1 Directive PNG008 March 29, 2018 Revision 1.1 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation Regulations, 2012 Order: 101/18

2 Record of Change Revision Date Description 0.0 September, 2015 Initial draft 1.0 December, 2015 Approved first version 1.1 March 29, 2018 Updated version for clarifications, added new definitions, new well completions and miscellaneous updates to align with IRIS requirements. March 29, 2018 Page 2 of 24

3 Contents 1. Introduction Definitions Governing Legislation Well Completion Types of Disposal/Injection Wells Well Completion Types without Authorizations before Licensing Well Completion Types Requiring Authorization before Licensing Application, Consents and Notification Requirements IRIS Application Drainage Unit/Area for Disposal/Injection Wells Written Consent for Disposal Wells Written Consent for Injection Wells Written Consent Format Public Notification for Offsetting Owners Casing and Cementing Requirements Completion, Operation and Monitoring Requirements Logging Requirements Logging Amendment Annulus Test Requirements Injectivity Test Requirements Surface Facilities Measurement and Reporting Requirements Well Data Submission Requirements Appendix 1: Common Disposal Pools Appendix 2: Flow Chart Related to Applying for a Licence for a Disposal Well Appendix 3: Calculation of Maximum Wellhead Injection Pressure Appendix 4: Potash Waste Disposal Well Appendix 5: Logging Guidelines Appendix 6: Recommended Procedures for Step-Rate Injectivity Test March 29, 2018 Page 3 of 24

4 1. Introduction Directive PNG008: (Directive PNG008) sets out the requirements of the Saskatchewan Ministry of Energy and Resources (ER) for the licensing and operation of disposal and injection wells. The purpose of this Directive is to detail the wellbore design, wellbore integrity logging, operational monitoring, and reporting requirements for disposal and injection wells. Injection refers to injection of fluids into subsurface pools for the purpose of enhanced recovery and storage. Disposal refers to disposing of fluids into subsurface pools for purposes other than enhanced recovery or storage. The requirements in this Directive are designed to ensure hydraulic isolation of stored, injected or disposed fluids, and to protect groundwater and energy resources. Disposal and injection wells that were approved before the release of this Directive (Revision 1.1) dated March 29, 2018 must meet the current completion, operation, monitoring and logging requirements within five years of the effective date of this revised Directive, unless otherwise approved by ER. ER refers to the latest edition of Canadian Standards Association Standard (CSA) Z341: Storage of Hydrocarbons in Underground Formations and Salt Cavern Waste Disposal, for additional requirements for the design, construction, testing, operation, maintenance and repair of underground hydrocarbon storage and cavern waste disposal projects in Saskatchewan. CSA Z341 can be accessed at CSA website at Questions on Directive PNG008 can be directed to the ER Service Desk at or 2. Definitions Acid gas means a gas that is separated during the treating of solution, or non-associated gas that contains hydrogen sulfide (H 2S), totally reduced sulfur compounds, and/or carbon dioxide (CO 2). Casing inspection log means a log that determines the depth of anomalies into the well casing; distinguishes between external and internal corrosion; and detects holes, pits, perforations, metal loss and metal thickness in the casing. Cement bond log means a log used to determine the quality of cement bonding between casing and rock formations. Commingled disposal means the disposal of fluids into two or more pools through a common wellbore without separate measurement of the disposal into each pool. Common disposal pool means a pool that is non-hydrocarbon bearing and for the purpose of disposal, as shown in Map 1 and Map 2 in Appendix 1. Disposal well means a well that has a primary purpose of fluid disposal. March 29, 2018 Page 4 of 24

5 Fracture gradient means the pressure gradient that, when applied to subsurface formations, causes the formations to fracture physically. Hydraulic isolation log means a log that detects the flow of injected fluids behind the casing string. Injection well means a well that is linked to a project as part of a project for incremental recovery or for underground storage. Integrated Resource Information System (IRIS) means an online business system that supports the development and regulation of Saskatchewan's energy and resources industry. Through IRIS, the oil and gas industry completes regularly performed business activities and regulatory tasks with the province online. Non-routine application means an application that is not a routine application. Packer isolation test means a pressure test of the tubing-casing annulus designed to evaluate the integrity of the casing, tubing and packer. Produced salt water means water produced in association with the recovery of hydrocarbons and other gases. Project means a development that groups one or more wells for approval of a specialized scheme, e.g., waterflood, EOR, storage, etc. Routine application means an application submitted to ER where a licensee self-declares that all the necessary regulatory requirements are met. Routine applications are authorized without additional review and they may be reviewed after authorization through the auditing process. Step-rate injectivity test means an injectivity test that plots stabilized injection pressures against stabilized flow rates, at increasing flow rate steps sufficient to indicate either formation fracture, or the absence of fracture. Thermal Enhanced Oil Recovery (EOR) means any process that utilizes heat to aid in the recovery of hydrocarbons, including but not limited to, steam injection, heated water injection, heated oil injection and in-situ combustion. Waste processing facility means any facility that is constructed and operated for the purpose of containing, storing, handling, treating, processing, recovering, reusing, recycling, destroying or disposing of oil-and-gas waste. March 29, 2018 Page 5 of 24

6 3. Governing Legislation The requirements in this Directive are authorized under and supplemented by: The Oil and Gas Conservation Act (OGCA) The Oil and Gas Conservation Regulations, 2012 (OGCR) Associated Directives and Guidelines Directive PNG001: Facility Licence Requirements Directive PNG005: Casing and Cementing Requirements Directive PNG006: Horizontal Oil Well Requirements Directive PNG009: Public Notice Requirements Directive PNG010: Well Logging Requirements Directive PNG013: Well Data Submission Requirements Directive PNG017: Measurement Requirements for Oil and Gas Operations Guideline PNG021: Determining Drainage Units and Target Areas Guideline PNG024: Reclassification and Recompletion Guideline PNG029: Annulus Test Reporting Requirements 4. Well Completion Types of Disposal/Injection Wells 4.1 Well Completion Types without Authorizations before Licensing The following well completion types do not require additional authorization in IRIS before licensing, as long as they are not used for commingled disposal: (a) Disposal Well Disposal wells are used for the disposal of produced salt water or brine equivalent fluids and when the well is not part of an active project approved by ER (i.e., waterflood project, EOR project, storage project, etc.). Examples of the disposal fluids include the following: produced salt water associated with the recovery of hydrocarbons and other gases; water-based pigging fluids from cleaning of a collection or injection line, provided it does not contain additional chemicals; brine reject or backwash from water softeners associated with enhanced recovery schemes; water from enhanced recovery schemes (can contain polymers or chemicals); and brine, excluding potash waste brine as described in Appendix 4 and brine as a byproduct from the prescribed industries in subclause 4.1(c)(ii). (b) Potash Waste Disposal Well Potash waste disposal wells are used for the disposal of potash waste brines recovered from potash operations. Please refer to Appendix 4 for the description of potash waste brines. (c) Waste Disposal Well Most waste disposal wells are associated with an approved waste-processing facility regulated by ER and/or an industrial facility regulated by the Saskatchewan Ministry of Environment. Waste disposal wells are used for disposal of the following: March 29, 2018 Page 6 of 24

7 (i) oil-and-gas field non-hazardous waste fluids including produced salt water and specific common oil-and-gas field waste streams. Examples of non-hazardous oil-and-gas field wastes that may be disposed include boiler blowdown water, tank wash water, rig wash, spent glycol and drilling waste leachate; and/or (ii) non-oil-and-gas or industrial waste fluids generated from the following prescribed industries: the chemical and petro-chemical refining industry, the mining and minerals processing industry, the electrical energy generating industry, the manufacturing industry, the forestry and forestry products industry, the construction industry, the transportation industry, the service industry, the waste management industry, and the geothermal industry. 4.2 Well Completion Types Requiring Authorization before Licensing A well licence cannot be issued for certain well completion types prior to obtaining additional authorization in IRIS. Most of the well completion types are associated with a project, e.g., waterflood, EOR, or storage. Upon authorization, a licensee must specify the authorization number at the time of licensing for every well approved by that authorization. The following are well completion types requiring additional authorization in IRIS before licensing: Pressure Maintenance Water Injection Well Pressure Maintenance Gas Injection Well Air Injector (Combustion) Well Alternating Pressure Maintenance Water Injection/Air Injection Alternating Pressure Maintenance Water Injection/CO 2 Injection Alternating Pressure Maintenance Water Injection/Gas Injection CO 2 Injector Well (these are wells used for the injection of CO 2 into a reservoir matrix for an enhanced recovery operation) Disposal wells listed in subsection 4.1 and used for commingled disposal Cyclic Oil/Steam Injector Well Gas Storage (Cavern) Well Gas Storage Well (these are wells used for the storage of gas in underground reservoir formations) Liquid Gas/NGLS Storage Well Nitrogen Injector Well Oxygen Injector Well Permanent Oil/Steam Injector Well Polymer Injector Well Solvent Injector Well Steam Injector Well (Permanent) (these are wells used for the injection of steam from potable water or recycled water into a reservoir matrix to stimulate reservoir production) Acid Gas Disposal Well (these are wells used for the disposal/injection of acid gas into a deep saline aquifer or depleted hydrocarbon pool in non-eor operations) CO 2 Storage Well (these are wells used for the injection of anthropogenic CO 2 into a deep saline aquifer or depleted hydrocarbon pool in non-eor operations) Waste Disposal (Cavern) Well (these are wells associated with waste disposal cavern systems, which can receive hydrocarbon based drilling wastes and other types of authorized wastes) Permanent Oil and Oil Injector Well March 29, 2018 Page 7 of 24

