CO TAQA Technical Report

Size: px
Start display at page:

Download "CO TAQA Technical Report"

Transcription

1 CO TAQA Technical Report I-35E/US 67 Project Dallas District I-35E from US 67 to I-30 and US 67 from I-20 to I-35E CSJ: , , Dallas County, Texas Prepared by: HNTB Corporation June 2016 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

2 CO TAQA Technical Report I-35E/US 67 Project TABLE OF CONTENTS 1. Introduction Existing Facility Proposed Facility Carbon Monoxide Traffic Air Quality Analysis (CO TAQA) Background Analysis Methodology and Assumptions CO TAQA Receptors Analysis Results... 6 TABLES Table 2-1: Traffic Data... 4 Table 2-2: CO Emission Rates (gpm)... 5 Table 2-3: Modeling Parameters... 5 Table 2-4: Modeled Roadway Information... 6 Table 2-5: Carbon Monoxide Concentrations... 7 ATTACHMENTS ATTACHMENT A: Exhibits ATTACHMENT B: Supplemental Documentation CSJs: , etc. June 2016 i

3 CO TAQA Technical Report I-35E/US 67 Project 1. Introduction The Texas Department of Transportation (TxDOT) proposes improvements to Interstate Highway 35 East (I-35E) from U.S. Highway (US 67) to Interstate Highway 30 (I-30) and along US 67 from Interstate Highway 20 (I-20) to I-35E a total of approximately 11 miles in Dallas County, Texas. The I-35E/US 67 Project (proposed project) has been referred to in the past as the Southern Gateway Managed Lanes Project (see Attachment A, Exhibit 1: Project Location Map) Existing Facility I-35E between Colorado Boulevard (Blvd.) and Reunion Blvd. consists of 5 northbound and 4 southbound mainlanes that include an 11-foot (ft) wide reversible high occupancy vehicle (HOV) lane. This section is currently under construction and was approved as part of the Dallas Horseshoe Project (CSJ , etc.) which received A Finding of No Significant Impact on September 18, Once construction is complete (anticipated 2017), the I-35E northbound bridge will consist of 3 mainlanes; 2 reversible HOV lanes, and 5 Collector-Distributor (CD) lanes, and a 6-ft sidewalk. The I-35E southbound bridge would consist of 4 mainlanes, 4 CD lanes; and 6-ft sidewalks along the outside of the CD road. The right-of-way (ROW) at the Dallas Floodway crossing is approximately 848 ft. wide. On I-35E from US 67 to Colorado Blvd. the existing lane configuration is 8 mainlanes, 4 in each direction; with one reversible HOV lane. I-35E between Fairshop Drive (Dr.) (near the southern limits of construction along I-35E) and US 67 is 6 mainlanes (3 in each direction). South of Colorado Blvd., the existing ROW along I-35E varies from approximately 244 ft to 435 ft. On US 67 from I-20 to I-35E the existing lane configuration is 4 mainlanes, 2 in each direction, with 1 concurrent HOV lane. The existing ROW along US 67 varies from approximately 305 ft to 469 ft. Except for the bicycle accommodations within the section of I-35E between Colorado Blvd. and Reunion Blvd., currently under construction as part of the Dallas Horseshoe Project, no bicycle accommodations exist within the I-35E/US 67 Project limits. Similarly, sidewalks are currently being implemented as part of the Dallas Horseshoe Project. Discontinuous pedestrian accommodations (sidewalks) currently exist within the project limits Proposed Facility The proposed project or Build Alternative would consist of improvements to I-35E between US 67 and Reunion Blvd. and to US 67 between I-20 and I-35E. The improvements would consist of converting the existing HOV lanes to reversible non-toll express lanes, adding reversible non-tolled express lanes and general purpose lanes (mainlanes), along with bicycle and pedestrian accommodations. TxDOT is also CSJs: , etc. 2 June 2016

4 CO TAQA Technical Report I-35E/US 67 Project planning local enhancements consisting of a deck plaza along I-35E, near Ewing Avenue (Ave.). The enhancements would be funded by and maintained by the City of Dallas. I-35E improvements from US 67 to Fairshop Dr. consist of a tie in/transition into the existing facility. The proposed project is shown in Attachment A, Exhibit 1: Project Location Map and described below. a) I-35E between Colorado Blvd. and Reunion Blvd.: Convert 2 existing reversible HOV lanes to 2 reversible non-tolled express lanes. b) I-35E between the US 67 and Colorado Blvd.: Full reconstruction to include two reversible non-tolled express lanes, increasing the number of the mainlanes from 8 to 10, and increasing the number of frontage road lanes from 4 to 4/6. c) US 67 from I-20 to I-35E: Partial reconstruction to change the existing concurrent HOV lane to one reversible non-tolled express lane within the existing median and increasing the number of mainlanes from 4 to 6 along with slip ramp modifications. d) Sidewalks and 14-ft shared use lanes to accommodate vehicles and bicyclists would be implemented along those frontage roads where reconstruction is proposed. e) Dedicated bicycle lanes and sidewalks would be implemented at cross-streets where reconstruction is proposed. 2. Carbon Monoxide Traffic Air Quality Analysis (CO TAQA) This Carbon Monoxide Traffic Air Quality Analysis (CO TAQA) technical report was prepared in accordance to the TxDOT s CO TAQA Standards Operating Procedures, Documentation Standard for a CO TAQA Technical Report, and Standard Operating Procedures for Preparing Air Quality Statements. This report documents results of the CO TAQA analysis, and supports the environmental document that evaluates the social, economic, and environmental impacts resulting from the proposed project. The Build Alternative was evaluated in 2021, the estimated time of completion (ETC), and in 2037, the design year Background If a roadway project is not exempt under 40 Code of Federal Regulations (CFR) , is adding capacity and would reach average annual daily (AADT) traffic greater than 140,000 by the design year, a CO TAQA is required. Because the proposed project would not be exempt per 40 CFR , would increase capacity, and the AADT for the ETC (2021) and design year (2037) is above 140,000 vehicles per day (vpd), a CO TAQA is required. Specifically, traffic for the ETC year (2021) for I-35E and US 67 is estimated to be 218,000 vehicles per day (vpd) and 125,000 vpd, respectively. Traffic for the design year (2037) for I-35E and US 67 is estimated to be 311,400 vpd and 192,800 vpd, respectively. A consultative call between TxDOT and the North Central Texas Council of Governments (NCTCOG) to discuss the CO TAQA methodology and assumptions was held on January 26, Notes from the coordination call are CSJs: , etc. 3 June 2016

