Orange County Central Utility Facility Upgrade IP

Size: px
Start display at page:

Download "Orange County Central Utility Facility Upgrade IP"

Transcription

1 MITIGATION MONITORING AND REPORTING PROGRAM The California Public Resources Code, Section , requires that a lead or responsible agency adopt a mitigation monitoring and reporting plan when approving or carrying out a project when an MND identifies measures to reduce potential environmental impacts. As lead agency for the project, the County is responsible for adoption and implementation of the mitigation monitoring and reporting program. Biological Resources BIO-1 Prior to removal of any vegetation that shall occur between September 1 X X County of Orange in and January 1. If this timing is not feasible and removal must occur between consultation with January 1 and August 31, a nesting bird survey shall be conducted by a qualified California biologist no more than 72 hours prior to planned vegetation removal activity. If Department of Fish occupied nests are present, vegetation shall not be removed until the young have and Wildlife fledged and the nesting cycle is deemed complete by a qualified biologist. BIO-2 Prior to the start of construction, but no longer than 72 hours in advance of X X County of Orange in construction, a nesting bird survey will be conducted by a qualified biologist and consultation with approved by the California Department of Fish & Wildlife. If nests are discovered California during the pre-construction survey, the biologist will identify an appropriate setback Department of Fish zone the construction crew must observe in order to ensure that existing noise and Wildlife levels remain. Once the juvenile birds have fledged or the nest is deemed no longer active by a qualified biologist, construction restrictions/monitoring shall cease. BIO-3 Each tree or shrub that will be removed prior to or during construction X X X County of Orange in Date of 1 December 2015 Page 1 of 11

2 must be indicated on project plans. These plans shall be reviewed by the Civic Center Authority. The County will evaluate comments received from the Civic Center Authority and implement them accordingly. Additionally, removal of any palm trees located in the Plaza of the Flags will be conducted under the supervision of a certified arborist. The contractor responsible for removal of any palm trees in the Plaza of the Flags will replace the palm trees in accordance with any established Civic Center guidelines, if any after construction and ensure the trees survival after removal and before replacement. Cultural Resources CUL-1 Prior to grading/excavation activities, the County of Orange (County) shall prepare an archaeological monitoring plan that includes an on-site, Countyapproved archaeological monitor to oversee initial grading/excavation and any subsurface work anticipated during pipeline trenching activities. In the event that archaeological resources are encountered, the archaeological monitor shall have the authority to stop all construction work in the vicinity of the discovery until a qualified archaeologist can evaluate the discovery. activities may continue in other areas, but should be distanced at least 100 feet from the find. If the discovery proves significant under CEQA (Section f; PRC 21082), additional work such as testing or data recovery may be warranted. CUL-2 Prior to grading activities, the County shall prepare a paleontological monitoring plan that includes an on-site, County-approved paleontological monitor to oversee initial grading and any subsurface work anticipated during pipeline trenching activities. In the event potential paleontological resources are encountered, the monitor shall have the authority to stop all construction work in the consultation with the Civic Center Authority X X X X County of Orange in consultation with California Office of Historic Preservation X X X X County of Orange in consultation with California Office of Historic Preservation Date of 2 December 2015 Page 2 of 11

3 vicinity of the discovery until a County-qualified paleontologist can evaluate the discovery to determine whether it is scientifically significant. If the resource is determined to be of significance, specific steps shall be implemented, as indicated in the plan and under the direction of the paleontologist, to protect the resource. Such steps would possibly include salvage. CUL-3 In the event that any sites containing human remains are inadvertently discovered during excavation or pipeline drilling/trenching, construction will cease in the vicinity of the discovery or any nearby area and the following actions will be taken: The County Coroner s Office shall be notified immediately. If the County Coroner determines that the remains are Native American, the Native American Heritage Commission shall be contacted within 24 hours, per California state law (California Public Resources Code, Section ). The Native American Heritage Commission shall designate a most likely descendant, who may make recommendations concerning the disposition of the remains and associated grave goods in consultation with the County. If the Native American Heritage Commission is unable to identify a most likely descendant or if the most likely descendant fails to make a recommendation within 24 hours, or if the County rejects the recommendations of the descendant and mediation efforts fail to provide measures acceptable to the County, then the County or its designee shall rebury the remains and associated grave goods in an area that shall not be disturbed. Only after the above actions are taken and the inadvertent discovery of human remains is resolved will construction activity begin again. X X X County of Orange in consultation with California Office of Historic Preservation Date of 3 December 2015 Page 3 of 11

4 Hazards and Hazardous Materials HAZ-1 Prior to start of construction, a hazardous materials management plan shall be prepared by the County or its contractor in consultation from the Regional Water Quality Control Board. The plan shall include the following components associated with the construction and operation phases of the project: The plan shall identify anticipated chemical and fuel storage, including anticipated chemicals to be stored, storage locations, container types, and quantities. The plan shall discuss spill prevention measures, inspection procedures, and spill response. The plan shall also discuss anticipated hazardous wastes to be generated at the site, waste handling, and disposal. HAZ-2 Prior to the start of construction/demolition of the existing boiler and chilled water system at the CUF, an asbestos abatement work plan shall be prepared by the County or its contractor in compliance with federal, state, and local regulations for any necessary removal and disposal of such materials, (including, but not limited to, 40 CFR 61 Subpart M, Occupational Safety and Health Administration 8 CCR 1529, and South Coast Air Quality Management District Rule 1403). The asbestos abatement work plan shall include the following: Demolition plans and contract specifications shall incorporate any necessary abatement measures for the removal of materials containing asbestos to the satisfaction of the County Health Care Agency. Only a California Department of Occupational Safety and Health-certified contractor that is retained by the County to perform asbestos abatement on the X X X X County of Orange Health Care Agency in consultation with the Regional Water Quality Control Board X X X County of Orange Health Care Agency Date of 4 December 2015 Page 4 of 11