8 Oil Producer and Water Injector Well Cyclic Oil/Solvent Injector Gas Producer and Gas Injector Oil Producer/Alternating Pressure Maintenance Water Injection/Gas Injection Permanent Oil/CO 2 Injection Waste Disposal Well, used for the disposal of cooling formation water after a heat extraction process and is part of geothermal project 5. Application, Consents and Notification Requirements 5.1 IRIS Application Licences for disposal wells with a well completion type listed in subsection 4.1 can be applied for through the licensing process in IRIS, without requiring additional authorization from ER. An application for a disposal well licence is either a routine or non-routine application in IRIS depending on the licensee s response to disclosure questions. An application for a potash waste disposal well licence or a waste disposal well licence is a non-routine application. Appendix 2 shows the flow chart for decisions when licensing a disposal well. Licences for disposal/injection wells with a well completion type listed in subsection 4.2 must be applied for through the licensing process in IRIS, after receiving additional authorization from ER. Reclassification and/or recompletion to disposal/injection wells after the initial completion of the well must be applied for in IRIS, using the appropriate application process. Refer to Guideline PNG Drainage Unit/Area for Disposal/Injection Wells The drainage unit/area assigned to a disposal/injection well is that which would be assigned to an oil producing well. Please refer to Directive PNG006 and Guideline PNG021 on how to determine the drainage unit/area. Please note that target area is not applied to disposal/injection wells. A request for modification of drainage unit/area for a disposal/injection well that is subject to a lease of spaces agreement issued under The Oil and Gas Tenure Registry Regulations must be ed to petlands@gov.sk.ca. 5.3 Written Consent for Disposal Wells Before submitting an application in IRIS, applicants must obtain the right to dispose within the proposed disposal pool. Proof of the right to dispose includes the following: Freehold land: written consent from all freehold mineral owners, other than the applicant, within the drainage unit/area of the proposed disposal well. Disposed Crown land: written consent from the holders of the Crown disposition, other than the applicant, within the drainage unit/area of the proposed disposal well. Dispositions include oil and gas leases, licences or permits issued pursuant to The Crown Minerals Act. March 29, 2018 Page 8 of 24

9 Undisposed Crown land: consent or non-objection letter from the Crown, within the drainage unit/area of the proposed disposal well. The licensee must the request to 5.4 Written Consent for Injection Wells Written consent is required from all freehold mineral owners within the drainage unit/area of the proposed injection well, before submitting an application for the injection well. 5.5 Written Consent Format Please refer to Directive PNG009 for the consent format. 5.6 Public Notification for Offsetting Owners The applicant must notify offsetting or impacted mineral owners or operators whose lands are offsetting the proposed well. The notification can be conducted through the public notice process. Please refer to Directive PNG009 for the public notice process related to disposal/injection wells. Notification is not required if disposing of produced salt water into a common disposal pool. The applicant may choose to obtain consents from all parties within the notification area as identified in Directive PNG009. If all consents are obtained, then the public notice requirement is considered to be satisfied. Note: It is the responsibility of the applicant to identify any potentially or directly affected parties outside of the minimum notification area and provide notification to these parties. 6. Casing and Cementing Requirements The well casing and cement must provide hydraulic isolation of the disposal/injection contact intervals as well as protection of useable groundwater from aquifer cross-flow of the injected fluid, regardless of the fluid being disposed. In addition to the casing and cementing requirements outlined in Directive PNG005, special cements are required in the following: (a) Acid gas disposal well Acid-resistant cement must be used from total depth to above the disposal zone. (b) Wells in thermal project areas Any new injection and disposal wells within an approved thermal EOR project area, as defined in a Minister s Order for that specific project, will be required to have thermal cement and casing from total depth to surface. It is recommended that all new injection and disposal wells, currently outside of an approved thermal EOR project area but may be included as part of the future thermal development, be completed with thermal casing and cement. March 29, 2018 Page 9 of 24

10 7. Completion, Operation and Monitoring Requirements A licensee must ensure that all disposal/injection wells maintain wellbore integrity and hydraulic isolation of the disposal/injection fluids from other porous stratigraphic units. Any well that does not meet the requirements of this Directive may have its application denied or be subject to additional requirements. Please refer to CSA Z341 for additional completion, testing, operation and monitoring requirements for wells used for hydrocarbon storage and cavern waste disposal. A licensee must meet the following requirements: (a) Maximum Wellhead Injection Pressure (MWHIP) Disposal/Injection pressure in the disposal/injection formation must not exceed the formation fracture pressure. All disposal/injection wells will be subject to a MWHIP. The recommended practice for the determination of the MWHIP is based on the formation fracture pressure with a safety factor applied (refer to Appendix 3). The formation fracture pressure may be determined by step-rate injectivity tests (see Appendix 6 for recommended procedures), in-situ stress tests, or reliable offset data. A safety factor of 90 per cent must be used, unless otherwise approved by ER on an application through IRIS, or an request to the ER Service Desk tat ER.servicedesk@gov.sk.ca after an IRIS authorization. An IRIS obligation is generated for a Well Completion when a disposal or injection well licence is issued or a disposal/injection reclassification or recompletion application is authorized. To fulfill the obligation, a MWHIP report and MWHIP value must be submitted on all disposal and injection wells through IRIS, within 30 days of completion. The subsequent MWHIP report and MWHIP value must be submitted through IRIS if there are any changes from the initial reported MWHIP. The report must include the following: (i) the calculation of the MWHIP in accordance with Appendix 3; (ii) the complete test data, plots and all analyses, if testing is conducted to determine the formation fracture pressure outlined in section 11 of this Directive; (iii) technical justification of the proposed MWHIP, locations and testing conducted in the offset wells, discussion of the stratigraphic, structural and lithological analogies and insitu stress conditions, etc., if the offset data is used to determine the MWHIP; and (iv) reasons for the change of MWHIP if the formerly reported MWHIP is changed. Once the MWHIP report is submitted and the MWHIP value is entered in IRIS, ER deems it acceptable given the MWHIP determination is in accordance with this Directive. ER may audit, re-evaluate and enforce compliance where the MWHIP does not meet the requirement in accordance with this Directive. ER also has authority to assess and override MWHIP values at ER s discretion. March 29, 2018 Page 10 of 24

11 (b) Injection packer With the exception of previously approved disposal/injection wells, an injection packer is required for all disposal/injection wells. Unless otherwise approved on an application through IRIS, the injection packer must be set within the disposal/injection pool or below the next porous interval above the disposal/injection pool, at a location no more than five (5) metres true vertical depth (TVD) to: the top of the perforations; the casing seat in an open hole completion; or the top of the liner hanger in a liner completion. A request to deviate from the above injection packer requirement after an IRIS authorization must be ed to the ER Service Desk at ER.servicedesk@gov.sk.ca. (c) The tubing-production casing annulus must be filled with corrosion-inhibiting fluid and maintained at a positive pressure. (d) The portion of the casing exposed to disposal/injection fluids below the perforations must not exceed 25 m within the disposal/injection pool or within a shale formation directly below the disposal/injection pool. The portion of the wellbore below the disposal/injection interval must be plugged back in accordance with Guideline PNG024. (e) An initial packer isolation test is required in accordance with Guideline PNG029. (f) The tubing-production casing- annulus and tubing pressures must be monitored and recorded on a: daily basis for waste disposal wells, potash waste disposal wells, acid gas disposal wells and CO 2 storage wells; or monthly basis for other wells not included in (a) above. ER can set a different frequency for monitoring annulus and tubing pressures based on wellspecific conditions. Pressure records must be retained by the licensee for a period of not less than five (5) years. The pressure data must be made available upon request by ER within two (2) business days for compliance audit purposes. (g) The hydraulic stimulation of any formation in the disposal well is not allowed. ER will require licensees to apply through IRIS for any proposed hydraulic stimulation, approval may be granted provided the proper supporting technical information is provided. (h) For potash waste disposal wells, unless otherwise previously exempted by ER or on an application and authorization in IRIS, annual pressure fall-off tests must be conducted. The test report must be submitted in IRIS in accordance with Directive PNG013. Refer to Appendix 4: Potash Waste Disposal Well for details. (i) All surface casing vent issues (presence of gas or fluid at surface) must be reported to the appropriate field office or ER s Petroleum and Natural Gas Emergency Support Line at March 29, 2018 Page 11 of 24

