGS June 6 & 7, 2018

PUBLIC HEARINGS June 6 & 7, 2018 PUBLIC HEARINGS June 6 & 7, 2018 STUDENT HOUSING WEST AGENDA & OUTLINE FOR THIS EVENING Agenda Present Student Housing West Project information. Present information specific to the Student Housing West

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

PROJECT INFORMATION SESSION May 30 & 31, 2018

PROJECT INFORMATION SESSION May 30 & 31, 2018 PROJECT INFORMATION SESSION May 30 & 31, 2018 STUDENT HOUSING WEST ABOUT THE PROPOSED PROJECT Project Transaction Structure Key RFP Project Performance Goals Master plan, develop and operate approximately

More information

These findings and the Mitigation Monitoring Program ( MMP, attached as Exhibit B) address only the impacts of the West Branch Library Project.

These findings and the Mitigation Monitoring Program ( MMP, attached as Exhibit B) address only the impacts of the West Branch Library Project. Page 1 of 6 FINDINGS OF FACT REGARDING ENVIRONMENTAL IMPACTS, MITIGATION MEASURES, ALTERNATIVES AND OVERRIDING CONSIDERATIONS FOR THE BERKELEY WEST BRANCH LIBRARY PROJECT INTRODUCTION: The Berkeley Branch

More information

UC CEQA CHECKLIST TEMPLATE INSTRUCTIONS & GLOSSARY

UC CEQA CHECKLIST TEMPLATE INSTRUCTIONS & GLOSSARY A. Introduction UC CEQA CHECKLIST TEMPLATE A project is an activity or transaction that may result in an environmental effect that is being approved or carried out by the University, and may consist of

More information

Attachment 3 UC MERCED 2020 PROJECT

Attachment 3 UC MERCED 2020 PROJECT Attachment 3 UC MERCED 2020 PROJECT Addendum No. 6 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report The following Addendum has been prepared

More information

Section 2.0 Introduction and Purpose

Section 2.0 Introduction and Purpose Section 2.0 SECTION 2.0 INTRODUCTION AND PURPOSE The California Environmental Quality Act (CEQA) requires that all State and local agencies consider the environmental consequences of projects over which

More information

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by: The California Environmental Quality Act CEQA BASICS Prepared for: Orange County Department of Education Prepared by: Contact: DWAYNE MEARS, AICP Principal 714.966.9220 dmears@planningcenter.com The Beginning

More information

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1 1.0 INTRODUCTION This Draft Environmental Impact Report (Draft EIR or EIR) has been prepared for the 1020 S. Figueroa Street Project (the Project). Jia Yuan USA Co., Inc., the Applicant, proposes to develop

More information

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION Sections 4.1 through 4.14 of Chapter 4.0 of this EIR contain a discussion of the potential environmental effects from implementation of the proposed

More information

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.)

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.) 2.1 PURPOSE OF THE ENVIRONMENTAL IMPACT REPORT The California Environmental Quality Act requires that all State and local governmental agencies consider the environmental consequences of projects over

More information

HEALTH AND WELLNESS CENTER

HEALTH AND WELLNESS CENTER HEALTH AND WELLNESS CENTER Draft Tiered Initial Study and Proposed Negative Declaration The following Initial Study has been prepared in compliance with CEQA. Prepared By: OFFICE OF RESOURCE MANAGEMENT

More information

Council Agenda Report

Council Agenda Report Agenda Item # 7 Council Agenda Report SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RIO VISTA APPROVING THE PRELIMINARY ENGINEERING REPORT, CONCEPT PLANS DESIGNS AND FINAL INITIAL STUDY/MITIGATED

More information

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510)

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510) Environmental and Development Services Department Planning Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 - FAX: (510) 233-5401 N O T I C E O F P R E P A R A T I O N DATE: April 4,

More information

V. MITIGATION MONITORING PLAN

V. MITIGATION MONITORING PLAN V. MITIGATION MONITORING PLAN A. INTRODUCTION The mitigation monitoring plan (MMP) contained herein satisfies the requirements of CEQA pursuant to Section 15097(a) of the State CEQA Guidelines as they

More information

Los Coyotes Country Club Development Plan

Los Coyotes Country Club Development Plan Los Coyotes Country Club Development Plan Community Meeting October 13, 2014 Community Development Department 1. Welcome and Introductions Community Meeting October 13, 2014 Community Development Department