5 CO TAQA Technical Report I-35E/US 67 Project available in Attachment B. The methodology and assumptions for this CO TAQA were determined during the call Analysis Methodology and Assumptions Carbon monoxide concentrations for the proposed project were modeled using CALINE3 and MOVES2010b and factoring in adverse meteorological conditions and sensitive receptors at the ROW line in accordance with the Standard Operating Procedure (SOP) for Complying with CO TAQA Requirements. The traffic data and K factor utilized in the analysis were obtained from the TxDOT Transportation Planning and Programming Division (TP&P) approved on June 3, 2016 (Attachment B: Traffic Data), to determine if the CO concentrations exceed the National Ambient Air Quality Standards (NAAQS) in the ETC and design years. The traffic data utilized in the analysis for each roadway segment analyzed for both ETC and design year is included in Table 2-1. Table 2-1: Traffic Data TAQA AREA ROADWAY SEGMENT 2021 ADT ETC (2021) DESIGN YEAR (2037) 2021 DHV 2037 ADT 2037 DHV US 67 NBFR 4, , US 67 EXIT 9, ,900 1,014 RAMP AREA 1: US US 67 NBML 51,080 4,750 72,600 6, South of US 67 SBML 50,900 4,734 74,900 6,966 Red Bird Ln. US 67 ENTRY 10, ,500 1,256 RAMP US 67 SBFR 4, , I-35E NBFR 12, ,500 1,163 I-35E EXIT RAMP 1, , I-35E NBML 105,300 7, ,900 10,118 AREA 2: I- I-35E EXL 10, ,400 1,530 35E North of 8TH St. I-35E SBML 100,560 7, ,200 9,090 I-35E 5, , ENTRY_RAMP I-35E SBFR 7, , Source: TP&P Approved Traffic Diagrams and Study Team (June 2016). ADT=Average daily traffic in vehicles per day. DHV=Design hourly volume in vehicles per hour. NBFR=North bound frontage road NBML=North bound main lane SBML=South bound main lane SBFR=South bound frontage road EXL=Express lane CSJs: , etc. 4 June 2016

6 CO TAQA Technical Report I-35E/US 67 Project The CO emission rates in grams per mile (gpm) corresponding to urban roadways for the design speeds of 60 miles per hour (mph) (general purpose lanes and express lanes) and 40 mph (frontage roads and ramps) are shown in Table 2-2 were utilized in the analysis. Table 2-2: CO Emission Rates (gpm) SPEED URBAN RESTRICTED ACCESS URBAN UNRESTRICTED ACCESS Source: MOVES2010b TxDOT emission rate look-up tables (July 2014). Other modeling parameters used in the analysis are included in Table 2-3. Table 2-3: Modeling Parameters Atmospheric stability class 6 Mixing height 1,000 meters Wind speed 1 m/s 30, 60, 90, 120, 150, 180, Wind directions modeled 210, 240, 270, 300, 330, (in degrees) 360 K-factors (in percent) 7.5 (I-35E) and 9.3 (US 67) Design Mainlane/Express 60 mph lanes vehicle speeds Design Frontage Roads/Ramps vehicle 40 mph speeds Source: Study Team (June 2015) CO TAQA Receptors The TAQA was completed for two receptors within areas with the highest traffic volumes within the project corridor. These areas were identified to be along US 67 ROW, between Club Terrace Dr. and Red Bird Ln. or Area 1 and along the I-35E ROW between 8th Street (St.) and 7th St. or Area 2. The TAQA receptor location areas are shown in Attachment A, Exhibit 2: TAQA Receptor Locations Map on Aerial and in Exhibit 3, TAQA Receptor Locations Map on Schematic. The distances from each roadway to the receiver are graphically shown in Attachment B. Table 2-4 includes the modeled roadways, distances of the roadways to the receptor for each area, ROW width, number of lanes, speed, DHV and emission factors used in the analysis. CSJs: , etc. 5 June 2016

7 CO TAQA Technical Report I-35E/US 67 Project AREA/ RECEPTOR 1 AREA/ RECEPTOR 2 AREA/ RECEPTOR 1 AREA/ RECEPTOR 2 Table 2-4: Modeled Roadway Information Distance Number to Speed Modeled Roadway DHV of Receptor in vpd Lanes in ft CO Emission Factor Year 2021 US 67 NBFR US 67 Exit Ramp US 67 NBML US 67 SBML US 67 ENTRY RAMP US 67 SBFR I-35E NBFR I-35E EXIT RAMP I-35E NBML I-35E EXL I-35E SBML I-35E ENTRY RAMP I-35E SBFR Year 2037 US 67 NBFR US 67 Exit Ramp US 67 NBML US 67 SBML US 67 ENTRY RAMP US 67 SBFR I-35E NBFR I-35E EXIT RAMP I-35E NBML I-35E EXL I-35E SBML I-35E ENTRY RAMP I-35E SBFR Source: TP&P, Study Team (June 2013) Analysis Results As indicated in Table 2-5, the 1-hr CO concentration for Area 1 is approximately 7 percent of the NAAQS and approximately 8 percent of the NAAQS for Area 2 in 2021 and The 8-hr CO concentration is approximately 30 percent and 32 percent of the NAAQS for Areas 1 and 2, respectively. Local concentrations of CO are not expected to exceed national standards at any of the receptors in 2021 or The CALINE3 model input and output files are available in ECOS. CSJs: , etc. 6 June 2016