12 Management of the issue after consultation and assessment review will be dealt with in manner that ensures worker, public, environmental and subsurface reservoir protection. 8. Logging Requirements All required logs outlined in this section must be submitted to ER through IRIS, accompanied by a detailed interpretation of the log against its specific objective performed by qualified personnel. Disposal or injection must not commence if log interpretation deems a lack of hydraulic isolation. In order to proceed, an application to repair a well must be submitted through IRIS and all work required must be completed to the satisfaction of ER area field office. For existing wells, all porous stratigraphic units, in addition to the disposal/injection pool, must be isolated by cement. In addition to the well logging requirements outlined in Directive PNG010, the following logging requirements must be met to evaluate hydraulic isolation of the disposal or injection contact intervals, unless otherwise approved by ER on an application through IRIS. Please refer to CSA Z341 for additional logging requirements for wells used for hydrocarbon storage and cavern waste disposal. (a) Cement Bond Log The cement bond log must demonstrate that hydraulic isolation exists between all porous stratigraphic units and provide a radial view of cement quality and identify lightweight cement quality. The cement bond log requirements include: An initial full-length cement bond log must be run for non-horizontal disposal/injection wells; or An initial cement bond log must be run from the top of the disposal/injection pool to the surface for horizontal wells. (b) Hydraulic Isolation Logs An initial hydraulic isolation log must be run on waste disposal or potash waste disposal wells; and A subsequent hydraulic isolation log must be run every five (5) years on waste disposal wells. ER can set a different frequency for running a subsequent hydraulic isolation log based on well-specific conditions. (c) Casing Inspection Log A full interpretation of the log must be submitted on a joint-by-joint basis that identifies anomalies, holes, pits, perforations, metal loss, wall thickness, and internal and external corrosion. The casing age, grade and collapse pressure of wells within the area of pressure influence must also be considered at the time of the application, which may be a potential limiting factor to the MWHIP. As casing integrity may degrade with age, an appropriate safety factor must be applied. The casing inspection log requirements include: An initial full-length casing inspection log must be run on: March 29, 2018 Page 12 of 24

13 new and existing wells being converted for waste disposal or potash waste disposal; existing wells being converted for injection of CO 2, solvent, or thermal fluids used in an EOR process; or existing wells being converted for disposal/injection of hydrocarbon or other gases; and A subsequent casing inspection log must be run every ten (10) years on waste disposal wells and potash waste disposal wells. ER can set a different frequency for running a subsequent casing inspection log based on well-specific conditions. Table 1 summarizes the logging requirements for disposal and injection wells. Appendix 5 provides the logging guidelines. Table 1 Logging Requirements Types of Disposal/Injection Fluids (1) (2) (3) (4) (5) (6) (7) Waste a Potash Waste Brine Produced Water CO2 or Solvent (EOR) Hydrocarbon a or Other Gases Therma l EOR Fluids c Other EOR Fluids d Logging Requirements - Initial Cement bond log X X X X X X X Hydraulic isolation log X X Casing inspection log X X X X X (conversion) Casing inspection log X X (new) Logging Requirements - Subsequent Hydraulic isolation log X (every 5 years) Casing inspection log (every 10 years) X X b a: Please refer to most recent edition of CSA Z341 for requirements in hydrocarbon storage wells/caverns and waste disposal caverns. b: Please see Appendix 4: Potash Waste Disposal Well for additional requirements. c: All thermal EOR wells, when used for injection, will require a cement bond log. d: Other EOR fluids include but not limited to: polymer, surfactant, and alkaline, etc. 9. Logging Amendment ER will consider requests for amendment of logging requirements described in section 8 under certain circumstances. A licensee may apply through IRIS for amendment from the logging requirements of this Directive where special circumstances warrant. March 29, 2018 Page 13 of 24

14 10. Annulus Test Requirements All disposal and injection wells must be tested and inspected at least once every year. All tests must be conducted in accordance with section 53 of the OGCR. Please refer to Guideline PNG029 for more information. 11. Injectivity Test Requirements Subject to conditions in clause 11 (b) being met, a maximum cumulative water injection of 500 m 3 in order to acquire the information to determine the MWHIP or injectivity may be undertaken without prior authorization from ER. A step-rate injectivity test can be used to determine the MWHIP or to confirm injectivity without fracturing the formation. Please note that step-rate test data from tests conducted after a hydraulic fracture stimulation may be inconclusive, and may not be acceptable for determining fracture pressure. (a) Procedure The recommended standard procedure for carrying out a step-rate injectivity test is described in Appendix 6. Other types of testing methods, such as in-situ stress tests, minimicro frac tests, or Diagnostic Fracture Injection Tests (DFIT), can also be used to determine the MWHIP. (b) Conditions The following conditions must be met when conducting a step-rate injectivity test or an analogous test to determine the MWHIP or injectivity of a well: (i) The licensee must have the Right to Dispose/Inject; (ii) The test period must not exceed seven (7) days; (iii) The water injection volume must not exceed 500 m 3 ; (iv) The injection packer must be set in accordance with requirements in clause 7(2); (v) If a new completion is required for the injection, an approval to recomplete must first be obtained from ER prior to completing in a new pool (Refer to the Guideline PNG024); and (vi) The step-rate injectivity test report must be submitted through IRIS, meeting the same requirements set for MWHIP reporting in clause 7(1). If the proposed testing method does not meet the conditions above, an application to reclassify the well must be submitted through IRIS for approval prior to commencement of injection. 12. Surface Facilities A separate facility licence application must be submitted to ER through IRIS if an upstream facility is required for the disposal or injection well. For information on how to obtain a licence to construct and operate an upstream facility refer to Directive PNG001. March 29, 2018 Page 14 of 24

15 13. Measurement and Reporting Requirements Refer to Directive PNG017 for measurement and reporting requirements that are applicable to disposal or injection wells/facilities. 14. Well Data Submission Requirements Refer to Directive PNG013 for requirements for the submission of well data associated with drilling, completion, workover and abandonment activities. March 29, 2018 Page 15 of 24

16 Appendix 1: Common Disposal Pools There are two common disposal pools as shown in Maps 1 and 2 in Estevan area and Lloydminster area, respectively. Map 1: Common Disposal Pool in Estevan Area Pool Name: Mannville Sand (Misc Area 4) Pool Code: Stratigraphic Unit: 4900 Mannville Group Area within Common Disposal Pool: Townships 01 to 09, Ranges 30W1M to 16W2M; and Townships 10 to 12, Ranges 01W2M to 09W2M. March 29, 2018 Page 16 of 24

17 Map 2: Common Disposal Pool in Lloydminster Area Pool Name: Dina Sand (Misc.) Pool Code: Stratigraphic Unit: 6900 Dina Member Area within Common Disposal Pool: Townships 44 to 52, Ranges 23W3 to 28W3M; and Townships 48 to 50, Ranges 19W3M to 22W3M. March 29, 2018 Page 17 of 24

18 Appendix 2: Flow Chart Related to Applying for a Licence for a Disposal Well Disposal Well Application Process Is the proposed formation commonly used for disposal and considered to be nonhydrocarbon bearing (i.e. Common Disposal Pool as shown in Appendix 1 of Directive PNG008: ) Yes Routine Application No Are there any wells diversely owned or operated and currently producing from the proposed injection formation and are located within 800 m radius of proposed disposal well? No Yes, Consents are in place Is there any offsetting diversely held land within 800 m radius of the proposed disposal well? No Yes No Has written consent of all owners and fee simple mineral owners who may be adversely affected by the disposal been obtained? Yes Has the Public Notice process been completed and are all objections resolved? Yes No Attach documents Non Routine Application March 29, 2018 Page 18 of 24