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MAY 1, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Jennifer Le, Senior

More information

Schwan Self-Storage. Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No DP RV

Schwan Self-Storage. Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No DP RV Schwan Self-Storage Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No. 17-055-DP RV Prepared by: City of Goleta 130 Cremona Drive, Suite B Goleta, CA 93117 September 2017 Addendum

More information

Chapter 13C GREEN BUILDING REQUIREMENTS

Chapter 13C GREEN BUILDING REQUIREMENTS 1 of 8 9/12/2008 11:04 AM San Francisco Building Inspection Commission (BIC) Codes BUILDING CODE 2007 Edition Chapter 13C GREEN BUILDING REQUIREMENTS 1 Chapter 13C GREEN BUILDING REQUIREMENTS [Added 9-4-2008

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: SEPTEMBER 20, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

ATTACHMENT B THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CA RESOLUTION NO._6022_

ATTACHMENT B THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CA RESOLUTION NO._6022_ ATTACHMENT B THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CA RESOLUTION NO._6022_ RESOLUTION ADOPTING A DESIGN FOR DEVELOPMENT FOR BILLBOARD STRUCTURES IN THE ADELANTE EASTSIDE REDEVELOPMENT

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report To: From: Cc: Subject: Architectural Review Board Architectural Review Board Meeting: July 31, 2017 Agenda Item: 7.8 Russell Bunim, Associate Planner Stephanie Reich,

More information

2 Executive Summary 2.1 Project Location

2 Executive Summary 2.1 Project Location 2 Executive Summary 2.1 Project Location Draft Supplemental Environmental Impact Report page 11 2. Executive Summary 2.1 Project Location The proposed Project, known as the Outlets at San Clemente Sign

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: APRIL 20, 2016 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Jennifer Le, Principal

More information

Section 3.8.2, Regional Initiatives: update section on San Mateo County Green Building Ordinance to reflect ordinance language.

Section 3.8.2, Regional Initiatives: update section on San Mateo County Green Building Ordinance to reflect ordinance language. Memo To: Thomas Rogers, City of Menlo Park From: Mark Hoffheimer Date: March 6, 2012 Subject: Task H: Sustainability Revisions Purpose In accordance with the requirement that the Sustainability section

More information

NORTH BOWL PARKING LOT PHASE 1

NORTH BOWL PARKING LOT PHASE 1 NORTH BOWL PARKING LOT PHASE 1 Addendum No. 2 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report The following Addendum has been prepared in

More information

Gary Matthews Vice Chancellor Resource Management & Planning

Gary Matthews Vice Chancellor Resource Management & Planning UC San Diego Long Range Planning & Sustainability STAFF SUSTAINABILITY NETWORK: NOV 19, 2015 Gary Matthews Vice Chancellor Resource Management & Planning AGENDA LONG RANGE DEVELOPMENT PLAN UPDATE CURRENT

More information

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION WITH THE APPROVAL OF THE TELECOMMUNICATIONS INFRASTRUCTURE IMPROVEMENTS PHASE A PROJECT UNIVERSITY OF CALIFORNIA, SANTA CRUZ CAMPUS I. ADOPTION OF THE

More information

2.1 Project Definition/Classification/Initial Study Project Definition

2.1 Project Definition/Classification/Initial Study Project Definition 2.1 Project Definition/Classification/Initial Study 2.1.1 Project Definition The correct and complete definition of all reasonably foreseeable elements of a proposed project is the single most important

More information

5.0 ALTERNATIVE VARIATIONS

5.0 ALTERNATIVE VARIATIONS 5.0 ALTERNATIVE VARIATIONS 5.1 INTRODUCTION The Draft EIR for the Beverly Hilton Revitalization Plan evaluated five alternatives to the project, pursuant to Section 15126.6 of the California Environmental

More information

Boulder Ridge Fitness and Swim Center

Boulder Ridge Fitness and Swim Center Boulder Ridge Fitness and Swim Center First Amendment to Final Environmental Impact Report November 2014 County of Santa Clara Planning Office State Clearinghouse Number: 2013052012 INTRODUCTION The Draft

More information

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report Volume 3 SCH # 2008041009 November 2008 Prepared for: U.S. Army Corps of Engineers, Sacramento

