Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN

Size: px
Start display at page:

Download "Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN"

Transcription

1 Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN 1. INTRODUCTION Proposed project is for "Redevelopment of Anand Vihar Railway Station by Indian Railway Station Development Corporation Limited, as a part of the continuous process of augmenting and improving amenities keeping in view the World Class planning and targeting the year Indian Railways have identified five major railway stations to be developed to World Class standards, Anand Vihar Railway Station in East Delhi being one of them. Anand Vihar Railway Station is going to be a big multi modal transit hub with the following 5 modes of transport culminating at a single location: 1. Indian Railways Station 2. Existing Delhi Metro Phase I station 3. Anand Vihar ISBT 4. Proposed Delhi Metro Phase III station 5. Proposed Delhi Meerut high speed Regional Rail Transit Corridor station. The station has been planned for development in two phases. The horizon year for Phase -1 is 2025 and that for Phase - 2 is At present, the station is serving 76,100 passengers per day which includes both long distance passengers as well as commuter passengers. In the proposed phase I development, the number of platforms are proposed be increased to seven in total and the terminal will have a capacity to handle over three lakh passengers and as many as 270 trains daily and a new Passenger Reservation system (PRS) with world class facility. Also, Anand Vihar makeover involves linking of this terminal with the original Anand Vihar station (Station code: ANVR) which is a roadside station comprising two platforms serviced by only sub-urban trains. The total area available for the site development is 5,68, m 2 (56.8 ha). The constraints such as retaining of existing structure and yard have been considered while developing the concept. The built up area is 4, 69, m 2. The development will be as per the master plan of Delhi. The Project is designated under Category B and falls under Item 8(b) (Township and Area Development) of the Environmental Impact Assessment (EIA) Notification of September 14 th, 2006 and its amendments. 2. SITE SURROUNDING & CONNECTIVITY The proposed project site is connected to Noida, Ghaziabad and other NCR regions. It is surrounded by Patparganj, I.P. Extension, Dilshad Garden, Kaushamnbi, etc. residential areas Consultant-Ascenso Enviro Pvt. Ltd. Page 1 of 19

2 Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi within 5km radius area of the proposed project site. Site surroundings and Connectivity details of the proposed project are given in Table-1. Table-1: Site Surroundings and Connectivity Details S. No. Connectivity & Site Surroundings Description Distance and Direction 1. Nearest Railway Station Anand Vihar railway station The project itself 2. Nearest Metro Station Anand Vihar Metro Station Approx.170 m, E 3. Nearest Airport Hindan Air Force Airbase Approx. 6.0 km, NE Indira Gandhi International Airport Approx. 24 km, SW Arya Nagar Approx. 100 m, W 4. Nearest Residential Madhu Vihar Approx. 150 m, S Area Jaipuria Enclave Approx. 90 m, E JJ Colony Approx. 110 m, N 5. State Boundary Delhi -UP state border Delhi-Haryana border Adjacent, E Approx km, S 6. Nearest Highway NH-58 Approx.9.50 km, ENE and Roads NH-24 NH-91 Approx.2 km, SE Approx.10 km, ENE 7. River Yamuna River Approx. 4 km, W Government Sarvodaya Co Education Approx km, NNW 8. Nearest School Senior Secondary School Vivekanand School Approx km,nnw 9. Nearest Hospital Shanti Mukund Hospital approx. 0.5 km, NNW Arya Marriage approx. 1.60km, WSW 10. Places of worship Shivkala Temple approx. 2.5 km, NNW 11. Forest Nil Nil 12 Sanctuaries Okhla Bird Sanctuary approx. 8 km, S Source: Google Earth A Google Map of 500m buffer map showing the surrounding area of the proposed project is shown in Figure-1. The topographical map showing the surrounding area within 10 km radius is shown in the Figure-2 and topographical map showing the eco-sensitive area within 15 km radius is shown in the Figure-3. Consultant-Ascenso Enviro Pvt. Ltd. Page 2 of 19

3 Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi Figure-1: Google Map of 500m radius showing surroundingss of the area Consultant-Ascenso Enviro Pvt. Ltd. Page 3 of 19

4 Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi Source: Survey of India Figure-2: Topographical map (Survey of India) of 10km radius showing surrounding area Consultant-Ascenso Enviro Pvt. Ltd. Page 4 of 19