5 CUF, chilled water line properties and is authorized to perform the asbestos abatement on these properties. All other persons who may come into contact with any asbestos-containing material while working at the CUF and chilled water pipeline properties must be notified in writing to avoid removal or disturbance of the asbestos-containing material. If any suspect material not identified in the June 25, 2015 report is found during the course of demolition, all work must stop immediately, and a California Department of Industrial Relations Division of Occupational Safety and Healthcertified asbestos consultant must be notified to examine such material prior to the material being disturbed. All known asbestos-containing material or asbestos-containing construction material, to the extent that the asbestos-containing material or asbestoscontaining construction material become friable, must be removed prior to construction activity. The asbestos-containing waste material that is generated during demolition at the CUF and chilled water pipeline properties shall be properly handled and disposed of in compliance with applicable regulatory agencies (such as SCAQMD, California Department of Resources Recycling and Recovery, and the U.S. EPA) that may have jurisdiction over the asbestos-containing waste material. HAZ-3 Prior to the start of demolition or construction of the rooftop units on the Osborne Building or the Gates Building, an asbestos abatement work plan shall be prepared by the County or its contractor in compliance with federal, state, and local X X X County of Orange Healthcare Agency Date of 5 December 2015 Page 5 of 11

6 regulations for any necessary removal and disposal of such materials, (including, but not limited to, 40 CFR 61 Subpart M, Occupational Safety and Health Administration 8 CCR 1529, and South Coast Air Quality Management District Rule 1403). The asbestos abatement work plan shall include the following: Demolition plans and contract specifications shall incorporate any necessary abatement measures for the removal of materials containing asbestos or assumed to contain asbestos to the satisfaction of the County Health Care Agency. Only a California Department of Occupational Safety and Health-certified contractor that is retained by the County to perform asbestos abatement on the Osborne Building and the Gates Building is authorized to perform the asbestos abatement on these properties. All other persons who may come into contact with any asbestos-containing material while working at the Osborne Building and the Gates Building must be notified in writing to avoid removal or disturbance of the asbestos-containing material. If any suspect material not identified but assumed to contain asbestos as indicated in the June 20, 2015 report is found or will be disturbed during the course of demolition, all work must stop immediately, and a California Department of Industrial Relations Division of Occupational Safety and Healthcertified asbestos consultant must be notified to examine such material prior to the material being disturbed. All known asbestos-containing material or asbestos-containing construction material, to the extent that the asbestos-containing material or asbestos- Date of 6 December 2015 Page 6 of 11

7 containing construction material become friable, must be removed prior to demolition or mechanical unit installation activity. The asbestos-containing waste material that is generated during demolition of the units at the Osborne Building and the Gates Building shall be properly handled and disposed of in compliance with applicable regulatory agencies (such as SCAQMD, California Department of Resources Recycling and Recovery, and the U.S. EPA) that may have jurisdiction over the asbestoscontaining waste material. HAZ-4: Prior to the start of construction/demolition of the existing boiler and chilled water system at the CUF, a lead-based paint/lead-containing paint abatement work plan shall be prepared by the County or its contractor in compliance with federal, state, and local regulations (including, but not limited to Occupational Safety and Health Administration CCR Title 17 Section and Title 8 Section and South Coast Air Quality Management District Rule 301) for any necessary removal and disposal of such materials. This work plan shall also include the following elements as per the June 25, 2015 Asbestos Building Survey and Lead Paint Screening for the Central Utility Facility : Demolition plans and contract specifications shall incorporate any necessary abatement measures for the removal of materials containing lead-based paint and/or lead-containing paint to the satisfaction of Orange County Environmental Health Division - Hazardous Waste Specialist III. Prior to any demolition activity at the site a visual inspection of painted areas shall be performed to identify the condition of existing loose, flaking and peeling paint. All loose, flaking or otherwise deteriorated lead paint shall be stabilized prior to X X X County of Orange Healthcare Agency Date of 7 December 2015 Page 7 of 11

8 any other construction-related activity and/or demolition of the equipment onsite. Paint stabilization shall Include scraping paint and encapsulation of the scraped surfaces with an approved lead-paint primer. The stabilization process must be completed by California Department of Public Health Certified Workers under a California Department of Public Health Certified Supervisor. All loose and flaking paint irrespective of lead content shall be removed from the area of work. The area shall be cleaned using vacuum cleaners (equipped with high-efficiency particulate air filters). Work area preparations as well as adequate worker protection will be required during any equipment demolition activity. The level of work area preparation and worker protection will be dependent on the California Department of Industrial Relations Division of Occupational Safety and Health Trigger Tasks employed during equipment demolition and/or dismemberment. Personal air monitoring of workers conducting lead-related work is required by California Department of Industrial Relations Division of Occupational Safety and Health. An initial assessment shall be conducted to demonstrate that surface coatings that contain lead at concentrations equal to or in excess of 600 parts per million do not constitute a health hazard to these employees pursuant to 18 California Code of Regulations All lead-containing waste materials generated from the paint stabilization activities and/or demolition/dismemberment shall be handled and stored on-site temporarily. Prior to removal of the lead-containing waste material from the site, waste characterization sampling and analysis must be performed on the waste materials to determine the lead waste contents and establish appropriate Date of 8 December 2015 Page 8 of 11