8 CO TAQA Technical Report I-35E/US 67 Project Year Table 2-5: Carbon Monoxide Concentrations Location Description 1-HR CO Concentration (ppm)* 1-HR% NAAQS 8-HR CO Concentration (ppm)* 8-HR% NAAQS 2021 Area 1: US 67 Between Club Terrace Dr. and 2037 Red Bird Ln Area 2: I-35E between th St. and 7 th St Source: Study Team (June 2016). *The National Ambient Air Quality Standards (NAAQS) for CO are 35 parts per million (ppm) for 1-hr and 9 ppm for 8-hr. Analysis includes a 1-hour background concentration of 1.9 ppm and an 8-hr background concentration of 2.3 ppm [Appendix B of the TxDOT SOP for Complying with CO TAQA Requirements ()]. CSJs: , etc. 7 June 2016

9 ATTACHMENT A

10 I-35E from Colorado Blvd. to Reunion Blvd.: Change 2 Rever. HOV Lanes to 2 Rever. non-tolled express lanes (No added capacity) CSJs & Reunion Blvd DALLAS Colorado Blvd I-35E from US 67 and Colorado Blvd.: Full reconstruction including change of 1 exist. Rever. HOV lane to 2 Rever. non-tolled express lanes, and widening of GPs from 8 to 10 lanes and FRs from 4 to 4/6 lanes. CSJ Zang Blvd!( 342!( E Kiest Blvd US 67 from I-20 to I-35E: Reconstruction to change 1 exist. Concur. HOV lane to 1 Rever. non-tolled express lane within the median and widening of GPs from 4 to 6 lanes. CSJ !( Ledbetter Dr DUNCANVILLE 20 LANCASTER LEGEND ± Proposed Project Limits DESOTO Denton County Tarrant County Miles Collin County Rockwall County Kaufman County Danieldale Rd EXHIBIT 1 PROJECT LOCATION MAP I-35E/ US 67 PROJECT I-35E FROM US 67 TO I-30 US 67 FROM I-20 TO I-35E Sources: NCTCOG GIS Data - counties, cities, streets, rivers, and lakes Dallas County Ellis County CO TAQA TECHNICAL REPORT DALLAS COUNTY, TEXAS

11 AREA 1 AREA E RECEPTOR 1 RECEPTOR NOT TO SCALE EXHIBIT 3 TAQA RECEPTOR LOCATIONS MAP ON SCHEMATIC ± E Note: Based on April 2016 Schematic Plans I-35E/US 67 PROJECT I-35E: FROM US 67 TO I-30 US 67 : FROM I-20 TO I-35E CO TAQA TECHICAL REPORT DALLAS COUNTY, TEXAS

12 ON BLV D RED D BIR 6TH ST ERS 7TH ST JEF F PL RE LN MI NG AREA 2 FL E RD L P DALE ST BI 8TH ST D AREA 1 ) " B E 67 CHURCH ST R L THORNTON FWY RECEPTOR 1 CLUB WOOD DR RECEPTOR 2 180! ( E OR AC AN RR M TE UB UB CL CL Tenth Street Historic District DR DR Proposed ROW NRHP Listed District Bridge Displacement Driveway Managed Lane Ramp Frontage/Cross Road 0 ± ± Existing ROW 0 Feet LEGEND Potential Relocation EADS AVE CLIFF ST ± Sidewalk Proposed Pavement Source: TNRIS 2015 NAIP aerial imagery, roads Feet EXHIBIT 2 TAQA RECEPTOR LOCATIONS MAP ON AERIAL 30 General Purpose Lane Remove 125 I-35E/US 67 PROJECT I-35E: FROM US 67 TO I-30 US 67 : FROM I-20 TO I-35E 35E Note: Based on April 2016 Schematic Plans CO TAQA TECHICAL REPORT DALLAS COUNTY, TEXAS 500

13 ATTACHMENT B

14 I-35E/US 67 PROJECT Air Quality Consultative Call Date: January 26, 2016, 1:30pm MEETING NOTES Attendees: Ashton Strong (TxDOT), John Nguyen (TxDOT), Sandra Williams (TxDOT), Tim Wood (TxDOT), Sandy Wesch (NCTCOG), Berrien Barks (NCTCOG), Rusty Ozmer (HNTB), Lupe Pettit (HNTB). The participants were provided with the following project information and proposed modeling methodology for MSAT and CO. The group was also provided with a project location map and 2003 approved traffic showing ADT above 140,000 ADT. A summary of the items discussed and decisions made are included on pp.2 and Background: Since the last air quality consultative call held on August 14, 2015, the project limits and scope have changed. The project will require a quantitative MSAT analysis because it is an increase capacity project with over 140,000 ADT and is federally funded. The following describes the proposed project as of January Limits: I-35E from US 67 to Reunion Blvd. and US 67 from I-20 to I-35E for a project length of approx. 11 miles (see Exhibit 1: Project Location Map); 1.2. Proposed improvements: The improvements would consist of conversion of existing HOV lanes to reversible non-toll express/managed lanes, addition of reversible non-tolled express/managed lanes, and addition of general purpose lanes, along with bicycle and pedestrian accommodations as follows: a) I-35E between Colorado Blvd. and Reunion Blvd.: Convert two reversible HOV lanes to two reversible non-tolled express/managed lanes. b) I-35E between the US 67 and Colorado Blvd.: Full reconstruction to include two reversible non-tolled express/managed lanes, widening of the mainlanes from 8 to 10, and increasing the number of frontage road lanes. c) US 67 from I-20 to I-35E: Partial reconstruction to change the existing concurrent HOV lane to one reversible non-tolled express/managed lane within the existing median and widening the mainlanes from 4 to 6 along with slip ramp modifications. d) Full reconstruction of the I-35E/US 67 Interchange Planning: The project will be consistent with the 2040 MTP and STIP currently under development Environmental document: EA per workshop held With FHWA and ENV on June 13, Construction Begin: ETC: MTP Horizon Yr: Anticipated FONSI: December Traffic: Per attached TP&P traffic from 2003 that traffic within project limits is over 140,000 ADT in year Traffic updates are in progress and are anticipated to be above 140,000 ADT. 2. Proposed methodology for MSAT 2.1. MSAT methodology: link-by-link/quantitative MSAT 2.2. Affected transportation network threshold: links with traffic changes between Build and No-build scenarios of +/- 5% CSJ: , etc. 1 January 2016