5 Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi Source: Survey of India Figure-3: Topographical map (Survey of India) of 15km radius showing Eco-sensitive area Consultant-Ascenso Enviro Pvt. Ltd. Page 5 of 19

6 3. PROJECT LOCATION AND DESCRIPTION Indian Railway Station Development Corporation Limited is going for Redevelopment of Anand Vihar Railway Station on the total land area measuring 5,68,145 sq.m. The coordinates of the project boundary along with the centre of the project site is given below in the Table-2. Table-2: Coordinates of the Project Boundary Latitude Longitude Centre of the Plot 28 38'43.30"N 77 18'38.30"E Corner-I 28 39'13.73"N 77 19'8.89"E Corner-II 28 38'27.73"N 77 18'10.53"E Corner-III 28 38'19.86"N 77 18'16.88"E Corner-IV 28 38'57.63"N 77 19'4.55"E The project envisages redevelopment of Anand Vihar Railway Station in form of construction / redevelopment of Main station building with construction of facilities like Hotel, Station Retail and Commercial Office. The parking shall be provisioned in basement and 34,000 m 2 is to be developed / maintained as garden and lawns. The area details are given in Table-3. Table-3: Detailed Area Statement S. No. Particulars Area in Sq.m. 1 Total Plot Area 5,68, Permissible 1 of plot area 5,68, Proposed FAR@0.47 of Plot area 2,66, Commercial 1,70, Station and other building 50, Platforms existing + new 46, Total Basement Area 2,02, Hotel 19, Station Retail 70, Office 1,02, Passenger & Operations 9, Built Up Area (Proposed FAR + Basement) 4,69, Landscape Area 6% of plot area 34, Lawns/Garden 15, Green Belt 18, The Layout Plan of Existing Yard is attached as Annexure-I. Consultant-Ascenso Enviro Pvt. Ltd. Page 6 of 19

7 4. DETAIL OF BUILDING BLOCK The proposed redevelopment project involves construction / redevelopment of station building with construction of hotel, station retail and commercial office. The master plan approval for redevelopment project has been granted by Northern Railway. The copy of the approval letter is attached as Annexure-II. Approval for the redevelopment project has also been granted by Delhi Development Authority. The approval letter is attached as Annexure-III. The redevelopment project does not fall under prohibited or regulated area. The NOC for the same has been granted by Archaeological Survey of India and is attached as Annexure-IV. The height clearance from Airport Authority of India is attached as Annexure-V. The approval from DUAC is attached as Annexure-VI. The NOC from PWD is attached as Annexure-VII. The project involves cutting of trees for which the application for the permission of the same has been submitted to the North Forest Division, GNCTD. The copy of the receipt of same is attached as Annexure-VIII. 5. POPULATION DETAIL Total population of the proposed redevelopment project will be 1,64,838 as per the projection for the year 2038 which include the main passenger load per day, guests staying in hotel and staff. Breakup of the population is given in Table-4. Table-4: Calculation of Population S. No. Types No of unit / Person Per Area in sq.m. Unit Population 1. Hotel Guest Rooms 200 nos Passenger load per day Projection for year ,11, Employees Projection for year , Greeters / Meters Projection for year , Retail Population Projection for year , Office Population Projection for year ,930 Total Population 1,64,838 *Source- National Building Code, 2005 Consultant-Ascenso Enviro Pvt. Ltd. Page 7 of 19

8 6. PARKING DETAILS Parking Requirement at Railway Station The station parking bays are calculated based on the traffic surveys and forecasts. Basement parking of area 9,766 sq.m is proposed for station. The parking bays required for the station is for 686 ECS and the proposed parking bays will be for 902 ECS. Parking Requirement for Non-Railway Development The parking requirement for the proposed non-railway development and the proposed is as given in Table-5. Table-5: Parking Propsoed for Non-Railway Development Description FAR Required 3 ECS/100 sqm FAR Proposed Parking Parking area 32 sqm/ecs Office 69,850 2,096 3,198 1,02,336 Station Retail 91,940 2,758 2,208 70,656 Hotel 8, ,488 Total 5,101 6, LANDSCAPE DEVELOPMENT Increasing vegetation in the form of greenbelt is one of the preferred methods to mitigate air pollution. Plants serve as a sink for pollutants, reduce the flow of dust and reduce noise pollution. The green area to be developed / maintained is 6% of the total plot area i.e. 34,000 sq.m. Table-6 indicates various planned species to be used in greenbelt development. Table-6: List of Species for Greenbelt Development S.No. Scientific Name Common Name Girth Height Spread Details 1 Azadirachta indica Neem Evergreen tree -Medicinal value -Used as periphery plantation 2. Bauhinia variegata Kachnaar Deciduous in dry seasons -Flowering plant with bright pink flowers 3. Bauhinia candida Kachnaar white Deciduous in dry seasons -Flowering plant with Consultant-Ascenso Enviro Pvt. Ltd. Page 8 of 19

