E533 Vol. 39 ENVIRONMENT MANAGEMENT PLAN (EMP) 220KV BAC LIEU - SOC TRANG TRANSMISSION LINE PROJECT

Size: px
Start display at page:

Download "E533 Vol. 39 ENVIRONMENT MANAGEMENT PLAN (EMP) 220KV BAC LIEU - SOC TRANG TRANSMISSION LINE PROJECT"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCALST REPUBLC OF VETNAM ELECTRCTY OF VETNAM POWER ENGNEERNG CONSULTNG COMPANY 2 PROJECT DD KV BAC LEU - SOC TRANG TRANSMSSON LNE PROJECT E533 Vol. 39 ENVRONMENT MANAGEMENT PLAN (EMP) Ho Chi Minh City, May 2007

2 SOCALST REPUBLC OF VETNAM ELECTRCTY OF VETNAM POWER ENGNEERNG CONSULTNG COMPANY 2 PROJECT DD KV BAC LEU - SOC TRANG TRANSMSSON LNE PROJECT ENVRONMENT MANAGEMENT PLAN (EMP) Prepare by: Head of the Department of Environment and Resettlement: MSc. Chu Duy Tuyen Eng: Huynh Le Trung Ho Chi Minh Citit May, 2007 SOUTHERN POWER PROJECTJ POWER ENGNEERNG MANAGEMENT MNGMTR!,BOARD BO, C 3,CONSULTNG COMPANY 2 JA J K B AN4 O CAC CONG TRNH EN ->MN N l YA DV 6 b ^, '/+ -

3 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP Table of contents. DETALS OF THE PROJECT ENVRONMENT SCREENNG COMMUNTY CONSULTATON NEGATVE MPACTS MTGATON PLAN MONTORNG PLAN ORGANSATONS PARTCPATE N ENVRONMENT MONTORNG PLAN FORM FOR ENVRONMENT MONTORNG REPORT (FOR CONTRACTOR) FORM FOR ENVRONMENT MONTORNG REPORT (FOR PMU AND SMC) MPLEMENTATON COST ESTMATON FOR ENVRONMENT MONTORNG PLAN ABLTY STRENGTHENNG MPLEMENTATON ORGANZATON MONTORNG AND REPORT SYSTEM MPLEMENTATON COST ESTMATON FOR ENVRONMENT MANAGEMENT PLAN APPENDX 1: LST OF PARTCPANTS TO MPLEMENT EMP REPORT... 5

4 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 1- DETALS OF THE PROJECT. Name of the project 220kV Bac Lieu- Soc Trang transmission line 2. Name of the program 3680-VN 3. New construction / El New construction reclaimation project? Bac Lieu Vinh Loi - Chau Thoi Commune Province District - Chau Hung Commune Bac Lieu - Ward 7 Town 5 Soc Trang Thanh Tru - Phu Loc Town 4. Location of the project Province District - Thanh Tri Commune 1. Commune/ward - Tuan Tuc Commune ii. District - Lam Kiet Commune iii Province - Chau Hung Commune My Xuyen District - Thach Phu Commune - Ai Tam commune - Thach Quoi Commune Soc Trang Ward 10 Town 5. Length and voltage of the high Length =46,538 km Voltage = 220 KV voltage transmission line 6. Transmission capacity 278 MVA 7. Width of ROW (Right of way) Width = 21.6 m Numbers of pole Height of poles 8. Number and height of poles = m m 9. Numberof substations 10. Begin and end construction Beginning time: End time: time (month/year): (proposal) Construction is in rainy Pl Yes season? ncluding impacted 67 houses: 23 houses with. 1leaf roof and 44 houses with iron roof, divided: 12. Number of mpacted housesl by the project Bac Lieu Province Soc Trang Province 3 _9 5 8 A Api,7X7Pp