9 disposal requirements. HAZ-5 A hazardous materials contingency plan shall be prepared by the County or its contractor, approved by the County Health Care Agency in consultation with the applicable State Agency, and followed during excavation at the project areas. The plan should (1) specify measures to be taken to protect worker and public health and safety and (2) specify measures to be taken to identify, manage, and remediate wastes should impacted soil be encountered. The plan should include the following: Identification of the known soil contamination areas. Information on how to identify suspected contaminated soil. A 40-hour HAZWOPER-certified safety officer shall monitor the excavation work in areas of anticipated petroleum or volatile organic compound contamination (based on the existing data for the closed release sites). Visual observation for contamination as well as air monitoring with an organic vapor analyzer should be used to identify contaminated soils in these areas. Procedures for temporary cessation of construction activity and evaluation of the level of environmental concern (sampling and risk evaluation). Procedures for limiting access to the contaminated area to properly trained personnel. Procedures for notification and reporting, including internal management and local agencies, as needed. Procedures for characterizing and managing excavated soils. Noise X X X County of Orange Healthcare Agency Date of 9 December 2015 Page 9 of 11

10 NOI-1 To reduce construction noise generated by the proposed project, the X X County of Orange County will ensure that prior to commencement of construction, the project contractor shall provide proof of implementation of the following measures: Electrically powered equipment will be used instead of pneumatic or internal combustion powered equipment, where feasible. Material stockpiles and mobile equipment staging, parking, and maintenance areas will be located as far as practicable from noise-sensitive receptors. The use of noise-producing signals, including horns, whistles, alarms, and bells, will be for safety warning purposes only. The on-site construction supervisor will have the responsibility and authority to receive and resolve noise complaints. A clear appeal process to the City will be established prior to construction commencement that will allow for resolution of noise problems that cannot be immediately solved by the site supervisor. signs will be posted at the project site identifying a contact name and phone number to register noise complaints. Transportation and Traffic TRA-1 Prior to commencement of project construction, the County shall prepare X X X County of Orange a construction traffic control plan for each roadway, pedestrian corridor, or parking area that will be affected during construction. The plans should include, but should not be limited to, the provision of warning signs, lights, flashing arrow boards, barricades, cones, lane closures, flaggers, pedestrian detours, parking restrictions, and restricted hours during which lane closures would not be allowed (e.g., 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m.). This plan shall also indicate the protocol the County or its designee shall follow prior to beginning work within a Date of 10 December 2015 Page 10 of 11

11 street or parking area that will allow for advanced warning to local law enforcement and emergency service providers and ensure safe passage of emergency vehicles throughout construction. The County will also review the applicable emergency evacuation plan(s) to ensure that construction would not impede emergency evacuation or response procedures. The plan shall be reviewed and approved by the County and the City. Finally, the County or its designee shall ensure that written notification is provided to any property owner or tenant that will experience driveway or ingress/egress disruptions as a result of construction. This notice shall be delivered at least 10 days in advance of the construction activity and shall provide contractor and County representative contact information in case further coordination is needed. Date of 11 December 2015 Page 11 of 11

MITIGATION MONITORING & REPORTING PLAN

MITIGATION MONITORING & REPORTING PLAN MITIGATION MONITORING & REPORTING PLAN The following environmental mitigation measures shall be incorporated into the project development as Conditions of Approval (MND 2318). The Project Applicant shall

More information

8.0 MITIGATION MONITORING AND REPORTING PROGRAM

8.0 MITIGATION MONITORING AND REPORTING PROGRAM 8.0 MITIGATION MONITORING AND REPORTING PROGRAM Public Resources Code, Section 21081.6 requires that mitigation measures identified in environmental review documents prepared in accordance with CEQA are

More information

State Clearinghouse Number Prepared for: City of Fontana 8353 Sierra Avenue Fontana, CA

State Clearinghouse Number Prepared for: City of Fontana 8353 Sierra Avenue Fontana, CA for the Seefried Valley & Catawba Warehouse Project Focused Environmental Impact Report City of Fontana, San Bernardino County, California State Clearinghouse Number 2018041008 Prepared for: City of Fontana

More information

Mitigation Monitoring and Reporting Program

Mitigation Monitoring and Reporting Program Mitigation Monitoring and Reporting Program Mitigation Monitoring and Reporting Program The Infill Environmental Checklist identifies the applicable mitigation measures from the Downtown Area Plan Environmental

More information

MITIGATION MONITORING & REPORTING PLAN

MITIGATION MONITORING & REPORTING PLAN MITIGATION MONITORING & REPORTING PLAN The following environmental mitigation measures shall be incorporated into the project development as Conditions of Approval (MND 2329). The project applicant shall

More information

Mitigation Monitoring and Reporting Program

Mitigation Monitoring and Reporting Program ATTACHMENT 2 Mitigation Monitoring and Reporting Program Mitigation Monitoring and Reporting Program The following Mitigation Monitoring and Reporting Program (MMRP) provides a summary of each Mitigation

More information

ANAHEIM FIVE COVES (NORTHERN EXTENSION) PARK PROJECT MITIGATION MONITORING PLAN NO. 341

ANAHEIM FIVE COVES (NORTHERN EXTENSION) PARK PROJECT MITIGATION MONITORING PLAN NO. 341 Terms and Definitions: 1. Property Owner/Developer 2. Environmental Equivalent/Timing Any mitigation measure and timing thereof, subject to the approval of the City, which will have the same or superior

More information

MITIGATION MEASURES TO BE INCLUDED IN THE PROJECT AND AGREED TO BY THE PROJECT SPONSOR AND ALL SUBSEQUENT PROPERTY OWNERS AND PERMITEES FOR THE

MITIGATION MEASURES TO BE INCLUDED IN THE PROJECT AND AGREED TO BY THE PROJECT SPONSOR AND ALL SUBSEQUENT PROPERTY OWNERS AND PERMITEES FOR THE MITIGATION MEASURES TO BE INCLUDED IN THE PROJECT AND AGREED TO BY THE PROJECT SPONSOR AND ALL SUBSEQUENT PROPERTY OWNERS AND PERMITEES FOR THE TIBURCIO VASQUEZ HEALTH CENTER ALAMEDA COUNTY, CALIFORNIA