19 Appendix 3: Calculation of Maximum Wellhead Injection Pressure Typically for disposal and waterflood injection wells, a safety factor of 90 per cent of the formation fracture pressure has been used to determine the maximum wellhead injection pressure (MWHIP) by using the following formula, assuming the frictional pressure loss is negligible: MWHIP = (P Fracture 0.9) P Fluid P Fracture: Formation fracture pressure, in kpa, determined from procedures outlined in section 11 of this Directive. P Fluid: Hydrostatic pressure of disposal or injection fluid column in the wellbore, in kpa. P Fluid = depth to top of injection/disposal interval (mtvd) disposal/injection fluid gradient (kpa/m) A more conservative safety factor may be required, by a Minister s Order, subject to the well completion type, higher operational risks, wellbore and reservoir integrity, etc. In the absence of local fracture pressure data, the MWHIP can be calculated using the following formula: MWHIP = depth to top of injection/disposal interval (mtvd) (18.1 disposal/injection fluid gradient) (kpa/m) Note that the fluid gradient is given as the change in pressure per unit of depth for given fluid. The fluid gradient can be calculated from its density, which is affected by fluid salinity, temperature and pressure. For example, for fresh water (assuming incompressible at 4 degrees Celsius) with a density of 1000 kg/m 3, the gradient is 9.8 kpa/m; similarly, for produced salt water with a density of 1070 kg/m 3, the gradient is 10.5 kpa/m. The well licensee or operator should use the actual fluid gradient to calculate the MWHIP. An alternative method, other than the above methodology, to establish an appropriate and correlated accompanying maximum wellhead injection pressure, may be considered upon application to and approval by ER. The licensee must the application to ER.servicedesk@gov.sk.ca. March 29, 2018 Page 19 of 24

20 Appendix 4: Potash Waste Disposal Well Potash waste disposal wells are wells used for the disposal of potash waste brines recovered from potash operations. Potash waste brines are waste brines generated from potash mining consisting primarily of Na, K and Cl, with lesser amounts of Ca, Mg, HCO3 and SO4, trace amounts of reagents used in the milling process, and leached components derived from wastes that are to be disposed in a Tailings Management Area (TMA). TMA is the designated area for the collection and containment of brine, tailings and other wastes, including the salt storage area, and the brine ponds, as approved by the Saskatchewan Ministry of Environment. Casing and Cementing The requirements set out in Directive PNG005 must be met. Potash waste disposal pool will require hydraulic isolation to ensure the waste brine does not migrate out of disposal pool. Wellbore Integrity Logs An initial full-length cement bond log and a hydraulic isolation log must be run to demonstrate hydraulic isolation; An initial full-length casing inspection log must be run on the production casing string; A full-length casing inspection log must be run on any wellbore conversions to ensure the casing is in good condition prior to disposal; and A subsequent casing inspection log must be conducted every 10 years. If conducting a casing inspection log is not feasible, ER may approve an alternative method upon application through IRIS. The applicant must ensure casing integrity is demonstrated and supporting information must be provided to justify the alternative method. Operational Monitoring The MWHIP must not exceed the formation fracture pressure and is subject to the calculation criteria in this Directive; The tubing-production casing/ annulus and tubing pressures must be monitored on a daily basis; The annulus test must be conducted annually in accordance with section 53 of the OGCR (Refer to Guideline PNG029 for more information); and Unless otherwise previously exempted by ER or authorized on an application through IRIS, an annual pressure fall-off test must be conducted and the test result must be submitted through IRIS within 30 days after the test is performed. Refer to Directive PNG013 for requirements on submission of well data for a Test Bottom Hole Pressure Survey. March 29, 2018 Page 20 of 24

21 Appendix 5: Logging Guidelines The following are general guidelines that should be considered when running a hydraulic isolation, casing or cement integrity log. Certain aspects of these guidelines may not be appropriate in all situations. Regardless, logging company representatives should always be made aware of why logging is being conducted, to ensure that the configuration of programs and tools is appropriate for the specific well situation. Hydraulic Isolation Logs For all logs requiring injection (i.e., temperature and radioactive tracer), the following general design considerations apply: The well should be capable of accepting a stable injection rate, with sufficient fluid made available to conduct the entire logging program; Logging should be conducted with the well under normal injection conditions, preferably at or near the approved or requested MWHIP; Wireline pressure control equipment that is capable of maintaining a casing pressure at least equal to the maximum injection pressure without significant pressure bleed-off while logging should be installed; and The hydraulic isolation log must be run from the top of the injection interval to at least 200 m above the top of the zone of interest. (a) Temperature Logs The temperature of the injected fluid should be adjusted to provide for a differential of at least 5 C at the injection zone. All temperature logs should be obtained logging down at a limit of 10 m per minute with the speed displayed on the log. If conducting a temperature log on a horizontal well, an extended reach system may be needed. Wells with or without prior injection (e.g., new, existing, extended shut-in, and converted wells) The following procedures should be followed if no significant injection has occurred or the well has been shut in for an extended period where wellbore temperatures would be expected to be near geothermal: with the well shut in, run a baseline temperature log (logged down) and a baseline gamma ray log (logged up) from approximately 200 m above the top of the zone of interest to plug back total depth (PBTD); inject a volume of fluid at or near the maximum operating pressure under normal injection conditions; and with the well shut in, conduct four temperature runs (logged down) at intervals of at least a half hour to help identify storage areas. Be aware of boundary effects when analyzing for reservoir inflow. March 29, 2018 Page 21 of 24

22 The shut-in logs obtained should be presented as a composite overlay on the same axis for comparative purposes. Displays should enhance visual identification of anomalies by compressing the depth scale and expanding the temperature scale. If running a temperature log on a steam injection well, it should be run a minimum of 200 m above the injection zone, full length if total depth (TD) is less than 200 m, or to the top of the horizontal section. Temperature logs should be run at a target downhole temperature in the range of 140 C to 160 C. (b) Radioactive Tracer Logs Radioactive tracer log means a log that injects soluble radioactive material with a downhole injector at or near the maximum allowable injection pressure. Radioactive tracer logs can be effective for detecting near-wellbore flow behind casing. The tracer material should be compatible with the injection fluid to avoid density segregation or dropout of the tracer material. Logging tools should be centralized to avoid tracer ejection against the casing wall. The wellbore should be clear of tubing and packers over the zone of interest wherever practical, to avoid any radioactive tracer traps and to enhance interpretation. The logging program should include the following basic components: the radioactive tracer material should be miscible with the fluid/gas being injected; with the well shut in, a baseline gamma ray (logged up) should be run from the TD or the PBTD to at least 200 m above the top of the zone of interest; with the well under a stable injection rate at or near the maximum injection pressure, a series of stationary tracer injections should be performed commencing above and continuing through the perforated interval until the bottom detector no longer detects the ejected slug. In cases of low injection rates, log-through procedures may be used in which the tracer ejections are not stationary; injection of a slug of tracer above the perforations should be followed by four consecutive logging runs (i.e., storage passes) from the TD or the PBTD to 200 m above the zone of interest until the slug disappears or becomes stationary; and it is recommended that stationary checks be performed above the packer to verify that the packer is holding (if applicable). The results of the storage passes should be presented as a composite overlay. Cement Bond Logs All cement bond logs should be run after cement has cured; the timing of the logs is subject to the cement blend and downhole wellbore conditions. (a) General Design Considerations The well history should be researched to determine the cement type and anticipated placement, casing sizes and grades, and maximum fluid pressure exerted on the casing since the annular cement has cured. The logging tool should be selected and calibrated for the type of cement used. The logging tool should be properly centralized in the casing and be appropriately sized for the diameter casing used. March 29, 2018 Page 22 of 24

23 (b) Well Preparation The casing should be cleared of any internal cement sheathing prior to logging. The wellbore fluid should be displaced with a consistent fluid of fresh water, drilling mud, or dead crude. Mud weights should be kept below 1200 kilograms per cubic metre to avoid attenuation problems. (c) Logging Procedures The main logging pass should, where possible, be run with the maximum historical fluid pressure on the casing to avoid micro-annulus effects. If possible, a section of free pipe should be logged as a baseline reference and for transit time/amplitude calibration. Casing Inspection Logs (a) General Design Considerations The history of the well should be researched to determine all casing sizes, weights, and any activities that would influence the magnetic characteristics of the wellbore. (b) Well Preparation All tubing and mechanical items should be removed from the well. March 29, 2018 Page 23 of 24

24 Appendix 6: Recommended Procedures for Step-Rate Injectivity Test The following procedure should be used as a guideline for performing a step-rate injectivity test 1 : (a) Shut in the well or inject at a low rate until the bottom hole pressure has stabilized. This step will represent the first point of the pressure vs. rate plot. (b) Commence injection at a low rate until wellbore storage has been overcome and radial flow conditions are achieved. A stabilized pressure will indicate that radial flow conditions have been achieved. The time interval required to achieve a stabilized pressure must be applied to all subsequent injection periods. (c) Increase injection rate and continue to inject for the same time interval as the first injection period. Record the injection rate used and pressure at the end of this time interval. (d) Repeat step (c) at increasing injection rates until a minimum of five injection periods have been recorded. If formation fracture is achieved, two or more injection periods should be above the fracture pressure to clearly identify the inflection point in the pressure vs. rate plot. (e) Plot the stabilized pressures and injection rates. Draw a straight line through the data points. The point of inflection will indicate the formation fracture pressure, if achieved. 1 Singh, P.K., Agarwal, R.G. and Jrase, L.D. (1987): Systematic design and analysis of step-rate tests to determine formation parting pressure; SPE paper 16798, presented at the 62 nd Annual Technical Conference and Exhibition of the Society of Petroleum Engineers, Dallas, Texas, September 27 to 30, March 29, 2018 Page 24 of 24

Draft Directive 051. Wellbore Injection Requirements. Contents. Revised edition August 14, Replaces previous edition issued March 1994.