More information

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report Volume 3 SCH # 2008041009 November 2008 Prepared for: U.S. Army Corps of Engineers, Sacramento

More information

LAX Terminals 2 and 3 Modernization Project DRAFT EIR PUBLIC MEETING. Tuesday, March 21, :00 pm to 8:00 pm

LAX Terminals 2 and 3 Modernization Project DRAFT EIR PUBLIC MEETING. Tuesday, March 21, :00 pm to 8:00 pm DRAFT EIR PUBLIC MEETING Tuesday, March 21, 2017 6:00 pm to 8:00 pm Project Site Project Site Terminal 3 Terminal 2 Existing Conditions TICKETING HALL Overcrowded Security Checkpoints Dated Concourse Areas

More information

Bay Fair Transit-Oriented Development Specific Plan EIR Public Scoping Meeting. March 16, 2017 Planning Commission

Bay Fair Transit-Oriented Development Specific Plan EIR Public Scoping Meeting. March 16, 2017 Planning Commission Bay Fair Transit-Oriented Development Specific Plan EIR Public Scoping Meeting March 16, 2017 Planning Commission Purpose of Scoping Meeting Receive comments from members of the public, organizations and

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: NOVEMBER 15, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING

UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING Regents Committee on Grounds and Buildings Preliminary Review of Design November 18, 2008 UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING Project Background 225 (2 bedroom apartment

More information

UC MERCED 2020 PROJECT. Addendum No. 7 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report

UC MERCED 2020 PROJECT. Addendum No. 7 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report ATTACHMENT 10 UC MERCED 2020 PROJECT Addendum No. 7 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report The following Addendum has been prepared

More information

Christy Usher, AICP Associate Planner Phone Fax:

Christy Usher, AICP Associate Planner Phone Fax: Item No: 2 Meeting Date: March 12, 2013 To: Planning Commission Date: March 7, 2013 Authorized By: Ron Munekawa Chief of Planning By: Christy Usher, AICP Associate Planner Phone 650 522-7215 Fax: 522-7201

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 21, 2015 TO: THRU: FROM: SUBJECT: Chair McCormack and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Kelly Christensen

More information

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT June 26, 2012

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT June 26, 2012 SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT June 26, 2012 PROJECT: Winant-Sanders SFD Demo-Rebuild HEARING DATE: July 16, 2012 STAFF/PHONE: J. Ritterbeck, (805) 568-3509 GENERAL INFORMATION

More information

SECTION 9.0 Effects Found Not To Be Significant

SECTION 9.0 Effects Found Not To Be Significant SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed

More information

Draft Finding of No Significant Impact

Draft Finding of No Significant Impact Draft Finding of No Significant Impact PROPOSED CONSTRUCTION AND OPERATION OF OPERATIONAL READINESS TRAINING COMPLEX FORT HUNTER LIGGETT, MONTEREY COUNTY, CALIFORNIA Pursuant to the Council on Environmental

More information

DRAFT FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT. Conference Center, Hotel, and Graduate School of Management Building University of California, Davis

DRAFT FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT. Conference Center, Hotel, and Graduate School of Management Building University of California, Davis DRAFT FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT Conference Center, Hotel, and Graduate School of Management Building University of California, Davis Prepared for: University of California, Davis Office

More information

PHYSICAL SCIENCES EXPANSION AND SERVICE UNIT PARK

PHYSICAL SCIENCES EXPANSION AND SERVICE UNIT PARK PHYSICAL SCIENCES EXPANSION AND SERVICE UNIT PARK Tiered Initial Study and Mitigated Negative Declaration The following Initial Study has been prepared in compliance with CEQA. Prepared By: OFFICE OF RESOURCE

More information

The Village at Corte Madera Expansion Project

The Village at Corte Madera Expansion Project The Village at Corte Madera Expansion Environmental Report Addendum State Clearinghouse Number: 2016102061 Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94925 April 2018 The Village at Corte

More information

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT EXECUTIVE SUMMARY ES.1 BACKGROUND The purpose of this Draft Environmental Report (DEIR) is the implementation of improvement projects at Charles M. Schulz Sonoma County Airport (the Airport). The improvement

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 15, 2017 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director Monique