5 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 13. Tofal impacted cultivation Temporary = ha land area within the corridor 14. Total impacted cultivation Permanent= 0.16 ha land area to build pole foundation 15. mpacted forest area Temporary 0 ha Permanent = ha Temporary 20.1 ha Permanent = ha 16. mpacted resident land area n 67 impacted householders 17. mpacted other land area (wild Temporary = 8.6 ha Permanent = ha land, fish pond area...) 18. Total cost of the project (VND 81,583,000,000 VND Cost = 5,196,396.4 USD & USD) Exchanged rate USD: 1USD = 15,70O V2VD DETALED PROJECT DESCRPTON The 220kV Bac Lieu - Soc Trang transmission line project starts from the 220kV busbar of Bac Lieu substation and finishes at 220kV busbar of Soc Trang substation. The transmission line goes through two provinces. * n Bac Lieu Province, the transmission line goes through ward No.7 belonging to Bac Lieu Town, and Chau Hung, Chau Thoi Communes of Vinh Loi District with 7.8 km in length. * n Soc Trang Province, the transmission line goes through Phu Loc Town, and communes of Thanh Tri, Tuan Tuc, Lam Kiet, Chau Hung belonging to Thanh Tri District; communes of Thanh Phu, Dai Tam, Thanh Quoi belonging to My Xuyen District and Ward No.10 of Soc Trang Town with 38,738 km in length. n general, the transmission line run through paddy field and fruit tree garden. ts topography is relatively flat. The transmission line does not cross big rivers, but only small ones. Detailed description on the selected route alternative: * The section from berzinin' point to T.268 with 4521m in length The section has two circuits in company with 220kV Rach Gia - Bac Lieu transmission line. * The section from T GA with 1114m in length At T.268 point, the transmission line is turned right 40 30'00" and running through flat paddy field. The G1A tower is located at paddy field Featiures along the transmission line route: - Power transmission line: 01 time (crossing a 22 KV transmission line) - Traffic road: 01 time April)2007 Pape 2

6 221k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP - Houses: 06 houses within ROW * T/e section from GA to G with 4034 m in leng-th At GA location, the transmission line is turned right 10 18'00" then running through paddy field. Topography of the route is relatively flat. Features along the transmission line route. - Rivers, canals: 01 time the transmission line is across big river - Houses: 07 houses within ROW * The section from G to G2 with 6918 m in length t is turned 16 02'40" through paddy and crops fields of residential area to G2. G2 is located at paddy field. Features along the transmission line route: - Power transmission line: 02 times (01 time crossing 35kV transmission line; 01 time crossing a 22kV transmission line) - Traffic road: 02 times - River: 01 time crossing a big river - House: 15 houses within ROW * The section from G2 to G3 with 7153 m in length At G2 location, the transmission line is turned right 52 20"20" then going through a flat paddy field. G3 point is located at paddy field next to residential area. Features along the transmission line route: - Power transmission line: 02 times crossing 22kV transmission line - Traffic road: 02 times crossing large road - River: 01 time crossing a big river - House: 10 houses within ROW * The section from G3 to G4 with 3094m in len,th At G3 location, the transmission line is turned left 20 00'00". The section is relative flat with mostly paddy field. G4 point is located on a paddy field too. Features along the transmission line route. - House: 03 houses within ROW * The section from G4 to GS with 3993m in len2th At G4 location, the transmission line is turned left 20031'13" and running through paddy field. Topography is flat without houses, G5 point is located on a paddy field too. * The section from GS to GSA with 5434m in len!th At G5 location, the transmission line is turned right 30 35'12" and running through paddy and crops fields. Topography is relatively flat. G5A point is located on a paddy field too. Features along the transmission line route. - Power transmission line: 03 times crossing 22kV transmission line.4pril,2007 Pape 3

7 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Muanagement Plan - EMUP - Traffic road: 01 time crossing large road - River: 01 time crossing a big river - House: 17 houses within ROW * The section from GSA to G6 with 1610m in length At G5A location, the transmission line is turned right 02057'22" and running through paddy field without houses. G6 point is located on a paddy field. * The section from G6 to G7 with 4537m in lenrth At G6 location, the transmission line is turned left 18036'12" and running through paddy field. G7 point is located on residential area. Featuires along the transmission line route: - Power transmission line: 02 times crossing 22kV transmission line - Traffic road: 02 times - River: 01 time crossing a big river - House: 06 houses within ROW * The section from G7 to G8 with 3959m in length At G7 location, the transmission line is turned left 19017'50" and running mostly through paddy field without houses. G8 point is located on a paddy field. * The section from G8 to DC with 170 m in length At G8 location, the transmission line is turned right 90 00'00". The route is across current 110kV Soc Trang - Bac Lieu transmission line with height of 18m. The route is also across 110kV Soc Trang-Vinh Chau which is not constructed yet. End point is located on paddy field that is proposed to construct 220kV Soc Trang substation. Features along the transmission line route: - Power transmission line: 01 times crossing 11 OkV Soc Trang - Bac Lieu transmission line Conclusion n generally, the Bac Lieu-Soc Trang 220 KV transmission line plan to be constructed on a flat topography and mostly goes though paddy field, scatted residential areas, and transport system is under favourable for construction process. 3April, 2007 Pape 4