9 white flowers 4 Cassia fistula Amaltas Deciduous in dry seasons -Summer flowering tree with yellow flowers- 5. Cassia renegera Deciduous in dry seasons -Flowering tree with pink flowers 6 Chorisia speciosa Mexican silk cotton Leafless in winters -Winter flowering tree with pink flowers 7. Anthocephal us cadamba Kadamba Fastigate tree -White-cream flowers in spring 8 Gardenia latifolia Gardenia Small tree with yellow fragrant flowers 9 Lagerstroemi a flosreginae Jarul Flowering tree -Drought tolerant tree 10 Mangifera indica Mango Evergreen tree with edible fruit. 11 Manilkara zapota Chikoo Evergreen medium sized tree with edible fruits 12 Psidium guajava Guava Medium sized tree with edible fruits. 13 Mimusops elengi Maulshri Small evergreen tree with white flowers 14 Syzygium cumini Jamun Tall tree fruit bearing -Attracts birds 15 Schleichera oleosa Kusum Kusum is a beautiful tree with a broad, shady crown, found widespread in tropical himalayas Source: Guidelines for development of greenbelt CPCB-2007 Consultant-Ascenso Enviro Pvt. Ltd. Page 9 of 19

10 8. WATER REQUIREMENT, SUPPLY AND DISTRIBUTION Water Requirement for the proposed project is discussed below. 8.1 Water requirement during Construction phase Water requirement during the Construction phase will be met by private water tanker or treated water from CSTP. 8.2 Water requirement during operation phase The current source of water supply for the Railway station is a Ranney well located at Mandawali, which shall also cater for the water supply for the proposed redevelopment project. The capacity of the ranney well is 7 MLD, which will be able to cater the demand for year For the demand beyond 2025, another ranney well of 5.90 MLD will be required. The total water requirement for the proposed project has been estimated to be 12 MLD. This includes potable water requirement, flushing, landscaping, requirement for washing purposes. The total fresh water requirement is 5.31 MLD. The water requirement for Flushing, washing and landscaping will be met through treated water from STP and ETP. Details of break-up of water requirement are given in Table-7. Consultant-Ascenso Enviro Pvt. Ltd. Page 10 of 19

11 Description Total Population / Area Table 7: Details of Water Requirement Unit Water Consumption (LPCD) Total Water Requirement (MLD) Fresh Water Requirement (MLD) Flushing Requirement (MLD) Wastewater Generation (MLD) Hotel Rooms Passengers Employees Greeters / Meeters Retail Population Office Population Catering for 10% of total passengers Landscaping 34, sq.m 3 liters/sqm Cleaning of trains 1,144 Coaches 500 liters/coach Apron Washing 23,604 sq.m 10 liters/sq.m Platform Floor 86,361 sq.m 5 liters/sq.m Watering of trains on Platforms 1,144 Coaches 1350 liters/coach Rake washing of coaches of trains in washing lines liters/coach Rake Water filling 1, liters/coach HVAC Cooling 170 ton 10/ltrs/hr/ton Fire Fighting (one time) Total Say Say Say Say 5.62 Consultant-Ascenso Enviro Pvt. Ltd. Page 11 of 19

12 8.3 Wastewater Generation The total estimated quantity of wastewater to be generated from proposed project is 5.62 MLD. Calculation of wastewater generation is shown below in Table-8. Table-8: Calculation of Wastewater Generation Details Water (MLD) Water requirement for domestic purpose 1.89 Wastewater to be generated from domestic use 80% of domestic water requirement) 1.51 Water requirement for Flushing Purpose 1.76 Wastewater to be generated from Flushing 100% of flushing requirement) 1.76 Wastewater to be generated from Washing 3.10 Wastewater to be generated from Washing 75% of washing water requirement) 2.32 Total Wastewater generated 5.62 Water balance diagram for Non-Monsoon is given in Figure-4 and for Monsoon is given in Figure-5. Consultant-Ascenso Enviro Pvt. Ltd. Page 12 of 19

