Cost analysis for heavy equipment in earthfill work An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

Size: px
Start display at page:

Download "Cost analysis for heavy equipment in earthfill work An optimization of heavy equipment fleet (Case study: Jabung ring dike project)"

Transcription

1 Cost analysis for heavy equipment in earthfill work An optimization of heavy equipment fleet (Case study: Jabung ring dike project) Muhammad Faizal Ardhiansyah Arifin Citation: AIP Conference Proceedings 1818, (2017); View online: View Table of Contents: Published by the American Institute of Physics Articles you may be interested in Preface: 5th International Conference on Education, Concept, and Application of Green Technology by Engineering International Committee AIP Conference Proceedings 1818, (2017); / Application of woven tires waste as soft clay subgrade reinforcement for preventing highway structural failure AIP Conference Proceedings 1818, (2017); / Thermal characteristics analysis of microwaves reactor for pyrolysis of used cooking oil AIP Conference Proceedings 1818, (2017); / Factors on green service industry: Case study at AirAsia AIP Conference Proceedings 1818, (2017); / Competitive adsorption of Pb 2+ and Zn 2+ ions from aqueous solutions by modified coal fly ash AIP Conference Proceedings 1818, (2017); / A study on the static and impact structural behavior of concrete filled steel tubular members under Tsunami flotsam collision AIP Conference Proceedings 1818, (2017); /

2 Cost Analysis For Heavy Equipment in Earthfill Work An optimization of heavy equipment fleet (Case study : Jabung Ring Dike Project) Muhammad Faizal Ardhiansyah Arifin 1,a) 1 Civil Engineering Department, Engineering Faculty, Universitas Negeri Semarang, Indonesia a) Corresponding author:faizal.arifin.2008@gmail.com Abstract: Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time. INTRODUCTION In the work related to earthfill in large scale then we have to use heavy equipment to support the implementation process in this case commonly referred to as a mechanical earthmoving. It would require the implementation of the work plans are carefully and accurately to handle earthen embankment jobs on a large scale in order to avoid the occurrence of inefficiencies in the use of heavy equipment. It is expected to know the type of equipment and the number of equipment required then the work can be done efficiently so as to obtain the maximum benefit as well as the completion of the work in a timely manner in accordance with the plan target. And if possible even to do the job faster completion than the planned schedule. Mechanical earthmoving will be many uses of various types of heavy equipment that has the intent and purpose different but mutually supporting between one machine to the other heavy equipment. Where there is enormous dependency between one machine to the other heavy equipment, so there is no one type of heavy equipment that can work without the support than other heavy equipment to do various jobs there. Engineering International Conference (EIC) 2016 AIP Conf. Proc. 1818, ; doi: / Published by AIP Publishing /$

3 FIGURE 1.Site Plan of Study Area Object observed projects here are inundated project for flood control on the Solo River with locations in Tuban and Lamongan in East Java. This project has a scope of work largely in the form of jobs earthen embankment for water dike with a height varying between 3-5 m wide and 4-5 m above the dike. By using the selected material in core body embankment. Given the large volume of earthen embankment work that will be done then the source location embankment material using two locations within 5-6 km and 7-8 km from the project site. Therefore use two different location of the source material, the productivity of the machine will be different, especially Dump Truck productivity that used as a tool to mobilize the embankment material from the excavation site to the project site. Required careful and detailed planning to determine the configuration of the mechanically earthmoving. Configuration here one of which determine the various kinds of heavy equipment needed to perform the job earthen embankment. The heavy equipment will be used to do the job from the core embankment dike body includes : 1. Vibrator Roller 2. Water Tank Truck 3. Bulldozer 4. Dump Truk 8 Ton 5. Wheel Loader. Each machine that you mentioned above was needed according to the functions and demands the implementation of the work earthen embankment. Later after determining the configuration of a variety of heavy equipment such as those mentioned above, then we need to do the calculations required number of each machine in the fleet. Factors that should be considered in the calculation of the cost to determine the profit target from the the work of the land must be remembered that all five of its heavy equipment have different productivity. Base of calculation to determine the productivity of each all 5 heavy equipment varies depending from the shape of the dimensions, the workings and functions of each of these equipment. The following description of the factors that are used to make the calculation of productivity of each machine above : 1. Vibrator Roller : Avarage Speed, effective lenght of compaction, thick of carpet, a lot of trajectory, equipment efficiency factor. 2. Water Tank Truck : Basin capacity once load, equipment efficiency factor, avarege thread of water, avarege speed, empty avarage speed. 3. Bulldozer : Apart the mean operation, avarege speed, wide blade, thick of carpet, a lot of trajectory, equipment efficiency factor 4. Dump Truck : Basin capacity once load, equipment efficiency factor, avarage Speed, empty avarage speed 5. Wheel loader : bucket capacity, volume convercy factor, bucket factor, head speed, backward speed, distance

4 In the discussion in this paper on the project object we observed, we enter the Master Schedule earthen embankment work on the core body of the dike as a source Data to analyze the target volume earthen embankment work on the body s core dike. Then as consideration for the optimum benefit from the the operation of various kinds of heavy equipment that we also took a heavy equipment rental rates and unit price earthen embankment for the embankment core body as a source of data that we will though. Therefore these data will be outlining by the relationship productivity equipment with the target volume to be achieved in one day or at a certain time and do well with large costs for the operation of heavy equipment, so it can get the amount of each the ideal tool in the fleet of heavy equipment. FIGURE 2. Work Methode RESULT AND DISCUSSION Analysis Targeting Volume of Embankment Work As a basis for analyzing the target volume of work to be accomplished at a certain time so we took Data volume of work "Embankment of the Core Zone (hauling distance m)" and work "Embankment of the Core Zone (hauling distance m)" contained in the Master Schedule contract on the object which we observe. The quantity each volume of work that we observed is Cu M and Cu M. Where each volume of the work in accordance with the Master Schedule that there should be completed within a period of 12 months or less 368 days. Thus the target volume of each such work must be accomplished in one month Cu M and Cu M within one day should be reached 571 Cu M and 1713 Cu M. Based on the volume of the target data, the next step we will take into account the need for equipment to answer the targets that must be achieved so that the schedule for completion of the work can be completed on time or faster. Technique Analysis for Heavy Equipment Productivity In doing analysis we need to remember that we observe embankment material sourced from two locations that have different distances thereby affecting productivity values from the certain tools in machine configurations in a single fleet

5 In accordance with the factors we have mentioned above for calculating the production capability of the machine. then the following is an analysis of production for each of the heavy equipment that has been adapted to the distance of the source material referred earthen embankment. A. Earthen embankment for Dike Core Zone Distance 5 6 Km a. Vibro Roller Avarage Speed (v) = 3 Km/hour Effective Length of Compaction (b) = 3 Thick of Carpet (t) = 0,3 Ln m A lot of Trajectory (n) = 8 Equipment efficiency factor (Fa) = 0,85 Capacity production an hour determined as follow : Qa = [ (V x 1000) x b x Fa x t ] / n Then it was found that the value of Vibro Roller Production Capacity for each hour (Qa) is at 153 Cu M / hour. b. Water Tank Truck Avarage speed (v1) = 25 Km/hour Empty avarage speed (v2) = 40 Km/hour Basin capacity once load (V) = 5 Cu M Equipment efficiency factor (Fa) = 0,83 Avarage Thread of Water = 0,5 Km Cycle Time (TSL) by calculating time of the charge, without charge, load time, and more time is needed, then get the 4.11 minute. The production capacity an hour is determined as follows: Q2 = (V x Fa x 60) / Tsl So determined that the value of production capacity Water Tank Truck for each hour (Q2) is equal to Cu M / Hour c. Bulldozer Avarage speed (s) = 5 Km/hour Apart the mean operation (d) = 50 Ln m Wide of Blade (W) = 3,2 Ln m Thick of Carpet (t) = 0,4 Ln m A lot of trajectory (n) = 2 trajectory Equipment efficiency factor (fl) = 0,85 Cycle Time (CT) by calculating time of digging and loading (C1) and the other time 0.02 hour (C2) 0.03 hour, then get CT = 0.05 hour. Production capacity an hour determined as follow : Q = (d x W x t x fl / 0,1) / (CT x n) So determined that the value of the Bulldozer production capacity for each hour (Q) is equal to 544 Cu M / hour. d. Dump Truck 8 Ton Avarage speed (v1) = 20 Km/hour Empty avarage speed (v2) = 35 Km/hour Basin capacity once load (V) = 3,75 Cu M Equipment efficiency factor (Fa) = 0,925 Cycle Time (TSL) to account for the time to charge (T1), without charge (T2), load time (T3), and more time is required (T4), then get minute