Draft Directive 051. Wellbore Injection Requirements. Contents. Revised edition August 14, Replaces previous edition issued March 1994. Draft Directive 051 Revised edition August 14, 2012. Replaces previous edition issued March 1994. Wellbore Injection Requirements The Energy Resources Conservation Board (ERCB/Board) has approved this

More information

Draft Directive 065 (released December 2012) Stakeholder Feedback and AER Response

Draft Directive 065 (released December 2012) Stakeholder Feedback and AER Response Draft Directive 065 (released December 2012) Stakeholder Feedback and AER Response 1. Notification Requirements Section 2.1.3.2 Pg 2-7 Inconsistent with Table 1, Notification Requirements on page 19. Fekete

More information

Water Service Wells Summary Information. October 2017 Version 2.6

Water Service Wells Summary Information. October 2017 Version 2.6 Water Service Wells Summary Information October 2017 Version 2.6 Table of Contents Table of Revisions... 4 Deep Water Source Wells... 7 Permit... 7 Well Classification, Spacing and Tenure... 7 Wellbore

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS. Filed with the Secretary of State on

DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS. Filed with the Secretary of State on DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS Filed with the Secretary of State on These rules become effective immediately upon filing with the Secretary of

More information

Incident Reporting Requirements

Incident Reporting Requirements Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation

More information

Measurement, Accounting and Reporting Plan for Thermal Heavy Oil Recovery Projects

Measurement, Accounting and Reporting Plan for Thermal Heavy Oil Recovery Projects Appendix A Measurement, Accounting and Reporting Plan for Thermal Heavy Oil Recovery Projects Guideline PNG042 October 3, 2018 Version 2.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation:

More information

Cenovus EnCAID approval #10440J Performance presentation

Cenovus EnCAID approval #10440J Performance presentation Cenovus EnCAID approval #10440J Performance presentation Claire Hong Staff Production/Completion Engineer Dubert Gutierrez Sr. Reservoir Engineer AER offices Calgary February 2015 Advisory This document

More information

Tennessee Underground Injection Control Program Overview

Tennessee Underground Injection Control Program Overview Tennessee Underground Injection Control Program Overview Mission of the UIC Program The UIC program s mission is to protect underground sources of drinking water from contamination by regulating the construction

More information

January 8, 2010 SUBJECT. Middle Bakken Formation / Three Forks Formation. Daly Bakken Three Forks Pool (01 62B) Daly Field, Manitoba

January 8, 2010 SUBJECT. Middle Bakken Formation / Three Forks Formation. Daly Bakken Three Forks Pool (01 62B) Daly Field, Manitoba January 8, 2010 SUBJECT Middle Bakken Formation / Three Forks Formation Daly Bakken Three Forks Pool (01 62B) Daly Field, Manitoba Proposed Unitization of Ebor Unit No. 2 Application for Enhanced Oil Recovery

More information

INTEGRITY DIGS AND STORAGE CAVERNS

INTEGRITY DIGS AND STORAGE CAVERNS INTEGRITY DIGS AND STORAGE CAVERNS Why do we need Asset Integrity Public and Employee Safety Protection of the Environment Asset Life Maximization Comply with Regulatory Requirements Regulatory Requirements

More information

SUBCHAPTER 8. ADDITIONAL REQUIREMENTS FOR UNDERGROUND INJECTION CONTROL (UIC) PROGRAM

SUBCHAPTER 8. ADDITIONAL REQUIREMENTS FOR UNDERGROUND INJECTION CONTROL (UIC) PROGRAM SUBCHAPTER 8. ADDITIONAL REQUIREMENTS FOR UNDERGROUND INJECTION CONTROL (UIC) PROGRAM 7:14A-8.1 Purpose and scope (a) This subchapter establishes a system of controls to ensure that underground injection

More information

Proposed regulation change under the Oil, Gas and Salt Resources Act

Proposed regulation change under the Oil, Gas and Salt Resources Act Proposed regulation change under the Oil, Gas and Salt Resources Act Regulating Compressed Air Energy Storage (CAES) in Porous Rock Reservoirs and Solution-Mined Salt Caverns October 2017 Ministry of Natural

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Directive 083: Hydraulic Fracturing Subsurface Integrity January 2016 Q1. How does the AER differentiate between a dual- and single-barrier system? A1. A dual-barrier system

More information

Water - policy and government regulation for heavy oil and oilsands development

Water - policy and government regulation for heavy oil and oilsands development Water - policy and government regulation for heavy oil and oilsands development Robert George, Alberta Environment and Sustainable Resource Development, Edmonton, Alberta Summary This presentation outlines

More information

Artificial Lift Technique (VI Semester)

Artificial Lift Technique (VI Semester) Artificial Lift Technique (VI Semester) Q.1. What do you mean by artificial lift technique in Petroleum industry? Answer. Artificial lift is a means of overcoming bottomhole pressure so that a well can

More information

6 th Well Bore Integrity Network Meeting

6 th Well Bore Integrity Network Meeting 6 th Well Bore Integrity Network Meeting Alberta ERCB CO2 Injection Well Classification The Hague, The Netherlands April 28-29, 2010 Dr. Fran Hein, P.Geol., Chief Geologist ERCB Theresa Watson, P.Eng.

More information

RULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS

RULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS RULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS I. Definitions For the purposes of this Rule 1. Ambient Exposure Rate

More information

SUBCHAPTER 8. This is a courtesy copy of this rule. All of the Department s rules are compiled in Title 7 of the New Jersey Administrative Code.

SUBCHAPTER 8. This is a courtesy copy of this rule. All of the Department s rules are compiled in Title 7 of the New Jersey Administrative Code. SUBCHAPTER 8. ADDITIONAL REQUIREMENTS FOR UNDERGROUND INJECTION CONTROL (UIC) PROGRAM 7:14A-8.1 Purpose and scope (a) This subchapter establishes a system of controls to ensure that underground injection

More information

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services rick@curaes.com And ye shall know the truth and the truth shall make you free.

More information

Available online at Energy Procedia 1 (2009) (2008) GHGT-9

Available online at   Energy Procedia 1 (2009) (2008) GHGT-9 Available online at www.sciencedirect.com Energy Procedia 1 (2009) (2008) 3531 3537 000 000 Energy Procedia www.elsevier.com/locate/procedia www.elsevier.com/locate/xxx GHGT-9 Review of failures for wells

More information

INTERIM DIRECTIVE ID 91-3

INTERIM DIRECTIVE ID 91-3 ID 91-03: Heavy Oil/Oil Sands Operations Page 1 of INTERIM DIRECTIVE ID 91-3 28 March 1991 To: All Oil and Gas Operators All In Situ Oil Sands Operators All Drilling and Servicing Contractors HEAVY OIL/OIL

More information

Understanding Mechanical Integrity Testing and Underground Gas Storage: The Key to Success

Understanding Mechanical Integrity Testing and Underground Gas Storage: The Key to Success Understanding Mechanical Integrity Testing and Underground Gas Storage: The Key to Success Prepared by: J. Daniel Arthur, P.E., SPEC (ALL Consulting) Tom Tomastik, C.P.G. (ALL Consulting) Jeff Kennedy

More information

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba April 23, 2015 Crescent Point Resources Partnership Table of Contents Section

More information

Water Sourcing and Recycling in Oil & Gas Operations. Michael Sims, P.E. Technical Permitting, Oil &Gas Division Main Line:

Water Sourcing and Recycling in Oil & Gas Operations. Michael Sims, P.E. Technical Permitting, Oil &Gas Division Main Line: Railroad Commission of Texas Water Sourcing and Recycling in Oil & Gas Operations Michael Sims, P.E. Technical Permitting, Oil &Gas Division Main Line: 512.463.3840 RRC Background Founded in 1891 to regulate

More information

Requirements for Surveillance, Sampling, and Analysis of Water Production in Hydrocarbon Wells Completed Above the Base of Groundwater Protection