13 All Figures in MLD One time Requirement = Total fresh water requirement = Landscaping = 0.10 Fire fighting requirement (one time) = 1.21 Water refill of train coaches = 3.41 Domestic Water requirement = 1.89 Flushing water requirement = Cleaning / Washing of platform,apron and floors = 1.23 Wastewater generation (Domestic + washing area) = 3.86 Flushing Wasteweter 100 % = Rake washing of coaches of trains in washing lines = 1.87 Total Wastewater generation = HVAC Cooling = 0.04 One time Requirement Fresh Water Requirement Wastewater Generation STP Capacity = 5.10 ETP Capacity =1.72 Recycled 90% = 5 Treated Water Zero Water Discharge Figure-4: Water Balance Diagram for Non-Monsoon Season Consultant-Ascenso Enviro Pvt. Ltd. Page 13 of 19

14 All Figures in MLD One time Requirement = Total fresh water requirement = Landscaping = 00 Fire fighting requirement (one time) = 1.21 Water refill of train coaches = 3.41 Domestic Water requirement = 1.89 Flushing water requirement = Cleaning / Washing of platform,apron and floors = 1.23 Wastewater generation (Domestic + washing area) = 3.86 Flushing Wasteweter 100 % = Rake washing of coaches of trains in washing lines = 1.87 One time Requirement Total Wastewater generation = HVAC Cooling = 0.04 Discharge to sewer = 0.10 Fresh Water Requirement STP Capacity = 5.10 ETP Capacity =1.72 Recycled 90% = 5 Wastewater Generation Figure-5: Water Balance Diagram for Monsoon Season Consultant-Ascenso Enviro Pvt. Ltd. Page 14 of 19

15 Reuse of Treated Water: Total waste water generated is 5.62 MLD, which will be treated in the STP of capacity 5.1 MLD and waste water generated from washing the platforms, aprons, coaches will be treated in the ETP capacity of 1.72 MLD. The treated water available is 5.0 MLD of 90%) and it will be recycled and re-used for flushing, washing, cooling and landscaping. During the monsoon season, as there will be no requirement of water for landscaping, the excess treated water i.e. 0.1 MLD will be discharged to sewer. The details of recycled water uses are provided in Table-9 below. Table-9 Recycled Water Uses Non-Monsoon Season Monsoon Season Treated Water 5.0 MLD 5.0 MLD Flushing 1.76 MLD 1.76 MLD Landscaping HVAC Cooling Cleaning / of platforms, aprons and floors Rake washing of coaches of trains in washing lines Discharge to sewer 0.10 MLD MLD 1.87 MLD MLD 1.87 MLD 0.10 MLD Wastewater Treatment Scheme The waste water generated will be treated in the Sewage Treatment Plant capacity of 5.1 MLD, and ETP of the capacity of 1.72 MLD. 9. STORM WATER DRAINAGE The existing storm water drainage network at the Anand Vihar railway station building collects the storm water and discharges to the existing nallah to the south east of the station building. The existing network which serves the station building only, comprises of a piped system of RCC hume pipes with intermediate chambers. A separate storm water drainage network apart from sewerage system is proposed in the development area for the collection and safe disposal of storm water during rainfall. The design criteria to be followed for design of Storm Water Drainage network would be broadly based on the recommendations as laid down in the CPHEEO Manual of Sewerage and Sewage Treatment, Ministry of Urban Development, Govt. of India and as per provisions laid down in the relevant I.S. and IRC codes. 10. RAINWATER HARVESTING During the monsoon months, the storm water runoff could be stored and used for coach washing. The proposed rainwater harvesting system would need to be based on environmental and sustainable concepts. Consultant-Ascenso Enviro Pvt. Ltd. Page 15 of 19