More information

IRVINE UNIFIED SCHOOL DISTRICT MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL

IRVINE UNIFIED SCHOOL DISTRICT MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL IRVINE UNIFIED SCHOOL DISTRICT MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL Prepared for: IRVINE UNIFIED SCHOOL DISTRICT Facilities Planning & Construction

More information

RESOLUTION NO Adopted by the Sacramento City Council. July 14, 2015

RESOLUTION NO Adopted by the Sacramento City Council. July 14, 2015 RESOLUTION NO. 2015-0219 Adopted by the City Council July 14, 2015 APPROVING THE PRELIMINARY PLANS AND ADOPTING THE MITIGATED NEGATIVE DECLARATION AND THE FOR THE VINCI AVENUE BRIDGE REPLACEMENT PROJECT

More information

Site 18A Culvert Replacement and Fish Passage Enhancement Project

Site 18A Culvert Replacement and Fish Passage Enhancement Project EXHIBIT C Final Mitigation Monitoring and Reporting Program for the Site 18A Culvert Replacement and Fish Passage Enhancement Project SCH#2015042009 Prepared for: May 8, 2015 Final Mitigation Monitoring

More information

MMRP for Metro Red/Purple Line Core Capacity Improvements Project

MMRP for Metro Red/Purple Line Core Capacity Improvements Project MMRP for This (MMRP) contains mitigation measures for the Red/Purple Line Core Capacity Improvements Project, which will be approved by the Los Angeles County politan Transportation Authority () Board

More information

RD:JVP:JMD 05/04/2016 RESOLUTION NO.

RD:JVP:JMD 05/04/2016 RESOLUTION NO. RD:JVP:JMD 05/04/2016 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE ADOPTING THE SCOTIA APARTMENTS (1777-1797 ALMADEN ROAD) PLANNED DEVELOPMENT REZONING PROJECT MITIGATED NEGATIVE

More information

INTRODUCTION. Mitigation Implementation and Monitoring. Mitigation Enforcement

INTRODUCTION. Mitigation Implementation and Monitoring. Mitigation Enforcement INTRODUCTION This mitigation monitoring and reporting plan summarizes identified mitigation measures, implementation schedule, and responsible parties for the Proposed Project. will use this mitigation

More information

San Diego State University: New Student Housing Project. Mitigation Monitoring and Reporting Program

San Diego State University: New Student Housing Project. Mitigation Monitoring and Reporting Program : New Student Housing Project Mitigation Monitoring and Program (Pursuant to Public Resources Code Section 21081.6, And State CEQA Guidelines Section 15097) Final Environmental Impact Report (State Clearinghouse

More information

Prepared for: City of Santa Ana 20 Civic Center Plaza Santa Ana, CA, Contact: Selena Kelaher, Associate Planner

Prepared for: City of Santa Ana 20 Civic Center Plaza Santa Ana, CA, Contact: Selena Kelaher, Associate Planner for the 2129 N. Main Street Hampton Hotel Study/Mitigated Negative Declaration, Orange County, California Prepared for: 20 Civic Center Plaza Santa Ana, CA, 92701 714.647.5400 Contact: Selena Kelaher,

More information

V. MITIGATION MONITORING PLAN

V. MITIGATION MONITORING PLAN V. MITIGATION MONITORING PLAN A. INTRODUCTION The mitigation monitoring plan (MMP) contained herein satisfies the requirements of CEQA pursuant to Section 15097(a) of the State CEQA Guidelines as they

More information

FINDING OF NO SIGNIFICANT IMPACT

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT Additional Storage Reservoir for the Non-Potable Water Supply System City of Santa Monica, California, United States September 2011 The U.S. Environmental Protection Agency

More information

Orange County Water District Mid Basin Centennial Park Injection Well Project

Orange County Water District Mid Basin Centennial Park Injection Well Project Orange County Water District Mid Basin Centennial Park Injection Well Project Final Environmental Report/Environmental Assessment State Clearinghouse No. 2015061055 s of Fact Prepared By Orange County

More information

MEDITERRA PROJECT MITIGATION MONITORING AND REPORTING PROGRAM

MEDITERRA PROJECT MITIGATION MONITORING AND REPORTING PROGRAM Aesthetics AES-1 The landscape plan approved for the north side of Greenspot Road along the proposed project shall incorporate native trees and plants that can buffer the visual appearance of the residential

More information

Taylor Yard Bikeway/Pedestrian Bridge Over the Los Angeles River Project Mitigation Monitoring and Reporting Program

Taylor Yard Bikeway/Pedestrian Bridge Over the Los Angeles River Project Mitigation Monitoring and Reporting Program Mitigation and Reporting Program Prepared By: ICF 601 W. Fifth Street, Suite 900 Los Angeles, CA 90071 for the City of Los Angeles Department of Public Works Environmental Management Group 1149 S. Broadway,

More information

MITIGATION MONITORING AND REPORTING PROGRAM

MITIGATION MONITORING AND REPORTING PROGRAM MITIGATION MONITORING AND REPORTING PROGRAM This Mitigation and Reporting Program (MMRP) has been prepared pursuant to CEQA Guidelines (California Code of Regulations, Title 14), which state the following:

More information

TEL FAX

TEL FAX 20 EXECUTIVE PARK, SUITE 200 IRVINE, CALIFORNIA 92614 949.553.0666 TEL 949.553.8076 FAX BERKELEY CARLSBAD FORT COLLINS FRESNO PALM SPRINGS PT. RICHMOND RIVERSIDE ROCKLIN SAN LUIS OBISPO November 15, 2013

More information

Mitigation Monitoring and Reporting Plan

Mitigation Monitoring and Reporting Plan Mitigation Monitoring and Reporting Plan for the Griffith Park Crystal Springs New Baseball Fields Project SCH#2013011012 Prepared by: City of Los Angeles Department of Public Works Bureau of Engineering,

More information

RD:SSL:JMD 08/18/2015 RESOLUTION NO.