Requirements for Surveillance, Sampling, and Analysis of Water Production in Hydrocarbon Wells Completed Above the Base of Groundwater Protection Directive 044 Release date: March 15, 2016 Effective date: March 15, 2016 Replaces previous edition issued July 14, 2011 Requirements for Surveillance, Sampling, and Analysis of Water Production in Hydrocarbon

More information

RP 65 and other API Activities on Carbon Capture and Storage

RP 65 and other API Activities on Carbon Capture and Storage RP 65 and other API Activities on Carbon Capture and Storage Co-authors: R. Sweatman, S. Crookshank. M. Parker, S. Meadows, K. Ritter, B. Bellinger Presented at 3 rd Well Bore Integrity Network Meeting

More information

Alberta Oil and Gas Regulations The Key to Wellbore Integrity

Alberta Oil and Gas Regulations The Key to Wellbore Integrity Alberta Oil and Gas Regulations The Key to Wellbore Integrity Presented by Theresa Watson at the Third Wellbore Integrity Network Meeting Santa Fe, New Mexico March 13, 2007 Overview Alberta Oil and Gas

More information

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 652. UNDERGROUND INJECTION CONTROL

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 652. UNDERGROUND INJECTION CONTROL Codification through the 2016 legislative session. Subchapters 1, 3 and 11 Board adoption - June 16, 2015 Gubernatorial approval - June 9, 2016 Effective date - September 15, 2016 TITLE 252. DEPARTMENT

More information

6 DRILLING AND COMPLETIONS

6 DRILLING AND COMPLETIONS Cenovus FCCL Ltd. 6-1 Drilling and Completions 6 DRILLING AND COMPLETIONS 6.1 OVERVIEW This section contains information about the drilling and completion of wells within the CLTP. Well counts, locations

More information

Shale Fracking What are the Risks? Control of Well Coverage Issues

Shale Fracking What are the Risks? Control of Well Coverage Issues Willis North America Energy Conference Shale Fracking What are the Risks? Control of Well Coverage Issues Daniel C. Dan Mason Houston - London Willis North America Energy Conference Shale Fracking: What

More information

Comments of the Railroad Commission of Texas

Comments of the Railroad Commission of Texas and Natural Sector: New Source Performance Standards and National Emission Standards for Hazardous Air Pollutants Reviews, 76 Fed. Reg. 52738 (August 23, 2011), Workover and completion or re-completion

More information

The Crown Minerals Act The Freehold Oil and Gas Production Tax Act, 2010

The Crown Minerals Act The Freehold Oil and Gas Production Tax Act, 2010 Saskatchewan Ministry of the Economy INFORMATION CIRCULAR PR - IC03 Last Update: April 2013 ACTS: The Crown Minerals Act The Freehold Oil and Gas Production Tax Act, 2010 REGULATIONS: The Crown Oil and

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations

More information

Understanding The Class II Underground Injection Control Application Process In Colorado To Comply Cost-Effectively

Understanding The Class II Underground Injection Control Application Process In Colorado To Comply Cost-Effectively Understanding The Class II Underground Injection Control Application Process In Colorado To Comply Cost-Effectively Denise M. Onyskiw, P.E. Underground Injection Control Program Supervisor Colorado Oil

More information

Chaparral Natural Resources, Inc.

Chaparral Natural Resources, Inc. OIL AND GAS DOCKET NO. 09-0254315 THE APPLICATION OF CHAPARRAL NATURAL RESOURCES, INC. TO INJECT FLUID INTO A RESERVOIR PRODUCTIVE OF OIL AND GAS, SCHERTZ UNIT WELL NO. 2, BIG BUCK (CADDO 1 ST ) FIELD,

More information

October Published by. Energy Resources Conservation Board Avenue SW Calgary, Alberta T2P 3G4

October Published by. Energy Resources Conservation Board Avenue SW Calgary, Alberta T2P 3G4 Report 2009-B Status Report on Enhanced Groundwater Protection Efforts Under Directive 044: Requirements for the Surveillance, Sampling, and Analysis of Water Production in Oil and Gas Wells Completed

More information

Suspension Requirements for Wells

Suspension Requirements for Wells Directive 01 Suspension Requirements for Wells July 24, 2007 Effective January 1, 2008, the Alberta Energy and Utilities Board (EUB) has been realigned into two separate regulatory bodies, the Energy Resources

More information

Best Petroleum Explorations, Inc. M. Brad and Sandra Dixon Themselves PROCEDURAL HISTORY

Best Petroleum Explorations, Inc. M. Brad and Sandra Dixon Themselves PROCEDURAL HISTORY OIL AND GAS DOCKET NO. 09-0273686 THE APPLICATION OF BEST PETROLEUM EXPLORATIONS, INC. FOR DISPOSAL AUTHORITY PURSUANT TO STATEWIDE RULE 9 FOR THE RUBY LEASE, WELL NO. 1D, JACK COUNTY REGULAR FIELD, JACK

More information

Ron Stefik, Eng.L. Supervisor, Reservoir Engineering Oil and Gas Commission Attachment COMMISSION. T F

Ron Stefik, Eng.L. Supervisor, Reservoir Engineering Oil and Gas Commission Attachment COMMISSION. T F COMMISSION June 10, 2016 3600-2800/2850-32640-02 Nicholas Haddow, Regulatory Specialist Aqua Terra Water Management Inc. #108, 32 Burnt Lake Crescent Red Deer, AB T4S 0K6 Dear Mr. Haddow: RE: PRODUCED

More information

North End and South End Section Hauled Wastewater Receiving Facilities Page 1 Bid Opportunity No

North End and South End Section Hauled Wastewater Receiving Facilities Page 1 Bid Opportunity No Hauled Wastewater Receiving Facilities Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Materials and installation for sewage force mains. 1.2 RELATED SECTIONS.1 CW 2110 Watermains and all specifications referenced

More information

Colorado Oil and Gas Conservation Commission

Colorado Oil and Gas Conservation Commission Colorado Oil and Gas Conservation Commission AQUIFER PROTECTION, WELLBORE INTEGRITY & SETBACK MITIGATION August 2013 COGCC MISSION FOSTER THE RESPONSIBLE DEVELOPMENT OF COLORADO S OIL AND GAS NATURAL RESOURCES.

More information

Safety and Monitoring of CO 2 Storage Projects

Safety and Monitoring of CO 2 Storage Projects Sustainable Development and CCS New York, NY September 10-11, 2007 Safety and Monitoring of CO 2 Storage Projects Professor Sally M. Benson Energy Resources Engineering Department Executive Director, Global

More information

C0 2 / Acid Gas. Conversion. Prepared for the 5 Th Well Bore Integrity Network Meeting. Calgary Alberta May 14, 2009

C0 2 / Acid Gas. Conversion. Prepared for the 5 Th Well Bore Integrity Network Meeting. Calgary Alberta May 14, 2009 C0 2 / Acid Gas Injection Well Conversion Prepared for the 5 Th Well Bore Integrity Network Meeting. Calgary Alberta May 14, 2009 Agenda Wellbore integrity Well design with annular integrity Well design

More information

Exempt Exploration and Production Wastes

Exempt Exploration and Production Wastes Waste Management Exempt Exploration and Production Wastes In 1988, EPA issued a Regulatory Determination stating that control of exploration and production (E&P) wastes under RCRA Subtitle D was not warranted.

More information

The Mineral Industry Environmental Protection Regulations

The Mineral Industry Environmental Protection Regulations MINERAL INDUSTRY E-10.2 REG 5 The Mineral Industry Environmental Protection Regulations Repealed by Chapter 10.2 Reg 7 (effective March 6, 1996). Formerly Chapter E-10.2 Reg 5. NOTE: This consolidation

More information

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection Injection Wells for Liquid-Waste Disposal Long-term reliability and environmental protection ACHIEVE MULTIPLE GOALS FOR LIQUID-WASTE DISPOSAL INJECTION WELLS Expertly located, designed, constructed, and

More information

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION M.S. Bruno and J. Couture, GeoEnvironment Technologies LLC J.T. Young, Terralog Technologies USA, Inc. Abstract The Reverse Osmosis (RO) process

More information

The Alberta Energy Regulator (AER) has approved this directive on February 17, 2016.