8 220kV Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 2- ENVRONMENT SCREENNG POTENTAL MPACTS MPACTS COMMENTS YES NO _ CONSTRUCTON STAGE mpact on mpacts on vegetation and residential areas are caused from vegetation and pole foundation construction and safety corridor residential areas establishment for transmission line according to Decree due to establishing 106/2005/ ND-CP as follow: the safety corridor mpacted land areas as follow: or access road for * Paddy land area: ha construction of * l pole foundation, Crop land area: 28.6 ha wire stretch. * Fruit tree land area: 42.0 ha wire stretch. * Resident land area: 20.1 ha * Wild land area: 8.6 ha *Permanently impacted land (occupied by pole foundation) 0.16 ha mpacts on vegetation as follows: Type 1 Unit Quantity j Type Unit fuantit eucalyptus tree Star-apple tree 12 Bamboo clump 1530 banana clump mango tree 298 grapefruit tree 14 Orange tree 48 Guava tree 12 coconut tree 377 palm tree 2 plum tree 119 Logan tree 23 l Jack tree 61 _ l mpacts on resident areas are houses lying inside ROW with statistics: ncluding 67 houses divide 23 houses with leaf roof and 44 houses with iron roof as follows: Bac Lieu Province Soc Trang Province 9 58 mpacts are scatter along the transmission line route with length of km. All of pole foundations will be constructed on paddy field, therefore, permanent occupied land area is mostly paddy land. From start point to T268 with 4521m in length, the transmission line uses only one circuit. From T268 point, the transmission line goes separately with length of km dividing into 12 sections and only 2 sections (G3 and.april,2007 Pape 5

9 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP G7) are located nearby current resident areas with distance of about m, remainder sections (10/12) are located on paddy field. mpacted vegetations are rice and some fruit trees and mostly concentrated inside ROW. Most of impacted trees such as eucalyptus, bamboo, coconut... are trees that it's body developing very quickly but bringing low economic value in comparison with impacted trees with small numbers such as jack-fruit,, longan, banana, guava, orange, grapefruit. All of impacted houses are lying inside ROW according to Degree 106, including 67 houses of 4-grade in which 23l houses with leaf roof and 44 houses with iron roof and concentrate mainly on Soc Trang Province (58 houses). These impacted houses are scattered through the transmission line route. Characteristic of these houses are very simple with low value. Therefore, above impacted levels are insignificant. Erosion or / Earth work items in construction are often causes of soil deposition due to erosion and deposition phenomenons. n this project, excavation/backfill construction work of pole foundation of the transmission work items line route is principle impact. Soil erosion and deposition phenomenons should impact on irrigation, drainage and water supply systems and on water quality surround pole foundation area. At each pole foundation position, volume of soil and rock uses to construct per foundation pit following: - Foundation excavation: 29, m3 - Foundation backfill: 22, m 3 - Sand filling into foundation bottom: 1, m3 - Foundation footing backfill: m 3 Construction will be carried out by hand. Around foundation pit, there are two drain ditches leading to sump with volume of 0.5m 3 in order to collect rainy water and ground water, and after that water is pumped out of foundation pit. Excavated soil from foundation pit is reused for foundation pit backfill and sprayed with water and compacted. n-situ excavation soil is still not satisfied for reusing requirement, shortage soil is about 10% volume. This shortage volume can be bought in-place or transported from other place..4pril, 2007 Pape 6

10 220k V Bac Lieu -Soc Trang Transmission1 Line Project - Environnent Management Plan - EMP Therefore, impacts of construction work on erosion or deposition phenomenon are insignificant. mpacts on / At the present, surface water quality along length of surface water km of the transmission line is well, it is not salted and quality aluminated. Field surveyed data and analyzed samples at some points on the transmission line route are shown as follows: Chemical component analyzed results of water at some positions on the 220kV Bac Lieu -Soc Trang transmission line: Locations LK2 -GA LK8-G2 Depth of sample Temperature of sample Sample taken date April/2004 April/2004 Analyzed date April/2004 April/2004 Sign of sample D1175 D1176 Na++K+ mg/l %me/l-me/l Cation Ca+ mg/l %me/l-me/l Mg mg/ e %me/l-me/l Fe ++Fe+ mg/l %me/l-me/ _ Cl+ mg/ %me/l-me/l Anion S04" mg/l _ %me/1-me/l HCO3 mg/l %me/1-me/ C 2- mg/l _ %me/1-me/ Value of ph Value of hardness( me/) Value of on (me/): Value of mine realize (mg/l) CO 2 free (mg/) Note: Ground- Groundwater water erode erode concrete concrete decreasino decreasin belonging belonging to free to SO 4 2 l l CO 2 and ph TCVN Water resource pollution is caused from erosion, washout Aprdl, 2007 Pcpe