6 Production capacity an hour determined as follow : Q2 = (V x Fa x 60) / Tsl So determined that the value of the Dump Truck production capacity for each hour (Q2) is equal to Cu M / Hour. e. Wheel Loader Bucket capacity (v1) = 1,5 Cu M Volume convercy factor (Ev) = 1 Work efficiency (Ea) = 0,83 Bucket factor (Eb) = 0,93 Head Speed (Vf) = 83,35 Backward speed (Vb) = 100,02 Distance (L) = 20 Ln m Cycle Time (CT) by calculating speed backward in a state of contents (t2), ahead speed in conditions of contents (t2), and other activities (turning, lifting, etc), then get CT = 0.59 minutes. Then by calculating Equipment efficiency factor (Fe) taking into account that Fe = Ev x Ea x Eb which found that Fe = To cycle produce an hour (v) = v1 x Fe = Production capacity an hour determined as follow : Q = (v x Fe x 60) / CT So determined that the value Wheel Loader of production capacity for each hour (Q) is equal to Cu M / hour. B. Earthen embankment for Dike Core Zone Distance 7 8 Km a. Vibro Roller Avarage Speed (v) = 3 Km/hour Effective Length of Compaction (b) = 3 Thick of Carpet (t) = 0,3 Ln m A lot of Trajectory (n) = 8 Equipment efficiency factor (Fa) = 0,83 Capacity production an hour determined as follow : Qa = [ (V x 1000) x b x Fa x t ] / n Then it was found that the value of Vibro Roller Production Capacity for each hour (Qa) is equal to Cu M / hour. b. Water Tank Truck Avarage speed (v1) = 25 Km/hour Empty avarage speed (v2) = 40 Km/hour Basin capacity once load (V) = 5 Cu M Equipment efficiency factor (Fa) = 0,83 Avarage Thread of Water = 0,5 Km Cycle Time (TSL) by calculating time of the charge, without charge, load time, and more time is needed, then get the 4.11 minute. Capacity production an hour determined as follow : Q2 = (V x Fa x 60) / Tsl So determined that the value of Water Tank Truck production capacity for each hour (Q2) is equal to Cu M / Hour. c. Bulldozer Avarage speed (s) = 5 Km/hour

7 Apart the mean operation (d) = 50 Ln m Wide of Blade (W) = 3,2 Ln m Thick of Carpet (t) = 0,4 Ln m A lot of trajectory (n) = 2 trajectory Equipment efficiency factor (fl) = 0,85 Cycle Time (CT) by calculating time of digging and loading (C1) and the other time 0.02 hour (C2) 0.03 hour, then get CT = 0.05 hour. Capacity production an hour determined as follow : Q = (d x W x t x fl / 0,1) / (CT x n) So determined that the value o f the Bulldozer production capacity for each hour (Q) is equal to 544 Cu M / hour. d. Dump Truck 8 Ton Avarage speed (v1) = 20 Km/hour Empty avarage speed (v2) = 35 Km/hour Basin capacity once load (V) = 3,75 Cu M Equipment efficiency factor (Fa) = 0,85 Cycle Time (TSL) to account for the time to charge (T1), without charge (T2), load time (T3), and more time is required (T4), then get minute Capacity production an hour determined as follow : Q2 = (V x Fa x 60) / Tsl So determined that the value of the Dump Truck production capacity for each hour (Q2) is equal to Cu M / Hour. e. Wheel Loader Bucket capacity (v1) = 1,5 Cu M Volume convercy factor (Ev) = 1 Work efficiency (Ea) = 0,83 Bucket factor (Eb) = 0,93 Head Speed (Vf) = 83,35 Backward speed (Vb) = 100,02 Distance (L) = 20 Ln m Cycle Time (CT) by calculating speed backward in a state of contents (t2), ahead speed in conditions of contents (t2), and other activities (turning, lifting, etc), then get CT = 1.03 minutes. Then by calculating Equipment efficiency factor (Fe) taking into account that Fe = Ev x Ea x Eb which found that Fe = To cycle produce an hour (v) = v1 x Fe = Capacity production an hour determined as follow : Q = (v x Fe x 60) / CT So determined that the value of Wheel Loader production capacity for each hour (Q) is equal to Cu M / hour. From the analysis of the productivity of of heavy equipment for each heavy equipment above we can do further calculations required number of each machine according to the production target volume to be done every day by comparing the volume target every day and production capacity of each tool each day. As assumption hours of work every day for each of the heavy equipment is in normal time is 8 hours for 1 day. Here are the results of calculations in accordance with the needs of heavy equipment and the production capacity of the target volume of work in one day

8 Works Embankment of the Core Zone (hauling distance m) with a target volume of 571 m3 per day. TABLE 1.Productivity Equipment for Hauling Distance m Equipment Type Productivity unit Equipment Number Vibrator Roller 153 M3/hour 1 unit WT. Truck 60,57 M3/hour 2 unit Bulldozer 544 M3/hour 1 unit Dump Truck 10,89 M3/hour 7 unit Wheel Load 85,13 M3/hour 1 unit Works Embankment of the Core Zone (hauling distance m) with a target volume of 1713 m3 per day. TABLE 2.Productivity Equipment for Hauling Distance m Equipment Type Productivity unit Equipment Number Vibrator Roller 149,4 M3/hour 2 unit WT. Truck 60,57 M3/hour 4 unit Bulldozer 544 M3/hour 1 unit Dump Truck 8,10 M3/hour 27 unit Wheel Load 48,76 M3/hour 5 unit The combination of the two work Embankment of the Core Zone (hauling distance m) with a target volume of 571 m3 per day and Embankment of the Core Zone (hauling distance m) with a target volume of 1713 m3 per day in getting appropriate equipment needs with the table below. TABLE 3.Equipment Needed Equipment Type Equipment Needed Vibrator Roller WT. Truck Bulldozer Dump Truck Wheel Load 2 unit 5 unit 1 unit 33 unit 6 unit

9 2 Equipment Configuration as Master Schedule Information : 1. Vibrator Roller 4. Dump Truck 2. WT. Truck 5. Wheel Load 3. Bulldozer FIGURE 3. Equipment Configuration as Master Schedule Analysis Cost Production and Revenues In analyzing the production costs we need a heavy equipment rental pricing data every hour every type of the heavy equipment is needed according to the analysis of the production capacity we have done. Obtained data from sources note that the rental price of each heavy equipment is as follows: a. Vibrator Roller = Rp / hour b. Water Tank Truck = Rp / hour c. Bulldozer = Rp / hour d. Dump Truck 8 Ton = Rp / hour e. Wheel Loader = Rp / hour From needs analysis equipment where the combination work between the Embankment of the Core Zone (hauling distance m) and Embankment of the Core Zone (hauling distance m) then get that production costs there are as per the table below. TABLE 4.Equipment Cost a Day as Master Schedule Equipment Type Cost a Day (Rp) Vibrator Roller WT. Truck Bulldozer Dump Truck Wheel Load Jumlah With a daily production target of as much as 571 m3 for the work of "Embankment of the Core Zone (hauling distance m) and 1713 m3 for Embankment of the Core Zone (hauling distance m), the average production cost for per-m3 is equal to Rp ,00. Unit price used herein is Rp / m3 for "Embankment of the Core Zone (hauling distance m) and Rp / m3 for Embankment of the Core Zone (hauling distance m). The target of

10 volume then the work of embankment can be obtained revenue per day for Rp , - per day with a profit of Rp. 59,591,745 or profit per m3 of Rp As a note profit analysis calculations do not take into charge carriers, fuel and maintenance cost of the tool so the profit rate is still a rough idea only. Optimization Analysis The data will be used to perform optimization analysis starts from the heavy equipment needs of the target volume of the combined work "Embankment of the Core Zone (hauling distance m) and 1713 m3 for Embankment of the Core Zone (hauling distance m) amounted to 2284 m3. Then from the amount of the target volume of the work is done the analysis of productivity that can be obtained by each of its heavy equipment in order to obtain production capabilities one equipment in one day to serve two items of the work. The results from the the calculation data production capability of one equipment in one day can be seen in the analysis below, where there is inequality of productivity as in the table below. TABLE 5.Equipment Productivity a Day Equipment Type Productivity A Day Unit Vibrator Roller 1202,272 M3 WT. Truck 484,579 M3 Bulldozer 4352,000 M3 Dump Truck 69,306 M3 Wheel Load 436,777 M3 From the table it can be seen that the productivity Bulldozzer almost 9 times the productivity of Water Tank Truck, or even nearly 63-fold when compared with the productivity of Dump Truck. So as to optimize the production volume of these earthen embankment work productivity capabilities from the Bulldozer should be maximized, which means all the other heavy equipment minimized the inequality productivity by increasing the number of each equipment except the Bulldozer in the one fleet. From the analysis optimizations performed by adjusting the amount heavy equipment with the Bulldozer productivity capabilities then showed the number of heavy equipment configurations as follows. TABLE 6.Equipment Needed After Optimization Equipment Type Equipment Needed After Optimization Vibrator Roller WT. Truck Bulldozer Dump Truck Wheel Load 4 unit 9 unit 1 unit 63 unit 10 unit