15 2.3. MSAT study area: NCTCOG MPA affected transportation network 2.4. Analysis years/scenarios: Base year (2017), 2040 Build, and 2040 No-Build with no interim year Traffic data: Mobility 2040 MTP 2017 and 2040 networks 2.6. Pollutants: acrolein, benzene, 1,3-butadiene, diesel particulate matter plus diesel exhaust organic gases (DPM), formaldehyde, naphthalene, and polycyclic organic matter Data Needs: +/-5% affected network and MSAT emissions factors processed with MOVES2010b (if generated before Oct. 7, 2016) or with MOVES2014 (if generated after Oct. 7, 2016). To be provided NCTCOG by 4/29/ Proposed methodology for TAQA (CO analysis) 3.1. Analysis years/scenarios: 2021 (ETC year) and 2040 (MTP horizon year) 3.2. Data Needs: MOVES emission factor look up tables from ENV, traffic data (TP&P approved traffic numbers). The scenario traffic numbers will be derived from the TP&P approved numbers CO Model: CALINE3/CAL2001 (TxDOT s software) 4. Additional Items of discussion: 4.1. Project level toll analysis: Not needed because no tolling component Conformity report would be submitted to FHWA as early as possible for FHWA review and approval once the 2016 conformity is approved by FHWA. Summary of discussion/decisions: Ashton inquired about an additional reversible managed lane along US 67 in 2040 that had been mentioned in Sandy s but was not shown in the draft MTP tables. Sandy said that the MTP tables are incorrect for US 67 (year 2040). They currently show 1R but should be 2R and will be revised. MSAT: Tim and Sandy discussed the proposed MSAT out-year scenario year. Sandy disagrees with the proposed year of 2040 because that network would not reflect the proposed project (3-1R-3), but the ultimate configuration for US 67 (3-2R-3). Sandy was concerned about inconsistency in the EA, which would clear the interim configuration, not the ultimate configuration and from the conformity point of view. Tim clarified that conformity would not apply to MSAT and explained that the purpose of the 2040 scenario is to show the trend of MSAT emissions mainly for comparison purposes, and that it is common for environmental documents to have different analysis years for different resources. It was mentioned that the schematic will use 2017 and 2037 traffic. Traffic noise would be modeled for these same years. Tim stated that for MSAT TxDOT uses the MTP horizon year for the out year. He also explained the difference between the project and the corridor. Tim added that the no-build 2040 scenario would consist of removal of the proposed project and would leave all other projects as proposed in The group discussed what is involved in coding of the no-build scenario. Although atypical, and to avoid confusion, TxDOT agreed to complete the MSAT for 2037 instead of 2040 (MTP horizon year) because the project is environmentally being cleared as an interim project. In summary: o MSAT scenario years are 2017 (base), 2037 no-build, and 2037 build o The affected network would be based on the +/-5% threshold and will be provided by NCTCOG. CSJ: , etc. 2 January 2016

16 o NCTCOG will provide emissions for the MSAT analysis. For this purpose, NCTCOG will use the MSAT emission factors provided by Tim, which were determined using MOVES2010b. Tim advised that once MOVES2014 is required, TxDOT will provide updated emission tables. This requirement will come into effect on Oct. 7, CO: The group agreed that the proposed scenarios for the CO analysis should be 2021 (ETC) and 2037 (design year) using the CALINE3/Cal2001. TPP approved traffic numbers will be used of the CO analysis. TxDOT emission lookup tables available in the air quality toolkit online shall be used in the analysis. Schedule: Sandy said that the MSAT data would be provided in April of It is anticipated that the RTC will approve the MTP in March of Conformity is anticipated to be approved by FHWA in June/July CSJ: , etc. 3 January 2016

17 US67 SBML:4LANES:2037 ADT=74900 DIST=228FT US67 ENTRY RAMP:1LANE:2037 ADT=13500 DIST=308FT US67 NBML:3LANES:2037 ADT=72600 DIST=166FT RED BIRD LANE US67 EXIT RAMP:1LANE:2037 ADT=10900 DIST= 91FT US67 NBFR:2LANES:2037 ADT=6500 DIST=28 FT RED BIRD LANE US67 SBFR:2LANES:2037 ADT=5700 DIST=343FT TAQA R TAQA AREA 1 (NEAR STA ) CLUBTERRACE

18 E. 7th STREET I35E_SBML-5LANES:2037 ADT= DIST=238FT I35E_ENTRYRAMP-1LANE:2037 ADT=7100 DIST=296FT I35E_SBFR-2LANES:2037 ADT=8500 DIST=336FT 35R52 N E Elev R52 - COUNTY COURTHOUSE NAC-C (INTERIOR) Elev. 490 TAQA AREA 2 I35E_EXL-2LANES:2037 ADT=20400 DIST=184FT TAQA R2 I35E_NBFR-2LANES:2037 ADT=15500 DIST=26FT I35E_EXITRAMP-1LANE:2037 ADT=2400 DIST=58FT I35E_NBML-5LANES:2037 ADT= DIST=117FT E. 8th STREET E. 8th STREET

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis Draft Carbon Monoxide (CO) Traffic Air Quality Analysis North Houston Highway Improvement Project From US 59/I-69 at Spur 527 To I-45 at Beltway 8 North Harris County TxDOT Houston District CSJ: 0912-00-146

More information

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013 IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange Public Meeting Thursday April 4, 2013 1 Project Contacts: TxDOT-Fort Worth District John R. Tillinghast, P.E. IH 820 Project

More information

INTRO TO AIR QUALITY

INTRO TO AIR QUALITY INTRO TO AIR QUALITY Table of Contents 1 Introduction to Air Quality 4-7 2 Criteria Pollutants 8-16 3 Mobile Source Air Toxics (MSAT) 17-22 4 Project Level Compliance 23-29 5 Project-Level Transportation

More information

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

DRAFT AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida

More information

Robin Rhinesmith and Crystal Geiger, Florida Department of Transportation (FDOT) Lindsay Baumaister, KB Environmental Sciences, Inc.