11 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMVP l soil and aluminated phenomenons around foundation pit (due to excavation and backfill soil layers are aluminated, eroded, washed out by rain or pumping water out of foundation pit). These phenomenons of aluminated, erosion l E and deposition will be strongest in rainy and flooding days. Construction pit foundation area of 64m 2-168m 2 (MB4.4-8x8: MB x14) can cause water pollution, local deposition at foundation location with low impact level because of short construction time (about one month). Almost excavation soil is reused and compacted in order to protect from erosion, washout, especially some places is still consolidated by cement cover. Basing on surveyed drilling results to 12m in depth at some pole foundation locations, in fact content of alum in water is very low. Paddy rice is still cultivated in dry reason. Analysis results show that water quality is impacted insignificantly and locally in short duration. These impacts are disappeared after finishing construction work. Acidification of There are two types of acid sulphate soil (ASS). These are soil and water potential ASS and actual ASS. The potential ASS is soil surrounding pole containing a high content of pyrite (FeS 2 ). Normally, this foundation ASS is difficulty to plant trees, especially paddy rice. The actual ASS is potential ASS exposed to the sun and submerged in water creating high acid content. Due to high l acidity (low ph), high content of Fe, Al, and low nutrients in actual ASS is not suitable for cultivation. ASS may cause acidification for ground and surface water. Acidification may occur at some foundation pit construction locations, where pole foundation soil layers containing potential ASS or flooding foundation pit by rainy water creating good conditions to bring acid from other earth work surrounding area into pole foundation pit. Acidification water with low ph concentration can cause danger and can kill aquatic species living in rivers, canals close to foundation pit. Therefore, acidification shall be monitored during construction process, if ASS is detected, and then impact mitigation measures such as treatment by powdered lime until meeting requirement must be carried out before discharging into environment. The contractor should supply powdered lime volume sufficiently for treatment. ph degree could be test by indicator paper. The Contractor must also arrange gathering area for aluminated excavation soil to protect l l_canals, fish ponds, paddy fields from danger impacts of April, Pape 8

12 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP ASS. This ASS could be reuse for foundation pit. At present, at pole foundation pit locations, paddy rice have been being cultivated well, it show that potential ASS do not existed on surface soil layer. Basing on survey drilling results at some foundation pits. at depth of 12m. there are mainly clay and clay mud in general without ASS. Therefore, acidification will not occur. mpacts on Pole foundation pits construction of the transmission line irrigation and will impact on irrigation and drainage systems. drainage canal However, the transmission line have been designed far systems away from irrigation and drainage systems (including water supply system) with limit distance in order to prevent impacts on these systems and also to protect pole foundation from erosion due to operation of these irrigation and drainage systems. Therefore, irrigation, drainage and water supply systems will be impacted insignificant. mpacts on quality / Activities of construction machines operation, earth and air due to exhaust mixing concrete work items and toxic gas (SO 2, Nox, emission of CO... ) of vehicles, equipment discharging into air will vehicles, impact on quality air. equipment and However, the above mentioned impacts are insignificant dust from because construction volume at each foundation location is construction not very much, construction time only last about one activities month, number of vehicles is not much and foundation excavation work is mainly by manual. Most of the pole foundations (144 pole foundation locations) are all located on paddy field and scattered through length of the transmission line ( kim). Construction vehicles and equipments are almost specialty types and have been licensed by specialty authorizes including license of emission level. Materials transport as sand, cement according to transport regulations must be covered in order to prevent dust and water must be showered periodically in construction area if dust is over permit standard. Basing surveyed results, soil of foundation pits at 12m in depth are mainly clay and clay mud so that could not cause dust much. Properties of soil are shown as below: Layer- Layer-2 Clay Clay mud Natural humidity Degree of porosity ( n%) Pore index Eo Saturation G% April Pape 9