RD:SSL:JMD 08/18/2015 RESOLUTION NO. RD:SSL:JMD 08/18/2015 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JOSE APPROVING THE LAKE CUNNINGHAM BIKE PARK PROJECT MITIGATED NEGATIVE DECLARATION, FOR WHICH AN INITIAL STUDY

More information

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin MISSOURI DEPARTMENT OF NATURAL RESOURCES Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin 7/2001 Division of Environmental Quality Hazardous Waste

More information

8.0 Inventory of Mitigation Measures

8.0 Inventory of Mitigation Measures 8.0 Inventory of Mitigation Measures 8.0 INVENTORY OF MITIGATION MEASURES LAND USE AND RELEVANT PLANNING Consistency With City of Long Beach General Plan City of Long Beach Zoning Regulations Refer to

More information

SECTION AIR POLLUTION AND HAZARDOUS WASTE CONTROLS

SECTION AIR POLLUTION AND HAZARDOUS WASTE CONTROLS 1.0 GENERAL 1.01 DESCRIPTION SECTION 01 57 22 AIR POLLUTION AND HAZARDOUS WASTE CONTROLS The Work specified in this Section consists of eliminating or minimizing air and soil pollution generated by construction

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1993 Specifications CSJ 8015-24-003 SPECIAL SPECIFICATION TO ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1. DESCRIPTION. This item shall govern all work required to remove groundwater encountered

More information

SUMMARY. Mitigated Negative Declaration for the Academic Building, Mission Bay Block 25A State Clearinghouse Number

SUMMARY. Mitigated Negative Declaration for the Academic Building, Mission Bay Block 25A State Clearinghouse Number ATTACHMENT 5 SUMMARY Mitigated Negative Declaration for the Academic Building, Mission Bay Block 25A State Clearinghouse Number 2012062042 Project Location and Description UCSF proposes the construction

More information

MITIGATION MONITORING AND REPORTING PROGRAM CHABOT COLLEGE 2012 FACILITIES MASTER PLAN

MITIGATION MONITORING AND REPORTING PROGRAM CHABOT COLLEGE 2012 FACILITIES MASTER PLAN EXHIBIT 2 Prepared for Chabot Las Positas Community College October 29, 2017 Land Use and Environmental Planning 1.0 INTRODUCTION 1.1 Background When adopting a Mitigated Negative Declaration, Public Resources

More information

San Bernardino Valley College Master Plan Final Program Environmental Impact Report. February State Clearinghouse No

San Bernardino Valley College Master Plan Final Program Environmental Impact Report. February State Clearinghouse No San Bernardino Valley College Master Plan Final Program Environmental Impact Report State Clearinghouse No. 2009041098 February 2010 Prepared for: San Bernardino Community College District 114 South Del

More information

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section: SECTION 01 55 26 TRAFFIC CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Section covers requirements for traffic control during construction of the PROJECT. 1.02 REFERENCES A. The following is a list of

More information

III. Corrections and Additions

III. Corrections and Additions A. Introduction The following corrections and additions are set forth to update the 100 W. Walnut Planned Development Draft Environmental Impact Report (Draft EIR) in response to the comments received

More information

Exhibit G. Construction Mitigation Plan

Exhibit G. Construction Mitigation Plan Exhibit G Construction Mitigation Plan Construction Period Mitigation 1. A construction period mitigation plan shall be prepared by the applicant for approval by the Public Works Department prior to issuance

More information

Vesting Tentative Tract Map 8143 / PLN Mitigation Monitoring and Reporting Program

Vesting Tentative Tract Map 8143 / PLN Mitigation Monitoring and Reporting Program Aesthetics/Visual Commitments and Mitigation Measures Mitigation and Reporting Program Mitigation Measure 3-1: Lighting Design Plan. The Applicant shall design lighting to be sensitive to neighboring land

More information

Appendix F Asbestos Emission Control Plan (on CD-ROM)

Appendix F Asbestos Emission Control Plan (on CD-ROM) Appendix F Asbestos Emission Control Plan (on CD-ROM) rjmmmrmpv Asbestos Emission Control Plan MPCA VIC Project No. VP22480 Dakota County, Minnesota Prepared for the University of Minnesota November 14,

More information

Appendix H Mitigation Monitoring Plan

Appendix H Mitigation Monitoring Plan Appendix H Mitigation Monitoring Plan Appendix H No. Impact/Mitigation Measure Implementation & Monitoring 1. Traffic and Transportation Impacts All traffic control plans and mitigation measures, prepared

More information

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

GENERAL NOTES REQUIRED NOTES ON ALL PLANS GENERAL NOTES REQUIRED NOTES ON ALL PLANS ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION SHALL CONFORM TO THE CURRENT CITY OF SANTA ROSA DESIGN AND CONSTRICTIOIN STANDARDS AND CONSTRUCTION SPECIFICATIONS

More information

COASTAL DEVELOPMENT PERMIT

COASTAL DEVELOPMENT PERMIT STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY EDMUND G. BROWN, JR., GOVERNOR CALIFORNIA COASTAL COMMISSION North Central Coast District Office 45 Fremont Street, Suite 2000 San Francisco, California 94105-2219

More information

V. MITIGATION MONITORING AND REPORTING PROGRAM

V. MITIGATION MONITORING AND REPORTING PROGRAM V. MITIGATION MONITORING AND REPORTING PROGRAM A. INTRODUCTION Section 21081.6 of the Public Resources Code requires a Lead Agency to adopt a reporting or monitoring program for the changes made to the