11 1, 4 EQUIPMENT CONFIGURATION AFTER OPTIMIZATION 5, 10 4, 63 2, 9 3, Information : 1. Vibrator Roller 4. Dump Truck 2. WT. Truck 5. Wheel Load 3. Bulldozer FIGURE 4. Equipment Configuration After Optimization Along with the increasing number of heavy equipment, the productivity work per day also increased from the original in accordance with the Master Schedule is 2284 m3 per day to 4352 m3 per day to adjust the production capacity of Bulldozer. Thus, there is an increased cost of production per day as follows TABLE 7.Equipment Cost a Day After Optimization Equipment Type Cost a Day (Rp) Vibrator Roller WT. Truck Bulldozer Dump Truck Wheel Load Jumlah Despite the increased cost of production per day from the Rp million to Rp , but also a revenue increase from the previous Rp , - to Rp , -. Thus the per-day gains obtained after the change in the number heavy equipment with optimization becomes Rp , - or perm3 Rp , -. Aside from the cost and revenue optimization also occurs optimization time, which speeds the completion of work from the 368 days to 215 days

12 Comparative Income After Optimization Rp250,4 93, Rp131,7 03, Information : 1. Income a day before optimization 2. Income a day after optimization FIGURE 5. Cost and Profit/Loss After Optimization REFERENCES 1. Armstrong, Scott J., Principles of Forecasting. New York: Kluwer Academic Publisher. 2. Arif, J Analisa Earned Value Analysis Jabung Ring Dyke Project. Penelitian Tugas Akhir Sarjana Teknik Sipil UNDIP. 3. Biro Administrasi PT Hutama Karya Sosialisasi Manual Akuntansi PT. Hutama Karya. KPTS No.2189/KPTS/68/2006 Tanggal 26 Juni Ervianto, Wulfram I., Manajemen Proyek Konstruksi. Yogyakarta : Andi. 5. Ghozali, I. dan A. Chariri Teori Akuntansi. Semarang: Badan Penerbit Universitas Diponegoro 6. Heizer, Jay & Render, Barry Book 1 Operations Management. Jakarta: Salemba Empat. 7. Ikatan Akuntan Indonesia Standar Akuntansi Keuangan. PSAK. No 34: Akuntansi Kontrak Konstruksi. Jakarta: Salemba Empat 8. Iman Soeharto Manajemen Proyek. Jakarta: Erlanga. 9. Joni Evaluasi Penerapan Saat Pengakuan Pendapatan Terhadap Kelayakan Laba Secara Periodik (Studi Kasus pada Perusahaan Konstruksi). Jurnal Ilmiah Akuntansi. Vol. 5, No. 1, h Partono, Windu Evaluasi Kelayakan Pendanaan Proyek dengan Teknik Pemrograman Linier. Jurnal Teknik Sipil Vol. 28 hal 1-8. Semarang 11. Pranoto, Sumbogo. Priyono, E.Y. & Dwiyanto Buku Ajar Pemindahan Tanah Mekanis Teknik Sipil UNDIP. Semarang. 12. Preseiden Republik Indonesia, Peraturan Presiden Pengadaan Barang dan Jasa Pemerintah No. 54 Tahun 2010, Subianto, Agus Penerapan Pemrograman Linier pada Produksi Beton Ready Mix. Master Tesis Teknik Sipil Institut Teknologi Bandung. 14. Tenriajeng, Andi Pemindahan Tanah Mekanis. Jakarta: Penerbit Gunadarma

Time And Cost Comparison Of Conventional And Alternative Plate Hollow Slab, Halfslab And Metaldeck

Time And Cost Comparison Of Conventional And Alternative Plate Hollow Slab, Halfslab And Metaldeck Time And Cost Comparison Of Conventional And Alternative Plate Hollow Slab, Halfslab And Metaldeck Trijeti, Farid Dwi Atmawan, Muhamad Aswanto Abstract: With the development and fabrication of construction

More information

An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project

An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project International Journal of Engineering Management 2018; 2(1): 8-14 http://www.sciencepublishinggroup.com/j/ijem doi: 10.11648/j.ijem.20180201.12 An Evaluation of Implementation of Quality Management System

More information

The Evaluation of Consultant Supervisors Performance on Road Construction Project in East Borneo

The Evaluation of Consultant Supervisors Performance on Road Construction Project in East Borneo RESEARCH ARTICLE OPEN ACCESS The Evaluation of Consultant Supervisors Performance on Road Construction Project in East Borneo Amir *, Benny Mochtar, E.A **, Tiong Iskandar *** *(Civil Engineering Program

More information

A STUDY OF CONTRACTOR S PROCUREMENT PERFORMANCE CASE : PT. WASKITA KARYA (PERSERO) MOCHAMAD ANUGRAH WIBOWO SOEHARTO UNIVERSITI TEKNOLOGI MALAYSIA

A STUDY OF CONTRACTOR S PROCUREMENT PERFORMANCE CASE : PT. WASKITA KARYA (PERSERO) MOCHAMAD ANUGRAH WIBOWO SOEHARTO UNIVERSITI TEKNOLOGI MALAYSIA A STUDY OF CONTRACTOR S PROCUREMENT PERFORMANCE CASE : PT. WASKITA KARYA (PERSERO) MOCHAMAD ANUGRAH WIBOWO SOEHARTO UNIVERSITI TEKNOLOGI MALAYSIA iv A STUDY OF CONTRACTOR S PROCUREMENT PERFORMANCE CASE

More information

Analysis of Service Quality using Servqual Method and Importance Performance Analysis (IPA) in Population Department, Tomohon City

Analysis of Service Quality using Servqual Method and Importance Performance Analysis (IPA) in Population Department, Tomohon City Analysis of Service Quality using Servqual Method and Importance Performance Analysis (IPA) in Population Department, Tomohon City Marlin Yuvina Tileng Faculty of Information Technology Satya Wacana Christian

More information

Analysis of Factors That Affect Good Government Governance Implementation (Empirical Study on Government of Indragiri Hilir Regency)

Analysis of Factors That Affect Good Government Governance Implementation (Empirical Study on Government of Indragiri Hilir Regency) 70 Jurnal Akuntansi Keuangan dan Bisnis Vol. 10, No. 2, November 2017, 70-78 Jurnal Politeknik Caltex Riau http://jurnal.pcr.ac.id Analysis of Factors That Affect Good Government Governance Implementation

More information

The Effect of Mixed Composition Using Mix Design and Volume Ratio Towards the Strength of Concrete

The Effect of Mixed Composition Using Mix Design and Volume Ratio Towards the Strength of Concrete J. Basic. Appl. Sci. Res., 6(3)38-43, 2016 2016, TextRoad Publication ISSN 2090-4304 Journal of Basic and Applied Scientific Research www.textroad.com The Effect of Mixed Composition Using Mix Design and

More information

IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS

IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS The Utilization of Volcanic Ash and High Rusk Ash as Material Stabilization in Clay by Unconfined Compression Test (UCT) and California

More information

Efficiency of House-Walls Construction Using Building Ruins

Efficiency of House-Walls Construction Using Building Ruins IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Efficiency of House-Walls Construction Using Building Ruins To cite this article: Andi Prasetiyo Wibowo 2018 IOP Conf. Ser.: Mater.