13 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP. l Viscosity B Compressibility factor Adhesive force C ( kg/cm ) Total modulus of 25 7 deformation Load pressure Standard Ro ( kg/cm2) Therefore, it is difficult occurring air pollution by dust. Noise pollution / Noise pollution during constructing can occur from from operation of operation of vehicles, equipments, activities of excavation, vehicles and backfill, mixing cement work items by machine, and equipments materials transport... The transmission line run mainly through paddy fields, far way from resident areas and national highway, construction volume at each foundation location is not very much and mainly by hand, construction time only last about one month, number of vehicles is not much and construction vehicles and equipments have been licensed by specialty authorizes. Wire stretch work is only carried out during 1-2 days following short section and mainly by hand. Therefore, these impacts are insignificant. Pollution of soil, The project do not use equipments without PCBs, air and water due therefore, the leakage of PCBs will not occur. to using However, lubricant leakage construction machines, daneroarmu equipments and transport vehicles could impact on including PCBs. environment, especially in rainy season. Lubricant leakage i could convey by flowing water and impact on environment if do not treatment in time. However, construction time only last during short time and have been licensed, pole foundation locations is also scattered, so that impacts are insignificant. Traffic Traffic interruption due to activities of material transport interruption due to vehicles for foundation pit construction and wire stretch construction work items. activities nearby mpacts on traffic only occur during transport time of pole system l foundation construction materials, wire stretch equipments. Equipments, materials transport work items are mainly by road in order to utilize current inter-commune road, interprovincial road system and river system, therefore, temporary construction road must not be built. The contractor should arrange construction time out of.4pril,2007 Pape 10

14 22OkV Bac Lieu -Soc Trang Transmission Line Project - Environnent Mfanagement Plan - EMP peak hour traffic to avoid traffic congestion. - Due to construction volume at each pole foundation location is not very much and in short time, therefore, these impacts are insignificant. Construction and / Materials transportation and construction work will use material transport some current roads, and these roads will be downgraded, cause damage to and therefore, causing traffic congestion and accident... traffic roads However, in F/S document, pole foundation locations and roads have not analyzed in detail, therefore, detailed assessments have not been carried out yet. Basing on map of transmission line route, segment, materials volume and implementation work as well as implementation time at each foundation location, these impacts shall not be concentrated but extended with insignificant degree. Before construction, the contractor will contact with local road management boards to make regulations, road traffic sign in order to use these roads for construction purposes. The contractor must mitigate damage for roads and must be responsible to repair when roads damaged. After construction finished, these road shall be maintained and examined by acceptance board if necessary. Therefore, this impact will be in insignificant. Workers' camps / Due to scattered construction in short time, therefore, impacts on workers could rent a house depending on special branch of community health l themselves where convenient for pole foundation and safety. construction in order to reduce cost. Construction area is mainly on paddy field, therefore impacts on community health and safety will be insignificant. mpacts on / There are no historical and cultural monuments in the historical and project area. cultural During construction time, if any valuable historical and reservation zone Alpril,2007 cultural monuments have be discovered, then the contractor and project owner must be responsible to inform to special authorities and together issue suitable solution measures. 220 kv Bac Lieu-Soc Trang transmission line is far away the Doi pagoda with a distance of 5 km from Soc Trang substation. The Bac Lieu bird yard belonging to My Thanh Commune. Vinh Loi District in the direction of sea is far awav from Bac Lieu town about 5 km. The OkV Bac Lieu-Soc Trang transmission line starts Pape

15 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP from the 220kV Bac Lieu substation located in Bac Lieu. Town, in the opposite direction to the Bac Lieu bird yard from the Bac Lieu Town, so that this bird yard will be not impacted. Therefore, the 220kV Bac Lieu- Soc Trang transmission line will not impact on any local historical and cultural monuments and reservations. Land recovery for / Permanent recovery land area is 0.16ha in order to project construct 114 pole foundations. construction Recovery land areas for pole foundation construction are impact on local mainly paddy field land. Alignment process and selected people locations have been considered to avoid houses and to limit recovery land area to minimum level. Selected locations are according to local plan at the present and in the future. OPERATON STAGE mpacted land area and impacted house of local people are mainly lying in ROW. n general, impacted land areas have been being cultivating paddy rice. mpacted households must comply with regulations in Decree No.106/2005/ND- CP on high voltage power network safety protection, and damages will be compensated according to current regulations of the Government and local (Decree No.197/2004/ND-CP issued by the Government on 03/12/2004 on compensation, subsidization and resettlement for people who have recovered land). Local people have agreed to construct the project in community consultation meeting that organized at impacted local (see minutes of community consultation meeting - Part of Community Opinion Consultation). Compensation and subsidization alternatives shall be carried out in accordance with current policies. Number impacted houses are 67 including 23 houses with leaf roof and 44 houses with iron roof distributing in two provinces: Bac Lieu Province Soc Trang Province 9 58 mpacted houses are scattered through power network safety corridor, these houses have low value, easy reclaimation and easy moving. Therefore, these impacts are insignificant. High X' n design stage., electromagnetic intensity of 220kV electromagnetic transmission line has calculated by PECC2 within intensity permissible limit in accordance with special standard. Aprt/, 2007 Pape 12