More information

3. Asbestos Handling Program

3. Asbestos Handling Program 1.0 Introduction 3. Asbestos Handling Program This program will establish guidelines and procedures in the operations and maintenance of asbestos containing materials at PLU to protect all employees, contractors,

More information

Mitigation Measures INITIAL STUDY. Aesthetics

Mitigation Measures INITIAL STUDY. Aesthetics Appendix A2 Appendix A2 For ease of reference by the reader, the following tables are a compilation of all mitigation measures required of the proposed project, both from the Initial Study and Draft Environmental

More information

MITIGATION MONITORING AND REPORTING PROGRAM / PROJECT DESIGN FEATURES

MITIGATION MONITORING AND REPORTING PROGRAM / PROJECT DESIGN FEATURES MITIGATION MONITORING AND REPORTING PROGRAM / PROJECT DESIGN FEATURES Arroyo Verde Shopping Center, California Project No. D16-00014/CUP16-00012/ZA17-00003 SCH. No.: 2018051044 THIS PAGE LEFT BLANK INTENTIONALLY

More information

b. Asbestos Control Program A premises specific Asbestos Management Plan that keeps exposure to and risks from asbestos, to a minimum by:

b. Asbestos Control Program A premises specific Asbestos Management Plan that keeps exposure to and risks from asbestos, to a minimum by: ASBESTOS CONTROL PROGRAM (29 CFR 1910.1001) St. Norbert College 1. INTRODUCTION This document sets out the policy and procedures for managing asbestos in all St. Norbert College (SNC) buildings and facilities

More information

RD:JVP:JMD 05/10/2016 RESOLUTION NO.

RD:JVP:JMD 05/10/2016 RESOLUTION NO. RD:JVP:JMD 05/10/2016 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE ADOPTING THE WASTEWATER DIGESTER AND THICKENER FACILITIES UPGRADE PROJECT MITIGATED NEGATIVE DECLARATION, FOR WHICH

More information

Preliminary Project Assessment

Preliminary Project Assessment DISCLAIMERS: Date: March 14, 2014 Case No.: 2014.0097U Project Address: Third Street Crossing of Islais Creek Block/Lot: Public Right-of-Way Zoning: Not Applicable Area Plan: Not Applicable Project Sponsor:

More information

Appendix A: Mitigation Monitoring and Reporting Plan

Appendix A: Mitigation Monitoring and Reporting Plan of Response to Comments Appendix A: Mitigation Monitoring and Reporting Plan 295 S:\Luke\Projects\2749 of \0003 Telecom Towers\FEIR\FEIR\PSEC Final EIR and RTC's.doc of AIR QUALITY MEASURES MM AQ-1 All

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 037 TITLE: ENVIRONMENTAL INSPECTION AND SPECIALTY

More information

Mitigation Monitoring Program for the. Channel 35 Studio Relocation Project Mitigated Negative Declaration

Mitigation Monitoring Program for the. Channel 35 Studio Relocation Project Mitigated Negative Declaration Mitigation Monitoring Program for the Channel 35 Studio Relocation Project Mitigated Negative Declaration lk009i mm n rr i - r- r- f - 1 ", am_ i r V nil min ""piim"' irn «ii It i!!! F I i i m April 2016

More information

FINAL FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT D IGITAL A RTS F ACILITY UNIVERSITY OF CALIFORNIA, SANTA CRUZ

FINAL FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT D IGITAL A RTS F ACILITY UNIVERSITY OF CALIFORNIA, SANTA CRUZ FINAL FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT D IGITAL A RTS F ACILITY UNIVERSITY OF CALIFORNIA, SANTA CRUZ S EPTEMBER 2005 State Clearinghouse # 2005022004 SECTION 2.0 SUMMARY OF IMPACTS AND MITIGATION

More information

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures . GROUNDWATER AND SOILS 0.. Introduction.. Environmental Setting.. Applicable Regulations.. Impacts and Mitigation Measures... Project Impacts and Mitigation... Proposed Project... Construction Impacts

More information

4.14 HAZARDOUS MATERIALS

4.14 HAZARDOUS MATERIALS 4.14 HAZARDOUS MATERIALS INTRODUCTION The presence of hazardous materials is a part of everyday life that could affect residents, workers, and visitors within the County. Certain activities can pose a

More information

CHAPTER 11.0 MITIGATION, MONITORING, AND REPORTING PROGRAM

CHAPTER 11.0 MITIGATION, MONITORING, AND REPORTING PROGRAM 11.0, Program CHAPTER 11.0 MITIGATION, MONITORING, AND REPORTING PROGRAM CEQA (Pub. Res. Code Section 21081.6), requires that an MMRP be adopted upon certification an EIR to ensure that the mitigation

More information

MITIGATION MONITORING AND REPORTING PROGRAM

MITIGATION MONITORING AND REPORTING PROGRAM Summary AESTHETICS 3.3-1 Short-term visual impacts during construction. 3.3-1a For stationary (non-pipeline) project sites expected to be under construction or in use as a staging area for a period of

More information

MITIGATION MONITORING AND REPORTING PROGRAM FOR THE

MITIGATION MONITORING AND REPORTING PROGRAM FOR THE MITIGATION MONITORING AND REPORTING PROGRAM FOR THE Mazda Dealership and Future Dealership Project Master Case No. 18-033, Tentative Parcel Map No. 18-002, Design Review No. 18-009 Prepared for: City of

More information

I. INTRODUCTION. A. CEQA Process

I. INTRODUCTION. A. CEQA Process I. INTRODUCTION A. CEQA Process San Mateo County Community College District College of San Mateo Building 20 Demolition Final Subsequent Environmental Impact Report Findings of Fact for the College of