Robin Rhinesmith and Crystal Geiger, Florida Department of Transportation (FDOT) Lindsay Baumaister, KB Environmental Sciences, Inc. -MEMO- Date: February 21, 2019 To: From: CC: Robin Rhinesmith and Crystal Geiger, Florida Department of Transportation (FDOT) Lindsay Baumaister, KB Environmental Sciences, Inc. Steve Gordillo, WSP Subject:

More information

Air Quality Technical Report

Air Quality Technical Report Air Quality Technical Report Loop 336 South From IH 45 to FM 1314 Montgomery County CSJ: 0338-11-056 July 2017 The environmental review, consultation, and other actions required by applicable Federal environmental

More information

I-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report

I-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report I-70 East ROD 1: Air Quality Conformity Technical Report January 2017 I-70 East ROD 1: Air Quality Conformity Technical Report TABLE OF CONTENTS Chapter Page 1 PURPOSE OF THIS REPORT... 1 2 PROJECT DESCRIPTION...

More information

ENVIRONMENTAL ASSESSMENT and SECTION 4(f) EVALUATIONS for HIGHLAND LAKES PARK and USACE PROPERTY

ENVIRONMENTAL ASSESSMENT and SECTION 4(f) EVALUATIONS for HIGHLAND LAKES PARK and USACE PROPERTY ENVIRONMENTAL ASSESSMENT and SECTION 4(f) EVALUATIONS for HIGHLAND LAKES PARK and USACE PROPERTY IH 35E: FROM PRESIDENT GEORGE BUSH TURNPIKE TO FM 2181 CSJs: 0196-02-068, 0196-01-096, 0196-02-073, 0196-02-114,

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 4: State Road 400 (SR 400)/Interstate 4 (I-4) from East of SR 15-600/US 17-92 (Seminole/Volusia County Line) to ½ Mile East of SR 472 Volusia County (79110),

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 2: State Road 400 (SR 400) / Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road) Orange County (75280), Florida

More information

ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM INTERSTATE HIGHWAY 820 TO INTERSTATE HIGHWAY 30 CITY OF FORT WORTH TARRANT COUNTY, TEXAS

ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM INTERSTATE HIGHWAY 820 TO INTERSTATE HIGHWAY 30 CITY OF FORT WORTH TARRANT COUNTY, TEXAS ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM INTERSTATE HIGHWAY 820 TO INTERSTATE HIGHWAY 30 CITY OF FORT WORTH TARRANT COUNTY, TEXAS CSJ Nos. 0014-16-179 0014-16-268 PREPARED BY: UNITED STATES

More information

ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM STATE HIGHWAY 114 TO INTERSTATE HIGHWAY 820

ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM STATE HIGHWAY 114 TO INTERSTATE HIGHWAY 820 ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM STATE HIGHWAY 114 TO INTERSTATE HIGHWAY 820 CITIES OF FORT WORTH AND HASLET TARRANT AND DENTON COUNTIES, TEXAS CSJ Nos. 0014-16-252 0014-16-255 0081-12-041

More information

Final Air Quality Report

Final Air Quality Report Florida Department of Transportation - District VII County Line Road (C.R. 578) Project Development and Environment Study From U.S. 19 (S.R. 55) to U.S. 41 (S.R. 45) Work Program Item Segment Number: 257298

More information

PUBLIC HEARING LOOP 9

PUBLIC HEARING LOOP 9 PUBLIC HEARING LOOP 9 From Interstate (I)-35E to I-45 Dallas and Ellis Counties, Texas CSJ: Loop 2964-10-005 9: I-35E to I-45 Tuesday, June 20, 20, 2017 2017 Public Hearing Introductions ELECTED & PUBLIC

More information

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION AIR QUALITY ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION AIR QUALITY ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION AIR QUALITY ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Air Quality Analysis Technical Report City of Alexandria,

More information

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5 MEMO TO: Timothy Nesbitt, P.E. DATE: August 26, 2002 FROM: SUBJECT: Sandy Wesch-Schulze, P.E., AICP IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 3: State Road 400 (SR 400)/Interstate 4 (I-4) from One Mile East of SR 434 to East of SR 15-600/US 17-92 Seminole County (77160), Florida July 2016 Air

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: I-66 ITB West Falls Church Metro Garage Access Federal Project#: NHPP-066-1(356) Project Number: 0066-96A-493, B686, C501, P101 Project Type:

More information

ATTACHMENT A: EXHIBITS

ATTACHMENT A: EXHIBITS ATTACHMENT A: EXHIBITS Exhibit 1: Project Location Map Exhibit 2: FEMA Floodplain and USGS Quadrangle Map Exhibit 3: Typical Sections Exhibit 4: Proposed Schematic Plans Exhibit 5: Section 404 Impacts

More information

5.3 Air Quality and Greenhouse Gas Emissions

5.3 Air Quality and Greenhouse Gas Emissions 5. NEPA 5.3 Air Quality and Greenhouse Gas Emissions For a comprehensive discussion of the Project s affected environment and cumulative impacts as it relates to air quality and greenhouse gas (GHG) emissions,

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 1: from west of CR 532 (Polk/Osceola County Line) to west of SR 528 Beachline Expressway June, 2014 Stantec 615 Crescent Executive Court Suite 248 Lake

More information

INTERSTATE HIGHWAY (IH) 635

INTERSTATE HIGHWAY (IH) 635 INTERSTATE HIGHWAY (IH) 635 FROM: WEST OF GREENVILLE AVE TO: NORTH OF TOWN EAST BLVD DALLAS COUNTY CSJ: 2374-01-127 & 2374-02-053 ACCESS JUSTIFICATION IH 635 CORRIDOR EAST SECTION October 3, 2002 Texas

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

Harlem Avenue Interchange Design Discussion. August 24, 2015

Harlem Avenue Interchange Design Discussion. August 24, 2015 Harlem Avenue Interchange Design Discussion August 24, 2015 1 Expressway Construction Pre-dates Modern Design Standards Expressway designed and constructed in 1950 s No past experience to base design standards

More information

Environmental Consequences and Mitigation

Environmental Consequences and Mitigation Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives

More information

CSJ#: , , , , ,

CSJ#: , , , , , Table of Contents TABLE OF CONTENTS INTRODUCTION...1 I. NEED AND PURPOSE FOR PROPOSED PROJECT...5 II. DESCRIPTION OF EXISTING FACILITIES...7 A. Existing Facilities...7 B. Existing Land Use...13 III. DESCRIPTION