16 The calculation of rainwater harvesting is shown below: Roof area = 32,000 m 2 (approx.) Annual Rainfall = 800 mm Max. Hourly rainfall = 90 mm/hour = (23 mm/15 m) Runoff Coefficient = 0.8 Avg. rainwater collection per 15 minute during peak rainfall = = 32,000 x 0.8 x = 589 m 3 /15 minutes Annual Harvesting = 32000x0.8x0.8 = 20,480 m 3 /annum The harvested rain water will be used for train washing, platform wash down and other uses that do not require potable quality water. The calculation for number of rainwater harvesting pits required is shown below: Size of each rainwater harvesting pit: Desilting Tank 6 x 3 x 2 m effective depth - 36 m 3 Recharge Pit 3 x 2.5 x 2 m effective depth - 15 m 3 Total Capacity of one set 51 m 3 The average rainwater collection per 15 minutes (the retention period): 589 m 3 The number of pits required: 589/51 = ~ 12 pits We are proposing 5 RWH pits. 11. POWER REQUIREMENT The total electrical load demand has been estimated to be 34 MVA. 26 MVA for the commercial area and 8 MVA for station. The possible sources of power are 66 kv grid substations at Karkarduma and 220 kv substations at Mandawali. 12. SOLID WASTE GENERATION AND MANAGEMENT The project will adopt a systematic approach for solid waste collection and disposal. Solid waste generated from the project will be collected properly and will be managed as per Solid Waste Management Rule, Consultant-Ascenso Enviro Pvt. Ltd. Page 16 of 19

17 It is estimated that maximum solid waste generation would be about 24,725.7 kg/day, and 4 Tonne of sludge (wet basis). Following are the solid waste generation rate has been considered as given in Table-10. Table-10: Proposed Solid Waste Generation Rate S.No. Category of Solid Waste Waste Generation Rate Total Population Waste Generated 1 Commercial Refuse Total Kg/Cap/Day 1,64,838 24, ,725.7 kg/day * Source: Manual on Municipal Solid Waste Management, published by Central Public Health and Environmental Engineering Organization (CPHEEO), Ministry of Urban Development, Government of India. The E-waste generated will be managed as per the E-waste management Rules The detailed Solid Waste Generation Management Plan is provided in Figure-6 below: Consultant-Ascenso Enviro Pvt. Ltd. Page 17 of 19

18 Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi. Figure-6: Solid Waste Management Plan 13. FIRE FIGHTING SYSTEM The Fire Fighting will be designed as per the recommendations of the National Building Code of India: Part 4 Fire and Life safety: 1997.The firefighting system has been designed considering the following codes, manual and guidelines; National Building Code of India (NBC); As per requirement of fire officer/local fire approving authorities; and As per Indian Standard Code for Fire Protectionn (IS Codes) ) 14. DETAIL OF CONSTRUCTION MATERIAL List of building materials being used at site: Coarse sand Fine sand Stone aggregate Stone for masonry work Consultant-Ascenso Enviro Pvt. Ltd. Page 18 of 19

19 5. Cement 6. Reinforcement steel 7. Plywood & steel shuttering 8. Pipe scaffolding (cup lock system) 9. Bricks 10. Tiles 11. P.P.V.C. conduit 12. MCBs/DBs 13. PVC overhead water tanks 14. Wastewater lines 15. S.W. sewer line up to main sewer 16. PVC rain water down take 17. Stainless steel sink in kitchen List of Machinery to be used during Construction is as follows: 1. Dumper : Shall be used for mud and material handling 2. Concrete mixer with hopper : for RCC work 3. JCB/Pock line : Shall be used for digging and earth work 4. Concrete Batching Plant : Will be used for concrete mixing 5. Road roller : For compacting the earth Consultant-Ascenso Enviro Pvt. Ltd. Page 19 of 19

Conceptual Plan Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi

Conceptual Plan Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi INDIAN RAILWAY STATION DEVELOPMENT CORPORATION LIMITED Conceptual Plan Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi Submitted By CONSULTANT ASCENSO ENVIRO PVT. LTD Formerly

More information

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area

More information

Approval of Terms of Reference (TOR) For Development of Smart City Project, Ranchi, Jharkhand. M/s Ranchi Smart City Corporation Limited.

Approval of Terms of Reference (TOR) For Development of Smart City Project, Ranchi, Jharkhand. M/s Ranchi Smart City Corporation Limited. 1. INTRODUCTION The proposed Development of Smart City Project is at Ranchi, Jharkhand. The developer of the project is M/s Ranchi Smart City The Land use of the project site is as per master plan of the

More information

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge DETAILS OF PROJECT The project proponent wants to develop a Residential Building with all modern amenities Premises No. 116, Roy Bahadur Road (previously known as 352, Roy Bahadur Road), Kolkata - 700053

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT M/s. DAR Housing Ltd. Proposed Group Housing Project ATS Rhapsody, At Plot No. GH-12/1, Sector-01, Greater Noida (U.P.), having Plot

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld DETAILS OF PROJECT The project proponent, P N Memorial Neurocentre & Research Institute Limited, is developing a Hospital Building at Premises No.-720, Anandapur, Ward. Kolkata- 700 107, KMC, Ward No.