More information

CITY COUNCIL RESOLUTION NO. 02-

CITY COUNCIL RESOLUTION NO. 02- CITY COUNCIL RESOLUTION NO. 02- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF IRVINE APPROVING GENERAL PLAN AMENDMENT 48403-GA TO AMEND TABLE A-1 MAXIMUM INTENSITY STANDARDS BY PLANNING AREA AND TABLE

More information

PUBLIC AND AGENCY INVOLVEMENT

PUBLIC AND AGENCY INVOLVEMENT CHAPTER 5 PUBLIC AND AGENCY INVOLVEMENT Since late 2010, several types of public and agency participation have occurred as a part of the project design and the environmental review process, pursuant to

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 21, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Jennifer Le, Senior

More information

California State University Stanislaus Physical Master Plan Update. Program Environmental Impact Report

California State University Stanislaus Physical Master Plan Update. Program Environmental Impact Report California State University Stanislaus Physical Master Plan Update Program Environmental Impact Report State Clearing House No. 2005012035 Public Review Draft October 2008 California State University -

More information

NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT CEQA THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT CEQA THE CALIFORNIA ENVIRONMENTAL QUALITY ACT NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT Enacted in 1969 to provide review of Federal projects to identify significant impacts. NEPA applies to a project that requires discretionary actions by a

More information

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 CITY OF SANTA MONICA PLANNING AND COMMUNITY DEVELOPMENT 1685 MAIN STREET SANTA MONICA, CA 90401 INTRODUCTION This document is the Fifth Addendum

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report To: From: Cc: Subject: Architectural Review Board Meeting: February 6, 2017 Agenda Item: 7.7 Architectural Review Board Stephanie Reich, AIA, LEED AP, Design and Historic

More information

ENVIRONMENTAL REVIEW PROCESS AND ADOPTION OF MITIGATED NEGATIVE DECLARATION

ENVIRONMENTAL REVIEW PROCESS AND ADOPTION OF MITIGATED NEGATIVE DECLARATION CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF LANDELS HILL-BIG CREEK NATURAL RESERVE AT THE UNIVERSITY OF CALIFORNIA, LANDELS HILL-BIG CREEK NATURAL RESERVE I. ENVIRONMENTAL

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: JANUARY 15, 2014 TO: Chair Fox and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Robert Garcia,

More information

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions: SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.

More information

Requests Conditional Use Permits (Craft Brewery & Open Air Market) Staff Recommendation Approval. Staff Planner Kristine Gay

Requests Conditional Use Permits (Craft Brewery & Open Air Market) Staff Recommendation Approval. Staff Planner Kristine Gay Applicant Property Owner Derrick Borte Public Hearing October 11, 2017 City Council Election District Beach Agenda Item 11 Requests Conditional Use Permits (Craft Brewery & Open Air Market) Staff Recommendation

More information

County of El Dorado Notice of Preparation Tilden Park Project

County of El Dorado Notice of Preparation Tilden Park Project County of El Dorado Tilden Park Project DATE: December 19, 2012 TO: FROM: SUBJECT: Responsible Agencies, Trustee Agencies, and Interested Parties Pierre Rivas, Principal Planner, El Dorado County (NOP)

More information

MARIN COUNTY COMMUNITY DEVELOPMENT AGENCY ALEX HINDS, DIRECTOR

MARIN COUNTY COMMUNITY DEVELOPMENT AGENCY ALEX HINDS, DIRECTOR MARIN COUNTY COMMUNITY DEVELOPMENT AGENCY ALEX HINDS, DIRECTOR TO: FROM: Members of the Planning Commission Tom Lai RE: Item 6: Planning Commission Hearing of November 26, 2007 Development Code Amendments

More information

Notice of Preparation

Notice of Preparation Date: April 8, 2015 To: Subject: Notice of Preparation State Clearinghouse, Responsible Agencies, Trustee Agencies, Federal Agencies, Interested Parties, and Organizations Notice of Preparation of a Draft

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika

More information

Appendix H Traffic Study

Appendix H Traffic Study Appendix H Traffic Study Appendix I Description of Units Appendix J Responses to Comments RESPONSES

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 - Introduction In accordance with CEQA Guidelines Section 15126.6, this Draft Subsequent Environmental Impact Report (DSEIR) contains a comparative impact