More information

Identification And Risk Assessment Health, Safety, And Environment On Apartement Project

Identification And Risk Assessment Health, Safety, And Environment On Apartement Project Identification And Assessment Health, Safety, And Environment On Apartement Project Arif Rahman Hakim Abstract Occupational safety and health issues in Indonesia are still often overlooked. Data shows

More information

ANALYSIS EFFECT OF SERVICE QUALITY ON CUSTOMER LOYALTY AND SATISFACTION IN SERVICES TRAINING PT XYZ

ANALYSIS EFFECT OF SERVICE QUALITY ON CUSTOMER LOYALTY AND SATISFACTION IN SERVICES TRAINING PT XYZ ANALYSIS EFFECT OF SERVICE QUALITY ON CUSTOMER LOYALTY AND SATISFACTION IN SERVICES TRAINING PT XYZ Bayu Ajisaputro 1) and Suparno Master s Program in Management of Technology, Institut Teknologi Sepuluh

More information

BALANCED SCORECARD IN MANUFACTURING COMPANY. Meutia Rahma Sigit Handoyo. Univeristas Islam Indonesia ABSTRACT

BALANCED SCORECARD IN MANUFACTURING COMPANY. Meutia Rahma Sigit Handoyo. Univeristas Islam Indonesia ABSTRACT BALANCED SCORECARD IN MANUFACTURING COMPANY Meutia Rahma Sigit Handoyo sihando@yahoo.com Univeristas Islam Indonesia ABSTRACT Due to the competitiveness in business world has been rising rapidly; the company

More information

The Influence Leadership Style, Work Environment On Turnover Intentions Through Burnout Of Non-Permanent Employees At Jember University

The Influence Leadership Style, Work Environment On Turnover Intentions Through Burnout Of Non-Permanent Employees At Jember University International Journal of Business and Management Invention (IJBMI) ISSN (Online): 2319 8028, ISSN (Print): 2319 801X Volume 7 Issue 3 Ver. V March. 2018 PP 33-39 The Influence Leadership Style, Work Environment

More information

THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT

THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT Analysis of Factors Influencing Staff Performance at the General Affairs Bureau of the Ministry of Marine Affairs and Fisheries Kus Margono Student, Master

More information

Sinabung Volcanic Ash Utilization As The Additive for Paving Block Quality A and B

Sinabung Volcanic Ash Utilization As The Additive for Paving Block Quality A and B IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Sinabung Volcanic Ash Utilization As The Additive for Paving Block Quality A and B To cite this article: I S Sembiring and I P

More information

Strategy of Natural Disaster Management of Rob In Tanjung Emas Port Area Based on Value Engineering Analysis and Stakeholder Expectations

Strategy of Natural Disaster Management of Rob In Tanjung Emas Port Area Based on Value Engineering Analysis and Stakeholder Expectations Proceedings of International Conference : Problem, Solution and Development of Coastal and Delta Areas Semarang, Indonesia September 26 th, 2017 Paper No.C-46 Strategy of Natural Disaster Management of

More information

The Influences of Leadership Style and Job Satisfaction on Employee Performance

The Influences of Leadership Style and Job Satisfaction on Employee Performance IOSR Journal of Business and Management (IOSR-JBM) e-issn: 2278-487X, p-issn: 2319-7668. Volume 18, Issue 7.Ver. II (July 2016), PP 01-06 www.iosrjournals.org The Influences of Leadership Style and Job

More information

IMPORTED RAW MATERIAL INVENTORY CONTROL SYSTEM AS AN EFFORT TO MINIMIZE INVENTORY COST (A CASE STUDY IN PT APPAREL ONE INDONESIA)

IMPORTED RAW MATERIAL INVENTORY CONTROL SYSTEM AS AN EFFORT TO MINIMIZE INVENTORY COST (A CASE STUDY IN PT APPAREL ONE INDONESIA) IMPORTED RAW MATERIAL INVENTORY CONTROL SYSTEM AS AN EFFORT TO MINIMIZE INVENTORY COST (A CASE STUDY IN PT APPAREL ONE INDONESIA) Novelia Selvy Kurniasari, Yusmar Ardhi Hidayat, Nur Rini Jurusan Administrasi

More information

SintiaAndriana Department of Accounting, Faculty of Economics, Pakuan University, Bogor

SintiaAndriana Department of Accounting, Faculty of Economics, Pakuan University, Bogor THE EFFECT OF CORPORATE GOVERNANCE MECHANISM ON EARNINGS MANAGEMENT ACTIVITIES (Empirical Study in Manufacturing Companies of Food and Beverage Sub Sectors Listed On Stock Exchange of Indonesia 2012-2016)

More information

Development of work breakdown structure (WBS) dictionary for road construction works

Development of work breakdown structure (WBS) dictionary for road construction works IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Development of work breakdown structure (WBS) dictionary for road construction works To cite this article: L S R Supriadi et al

More information

Contractors Working Experience In Connection With Understanding On Contract Construction Projects

Contractors Working Experience In Connection With Understanding On Contract Construction Projects Contractors Working Experience In Connection With Understanding On Contract Construction Projects Taufik Dwi Laksono Department Civil Engineering, Wijayakusuma University, Purwokerto, Indonesia Abstract

More information

- Earthwork Operations & Equipments

- Earthwork Operations & Equipments - Earthwork Operations & Equipments Earthwork Operations Those construction processes that involve the soil or earth in its natural form and that precede the building of the pavement structure itself Basic

More information

Research Variable Variables and operational definitions of Competency Based Training (CBT), competency and performance can be seen in Table 2 below.

Research Variable Variables and operational definitions of Competency Based Training (CBT), competency and performance can be seen in Table 2 below. THE EFFECT OF COMPETENCY-BASED TRAINING (CBT) ON EMPLOYEE COMPETENCY AND PERFORMANCE OF EMERGENCY RESPONSE DIRECTORATE OF NATIONAL BOARD FOR DISASTER MANAGEMENT (BNPB) Galang Manunggaling Iman, Syamsul

More information

Factors Causing Rework at Building Construction in The Department of Highways and Settlements of Aceh Province

Factors Causing Rework at Building Construction in The Department of Highways and Settlements of Aceh Province Factors Causing Rework at Building Construction in The Department of Highways and Settlements of Aceh Province 1 T. Budi Aulia, 1 Mubarak, 2 Rahmatul Irfan 1 Department of Civil Engineering, Syiah Kuala

More information

THE CORRELATION ANALYSIS OF THE STAGES OF ASSET LIFECYCLE WITH ASSET MANAGEMENT PERFORMANCE

THE CORRELATION ANALYSIS OF THE STAGES OF ASSET LIFECYCLE WITH ASSET MANAGEMENT PERFORMANCE International Journal of Economics, Commerce and Management United Kingdom Vol. VI, Issue 1, January 2018 http://ijecm.co.uk/ ISSN 2348 0386 THE CORRELATION ANALYSIS OF THE STAGES OF ASSET LIFECYCLE WITH

More information

JURNAL SAINS PEMASARAN INDONESIA Volume XVI, No. 2, September 2017, halaman

JURNAL SAINS PEMASARAN INDONESIA Volume XVI, No. 2, September 2017, halaman JURNAL SAINS PEMASARAN INDONESIA Volume XVI, No. 2, September 2017, halaman 117-125 STUDY ON THE INFLUENCE OF POSITIONING STRATEGY, PRODUCT QUALITY, SERVICE QUALITY AND CORPORATE IMAGE TO DECISION OF SAVING

More information

The Study of E-Catalogue System on the Performance of Medical Equipments Procurement at West Bandung District (KBB) Health Services 2017

The Study of E-Catalogue System on the Performance of Medical Equipments Procurement at West Bandung District (KBB) Health Services 2017 The Study of E-Catalogue System on the Performance of Medical Equipments Procurement at West Bandung District (KBB) Health Services 2017 1 Ayu Laili Rahmiyati, 2 Gunawan Irianto 1,2 Public Health Science

More information

ECONOMIC CONDITION OF POST TIN MINING (CASE STUDY ON BANGKA BELITUNG ISLAND AS ONE OF THE LARGEST TIN PRODUCERS IN THE WORLD)

ECONOMIC CONDITION OF POST TIN MINING (CASE STUDY ON BANGKA BELITUNG ISLAND AS ONE OF THE LARGEST TIN PRODUCERS IN THE WORLD) Kusumah, 2017 Volume 3 Issue 3, pp.252-257 Date of Publication: 1 st December 2017 DOI-https://dx.doi.org/10.20319/pijss.2017.33.252257 This Paper Can Be Cited As : Kusumah, E. (2017). Economic Condition

More information

Special Provision Item P-152 Excavation and Embankment

Special Provision Item P-152 Excavation and Embankment Special Provision Item P-152 Excavation and Embankment DESCRIPTION This item shall be constructed in conformity with FAA Standard Specification "Item P-152 Excavation and Embankment, except as herein modified

More information

The influence of using volcanic ash and lime ash as filler on compressive strength in self compacting concrete

The influence of using volcanic ash and lime ash as filler on compressive strength in self compacting concrete IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS The influence of using volcanic ash and lime ash as filler on compressive strength in self compacting concrete To cite this article:

More information

Development of civil engineers certification system evaluation model

Development of civil engineers certification system evaluation model IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Development of civil engineers certification system evaluation model To cite this article: I Widiasanti et al 2018 IOP Conf. Ser.:

More information

THE IMPLEMENTATION OF ENVIRONMENTAL COSTS IN COMPANY TO REDUCE ENVIRONMENTAL IMPACT

THE IMPLEMENTATION OF ENVIRONMENTAL COSTS IN COMPANY TO REDUCE ENVIRONMENTAL IMPACT DOI https://doi.org/10.18551/rjoas.2017-11.34 THE IMPLEMENTATION OF ENVIRONMENTAL COSTS IN COMPANY TO REDUCE ENVIRONMENTAL IMPACT Dyani*, Mitra Dindha Ayu Faculty of Administrative Science, University

More information

Keywords: Conversion Period Inventory, Accounts Receivable Collection Period, Suspension Period payable, Current Ratio, Laverage, Size.