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

Details of Project. Underground source

Details of Project. Underground source Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

Indian Railways Station Development Corporation Limited. Project Information Document

Indian Railways Station Development Corporation Limited. Project Information Document Corporation Limited Redevelopment of Anand Vihar Railway Station on PPP mode October 2015 Delhi Integrated Multi-Modal Transit System Limited ` 1 INTRODUCTION 1.1 Background 1.1.1 About Delhi Delhi covers

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

M/s Ajnara India Ltd. 34

M/s Ajnara India Ltd. 34 CONCEPTUAL PLAN 1. INTRODUCTION M/s Ajnara India Ltd. has proposed to develop a Sport City Project at Plot No. Plot No. SC-02C, Sport City, sector-27, Greater Noida, Uttar Pradesh on an area of 251560.32

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

Indicative Checklist for construction projects of EC [Category 8(a)]:

Indicative Checklist for construction projects of EC [Category 8(a)]: Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page 13 2. Completed

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING ON 11th MAR 2017 and 1st April, 2017

CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING ON 11th MAR 2017 and 1st April, 2017 Prefab BHK,BHK & EWS Housing For Delhi Development Authority Pocket, Sector AA4, Narela, New Delhi FOLLOWING IS PRESENTATION OF THE CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING

More information

CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING ON 11th MAR 2017 and 1st April, 2017

CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING ON 11th MAR 2017 and 1st April, 2017 Prefab BHK,BHK & EWS Housing For Delhi Development Authority Pocket 4, Sector AA4, Narela, New Delhi FOLLOWING IS PRESENTATION OF THE CLARIFICATIONS / SUBMITTALS TO THE QUERIES AS RAISED AFTER SEAC MEETING

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

CONCEPTUAL PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF. Gwalior

CONCEPTUAL PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF. Gwalior PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF Gwalior AT Village Baretha & Laxangarh, Tehsil & District Gwalior (M.P.) Proponent Mr. P.K. Hedau Executive Engineer MPH&IDB,

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

306 kld (Landscaping - 95 kld, Dual Flushing 160 kld, Car Washing - 51 kld) Quantity Of Wastewater Discharge Quantum Of Fresh Water Required 409 kld

306 kld (Landscaping - 95 kld, Dual Flushing 160 kld, Car Washing - 51 kld) Quantity Of Wastewater Discharge Quantum Of Fresh Water Required 409 kld DETAILS OF PROJECT The project proponent wants to develop a Residential complex with all modern amenities at Plot no. IIG/7, Action area II, New town, Rajarhat, Kolkata- 700156.. The project site is a

More information

No construction activity started

No construction activity started Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name

More information

Consolidated Statement on various Environmental Aspects for Construction Project

Consolidated Statement on various Environmental Aspects for Construction Project Consolidated Statement on various Environmental Aspects for Construction Project S.N. Particular 1 Name of Project Development of IKEA Store in Navi Mumbai, India 2 Name, contact number & address of proponent

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

Mixed Landuse Project Madhav Menon University, Sector-17A, Yamuna Expressway, Greater Noida, UP PFR

Mixed Landuse Project Madhav Menon University, Sector-17A, Yamuna Expressway, Greater Noida, UP PFR INTRODUCTION The Mixed Land Use Project, Madhav Menon University is to be developed by M/s. India Knowledge City Foundation. The project site is located at Plot No- 3, Expressway, Greater Noida, U.P. on

More information

2. The expected cost of the project is Rs.50 crores.

2. The expected cost of the project is Rs.50 crores. Subject Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management System for Pathankot Cluster" by Municipal Council, Pathankot at Village Kalanaur,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE-Feasibility Report OF

PRE-Feasibility Report OF PRE-Feasibility Report OF Industrial (to be used for Group Housing) Complex At Plot No-15, Shivaji Marg, New Delhi- 110015 BEING DEVELOPED BY: M/S DLF HOME DEVELOPERS LTD. DLF Centre, Sansad Marg, New

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

Expansion of Calcutta Riverside (An Integrated Township)

Expansion of Calcutta Riverside (An Integrated Township) CONCEPTUAL PLAN Expansion of Calcutta Riverside (An Integrated Township) Project of Riverbank Developers Private Limited at Maheshtala, Batanagar, West Bengal. Project Proponent: Riverbank Developers Private

More information

CONCEPTUAL PLAN. Modification of Group Housing Project Trident Embassy. Plot no. 5 B, Sector 1, District Gautam Budh Nagar, Greater Noida, U.P.