More information

4.0 Mitigation Monitoring and Reporting Program

4.0 Mitigation Monitoring and Reporting Program 4.0 Mitigation Monitoring and Reporting Program 4.1 Aesthetics 4.1-6 allowed by the New General Plan could increase buildings heights in Downtown which could introduce new shadow effects. Mitigation Measure

More information

MITIGATION MONITORING AND REPORTING PROGRAM Valero Benicia Crude By Rail Project

MITIGATION MONITORING AND REPORTING PROGRAM Valero Benicia Crude By Rail Project MITIGATION MONITORING AND REPORTING PROGRAM Valero Benicia Crude By Rail Project Introduction This document describes the mitigation monitoring and reporting program (MMRP) for ensuring the effective implementation

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 1892-17 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WESTLAKE VILLAGE ADOPTING A MITIGATED NEGATIVE DECLARATION, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, AND APPROVING

More information

CEQA Findings of Fact and Statement of Overriding Considerations for the Nob Hill Pipeline Improvements Project Final Environmental Impact Report

CEQA Findings of Fact and Statement of Overriding Considerations for the Nob Hill Pipeline Improvements Project Final Environmental Impact Report CEQA for the Nob Hill Pipeline Improvements Project Final Environmental Impact Report State Clearinghouse No. 2013041037 June 2014 San Diego County Water Authority 4677 Overland Avenue San Diego, California

More information

DRAFT MITIGATION MONITORING AND REPORTING PROGRAM Document considered draft until Board considers document

DRAFT MITIGATION MONITORING AND REPORTING PROGRAM Document considered draft until Board considers document DRAFT MITIGATION MONITORING AND REPORTING PROGRAM Document considered draft until Board considers document Terminal Improvements Project Environmental Impact Statement/ Environmental Impact Report Prepared

More information

EBAY SOUTH CAMPUS MAIN STREET MULTI-PURPOSE BUILDING PROJECT

EBAY SOUTH CAMPUS MAIN STREET MULTI-PURPOSE BUILDING PROJECT MITIGATION MONITORING AND REPORTING PROGRAM EBAY SOUTH CAMPUS MAIN STREET MULTI-PURPOSE BUILDING PROJECT File Nos. PDC15-030, PD15-026 September 2015 PREFACE Section 21081.6 of the California Environmental

More information

Appendix G: Mitigation Monitoring and Reporting Program

Appendix G: Mitigation Monitoring and Reporting Program : Proposed Scotts Valley Multi-Agency Regional Intertie Project The following (MMRP) has been prepared for the Scotts Valley Multi-Agency Regional Intertie Project. The MMRP identifies project impact mitigation

More information

PUBLIC REVIEW DRAFT ENVIRONMENTAL IMPACT REPORT

PUBLIC REVIEW DRAFT ENVIRONMENTAL IMPACT REPORT PUBLIC REVIEW DRAFT ENVIRONMENTAL IMPACT REPORT 408 LINDA AVENUE TOWNHOUSES PROJECT PIEDMONT, CALIFORNIA State Clearinghouse Number: 2010032085 Submitted to: Public Works Department City of Piedmont 120

More information

Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites

Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites Hazardous Waste Program Fact Sheet Asbestos-containing materials and lead-based paint have the potential

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

RESOLUTION NO. File Nos. C14-061, SP15-004, HP15-001

RESOLUTION NO. File Nos. C14-061, SP15-004, HP15-001 RD:VMT:JMD 08/02/2016 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE ADOPTING THE OUR LADY LA VANG CHURCH AND MULTI-PURPOSE BUILDING PROJECT MITIGATED NEGATIVE DECLARATION, FOR WHICH

More information

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT I. APPROVAL OF THE MITIGATED NEGATIVE DECLARATION Pursuant to Title 14, California

More information

San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System

San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System Bureau of Environmental Management 1145 Market Street, Suite 500 San Francisco, CA 94103 T 415.934.5700 F 415.934.5750

More information

Attachment A Mitigation Measures

Attachment A Mitigation Measures Attachment A Attachment A The El Camino Real/Downtown Specific Plan EIR includes mitigation measures to reduce the potential impacts of implementation of the Specific Plan. Since the Project site is located

More information

Property and Public Protection Plan

Property and Public Protection Plan Property and Public Protection Plan OTTO CONSTRUCTION PROPERTY AND PUBLIC PROTECTION PLAN Otto Construction s pre-planning of construction activities includes procedures to protect the general public and

More information

Management of Kern County Erskine Wildfire Debris

Management of Kern County Erskine Wildfire Debris Management of Kern County Erskine Wildfire Debris To ensure safety to workers, the public, and the environment, certain protocols should be followed during a wildfire disaster when removing structural

More information

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town

More information

4.0 MITIGATION MONITORING AND REPORTING PROGRAM

4.0 MITIGATION MONITORING AND REPORTING PROGRAM 4.0 MITIGATION MONITORING AND REPORTING PROGRAM A. INTRODUCTION This Mitigation Monitoring and Reporting Program ( MMRP ) has been prepared pursuant to Public Resources Code Section 21081.6, which requires

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

ATTACHMENT B: CONDITIONAL USE PERMIT

ATTACHMENT B: CONDITIONAL USE PERMIT Quality Time Child Care Center Case No. 10CUP-00000-00038 Hearing Date: May 2, 2011 ATTACHMENT B: CONDITIONAL USE PERMIT SANTA BARBARA COUNTY CONDITIONAL USE PERMIT County Land Use & Development Code Section

More information

MITIGATION MONITORING and REPORTING PROGRAM. Malibu Legacy Park Project (SCH # )

MITIGATION MONITORING and REPORTING PROGRAM. Malibu Legacy Park Project (SCH # ) MITIGATION MONITORING and REPORTING PROGRAM (SCH # 2007111092) Prepared for City of Malibu 23815 Stuart Ranch Road Malibu, CA 90265-4861 Contact: Stephanie Danner Phone: (310) 456-2489, extension 276 Prepared