More information

I-10 KENDALL EXTENSION. Open House

I-10 KENDALL EXTENSION. Open House I-10 KENDALL EXTENSION Open House The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

The Metropolitan Transportation Plan for North Central Texas. Regional Transportation Council Chad McKeown, AICP January 14, 2016

The Metropolitan Transportation Plan for North Central Texas. Regional Transportation Council Chad McKeown, AICP January 14, 2016 The Metropolitan Transportation Plan for North Central Texas Regional Transportation Council Chad McKeown, AICP January 14, 2016 Mobility 2040 Guiding Principles Conduct comprehensive corridor evaluations

More information

UPTOWN TRAFFIC IMPACT ANALYSIS

UPTOWN TRAFFIC IMPACT ANALYSIS UPTOWN TRAFFIC IMPACT ANALYSIS This memorandum summarizes the results of the traffic analysis conducted to evaluate the traffic operations of the intersections along Post Oak Boulevard within Uptown Houston

More information

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS June 2011 PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS June 2011 Prepared by: Arkansas State Highway and Transportation Department

More information

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention

More information

Yellowstone National Park Winter Use Plan. Air Quality Analysis of Snowmobile and Snowcoach Emissions

Yellowstone National Park Winter Use Plan. Air Quality Analysis of Snowmobile and Snowcoach Emissions Yellowstone National Park 2004-05 Winter Use Plan Air Quality Analysis of Snowmobile and Snowcoach Emissions July 29, 2004 Air Resource Specialists 1901 Sharp Point Drive, Suite E Fort Collins, Colorado

More information

Noise Monitoring Data

Noise Monitoring Data Noise Monitoring Data Shatto Place 8 S. New Hampshire Avenue W. 5th Street 7 S. Vermont Avenue 1 5 W. 5th Street S. Westmoreland Avenue Site 1 4 Site 2 2 2 6 Legend 11 9 3 4 3 1 W. 6th Street 10 # 1 2

More information

Preparing a Reevaluation Using the Documented Reevaluation Checklist (DRC)

Preparing a Reevaluation Using the Documented Reevaluation Checklist (DRC) Guidance Preparing a Reevaluation Using the Documented This guidance outlines the TxDOT process for preparing a documented reevaluation as required by 43 TAC 2.85 and 23 CFR 771.129. TxDOT Environmental

More information

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management in Michigan Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management (ATM) Active Traffic Management Strategies: Dynamic Lane Use Dynamic Shoulder Use Queue Warning

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4 TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement

More information

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 I-64 Peninsula Shoulder Usage Evaluation Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 Briefing Purpose Evaluation Area / Existing Conditions Code and Policy Engineering Facts

More information

Outer Loop/Rail Bypass Study

Outer Loop/Rail Bypass Study Outer Loop/Rail Bypass Study Outer Loop Stakeholder Roundtable Southwest Segment Joshua City Hall April 16, 2008 North Central Texas Council of Governments Transportation Department Stakeholder Roundtable

More information

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee MEMORANDUM Date: July 14, 2006 Project #: 6389 To: US 97 & US 20 Refinement Plan Steering Committee From: Sonia Hennum, P.E., Andrew Cibor, E.I.T., & Julia Kuhn, P.E. Project: US 97 & US 20 Refinement

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: Federal Project#: Project Number: 0029-002-135, D624, P101 Project Type: Construction UPC: 77383 Charge Number: Route Number: 29 Route Type:

More information

Request for Classification

Request for Classification Request for Classification Smith Ranch Road from Hughes Ranch Road to North of Broadway (FM 518) CSJ No. 0912-31-293 Brazoria County The environmental review, consultation, and other actions required by

More information

Final Air Quality Analysis

Final Air Quality Analysis Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Final Air Quality Analysis Prepared By: NHDOT Project No. 13742 53 Regional Drive Concord, NH 03301 June, 2018 CONTENTS 1 Introduction...

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

FHWA s Interim Guidance on Mobile Source Air Toxics Analysis in NEPA Documents

FHWA s Interim Guidance on Mobile Source Air Toxics Analysis in NEPA Documents FHWA s Interim Guidance on Mobile Source Air Toxics Analysis in NEPA Documents Karen Perritt, M.S. Air Quality Specialist FHWA Office of Natural Environment Mobile Source Air Toxics for Transportation

More information

ENV125. Basics of Noise and Policy. Date. Date. Footer Text

ENV125. Basics of Noise and Policy. Date. Date. Footer Text ENV125 Basics of Noise and Policy Agenda Introduction and Overview Traffic Noise Toolkit Fundamentals of Noise Traffic Noise Analysis Process Regulations and Guidance The major objectives of a traffic

More information

YORK TOLL PLAZA MAINE TURNPIKE AUTHORITY AIR QUALITY REPORT. September 28, 2016 NOISE ANALYSIS REPORT MAINETURNPIKE AUTHORI TY

YORK TOLL PLAZA MAINE TURNPIKE AUTHORITY AIR QUALITY REPORT. September 28, 2016 NOISE ANALYSIS REPORT MAINETURNPIKE AUTHORI TY NOISE ANALYSIS REPORT MAINETURNPIKE AUTHORI TY YORK TOLL PLAZA MAINE TURNPIKE AUTHORITY AIR QUALITY REPORT September 28, 2016 (Cover photograph provided by MTA) TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY...