Keywords: Conversion Period Inventory, Accounts Receivable Collection Period, Suspension Period payable, Current Ratio, Laverage, Size. Proceeding of the International Seminar and Conference 2015: The Golden Triangle (Indonesia-India-Tiongkok) Interrelations in Religion, Science, Culture, and Economic. University of Wahid Hasyim, Semarang,

More information

A NOVELTY FACTORS OF DELIVERY ROAD STREETS IN MEDAN CITY BASED ON PERCEPTION STAKE HOLDER

A NOVELTY FACTORS OF DELIVERY ROAD STREETS IN MEDAN CITY BASED ON PERCEPTION STAKE HOLDER A NOVELTY FACTORS OF DELIVERY ROAD STREETS IN MEDAN CITY BASED ON PERCEPTION STAKE HOLDER Darlina tanjung University Of Islamic Sumatera Utara Sisingamangaraja Teladan street, Sumatera Utara Email - darlinatanjunguisu@yahoo.com

More information

Reflexivity of Intellectual Capital to Assets in Jakarta Islamic Index with Hahslm Approach

Reflexivity of Intellectual Capital to Assets in Jakarta Islamic Index with Hahslm Approach International Conference on Islamic Finance, Economics and Business Volume 2018 Conference Paper Reflexivity of Intellectual Capital to Assets in Jakarta Islamic Index with Hahslm Approach Roikhan Mochamad

More information

The Altman Model and Auditor s Opinion About Going Concern of the Companies

The Altman Model and Auditor s Opinion About Going Concern of the Companies Science Journal of Business and Management 2017; 5(5): 189-193 http://www.sciencepublishinggroup.com/j/sjbm doi: 10.11648/j.sjbm.20170505.12 ISSN: 2331-0626 (Print); ISSN: 2331-0634 (Online) The Altman

More information

MINING EQUIPMENT FOR MINES IN REK BITOLA

MINING EQUIPMENT FOR MINES IN REK BITOLA MINING EQUIPMENT FOR MINES IN REK BITOLA Skopje, 2016 INTRODUCTION Project description The procurement of the mining equipment for the mines in REK Bitola refer to the following mines: Underlying coal

More information

PERCEPTION OF GOVERNMENT AUDITORS ON RED FLAGS EFFECTIVENESS IN DETECTING FRAUD ON PROCUREMENT OF GOVERMENT GOODS AND SERVICES

PERCEPTION OF GOVERNMENT AUDITORS ON RED FLAGS EFFECTIVENESS IN DETECTING FRAUD ON PROCUREMENT OF GOVERMENT GOODS AND SERVICES PERCEPTION OF GOVERNMENT AUDITORS ON RED FLAGS EFFECTIVENESS IN DETECTING FRAUD ON PROCUREMENT OF GOVERMENT GOODS AND SERVICES Nayang Helmayunita, SE, M.Sc Universitas Negeri Padang nayang.helma@gmail.com

More information

Implementation of Quality Management System of ISO 9001:2008 In Graduate School, Bogor Agricultural University

Implementation of Quality Management System of ISO 9001:2008 In Graduate School, Bogor Agricultural University International Journal of Scientific and Research Publications, Volume 7, Issue 3, March 2017 409 Implementation of Management System of ISO 9001:2008 In Graduate School, Bogor Agricultural University Suprihartono

More information

Higher Education Institution XYZ Performance Measurement Using MBCfPE based on KPKU-BUMN Approach

Higher Education Institution XYZ Performance Measurement Using MBCfPE based on KPKU-BUMN Approach Higher Education Institution XYZ Performance Measurement Using MBCfPE based on KPKU-BUMN Approach Sugih Arijanto 1, Ambar Harsono 2, Harsono Taroepratjeka 3 1,2,3 Industrial Engineering Department s Lecturer,

More information

Sustainable road drainage system: Experimental model

Sustainable road drainage system: Experimental model Sustainable road drainage system: Experimental model Andung Yunianta 1,*, Suripin 1, and Bagus Hario Setiadji 1 1 Universitas Diponegoro, Civil Engineering Department, Semarang, Indonesia Abstract. Roadway

More information

REGULATORY IMPACT ANALYSIS OF GOVERNMENT REGULATION NO. 69 YEAR 2015 ON SHIPPING INDUSTRY INDONESIA

REGULATORY IMPACT ANALYSIS OF GOVERNMENT REGULATION NO. 69 YEAR 2015 ON SHIPPING INDUSTRY INDONESIA REGULATORY IMPACT ANALYSIS OF GOVERNMENT REGULATION NO. 69 YEAR 2015 ON SHIPPING INDUSTRY INDONESIA Eddy Widjanarko Master s Program in Management of Technology, Institut Teknologi Sepuluh Nopember Jl.

More information

ANALYSIS ON THE APPLICATION OF BALANCE SCORECARD METHOD TO MEASURE PERFORMANCE OF PROPERTY COMPANY

ANALYSIS ON THE APPLICATION OF BALANCE SCORECARD METHOD TO MEASURE PERFORMANCE OF PROPERTY COMPANY The 8th Asian Academy of Management International Conference Penang Malaysia, 18-20 December 2009 ANALYSIS ON THE APPLICATION OF BALANCE SCORECARD METHOD TO MEASURE PERFORMANCE OF PROPERTY COMPANY Rudy

More information

Utami Sylvia Lestari (1), Nurhafni Karina Resentia (1) Civil Engineering Departement, Universitas Lambung Mangkurat

Utami Sylvia Lestari (1), Nurhafni Karina Resentia (1)   Civil Engineering Departement, Universitas Lambung Mangkurat ISSN 2085-5761 (Print) Jurnal POROS TEKNIK, Volume 9 No. 1, Juni 2017 : 1-41 PAVEMENT DESIGN COMPARATIVE ANALYSIS USING BINA MARGA DESIGN METHOD (Pt T-01-2002-B) AND PAVEMENT DESIGN MANUAL (NO.04/SE/Db/2017)

More information

Nungki Komaryati Mataram University

Nungki Komaryati Mataram University THE IMPLEMENTATION OF BALANCED SCORECARD AS AN ALTERNATIVE TO THE PERFORMANCE OF PUBLIC SECTOR ORGANIZATIONS (CASE STUDY ON SAMSAT MATARAM) Nungki Komaryati Mataram University nungkyjasmine78@gmail.com

More information

The Influence of Corporate Social Responsibility to Corporate Financial Performance

The Influence of Corporate Social Responsibility to Corporate Financial Performance Journal of Applied Accounting and Taxation Article History Vol. 2, No. 1, March 2017, 54-60 Received July, 2016 e-issn: 2548-9925 Accepted December, 2016 The Influence of Corporate Social Responsibility

More information

Drivers of going concern audit opinions: empirical evidence from Indonesia

Drivers of going concern audit opinions: empirical evidence from Indonesia , pp. 79-90 DOI:10.1515/hjbpa-2017-0015 Drivers of going concern audit opinions: empirical evidence from Indonesia Abstract Lina Rahmawati, SUROTO, Faculty of Economics, Islamic University of Indonesia,

More information

Designing Cost Production of Concrete

Designing Cost Production of Concrete Journal of Physics: Conference Series PAPER OPEN ACCESS Designing Cost Production of Concrete To cite this article: Yunan Hanun et al 2018 J. Phys.: Conf. Ser. 1028 012063 View the article online for updates

More information

Analysis of Design for Assembly (DFA) in Waste Separation Machine of Ferromagnetic and Non-Ferromagnetic Material