More information

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Carpinteria Valley Water District Carpinteria Advanced Purification Project NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:

More information

ENVIRONMENTAL SCREENING REPORT

ENVIRONMENTAL SCREENING REPORT ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling

More information

Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado

Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado The purpose of the Contractor ESH briefing is for LMSSC to provide information

More information

Attachment 1 Findings and Conditions

Attachment 1 Findings and Conditions 2451 Ridge Road Use Permit #04-10000066 Attachment 1 Findings and Conditions APRIL 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions of the California Environmental Quality

More information

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 2 Definitions 2 Responsibilities 3 Hazard

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #2

I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #2 CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE CAMPBELL HALL REPLACEMENT BUILDING PROJECT, I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #2

More information

Mitigation Monitoring and Reporting Program

Mitigation Monitoring and Reporting Program Air Resources Board Southern California Consolidation Project Mitigation Monitoring and Reporting Program Prepared for: Department of General Services 707 Third Street West Sacramento, California 95605

More information

Mitigation Monitoring and Reporting Program for the Natomas Levee Improvement Program Landside Improvements Project

Mitigation Monitoring and Reporting Program for the Natomas Levee Improvement Program Landside Improvements Project Monitoring and Reporting Program for the Natomas Levee Improvement Program Landside Improvements Project State Clearinghouse # 2007062016 Prepared for: November 2007 Monitoring and Reporting Program for

More information

IV. MITIGATION MONITORING PROGRAM

IV. MITIGATION MONITORING PROGRAM IV. MITIGATION MONITORING PROGRAM The Mitigation Monitoring Plan (MMP) has been prepared in accordance with Public Resources Code Section 21081.6, which requires a Lead or Responsible Agency that approves

More information

Buena Vista Water Storage District. Northern Area Project

Buena Vista Water Storage District. Northern Area Project Northern Area Project MITIGATION MONITORING AND REPORTING PROGRAM The Mitigation Monitoring and Reporting Program (MMRP) is a CEQA-required component of the Mitigated Negative Declaration (MND) process

More information

AGRICULTURAL AND PRESCRIBED BURNING. (Adopted 10/18/1971, readopted 10/23/1978, revised 10/2/1990, and 5/16/2002)

AGRICULTURAL AND PRESCRIBED BURNING. (Adopted 10/18/1971, readopted 10/23/1978, revised 10/2/1990, and 5/16/2002) RULE 401. AGRICULTURAL AND PRESCRIBED BURNING. (Adopted 10/18/1971, readopted 10/23/1978, revised 10/2/1990, and 5/16/2002) A. Applicability This rule applies to all agricultural and prescribed burning

More information

Environmental Commitments Record

Environmental Commitments Record Introduction Commitments Record This section comprises a summary of the minimization, avoidance, and mitigation measures described in their respective environmental categories in this Impact Report/ Assessment.

More information

MITIGATION MONITORING & REPORTING PLAN

MITIGATION MONITORING & REPORTING PLAN The following environmental mitigation measures shall be incorporated into the project development as Conditions of Approval (MND 2340). The Project Applicant shall secure a signed verification for the

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3 Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-3 Form 2448 IH 35E Managed Lanes Project Book 2 - Technical Provisions Attachment 4-3 Show Form

More information

Appendix E. Development Regulation Amendments. Klickitat County Energy Overlay Environmental Impact Statement

Appendix E. Development Regulation Amendments. Klickitat County Energy Overlay Environmental Impact Statement Appendix E Development Regulation Amendments Klickitat County Energy Overlay Environmental Impact Statement PROPOSED AMENDMENTS TO DEVELOPMENT REGULATIONS ENERGY OVERLAY NEW SECTION (Chapter 19.39 Klickitat

More information

LEAD PAINT MANAGEMENT PROGRAM

LEAD PAINT MANAGEMENT PROGRAM LEAD PAINT MANAGEMENT PROGRAM CONTENTS 1.0 PURPOSE 2.0 APPLICABILITY AND SCOPE 3.0 APPLICABLE REGULATIONS AND STANDARDS 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 5.1 Responsibilities 5.2 Manager and Supervisor

More information

FINAL Mitigated Negative Declaration/Initial Study. Heart of the City Specific Plan Amendment for Rancho Coronado. City of San Marcos, California

FINAL Mitigated Negative Declaration/Initial Study. Heart of the City Specific Plan Amendment for Rancho Coronado. City of San Marcos, California FINAL Mitigated Negative Declaration/Initial Study Heart of the City Specific Plan Amendment for Rancho Coronado, California April 2014 Table of Contents TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY...

More information

Los Angeles International Airport (LAX) Terminal 1.5 Project. Mitigation Monitoring and Reporting Program

Los Angeles International Airport (LAX) Terminal 1.5 Project. Mitigation Monitoring and Reporting Program Los Angeles International Airport (LAX) Mitigation and Reporting Program November 2016 This document constitutes the Mitigation and Reporting Program (MMRP) for the Terminal 1.5 Project. This MMRP, prepared

More information

In general, the management plan development process consisted of:

In general, the management plan development process consisted of: NWASCO SCHOOL DISTRICT #21 ASBESTOS MANAGEMENT PLAN PART I: GENERAL PROVISIONS OF THE MANAGEMENT PLAN 1.0 INTRODUCTION This Asbestos Management Plan was developed in accordance with the United States Department

More information

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL 69 Bridge Street Dedham, MA 02026 Phone 781.251.0040 Fax 781.251.0901 40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT for INDIAN HEAD ELEMENTARY SCHOOL 726 Indian Head Street Hanson,

More information