More information

GREEN BUILDING GUIDELINES

GREEN BUILDING GUIDELINES 018110 GREEN BUILDING GUIDELINES PART 1: GENERAL 1.01 INTENT AND BACKGROUND A. Cornell is signatory to the American College and University Presidents Climate Commitment (PCC). By signing this document,

More information

Findings of Fact and Statement of Overriding Considerations

Findings of Fact and Statement of Overriding Considerations Findings of Fact and Statement of Overriding Considerations Pursuant to Sections 21081 and 21081.6 of the Public Resources Code and Sections 15091 and 15093 of the CEQA Guidelines Creative Arts & Holloway

More information

U S E P E R M I T. CITY OF BERKELEY ZONING ORDINANCE Berkeley Municipal Code Title 23 USE PERMIT # MODUP c/o The Austin Group LLC

U S E P E R M I T. CITY OF BERKELEY ZONING ORDINANCE Berkeley Municipal Code Title 23 USE PERMIT # MODUP c/o The Austin Group LLC Planning and Development Department Land Use Planning U S E P E R M I T CITY OF BERKELEY ZONING ORDINANCE Berkeley Municipal Code Title 23 USE PERMIT # MODUP2014-0001 Property Address: Permittee Name:

More information

Environmental Standards

Environmental Standards Revision 09/23/2015 Purpose: The Architect and/or Engineer shall incorporate the Rice specific requirements indicated in this standard s section into their design. The Architect and/or Engineer shall further

More information

ATTACHMENT C: CEQA EXEMPTION NOTICE OF EXEMPTION. Santa Barbara County Clerk of the Board of Supervisors

ATTACHMENT C: CEQA EXEMPTION NOTICE OF EXEMPTION. Santa Barbara County Clerk of the Board of Supervisors ATTACHMENT C: CEQA EXEMPTION NOTICE OF EXEMPTION TO: FROM: Santa Barbara County Clerk of the Board of Supervisors Dana Eady, Planning & Development The project or activity identified below is determined

More information

NAPA SANITATION DISTRICT SOLAR PROJECT

NAPA SANITATION DISTRICT SOLAR PROJECT NAPA SANITATION DISTRICT SOLAR PROJECT Addendum to Initial Study / Mitigated Negative Declaration Prepared for March 2016 Napa Sanitation District NAPA SANITATION DISTRICT SOLAR PROJECT Addendum to Initial

More information

FINAL ADDENDUM #1 TO THE 2003 LONG RANGE DEVELOPMENT PLAN ENVIRONMENTAL IMPACT REPORT (State Clearinghouse No ) November 2006

FINAL ADDENDUM #1 TO THE 2003 LONG RANGE DEVELOPMENT PLAN ENVIRONMENTAL IMPACT REPORT (State Clearinghouse No ) November 2006 Page 1 FINAL ADDENDUM #1 TO THE 2003 LONG RANGE DEVELOPMENT PLAN ENVIRONMENTAL IMPACT REPORT (State Clearinghouse No. 2002102092) I. INTRODUCTION On November 20, 2003, The Regents of the University of

More information

RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT

RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT Date: January 5, 2010 Subject: Re-Issue Notice of Intent to Prepare a Draft Subsequent Environmental Impact Report Project Title:

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

3 CUMULATIVE METHODS AND PROJECTS

3 CUMULATIVE METHODS AND PROJECTS 3 CUMULATIVE METHODS AND PROJECTS 3.1 INTRODUCTION This chapter is an introduction to the cumulative impacts analysis contained within each respective environmental impact category subsection of Chapter

More information

KINGS COUNTY PLANNING COMMISSION STAFF REPORT

KINGS COUNTY PLANNING COMMISSION STAFF REPORT Staff Report KINGS COUNTY PLANNING COMMISSION STAFF REPORT CUP Addendum Conditional Use Permit Nos. 11-09 (RE Mustang), 12-01 (RE Orion), and 12-02 (RE Kent South) Zoning Ordinance No. 269.69 January 6,

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition Chapter 1 GENERAL SECTION 101 GENERAL 101.1 Title. These regulations shall be known as the California San Francisco Green Building Standards

More information

UNIVERSITY OF CALIFORNIA FINAL INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION

UNIVERSITY OF CALIFORNIA FINAL INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION UNIVERSITY OF CALIFORNIA FINAL INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION Project Name: J. Craig Venter Institute UCSD Project Number: 968434 University of California, San Diego June 28, 2007 Prepared

More information

BOSTON REDEVELOPMENT AUTHORITY DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO. 103 SOUTH BAY DEVELOPMENT. 101 Allstate Road.