Analysis of Design for Assembly (DFA) in Waste Separation Machine of Ferromagnetic and Non-Ferromagnetic Material Analysis of Design for Assembly (DFA) in Waste Separation Machine of Ferromagnetic and Non-Ferromagnetic Material Dodi Sofyan Arief a,*, Rifki Ilyandi a,*, Tekad Indra Pradana Abidin b,*, Amir Hamzah c,*

More information

Master Management, Faculty of Economics and Business Hasanuddin University (

Master Management, Faculty of Economics and Business Hasanuddin University ( 2nd International Conference on Accounting, Management, and Economics (ICAME 2017) THE EFFECT OF WORK ENVIRONMENT AND ORGANIZATIONAL CULTURE ON EMPLOYEES PERFORMANCE THROUGH JOB SATISFACTION AS INTERVENING

More information

Sustinere Journal of Environment and Sustainability

Sustinere Journal of Environment and Sustainability Sustinere Journal of Environment and Sustainability Volume 1 Issue 2 (2017) 74 83 Print ISSN: 2549-1245 Online ISSN: 2549-1253 Website: https://sustinerejes.com E-mail: sustinere.jes@iain-surakarta.ac.id

More information

MUD UTILIZATION OF LAPINDO AS SOIL STABILIZATION MATERIALS THAT CONTAIN SALT CLAY

MUD UTILIZATION OF LAPINDO AS SOIL STABILIZATION MATERIALS THAT CONTAIN SALT CLAY MUD UTILIZATION OF LAPINDO AS SOIL STABILIZATION MATERIALS THAT CONTAIN SALT CLAY Gati Sri Utami Department of Civil Engineering, Institut Teknologi Adhi Tama Surabaya, Indonesia E-Mail: fita.fina3@gmail.com

More information

The Effects of Corporate Image, User Image, and Product Image Towards Purchasing Interest of Suzuki Motorcycle

The Effects of Corporate Image, User Image, and Product Image Towards Purchasing Interest of Suzuki Motorcycle The First International Research Conference on Economics and Business Volume 2018 Conference Paper The Effects of Corporate Image, User Image, and Product Image Towards Purchasing Interest of Suzuki Motorcycle

More information

INTELLECTUAL CAPITAL, FIRM VALUE AND FINANCIAL PERFORMANCE

INTELLECTUAL CAPITAL, FIRM VALUE AND FINANCIAL PERFORMANCE INTELLECTUAL CAPITAL, FIRM VALUE AND FINANCIAL PERFORMANCE Nikmah (UNIVERSITAS BENGKULU) Aida Irsyahma (UNIVERSITAS BENGKULU) Malaysia Indonesia International Conference on Economic Management and Accounting

More information

Development Strategy Of Competitive Health Of The Beginning Industry Through Management Of Value Added And Non Value Added Activity

Development Strategy Of Competitive Health Of The Beginning Industry Through Management Of Value Added And Non Value Added Activity Development Strategy Of Competitive Health Of The Beginning Industry Through Management Of Value Added And Non Value Added Activity Wiwik Sudarwati, Meri Prasetyawati, Anwar Ilmar Ramadhan Abstract: Jilbab

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

MANAGEMENT ACCOUNTING INFORMATION SYSTEM, STRATEGY, INNOVATION AND THE INFLUENCE TO OPERATING PERFORMANCE

MANAGEMENT ACCOUNTING INFORMATION SYSTEM, STRATEGY, INNOVATION AND THE INFLUENCE TO OPERATING PERFORMANCE MANAGEMENT ACCOUNTING INFORMATION SYSTEM, STRATEGY, INNOVATION AND THE INFLUENCE TO OPERATING PERFORMANCE OF COMPANY MANUFACTURING OF INDONESIA : ENTERING THE FREE TRADE ERA ABSTRACT Ratna A.ZR,Harry Prabowo,Tresno

More information

(Paraserianthes falcataria) and singkong gajah (Manihot esculenta) in PT. Inhutani II Pulau Laut

(Paraserianthes falcataria) and singkong gajah (Manihot esculenta) in PT. Inhutani II Pulau Laut Journal of Biodiversity and Environmental Sciences (JBES) ISSN: 2220-6663 (Print) 2222-3045 (Online) Vol. 12, No. 6, p. 244-249, 2018 http://www.innspub.net RESEARCH PAPER OPEN ACCESS Economic value of

More information

THE INFLUENCE OF ORGANIZATIONAL VALUES TOWARD VISION ACHIEVEMENT: CASE STUDY AT SBM-ITB

THE INFLUENCE OF ORGANIZATIONAL VALUES TOWARD VISION ACHIEVEMENT: CASE STUDY AT SBM-ITB JOURNAL OF BUSINESS AND MANAGEMENT Vol. 3, No.3, 2014: 358-365 THE INFLUENCE OF ORGANIZATIONAL VALUES TOWARD VISION ACHIEVEMENT: CASE STUDY AT SBM-ITB Belinda Tanzil and Yuni Ros Bangun School of Business

More information

LEVEL OF PUBLIC PARTICIPATION IN THE POLICY OF PREPARATION OF REGIONAL REVENUE AND EXPENDITURE BUDGET (APBD) Oleh: Hernimawati ABSTRACT

LEVEL OF PUBLIC PARTICIPATION IN THE POLICY OF PREPARATION OF REGIONAL REVENUE AND EXPENDITURE BUDGET (APBD) Oleh: Hernimawati ABSTRACT LEVEL OF PUBLIC PARTICIPATION IN THE POLICY OF PREPARATION OF REGIONAL REVENUE AND EXPENDITURE BUDGET (APBD) Oleh: Hernimawati ABSTRACT The objective of this research is to reveal and analyze the phenomenon

More information

ISSN (Print) : Miftahul Huda / International Journal of Engineering and Technology (IJET) Miftahul Huda.

ISSN (Print) : Miftahul Huda / International Journal of Engineering and Technology (IJET) Miftahul Huda. Dynamic model: The influence of project management competencies, resources and capabilities towards the performance of small-medium qualification contractor in Indonesia Miftahul Huda. Civil Engineering

More information

IMPROVING QUALITY OF SERVICE GRAHA PARI SRAYA (GRAPARI) PT TELKOMSEL APPROACH TO QUALITY FUNCTION DEPLOYMENT (QFD)

IMPROVING QUALITY OF SERVICE GRAHA PARI SRAYA (GRAPARI) PT TELKOMSEL APPROACH TO QUALITY FUNCTION DEPLOYMENT (QFD) IMPROVING QUALITY OF SERVICE GRAHA PARI SRAYA (GRAPARI) PT TELKOMSEL APPROACH TO QUALITY FUNCTION DEPLOYMENT (QFD) Rino 1) and Indung Sudarso Master s Program in Management of Technology, Institut Teknologi

More information

INTERNATIONAL JOURNAL OF RESEARCH SCIENCE & MANAGEMENT

INTERNATIONAL JOURNAL OF RESEARCH SCIENCE & MANAGEMENT THE EFFECT OF ORGANIZATIONAL CULTURE AND EMOTIONAL INTELLIGENCE ON EMPLOYEE PERFORMANCE WITH ORGANIZATIONAL COMMITMENTS AS INTERVENING VARIABLES (STUDY ON ZISCO IN FOUR BRANCHES OF YATIM MANDIRI FOUNDATION,

More information

A Design Productivity Of Improvement Using Total Productivity Model in Water Treatment Plant Deli Tua PDAM Tirtanadi North Sumatra Province

A Design Productivity Of Improvement Using Total Productivity Model in Water Treatment Plant Deli Tua PDAM Tirtanadi North Sumatra Province A Design Productivity Of Improvement Using Total Productivity Model in Water Treatment Plant Deli Tua PDAM Tirtanadi North Sumatra Province Qamaruddin Lubis Student Postgraduate Of University North Sumatera

More information

Analysis of Influence Organizational Culture toward Intellectual Capital

Analysis of Influence Organizational Culture toward Intellectual Capital Analysis of Influence toward Augustina Asih Rumanti, Trifenaus Prabu Hidayat, and Yordy Abstract culture commonly referred as work culture and is important in the SME (small and medium enterprises). If

More information

Influence of Bamboo Pile in The Pile Mattress Bamboo Construction Systems as Reinforcement of Soft Subgrade That Support Embankment Load

Influence of Bamboo Pile in The Pile Mattress Bamboo Construction Systems as Reinforcement of Soft Subgrade That Support Embankment Load Proceedings of Narotama International Conference on Civil Engineering 2015 ISBN : 978-602-72437-2-9 Influence of Bamboo Pile in The Pile Mattress Bamboo Construction Systems as Reinforcement of Soft Subgrade

More information

Suggested Guidelines for Hot Mix Asphalt (HMA) Underlayment in Track by AREMA Committee l-sub Committee No. 2 - Ballast.