More information

ENVIRONMENTAL ASSESSMENT & SECTION 4(f) DE MINIMUS DOCUMENT STATE HIGHWAY 121 / STATE HIGHWAY 183 (AIRPORT FREEWAY) FROM IH 820 TO SH 161

ENVIRONMENTAL ASSESSMENT & SECTION 4(f) DE MINIMUS DOCUMENT STATE HIGHWAY 121 / STATE HIGHWAY 183 (AIRPORT FREEWAY) FROM IH 820 TO SH 161 ENVIRONMENTAL ASSESSMENT & SECTION 4(f) DE MINIMUS DOCUMENT STATE HIGHWAY 121 / STATE HIGHWAY 183 (AIRPORT FREEWAY) FROM IH 820 TO SH 161 CSJ NOS. 0364-01-054, 0364-05-025, 0364-05-026, AND 0094-02-077

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

North Central Texas Council of Governments. Workshop TxDOT Dallas

North Central Texas Council of Governments. Workshop TxDOT Dallas Workshop TxDOT Dallas July 10, 2015 1 CMP Workshop Overview Overview of the CMP CMP and Documentation Project Implementation Form CMP Corridor Analysis Fact Sheet CMP Roadway Deficiency Form Project Examples

More information

Mobile Source Air Toxics Analysis for FHWA Projects

Mobile Source Air Toxics Analysis for FHWA Projects Mobile Source Air Toxics Analysis for FHWA Projects Jeff Houk FHWA Resource Center March 29, 2007 Overview Background on mobile source air toxics How MSATs became an issue for highway projects FHWA MSAT

More information

STATE ENVIRONMENTAL ASSESSMENT STATE HIGHWAY 121 FROM STATE HIGHWAY 5 TO CR 635 (FANNIN COUNTY LINE) CSJ: ,

STATE ENVIRONMENTAL ASSESSMENT STATE HIGHWAY 121 FROM STATE HIGHWAY 5 TO CR 635 (FANNIN COUNTY LINE) CSJ: , STATE ENVIRONMENTAL ASSESSMENT STATE HIGHWAY 121 FROM STATE HIGHWAY 5 TO CR 635 (FANNIN COUNTY LINE) CSJ: 549-3-18, 549-3-21 COLLIN COUNTY, TEXAS CITY OF MELISSA CITY OF ANNA TEXAS DEPARTMENT OF TRANSPORTATION

More information

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report s Evaluation Report Appendix C s Evaluation Report I-35W North Corridor Project EA Minnesota Department of Transportation Final Project s Report I-35W North Corridor Preliminary Design Project Report Version

More information

PUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas

PUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas PUBLIC HEARING US 69 WIDENING Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas CSJs: 0065-07-062 and 0200-11-095 Footer Text Thursday, April 26, 2018 Date ELECTED

More information

The Metropolitan Transportation Plan. Public Meetings January 2016

The Metropolitan Transportation Plan. Public Meetings January 2016 The Metropolitan Transportation Plan for North Central Texas Public Meetings January 2016 Presentation Agenda Mobility 2040 Draft Recommendations 2016 Transportation Conformity RTC Policy Bundle Concept

More information

Environme ntal Assessment Addendum

Environme ntal Assessment Addendum FI Improved Interchange at I-71 and Routes 36/37 and Proposed Sunbury Parkway Environme ntal Assessment Addendum DEL-71-7.91 PID 90200 September 20, 2017 The environmental review, consultation, and other

More information

Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project

Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project 23 CFR 771.129 Washington State Department of Transportation/Federal Highway Administration REGION/MODE SR PROJECT PROGRAM# FEDERAL

More information

11-1 INTRODUCTION 11-2 REGULATORY CONTEXT

11-1 INTRODUCTION 11-2 REGULATORY CONTEXT Chapter 11: Air Quality 11-1 INTRODUCTION In this chapter, the effect of the project s operation on air quality is analyzed. The regulatory context, methods of analysis, existing air quality, and the future

More information

Interstate-290 Carbon Monoxide Build vs No-build Analysis For Individual Intersection Locations in Oak Park

Interstate-290 Carbon Monoxide Build vs No-build Analysis For Individual Intersection Locations in Oak Park Interstate-290 Carbon Monoxide Build vs No-build Analysis For Individual Intersection Locations in Oak Park Description Carbon monoxide (CO) is an odorless, colorless gas that is somewhat lighter than

More information

5.0 AIR QUALITY. 5.1 Introduction

5.0 AIR QUALITY. 5.1 Introduction 5.0 AIR QUALITY 5.1 Introduction This chapter provides a summary of the detailed information in DSEIS Appendix B: Air Quality Written Reevaluation/Technical Report. The microscale carbon monoxide, regional

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: Rte 130 Bridge Replacement over Pedlar River Federal Project#: BR-005-3(116) Project Number: 0130-005-643, B650, C501, P101, R201 Project Type:

More information

DECEMBER P R O G R E S S R E P O R T

DECEMBER P R O G R E S S R E P O R T DECEMBER 201 2 P R O G R E S S R E P O R T The My 35 Plan is a dynamic document and will continue to be re-evaluated and updated by the Committee as needed. The My 35 Plan contains the ideas and recommendations

More information

SH 121: FM 423 TO SH 121 AT US 75 INTERCHANGE

SH 121: FM 423 TO SH 121 AT US 75 INTERCHANGE SH 121: FM 423 TO SH 121 AT US 75 INTERCHANGE RE-EVALUATION FOR PROPOSED TOLL FACILITY PREVIOUSLY APPROVED ENVIRONMENTAL DOCUMENTS SH 121 FROM FM 423 TO US 75 CSJs: 0364-03-067, 0364-03-066, 0364-04-038,

More information

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH

More information

AIR QUALITY ANALYSIS. I-77/I- 81 Overlap Improvements , P100 (UPC 51441) Prepared by:

AIR QUALITY ANALYSIS. I-77/I- 81 Overlap Improvements , P100 (UPC 51441) Prepared by: AIR QUALITY ANALYSIS I-77/I- 81 Overlap Improvements 0077-098-104, P100 (UPC 51441) Prepared by: Environmental Division Virginia Department of Transportation September 2009 TABLE OF CONTENTS Summary...

More information

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

TAMPA BAY NEXT MAJOR PROJECTS UPDATE TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023

More information

Abbreviated State Final Environmental Impact Statement

Abbreviated State Final Environmental Impact Statement Loop 375 Border Highway West Extension Project From Racetrack Drive to U.S. Highway 54 El Paso County, Texas CSJ: 2552-04-027 Abbreviated State Final Environmental Impact Statement Texas Department of

More information

PM 2.5 Conformity Hot-spot Analysis for Fairbanks, Alaska

PM 2.5 Conformity Hot-spot Analysis for Fairbanks, Alaska PM 2.5 Conformity Hot-spot Analysis for Fairbanks, Alaska November 24, 2010 Practical Overview While a process is needed to meet the PM 2.5 project-level requirements after December 14, 2010, it is unlikely

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD Scope of Services 12/08/2008 EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD TABLE OF CONTENTS Section Pace I. 0 PROJECT DESCRIPTION........................,............................................................