CONCEPTUAL PLAN. Modification of Group Housing Project Trident Embassy. Plot no. 5 B, Sector 1, District Gautam Budh Nagar, Greater Noida, U.P. Modification of Group Housing Project Trident Embassy At Plot no. 5 B, Sector 1, District Gautam Budh Nagar, For M/s Trident Infra Homes Pvt. Ltd Prepared By GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD.

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Expansion of Leela Hotel at Diplomatic Enclave, Africa Avenue, Netaji Nagar, Chanakyapuri, New Delhi by M/s Hotel Leelaventure Ltd.

Expansion of Leela Hotel at Diplomatic Enclave, Africa Avenue, Netaji Nagar, Chanakyapuri, New Delhi by M/s Hotel Leelaventure Ltd. Conceptual Plan Consultant-Ascenso Enviro Pvt. Ltd. Page 1 of 24 1. INTRODUCTION CONCEPTUAL PLAN M/s Hotel Leelaventure Ltd. has gone for Expansion of Leela Hotel at Diplomatic Enclave, Africa Avenue,

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

SIA/PB/NCP/53462/2016)

SIA/PB/NCP/53462/2016) Item No.148.08: Application for environmental clearance under EIA notification dated 14.09.2006 for the development of group housing project namely SSL Highway Towers at Chandigarh-AmbalaHighway, Dera

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

meeting held on meeting held on The SEAC observed that:

meeting held on meeting held on The SEAC observed that: Excerpt pertaining to item no. 147.14 of 147 th meeting of SEAC held on 30.06.2016 Item no.147.14: Application for obtaining Environmental Clearance under EIA notification dated 14.09.2006 for area development

More information

CONCEPTUAL PLAN COMMERCIAL PROJECT Located at PLOT NO. A & B, ECO CITY, SECTOR-75, NOIDA, UTTAR PRADESH

CONCEPTUAL PLAN COMMERCIAL PROJECT Located at PLOT NO. A & B, ECO CITY, SECTOR-75, NOIDA, UTTAR PRADESH COMMERCIAL PROJECT SPECTRUM@METRO-II Located at PLOT NO. A & B, ECO CITY, SECTOR-75, NOIDA, UTTAR PRADESH BY M/s. AIMS MAX GARDENIA DEVELOPERS PVT. LTD. CONTENTS S.NO. DESCRIPTION PAGE NO. 1. INTRODUCTION

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

Point wise reply. There is no change in water requirement and wastewater generation. However, water balance enclosed as Annexure-I.

Point wise reply. There is no change in water requirement and wastewater generation. However, water balance enclosed as Annexure-I. Mohammadpur Korji, P.S.- Phulwarisharif, District- Patna, Bihar by M/s Balprada Built Pvt. Ltd. Point wise reply Point 1: Submit revised water balance for the Project There is no change in water and wastewater

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

Environmental Clearance for Proposed development at Kandivali (E), Mumbai ANNEXURES

Environmental Clearance for Proposed development at Kandivali (E), Mumbai ANNEXURES ANNEXURES 35 LIST OF ANNEXURES Annexure I : Solid Waste Management Annexure II : Water Supply & Wastewater Management Annexure III : Proposed Area Statement Annexure IV : Environmental Management Plan

More information

Redevelopment of Gomti Nagar Railway Station, Gomti Nagar, Lucknow, U.P. CONCEPTUAL PLAN

Redevelopment of Gomti Nagar Railway Station, Gomti Nagar, Lucknow, U.P. CONCEPTUAL PLAN CONCEPTUAL PLAN 1 LIST OF TABLES Table 1: Area Statement... 5 Table 2: Population Break up... 6 Table 3: Water Requirement... 7 Table 4: Waste Water Calculations... 8 Table 5: Calculation of Solid Waste