Suggested Guidelines for Hot Mix Asphalt (HMA) Underlayment in Track by AREMA Committee l-sub Committee No. 2 - Ballast. Suggested Guidelines for Hot Mix Asphalt (HMA) Underlayment in Track by AREMA Committee l-sub Committee No. 2 - Ballast OVERVIEW June 11, 1998 The purpose of these Suggested Guidelines is to provide 1)

More information

CIVIL ENGINEERING CONSTRUCTION SBC2253

CIVIL ENGINEERING CONSTRUCTION SBC2253 CIVIL ENGINEERING CONSTRUCTION SBC2253 EARTHWORKS Sr Dr. Mohd Saidin Misnan Department of Quantity Surveying Faculty of Built Environment Universiti Teknologi Malaysia b-saidin@utm.my-earthworks INTRODUCTION

More information

LEGAL IMPLICATION OF THE AUDIT BOARD OF INDONESIA ON MANAGEMENT AUDIT AND FINANCIAL LIABILITY OF THE STATE AGAINST STATE-OWNED ENTERPRISES

LEGAL IMPLICATION OF THE AUDIT BOARD OF INDONESIA ON MANAGEMENT AUDIT AND FINANCIAL LIABILITY OF THE STATE AGAINST STATE-OWNED ENTERPRISES LEGAL IMPLICATION OF THE AUDIT BOARD OF INDONESIA ON MANAGEMENT AUDIT AND FINANCIAL LIABILITY OF THE STATE AGAINST STATE-OWNED ENTERPRISES Henny Juliani Faculty of Law, Diponegoro University hennyjuliani.fhundip@gmail.com

More information

Effect of Capital Structure on Financial Performance with Moderation of Good Corporate Governance (Empirical Study at BEI

Effect of Capital Structure on Financial Performance with Moderation of Good Corporate Governance (Empirical Study at BEI Everant.org/AFMJ Research Article Account and Financial Management Journal ISSN: 2456-3374 Effect of Capital Structure on Financial Performance with Moderation of Good Corporate Governance (Empirical Study

More information

J. Basic. Appl. Sci. Res., 6(5)72-78, , TextRoad Publication

J. Basic. Appl. Sci. Res., 6(5)72-78, , TextRoad Publication 2016, TextRoad Publication ISSN 2090-4304 Journal Basic and Applied Scientific Research www.textroad.com Optimization and Implication Local Material Due to the Characteristic Mortar in Merauke Regency

More information

To Link this Article: Vol. 8, No. 4, April 2018, Pg

To Link this Article:   Vol. 8, No. 4, April 2018, Pg The Influence of Good Corporate Governance and Corporate Social Responsibility towards the Financial Performance that has Implications for Firm Value of Banking Companies Listed in Indonesia Stock Exchange

More information

THE INFLUENCE OF ORGANIZATIONAL CULTURE WITH EMPLOYEE ENGAGEMENT ON PERFORMANCE (A Lesson from PT. Wika Bitumen Jakarta-Buton)

THE INFLUENCE OF ORGANIZATIONAL CULTURE WITH EMPLOYEE ENGAGEMENT ON PERFORMANCE (A Lesson from PT. Wika Bitumen Jakarta-Buton) 502 THE INFLUENCE OF ORGANIZATIONAL CULTURE WITH EMPLOYEE ENGAGEMENT ON PERFORMANCE (A Lesson from PT. Wika Bitumen Jakarta-Buton) M.R. Hazriansyah*, M Syamsul Maarif**, Sadikin Kuswanto** *) Post Graduate,

More information

THE INFLUENCE OF SALARY AND INCENTIVE TOWARD EMPLOYEE PRODUCTIVITY AT PT BANK RAKYAT INDONESIA (PERSERO) TBK MANADO BRANCH

THE INFLUENCE OF SALARY AND INCENTIVE TOWARD EMPLOYEE PRODUCTIVITY AT PT BANK RAKYAT INDONESIA (PERSERO) TBK MANADO BRANCH THE INFLUENCE OF SALARY AND INCENTIVE TOWARD EMPLOYEE PRODUCTIVITY AT PT BANK RAKYAT INDONESIA (PERSERO) TBK MANADO BRANCH Andre Horman, Franki M. Paath, Loureine P. Sumual ABSTRAK Kondisi ekonomi di Indonesia

More information

EXPERIMENTAL STUDY ON CONFINED CONCRETE OF THIN COLUMN SECTIONS (070S)

EXPERIMENTAL STUDY ON CONFINED CONCRETE OF THIN COLUMN SECTIONS (070S) EXPERIMENTAL STUDY ON CONFINED CONCRETE OF THIN COLUMN SECTIONS (070S) Ketut Sudarsana 1 1 Civil Engineering Dept., Udayana University, Bali, Indonesia Email : civil2001ca@yahoo.com; ksudarsana@civil.unud.ac.id

More information

THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT

THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT Motivation, Leadership, Competence and Training Impact towards Staff Performance Using Job Satisfaction as Intervening Variables (Case Study at Sukamandi

More information

Review of Recycled Asphalt Utilization (Rap) for Road Pavement Recycling

Review of Recycled Asphalt Utilization (Rap) for Road Pavement Recycling Proceedings of International Conference : Problem, Solution and Development of Coastal and Delta Areas Semarang, Indonesia September 26 th, 2017 Paper No. C-34 Review of Recycled Asphalt Utilization (Rap)

More information

THE STUDY ON THE GREEN CONSTRUCTION IMPLEMENTATION FOR BUILDING CONSTRUCTION IN BANDUNG

THE STUDY ON THE GREEN CONSTRUCTION IMPLEMENTATION FOR BUILDING CONSTRUCTION IN BANDUNG THE STUDY ON THE GREEN CONSTRUCTION IMPLEMENTATION FOR BUILDING CONSTRUCTION IN BANDUNG Fandy 1*, Anton Soekiman 1 1 Universitas Katolik Parahyangan, Indonesia ABSTRACT In the early 1990s, the implementation

More information

The design of control system of livestock feeding processing

The design of control system of livestock feeding processing IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS The design of control system of livestock feeding processing To cite this article: Juna Sihombing et al 2018 IOP Conf. Ser.: Earth

More information

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre CASE STUDY CONSTRUCTION OF HIGH ROAD EMBANKMENT OVER THICK SOFT SILTY CLAY- A CASE STUDY Radhakrishnan R, Geo-Enviro Engineers P Ltd, Chennai, Tamil Nadu, India, 044-24483522, geoenviro2012@gmail.com.

More information

Development of Assessment Tools for Road Safety Performance during Execution of National Road Project Improvement in Bali-Indonesia

Development of Assessment Tools for Road Safety Performance during Execution of National Road Project Improvement in Bali-Indonesia Journal of Safety Engineering 2018, 7(1): 37-41 DOI: 10.5923/j.safety.20180701.04 Development of Assessment Tools for Road Safety Performance during Execution of National Road Project Improvement in Bali-Indonesia

More information

Method Analytic Network Process (ANP) Financial Performance for Measuring on the Higher Education

Method Analytic Network Process (ANP) Financial Performance for Measuring on the Higher Education Method Analytic Network Process (ANP) Financial Performance for Measuring on the Higher Education Method Analytic Network Process (ANP) Financial Performance for Measuring on the Higher Education Yoyo

More information

Accounting Analysis Journal

Accounting Analysis Journal AAJ 5 (4) (2016) Accounting Analysis Journal http://journal.unnes.ac.id/sju/index.php/aaj Determining Factors of The Use of Accounting Information on Small and Medium Enterprises with Good Corporate Governance

More information

Technical Economy Study on Jurang Jero Small Dam Construction Project In Blora Regency

Technical Economy Study on Jurang Jero Small Dam Construction Project In Blora Regency Proceedings of International Conference : Problem, Solution and Development of Coastal and Delta Areas Semarang, Indonesia September 26 th, 2017 Paper No. C-10 Technical Economy Study on Jurang Jero Small

More information

EFFECT OF CORPORATE SOCIAL RESPONSIBILITY DISCLOSURE ON FINANCIAL PERFORMANCE WITH AUDIT QUALITY AS A MODERATING VARIABLE

EFFECT OF CORPORATE SOCIAL RESPONSIBILITY DISCLOSURE ON FINANCIAL PERFORMANCE WITH AUDIT QUALITY AS A MODERATING VARIABLE Binus Business Review, 7(2), August 2016, 149-155 DOI: 10.21512/bbr.v7i2.1687 P-ISSN: 2087-1228 E-ISSN: 2476-9053 EFFECT OF CORPORATE SOCIAL RESPONSIBILITY DISCLOSURE ON FINANCIAL PERFORMANCE WITH AUDIT