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: ROUTE 17 I95 BRIDGE TO HOSPITAL BLVD Federal Project#: NHPP-5111(298) Project Number: 0017-088-R72, B616, C501, P101, R201 Project Type: Construction

More information

Air Quality Technical Report PM2.5 Quantitative Hot spot Analysis. A. Introduction. B. Interagency Consultation

Air Quality Technical Report PM2.5 Quantitative Hot spot Analysis. A. Introduction. B. Interagency Consultation Air Quality Technical Report PM2.5 Quantitative Hot spot Analysis I 65, SR44 to Southport Road (Segmented from SR44 to Main Street and Main Street to Southport Road) A. Introduction This technical report

More information

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis Contra Costa Transportation Authority STAFF REPORT Meeting Date: February 15, 2017 Subject Summary of Issues Regional Measure 3 (RM3) Candidate Projects for Submittal to the Metropolitan Transportation

More information

DRAFT Geotechnical Technical Memorandum

DRAFT Geotechnical Technical Memorandum DRAFT Geotechnical Technical Memorandum US 19 (SR 55) Reevaluation from 66 th Avenue North to SR 690/118 th Avenue North Work Program Item Segment No. 435914-1 Project Development and Environment Study

More information

Community Advisory Committee Meeting No. 2. June 22, 2006

Community Advisory Committee Meeting No. 2. June 22, 2006 Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County Department of Transportation 1 Agenda Overview & Assumptions

More information

11-1 INTRODUCTION 11-2 REGULATORY CONTEXT

11-1 INTRODUCTION 11-2 REGULATORY CONTEXT Chapter 11: Air Quality 11-1 INTRODUCTION In this chapter, the effect of the project s operation on air quality is analyzed and includes a description of the regulatory context, methods of analysis, existing

More information

3. ALTERNATIVES ANALYSIS

3. ALTERNATIVES ANALYSIS 3. ALTERNATIVES ANALYSIS As described in the following sections, preliminary concepts were developed and screened. Following three rounds of screening, the remaining concepts were developed into alternatives

More information

TRANSPORTATION AIR QUALITY BRIEFING. William E. Knowles, P.E. TxDOT-TPP October 16, 2013

TRANSPORTATION AIR QUALITY BRIEFING. William E. Knowles, P.E. TxDOT-TPP October 16, 2013 TRANSPORTATION AIR QUALITY BRIEFING William E. Knowles, P.E. TxDOT-TPP October 16, 2013 Presentation Overview Federal Air Quality Regulations State Implementation Plan (SIP) Transportation Conformity 2

More information

Oregon Department of Transportation. Appendix E. Figure Descriptions

Oregon Department of Transportation. Appendix E. Figure Descriptions Appendix E. Descriptions Appendix E. Descriptions This appendix includes written descriptions of all figures included in this Technical Report. If needed, additional figure interpretation is available

More information

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES TABLE OF CONTENTS 1.0 PURPOSE AND NEED -------------------------------------------------------------------------------------------- 1-1 1.1 STUDY AREA -----------------------------------------------------------------------------------------------------

More information

TEXAS DEPARTMENT OF TRANSPORTATION AIR QUALITY GUIDELINES PREPARED BY THE ENVIRONMENTAL AFFAIRS DIVISION

TEXAS DEPARTMENT OF TRANSPORTATION AIR QUALITY GUIDELINES PREPARED BY THE ENVIRONMENTAL AFFAIRS DIVISION TEXAS DEPARTMENT OF TRANSPORTATION AIR QUALITY GUIDELINES 1999 PREPARED BY THE ENVIRONMENTAL AFFAIRS DIVISION OVERVIEW The National Environmental Policy Act (NEPA) of 1969 and the Clean Air Act of 1970

More information

Traffic Noise Analysis

Traffic Noise Analysis Traffic Noise Analysis For Interstate 10: Las Cruces to Texas State Line AC-GRIP-010-2(108)144; CN G18A1 Submitted to: Taschek Environmental Consulting and New Mexico Department of Transportation Prepared

More information

SECTION II CONTROLLED ACCESS FACILITIES

SECTION II CONTROLLED ACCESS FACILITIES SECTION II CONTROLLED ACCESS FACILITIES SYSTEM IDENTIFICATION A critical component of the Dallas-Fort Worth (DFW) Metropolitan Transportation System is the regional freeway and tollway systems, which are

More information

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT 2.1 EXISTING TRAVEL DEMAND MODEL In order to accurately project future year traffic volumes within this regional study area, it was first necessary to construct

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

Transportation Conformity Guidance for Qualitative Hot-spot Analyses in PM 2.5 and PM 10 Nonattainment and Maintenance Areas

Transportation Conformity Guidance for Qualitative Hot-spot Analyses in PM 2.5 and PM 10 Nonattainment and Maintenance Areas Transportation Conformity Guidance for Qualitative Hot-spot Analyses in PM 2.5 and PM 10 Nonattainment and Maintenance Areas United States Environmental Protection Agency Federal Highway Administration

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Appendix K. Detroit River International Crossing Study Air Quality Impact Analysis Technical Report Addendum

Appendix K. Detroit River International Crossing Study Air Quality Impact Analysis Technical Report Addendum Appendix K Detroit River International Crossing Study Air Quality Impact Analysis Technical Report Addendum Detroit International River Crossing Air Quality Impact Analysis Technical Report Addendum November

More information

Congestion Management Process in the US A Federal Requirement

Congestion Management Process in the US A Federal Requirement Congestion Management Process in the US A Federal Requirement ITS Argentina November 6, 2013 U.S. Department of Transportation Federal Highway Administration Outline of Seminar Discussion of Congestion

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: Widen E Elden St from Van Buren St to Fairfax County Parkway Federal Project#: HPT-5401( ) Project Number: U000-235-110, C501, P101, R201 Project

More information

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place

More information