The Alberta Energy Regulator (AER) has approved this directive on February 17, 2016. Directive 007 Release date: February 17, 2016 Effective date: February 17, 2016 Replaces previous edition issued February 25, 2015 Volumetric and Infrastructure Requirements The Alberta Energy Regulator

More information

Telephone Lake project

Telephone Lake project Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations

More information

PROCEDURAL HISTORY EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

PROCEDURAL HISTORY EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE THE APPLICATION OF COMMON DISPOSAL, LLC FOR AN ADMINISTRATIVELY DENIED APPLICATION FOR A COMMERCIAL PERMIT TO DISPOSE OF OIL AND GAS WASTE BY INJECTION INTO A POROUS FORMATION NOT PRODUCTIVE OF OIL OR

More information

Screenless Sand Control Completions. New dimensions in sand management

Screenless Sand Control Completions. New dimensions in sand management Screenless Sand Control Completions New dimensions in sand management Applications Primary sand control completion for new wells expected to produce formation sand Remedial sand control completion for

More information

Everything You Always Wanted to Know About Class I Injection Wells in Texas

Everything You Always Wanted to Know About Class I Injection Wells in Texas Everything You Always Wanted to Know About Class I Injection Wells in Texas Lorrie Council, P.G., Manager UIC Permits Section Texas Commission on Environmental Quality Shelly Bergel, MLEIP Intern Summer

More information

Appendix X.6 Queensland Government CSG Water Management Policy

Appendix X.6 Queensland Government CSG Water Management Policy Appendix X.6 Queensland Government CSG Water Management Policy Coal Seam Gas Water Management Policy June 2010 Tomorrow s Queensland: strong, green, smart, healthy and fair Purpose The purpose of this

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Subsurface Order No. 3 April 2015 Q1. What is a subsurface order? A1. A subsurface order is issued pursuant to section 11.104 of the Oil and Gas Conservation Rules (OGCR) and

More information

Should you have any questions, please contact Michelle Harding at (250) or the undersigned at (250) Sincerely,

Should you have any questions, please contact Michelle Harding at (250) or the undersigned at (250) Sincerely, COMMISSION April 19, 2016 3600-2800-32640-02 Nicholas Haddow, Regulatory Specialist Aqua Terra Water Management Inc. #108, 32 Burnt Lake Crescent Red Deer, AB T4S 0K6 Dear Mr. Haddow: RE: PRODUCED WATER

More information

Proposed New 18 CFR Part Hydraulic Fracturing in Shale and Other Formations:

Proposed New 18 CFR Part Hydraulic Fracturing in Shale and Other Formations: Proposed New 18 CFR Part 440 - Hydraulic Fracturing in Shale and Other Formations: SUBCHAPTER B SPECIAL REGULATIONS * * * * PART 440 HYDRAULIC FRACTURING IN SHALE AND OTHER FORMATIONS Sec. 440.1 Purpose,

More information

Challenges in the Transition from of CO 2 -EOR to CCS

Challenges in the Transition from of CO 2 -EOR to CCS Challenges in the Transition from of CO 2 -EOR to CCS Stefan Bachu, Canada Chair of the TG Task Force on Technical Challenges in the Transition from CO 2 -EOR to CCS 1 Background 2 Origin of the TG Task

More information

DEEP INJECTION WELL CONSTRUCTION AND OPERATION

DEEP INJECTION WELL CONSTRUCTION AND OPERATION DEEP INJECTION WELL CONSTRUCTION AND OPERATION MORGAN COUNTY PLANNING AND ZONING DEPARTMENT UIC WELL STAKEHOLDERS HAL DEMUTH, M.S. WES JANES, P.G. PETROTEK ENGINEERING CORPORATION SEPTEMBER 19, 2017 2

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

ERCB and Groundwater Protection Water Technologies Symposium 2011 April 14, 2011

ERCB and Groundwater Protection Water Technologies Symposium 2011 April 14, 2011 ERCB and Groundwater Protection Water Technologies Symposium 2011 April 14, 2011 Michael Bevan, M.Sc., P.Geol. Groundwater Protection Advisor ERCB Outline Groundwater protection at the ERCB Base of groundwater

More information

California Well Stimulation Treatment Regulations

California Well Stimulation Treatment Regulations California Well Stimulation Treatment Regulations Robert S. Habel California Department of Conservation Division of Oil, Gas, and Geothermal Resources Division Mandates Supervise the drilling, operation,

More information

Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD

Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD AGH DRILLING, OIL, GAS Vol. 33 No. 2 2016 http://dx.doi.org/10.7494/drill.2016.33.2.507 Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD 1. INTRODUCTION

More information

Statewide Rule 10 : Downhole Commingling

Statewide Rule 10 : Downhole Commingling RAILROAD COMMISSION OF TEXAS Statewide Rule 10 : Downhole Commingling Darren Tjepkema Class Synopsis SWR 10 Rule Exception Application Online Completions Frac Port Completions Applicable Statewide Rules:

More information

Swellpacker Technology Bests Zonal Isolation Challenge in High-Pressure Wells

Swellpacker Technology Bests Zonal Isolation Challenge in High-Pressure Wells E A S Y W E L L Swellpacker Technology Bests Zonal Isolation Challenge in High-Pressure Wells R e d Te c h PA P E R Part of the RedTech Learning Series O c t o b e r 2 0 0 7 HALLIBURTON E A S Y W E L L

More information

Unconventional Resources

Unconventional Resources Houston, Texas (World Headquarters) 4620 Southerland Road Houston, TX, 77092 Phone: 1-800-462-7617 or 713-462-7617 E-mail: info@tamintl.com Aberdeen, Scotland Phone: 44-1224-875105 E-mail: info@tam-northsea.com

More information

SHELL ONSHORE OPERATING PRINCIPLES

SHELL ONSHORE OPERATING PRINCIPLES SHELL ONSHORE OPERATING PRINCIPLES FOR TIGHT SAND OR SHALE OIL AND GAS In 2011, Shell publicly shared five aspirational operating principles that govern the activities where we operate and where hydraulic

More information

Permit Number: 1900B Expiration Date: July 15, 2021

Permit Number: 1900B Expiration Date: July 15, 2021 Expiration Date: July 15, 2021 GENERAL PERMIT WATER POLLUTION CONTROL FACILITIES CLASS V GEOTHERMAL FLUIDS INJECTION DURING GEOTHERMAL EXPLORATION ISSUED TO: GEN19 /NWR File No. Department of Environmental

More information

Schedule A. Directive PNG013: Well Data Submission Requirements. Directive PNG013. October 12, Version 1.0. Governing Legislation:

Schedule A. Directive PNG013: Well Data Submission Requirements. Directive PNG013. October 12, Version 1.0. Governing Legislation: Schedule A Directive PNG013: Well Data Submission Requirements Directive PNG013 October 12, 2016 Version 1.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation

More information

Water Wells and Ground Source Heat Exchange Systems

Water Wells and Ground Source Heat Exchange Systems Title: Policy Number: Directive AEP Water Quality 2018 No.3 ISBN Number: 978-1-4601-4158-8 Program Name: Groundwater Policy Effective Date: Table of Contents 1 Introduction... 3 1.1 Purpose... 3 1.2 Definitions...

More information

Well Integrity Master Class Well Cementing The most critical operation in achieving the ultimate well integrity

Well Integrity Master Class Well Cementing The most critical operation in achieving the ultimate well integrity Well Integrity Master Class Well Cementing The most critical operation in achieving the ultimate well integrity Keys to Successful Cementation Experience, Best practices, Technology, Job design and implementation

More information

Rule 326: Mechanical Integrity Guidance

Rule 326: Mechanical Integrity Guidance COGCC OPERATOR GUIDANCE RULE 326: MECHANICAL INTEGRITY GUIDANCE Document Control: Created Date: May 15, 2015 Last Updated Date: May 15, 2015 Last Updated By: Dave Kulmann Review Cycle: Yearly Review Systems

More information

Texas Commission on Environmental Quality

Texas Commission on Environmental Quality Texas Commission on Environmental Quality Bobby Janecka Radioactive Materials Section Manager bobby.janecka@tceq.texas.gov (512) 239-6415 Radioactive Materials Licensing Authorizing licenses for: Low-level

More information

UNDERGROUND INJECTION AND SEQUESTRATION AND UNDERGROUND SOURCES OF DRINKING WATER (PROTECTING A VALUABLE RESOURCE)

UNDERGROUND INJECTION AND SEQUESTRATION AND UNDERGROUND SOURCES OF DRINKING WATER (PROTECTING A VALUABLE RESOURCE) UNDERGROUND INJECTION AND SEQUESTRATION AND UNDERGROUND SOURCES OF DRINKING WATER (PROTECTING A VALUABLE RESOURCE) Presented by Richard Brown Subsurface Technology, Inc. INTRODUCTION Continued population

More information

Carbon Capture and Storage Regulatory Policy

Carbon Capture and Storage Regulatory Policy Province of British Columbia Carbon Capture and Storage Regulatory Policy Ministry of Natural Gas Development Revised January 2014 TABLE OF CONTENTS Carbon Capture and Storage Regulatory Policy 1. INTRODUCTION...