More information

DETERMINANTS TEST OF THE EFFECTIVENESS OF FIXED ASSET MANAGEMENT IN MATARAM CITY GOVERNMENT

DETERMINANTS TEST OF THE EFFECTIVENESS OF FIXED ASSET MANAGEMENT IN MATARAM CITY GOVERNMENT DETERMINANTS TEST OF THE EFFECTIVENESS OF FIXED ASSET MANAGEMENT IN MATARAM CITY GOVERNMENT Muhammad Juliadi Mataram University joulyadhy@yahoo.com Endar Pituringsih Mataram University endar07ringsih@yahoo.co.id

More information

ANALYSIS OF FACTORS THAT AFFECT ENTREPRENEURSHIP INTEREST IN STUDENTS OF ACCOUNTING EDUCATION FACULTY OF ECONOMICS YOGYAKARTA STATE UNIVERSITY

ANALYSIS OF FACTORS THAT AFFECT ENTREPRENEURSHIP INTEREST IN STUDENTS OF ACCOUNTING EDUCATION FACULTY OF ECONOMICS YOGYAKARTA STATE UNIVERSITY Analysis of Factor... (Syifa Nurrahmah) 1 ANALYSIS OF FACTORS THAT AFFECT ENTREPRENEURSHIP INTEREST IN STUDENTS OF ACCOUNTING EDUCATION FACULTY OF ECONOMICS YOGYAKARTA STATE UNIVERSITY ANALISIS FAKTOR-FAKTOR

More information

Muhammad Nashar, Ryani Dhyan Parashakti, Hilda Sona Fauziah. Mercubuana University, Jakarta, Indonesia. Introduction

Muhammad Nashar, Ryani Dhyan Parashakti, Hilda Sona Fauziah. Mercubuana University, Jakarta, Indonesia. Introduction Management Studies, July-Aug. 2018, Vol. 6, No. 4, 275-285 doi: 10.17265/2328-2185/2018.04.005 D DAVID PUBLISHING Effect of Training and Job Performance on Job Satisfaction in PT Garuda Indonesia Training

More information

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit ANNEX AGR I - 7 Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects Priority within the Sector: First Total requested fund : Code Item Description

More information

REPORT OF PORTION OF PECOS EXPERIMENTAL ROADS PROJECT BUILT BY SCOTT ENVIRONMENTAL SERVICES, INC.

REPORT OF PORTION OF PECOS EXPERIMENTAL ROADS PROJECT BUILT BY SCOTT ENVIRONMENTAL SERVICES, INC. REPORT OF PORTION OF PECOS EXPERIMENTAL ROADS PROJECT BUILT BY SCOTT ENVIRONMENTAL SERVICES, INC. This roadway portion was built by Scott Environmental Services, Inc. (SESI) using its Firmus process from

More information

DEVELOPING CURVE OF DISPLACEMENT FACTOR FOR DETERMINATION OF ADDITIONAL MODULUS OF SUBGRADE REACTION ON NAILED-SLAB PAVEMENT SYSTEM.

DEVELOPING CURVE OF DISPLACEMENT FACTOR FOR DETERMINATION OF ADDITIONAL MODULUS OF SUBGRADE REACTION ON NAILED-SLAB PAVEMENT SYSTEM. International Journal of Technology (2017) 1:124-133 ISSN 2086-9614 IJTech 2017 DEVELOPING CURVE OF DISPLACEMENT FACTOR FOR DETERMINATION OF ADDITIONAL MODULUS OF SUBGRADE REACTION ON NAILED-SLAB PAVEMENT

More information

CUSTOMER SATISFACTION AND LOYALTY OF PT. BRI, TBK MEDAN BRANCH OFFICE WITH TRUST AS INTERVENING VARIABLE

CUSTOMER SATISFACTION AND LOYALTY OF PT. BRI, TBK MEDAN BRANCH OFFICE WITH TRUST AS INTERVENING VARIABLE CUSTOMER SATISFACTION AND LOYALTY OF PT. BRI, TBK MEDAN BRANCH OFFICE WITH TRUST AS INTERVENING VARIABLE 1 Megasari Gusandra Saragih, 2 Harianto 1, 2 Management Study Program, Pembangunan Panca Budi University,

More information

DETERMINANT OF FRAUD IN GOVERNMENT AGENCY: EMPIRICAL STUDY AT THE FINANCE AND DEVELOPMENT SUPERVISORY AGENCY (BPKP) OF JAKARTA REPRESENTATIVE OFFICE

DETERMINANT OF FRAUD IN GOVERNMENT AGENCY: EMPIRICAL STUDY AT THE FINANCE AND DEVELOPMENT SUPERVISORY AGENCY (BPKP) OF JAKARTA REPRESENTATIVE OFFICE DETERMINANT OF FRAUD IN GOVERNMENT AGENCY: EMPIRICAL STUDY AT THE FINANCE AND DEVELOPMENT SUPERVISORY AGENCY (BPKP) OF JAKARTA REPRESENTATIVE OFFICE Barry Aditya Permana Finance and Development Supervisory

More information

Study The Application of Cleaner Production at Bukit Asam (Corporation) Tarahan Coal Terminal

Study The Application of Cleaner Production at Bukit Asam (Corporation) Tarahan Coal Terminal Study The Application of Cleaner Production at Bukit Asam (Corporation) Tarahan Coal Terminal Merza Rahmawati 1 and Erdi Suroso 2 1 Affiliation: Environmental Engineering, Institut Teknologi Sumatera,

More information

DECISION SUPPORT SYSTEM DETERMINATION OF BUSINESS LOCATION (CAKE SHOP) USING AHP AND TOPSIS METHOD

DECISION SUPPORT SYSTEM DETERMINATION OF BUSINESS LOCATION (CAKE SHOP) USING AHP AND TOPSIS METHOD RESEARCH ARTICLE OPEN ACCESS DECISION SUPPORT SYSTEM DETERMINATION OF BUSINESS LOCATION (CAKE SHOP) USING AHP AND TOPSIS METHOD Didik Wiguna*, Muhammad Ramdhan**, Sonny Nugroho Aji***, Andi Moch Januriana****

More information

EMPLOYEE WORK SAFETY AND HEALTH TRAINING FOR GROUND HANDLING PERFORMANCE

EMPLOYEE WORK SAFETY AND HEALTH TRAINING FOR GROUND HANDLING PERFORMANCE EMPLOYEE WORK SAFETY AND HEALTH TRAINING FOR GROUND HANDLING PERFORMANCE Novi Indah Susanthi Iqlima Puspa Seruni Yunitha Ardiana Nur STMT Trisakti STMT Trisakti STMT Trisakti oct4th2003@gmail.com iqlimaseruni@rocketmail.com

More information

JURNAL TEKNIK SIPIL & PERENCANAAN. The Effect of Soil Density on Infiltration Rate in The Urban Development Area of Padang

JURNAL TEKNIK SIPIL & PERENCANAAN. The Effect of Soil Density on Infiltration Rate in The Urban Development Area of Padang Jurnal Teknik Sipil & Perencanaan Vol. 20 No. 1 2018 p.1-5 JURNAL TEKNIK SIPIL & PERENCANAAN http://journal.unnes.ac.id/nju/index.php/jtsp/index The Effect of Soil Density on Infiltration Rate in The Urban

More information

Flexural Behavior Of Styrofoam-Filled Concrete.

Flexural Behavior Of Styrofoam-Filled Concrete. Flexural Behavior Of Styrofoam-Filled Concrete R. Irmawaty 1, R. Djamaluddin 1, Wa O. A. R. Malim 2 1Lecturer, Civil Engineering Dept. Hasanuddin University, Makassar Indonesia 2Student, Civil Eng. Dept.,

More information

The stability of clay using mount Sinabung ash with unconfined compression test (uct) value

The stability of clay using mount Sinabung ash with unconfined compression test (uct) value IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS The stability of clay using mount Sinabung ash with unconfined compression test (uct) value To cite this article: Ika Puji Hastuty

More information

The Impact of Hospital Image, Service Quality, and Cost Perception on Satisfaction And Trust

The Impact of Hospital Image, Service Quality, and Cost Perception on Satisfaction And Trust ISSN:2229-6247 Rahmatang et al International Journal of Business Management and Economic Research(IJBMER), Vol 9(4),2018, 1322-1326 The Impact of Hospital Image, Service Quality, and Cost Perception on

More information