More information

Group Housing Project at Plot No. 76, Sector- Sigma- IV, Greater Noida, Uttar Pradesh. Conceptual Plan

Group Housing Project at Plot No. 76, Sector- Sigma- IV, Greater Noida, Uttar Pradesh. Conceptual Plan Conceptual Plan Consultant-Ascenso Enviro Pvt. Ltd. Page 1 of 20 CONCEPTUAL PLAN 1. INTRODUCTION M/s Satilila Sahkari Awas Samiti Ltd., has develop Group housing Project at Plot no 76, Sigma IV, Greater

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1 Contents 1 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 PROJECT LOCATION 3 1.3 PROJECT FEATURES

More information

ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE

ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE Page 1 ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE SCOPE OF BUILDING: Residential LAND ACQUIRED: 10688.00 Sqm Survey No.: 88/p-22,

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

Amrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr

Amrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers proposes a Slum Rehabilitation project Amrut Manthan + Shree Mahalaxmi & Primus Residences located at C.T.S. No. 4091, 4091/1 to 37,

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

Expansion of Info Technology Park at Manapakkam Village, Kancheepuram District Chennai, Tamil Nadu

Expansion of Info Technology Park at Manapakkam Village, Kancheepuram District Chennai, Tamil Nadu FORM 1A CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental

More information

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report. The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PROJECT CONCEPT REPORT

PROJECT CONCEPT REPORT PROJECT CONCEPT REPORT for Proposed RESIDENTIAL BLOCK UNDER Expansion (Phase-2) of MANI CASADONA PROJECT at Plot No. IIF/04, Action Area-II, New Town, P.S. Rajarhat, New Town Kolkata Development Authority,

More information

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

COMPLIANCE REPORT THE CONDITIONS ENVIRONMENTAL CLEARANCE ORDER NO: 35/SEIAA/KL/6090/2012 DT

COMPLIANCE REPORT THE CONDITIONS ENVIRONMENTAL CLEARANCE ORDER NO: 35/SEIAA/KL/6090/2012 DT 1 COMPLIANCE REPORT TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE ORDER NO: 35/SEIAA/KL/6090/2012 DT. 14 11 2012 BY STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA) FOR PROPOSED QUARRY PROJECT AT Sy.Nos.

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Details of Project. 2 nos kva each & 2 nos. 500 kva each. Parking required 444 nos. (Car Parking 435, Bus Parking 9)

Details of Project. 2 nos kva each & 2 nos. 500 kva each. Parking required 444 nos. (Car Parking 435, Bus Parking 9) Details of Project The project proponent wants to develop a Office building at Plot No. CBD 4, Street MAR, AA II, New Town, P.S. Rajarhat, North 24 Parganas, West Bengal. The project site is a flat land

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village TABLE-1 PROJECT AT A GLANCE Registered Address M/s. Pallavada Technical Textiles Park Private Limited, No. 78, Greams Road, Thousand Lights, Chennai-600006. Communication Address of M/s. Pallavada Technical

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

Urban Rainwater Harvesting Systems: Promises and Challenges

Urban Rainwater Harvesting Systems: Promises and Challenges TheWaterChannel Webinar #5 Urban Rainwater Harvesting Systems: Promises and Challenges By Vishwanath S Zenrainman@gmail.com www.ircsa.org www.rainwaterclub.org Thanks for coming. The webinar will begin

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

RAJASTHAN REFINERY TOWNSHIP PROJECT, RAJASTHAN

RAJASTHAN REFINERY TOWNSHIP PROJECT, RAJASTHAN Page 1 of 10 PRE-FEASIBILITY REPORT FOR Page 2 of 10 Contents 1.0 Introduction... 3 2.0 Approach... 3 3.0 Environmental Sustainability Measures... 4 3.1 Environmental Measures... 4 3.2 Social measures...

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

Greater Mohali Area Development Authority (GMADA) vide its letter dated has applied for obtaining environmental clearance as

Greater Mohali Area Development Authority (GMADA) vide its letter dated has applied for obtaining environmental clearance as Excerpt pertaining to the item no. 142.1.8 from the proceedings of the 142 nd meeting of SEAC held on 11.03.2016 in Committee Room, Punjab Pollution Control Board, Patiala. Item No.142.1.8: Application

More information

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc. Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in

More information