More information

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications Well abandonment procedures and perforation with a slotted charge for cement squeeze applications European and West African Perforating Symposium (EWAPS) 7 9 th November 2012 Presented by Co-Author Frank

More information

Rebel Production Company and Greg Cloud Gene Powell Investments REVISED EXAMINERS REPORT AND PROPOSAL FOR DECISION PROCEDURAL HISTORY

Rebel Production Company and Greg Cloud Gene Powell Investments REVISED EXAMINERS REPORT AND PROPOSAL FOR DECISION PROCEDURAL HISTORY OIL AND GAS DOCKET NO. 06-0255034 THE APPLICATION OF ATLANTIS OIL COMPANY, INC. TO INJECT FLUID INTO A RESERVOIR PRODUCTIVE OF OIL OR GAS, MOODY NATIONAL BANK WELL NO. 6, GOOD SPRINGS, W. (WOODBINE) FIELD,

More information

Geologic Sequestration Rules: A Multi-Stakeholder Perspective

Geologic Sequestration Rules: A Multi-Stakeholder Perspective Geologic Sequestration Rules: A Multi-Stakeholder Perspective Ground Water Protection Council Annual Forum Pittsburgh, PA September 26-29, 2010 Bob Van Voorhees Carbon Sequestration Council Scott Anderson

More information

David Blackmon Managing Director for Public Policy and Strategic Communications FTI Consulting

David Blackmon Managing Director for Public Policy and Strategic Communications FTI Consulting Water and Energy in Texas October 4, 2012 David Blackmon Managing Director for Public Policy and Strategic Communications FTI Consulting Lower 48 Shale Plays * Not all natural gas that is consumed is combusted.

More information

For contact information, please visit our website:

For contact information, please visit our website: Weatherford s Integrated Laboratory Services (ILS) effectively combines the experience and expertise of leaders in the oil and gas service industry by integrating their considerable abilities under one

More information

Implementation of Underground Injection Control Program Regulations for Class V Shallow Disposal Systems

Implementation of Underground Injection Control Program Regulations for Class V Shallow Disposal Systems Implementation of Underground Injection Control Program Regulations for Class V Shallow Disposal Systems CPOW 2016 Annual Education Conference Lakewood, Colorado January 21, 2016 Wendy Cheung Underground

More information

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation ERCB offices Calgary February 2013 Advisory This document contains forward-looking

More information

Injection Wells. An injection well is a vertical pipe in the ground into which water, other liquids, or gases are

Injection Wells. An injection well is a vertical pipe in the ground into which water, other liquids, or gases are Injection Wells An injection well is a vertical pipe in the ground into which water, other liquids, or gases are pumped or allowed to flow. They are used for many purposes. In the 1930 s oil companies

More information

Santos Gas Field Development Project (GFD Project)

Santos Gas Field Development Project (GFD Project) Santos Gas Field Development Project (GFD Project) EPBC Approval No. 2012 / 6615 Annual Environmental Return 2017 Santos Ltd l 2017 GFD Project AER (2012/6615) l February 2018 Page 1 of 17 Introduction

More information

Natural Gas Reform Campaign

Natural Gas Reform Campaign Natural Gas Reform Campaign The Big Picture: Here s where we are today. U.S. Energy Consumption (by fuel) 2009 EIA Figures Renewables 6% Nuclear 9% Oil 39% Coal 21% Natural Gas 25% US Shale Gas Regions

More information

Isolating Potential Flow Zones During Well Construction

Isolating Potential Flow Zones During Well Construction Isolating Potential Flow Zones During Well Construction API Standard 65 Part 2 Glen Benge http://publications.api.org/ API Standard 65-2 Document highlights industry recommended cementing and well construction

More information

(NOTE: Unless specifically identified, the changes outlined below apply to BOTH Chapter 78 and Chapter 78a.)

(NOTE: Unless specifically identified, the changes outlined below apply to BOTH Chapter 78 and Chapter 78a.) DRAFT FINAL RULEMAKING 25 PA.CODE CHAPTER 78 (RELATING TO CONVENTIONAL OIL AND GAS WELLS) AND CHAPTER 78a (RELATING TO UNCONVENTIONAL WELLS) SUMMARY OF CHANGES FROM ANFR PUBLISHED ON APRIL 4, 2015 (NOTE:

More information

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation AER Office Calgary March 2014 Advisory This document contains forward-looking information

More information

Successful Completion Optimization of the Eagle Ford Shale

Successful Completion Optimization of the Eagle Ford Shale Successful Completion Optimization of the Eagle Ford Shale Supplement to SPE Paper 170764 Presented at the Society of Petroleum Engineers Annual Technical Conference and Exhibition Amsterdam, The Netherlands

More information

CCS Corporation. Section 40 Review and Variance of Application No , Class Ib Waste Disposal Scheme, Well 00/ W5M Brazeau River

CCS Corporation. Section 40 Review and Variance of Application No , Class Ib Waste Disposal Scheme, Well 00/ W5M Brazeau River Decision 2009-029 Section 40 Review and Variance of Application No. 1515213, Class Ib Waste Disposal Scheme, Well 00/09-01-048-14W5M Brazeau River March 24, 2009 ENERGY RESOURCES CONSERVATION BOARD Decision

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: 20 February 2015 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 12 For submission to CSS Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle

More information

Petroleum Production Systems

Petroleum Production Systems Petroleum Production Systems SECOND EDITION Michael J. Economides A. Daniel Hill Christine Ehlig-Economides Ding Zhu PRENTICE HALL Upper Saddle River, NJ Boston Indianapolis San Francisco New York Toronto

More information

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals DEQ Mission Statement The Michigan Department of Environmental Quality promotes wise management

More information

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,

More information

Seal 9 barrier verification by xlot and Communication test

Seal 9 barrier verification by xlot and Communication test Seal 9 barrier verification by xlot and Communication test P&A Forum 18 th Oktober 2017 Daniel Tomczak and Roar Flatebø Content Valhall overview and P&A Strategy Qualifying External Barriers Coil Tubing

More information

ORDINANCE NO.: AN ORDINANCE AMENDING CHAPTER OF THE ALAMEDA COUNTY GENERAL ORDINANCE CODE TO PROHIBIT HIGH-INTENSITY OIL AND GAS OPERATIONS

ORDINANCE NO.: AN ORDINANCE AMENDING CHAPTER OF THE ALAMEDA COUNTY GENERAL ORDINANCE CODE TO PROHIBIT HIGH-INTENSITY OIL AND GAS OPERATIONS ORDINANCE NO.: AN ORDINANCE AMENDING CHAPTER 17.06 OF THE ALAMEDA COUNTY GENERAL ORDINANCE CODE TO PROHIBIT HIGH-INTENSITY OIL AND GAS OPERATIONS The Board of Supervisors of the County of Alameda, State

More information

ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT

ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT STAFF REPORT TO: HEARING DATE: APRIL 4, 2016 GENERAL INFORMATION PROPOSED ZONING ORDINANCE AMENDMENT: ZONING: GENERAL PLAN DESIGNATION: ENVIRONMENTAL

More information

15A NCAC 02C.0219 AQUIFER STORAGE AND RECOVERY WELLS (a) Aquifer Storage and Recovery Wells are used to inject potable water for the purposes of

15A NCAC 02C.0219 AQUIFER STORAGE AND RECOVERY WELLS (a) Aquifer Storage and Recovery Wells are used to inject potable water for the purposes of 15A NCAC 02C.0219 AQUIFER STORAGE AND RECOVERY WELLS (a) Aquifer Storage and Recovery Wells are used to inject potable water for the purposes of subsurface storage and for later recovery of the injected

More information

NORSOK Standard D-010 Rev. 4 ( )

NORSOK Standard D-010 Rev. 4 ( ) The table below shows where and how NORSOK D-010 rev. 4 responds to the recommendations in the OLF s Summary report to Deepwater Horizon (Macondo) accident. Color denotes that OLF comment..; 1 : is fully

More information

COPYRIGHT. Sand Control Fundamentals. Virtual Instructor Led Session #2

COPYRIGHT. Sand Control Fundamentals. Virtual Instructor Led Session #2 Sand Control Fundamentals Non-Gravel Pack Applications Virtual Instructor Led Session #2 Open Hole with Slotted Liner Open Hole with Screen or Prepacked Screen Slotted liners and screens in a non-gravel

More information

Sand Control. Gravel packing is the oldest and simplest method of sand control. Works in both on and off shore wells.

Sand Control. Gravel packing is the oldest and simplest method of sand control. Works in both on and off shore wells. Sand Control Marine deposited sands, most oil and gas reservoir sands, are often cemented with calcareous or siliceous minerals and may be strongly consolidated. In contrast, Miocene or younger sands are

More information