BOSTON REDEVELOPMENT AUTHORITY DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO. 103 SOUTH BAY DEVELOPMENT. 101 Allstate Road. BOSTON REDEVELOPMENT AUTHORITY DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO. 103 SOUTH BAY DEVELOPMENT 101 Allstate Road Dorchester Allstate Road (Edens), LLC [, 2016] Development Plan: In accordance

More information

11.0 NOISE ELEMENT NOISE ELEMENT THE CITY OF AMERICAN CANYON GENERAL PLAN 11-1

11.0 NOISE ELEMENT NOISE ELEMENT THE CITY OF AMERICAN CANYON GENERAL PLAN 11-1 NOISE ELEMENT 11-1 STATUTORY REQUIREMENTS Government Code Section 65302(f) states the following: The General Plan shall include a noise element which shall identify and appraise noise problems in the community.

More information

Campus Planning Committee Staff Report Forest Science Lab East Wing Renovation Monday, May 24, Executive Summary

Campus Planning Committee Staff Report Forest Science Lab East Wing Renovation Monday, May 24, Executive Summary Facilities Services; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 T 541-737-2969 Campus Planning Committee Staff Report Monday, May 24, 2010 Executive Summary OVERVIEW The Campus Planning Committee

More information

ADDENDUM (No. 4) TO SAN RAFAEL GENERAL PLAN 2020 ENVIRONMENTAL IMPACT REPORT (SCH# )

ADDENDUM (No. 4) TO SAN RAFAEL GENERAL PLAN 2020 ENVIRONMENTAL IMPACT REPORT (SCH# ) ADDENDUM (No. 4) TO SAN RAFAEL GENERAL PLAN 2020 ENVIRONMENTAL IMPACT REPORT (SCH#2003052031) FOR AMENDMENT TO San Rafael General Plan 2020 Proposing: General Plan Update (10-year review) Project File

More information

DEPARTMENT OF DEFENSE DEPARTMENT OF THE NAVY

DEPARTMENT OF DEFENSE DEPARTMENT OF THE NAVY DEPARTMENT OF DEFENSE DEPARTMENT OF THE NAVY FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR IMPLEMENTATION OF THE DEVELOPMENT AGREEMENT BETWEEN THE CITY OF SAN DIEGO AND THE U.S. NAVY FOR REDEVELOPMENT OF

More information

TO THE MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM AMENDMENT OF THE LONG RANGE DEVELOPMENT PLAN, MERCED CAMPUS EXECUTIVE SUMMARY

TO THE MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM AMENDMENT OF THE LONG RANGE DEVELOPMENT PLAN, MERCED CAMPUS EXECUTIVE SUMMARY Office of the President GB5 TO THE MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For Meeting of May 15, 2013 ACTION ITEM AMENDMENT OF THE LONG RANGE DEVELOPMENT PLAN, MERCED CAMPUS EXECUTIVE SUMMARY

More information

Solar Ready Homes/Solar Oriented Developments Residential Stakeholder Meeting

Solar Ready Homes/Solar Oriented Developments Residential Stakeholder Meeting Solar Ready Homes/Solar Oriented Developments Residential Stakeholder Meeting California Statewide Utility Codes and Standards Program Jon Roberts CTG Energetics Buehler Alumni Center, UC Davis May 13,

More information

Los Gatos Creek Bridge Replacement / South Terminal Phase III Project

Los Gatos Creek Bridge Replacement / South Terminal Phase III Project Los Gatos Creek Bridge Replacement / South Terminal Phase III Project Board Meeting February 6, 2014 Presentation Topics Overview Location and Scope Environmental Review Project Construction Schedule Community

More information

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as:

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as: ALTERNATIVES TO THE PROPOSED PROJECT 5.0 5.1 CEQA REQUIREMENTS CEQA requires that an EIR analyze a reasonable range of feasible alternatives that meet most or all project objectives while reducing or avoiding

More information