16 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP mpacted zone by electromagnetic is a space in-which industrial frequency electric intensity > 5 kv/m. However, distance from cable to ground surface > 12m, at there electromagnetic intensity has low value basing on calculation results (about 2.5kV/m). Therefore, eiectromagnetic intensity would do not impact on human's health. So that this impact is not occur. mpacts on / mpacted plants are mainly lying inside ROW but vegetation and insignificant. Annually, these trees have been cut to animal l maintain safety for the transmission line by management - Due to regular board according to regulations in Degree 106/NO-CP. tree cutting Power network safety corridor run mostly on paddy field activities ( km in length, 21m in width). - Due to hits of Some fruit-trees lying in power network corridor have birds been impacted. n general, impacted trees are eucalyptus, bamboo... with low economic value, therefore change of plant structure with high economic value trees should be l l implemented. n power network safety corridor trees such as banana, orange, grapefruit... could be planted but these height must be accorded with regulations in Decree 106 (distance from lowest point to ground surface is Sm). mpacts on radio/ l / There are not impacts on radio/ television waves or other television waves communication facility. The project has been designed or other according to special standards as follows: lcommunication fcmuicati - Conductor diameter, distance, number of phase facility conductors have been selected suitable in order to reduce electric intensity on surface conductor. - Signals have been transmitted by digital technology. - Signals have been transmitted by armored cable, optical cable -Ensure safety distance from transmission line to communication facilities -Comply with electric special standards - And far away from communication structures (there are not communication facilities such as broadcast, l ] television stations... in the project area). l mpact on / There are not impacts on community health and safety. The community health project has been designed according to special standards, and safety power safety standards issued by special authorities and the including risk of Govemment from survey, design and construction stages to electric shock operation stage. However, when these standards are violated then impacts.4pril'2007 Pape 13

17 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP on community health and safety including risk of electric - shock could be occurred..4pril, ~007 Pape 14

18 20kV Bac Lieu -Soc Trang Transmission Line Project - Environnent Mvanagement Plan - EMP 3. COMMUNTY CONSULTATON METHOD DETAL ACTVtliES CONSULTAT ON RESULT'S Meeting 02, 03 Content of Popularize information of date and 04/ meeting the project as: June State impacts of the project on environment and human -Receive local people's opinions Answer local peoples questions Attached to - Proposal for compensation minutes of is based on market prices meeting to avoid causing disadvantage for the local people. -t is required having reasonable construction measures to limit damage. -Agreed to develop the project on provincial area. 3 Public - There is no opinion on meeting Location - People's committee Number environment of List and title of participants of the of Chau Thoi participants is attached to the meeting meeting Commune, Vinh minutes: Loi District, Bac 1/- Vinh Loi District : 9 Lieu Town impacted households - People's committee participated of My Xuyen, Soc 2/- My Xuyen District Trang Town including Dai Tam, Thanh - People's committee Quoi, Thanh My of Thanh Tru, Soc Communes: 29 impacted Trang Town households participated l - People's committee 3/- Thanh Tri District: 27 of Soc Trang Town impacted households participated 4/- Soc Trang town: 6 impacted households participated i5/- Relative local officers are invited to participate i meeting.april, 2007 Pape 1i

19 220k V Bac Lieu -Soc Trung Transmission Line Project - Environnent Management Plan - EMP METHOD DETAL ACTVTES CONSULTATON RESULTS nvited - Representatives of guests local authorities - mpacted households enclosed with list l Way of nvitations are sent invitation through districts Attached Community agenda? consultation program l _ (yes/no) n meetings, local people and relative authorizes agree to construct the project on their local and have not any opinions on environment. They only care about damage compensation so as to reasonable and recovered land areas so as minimum as possible in order to prevent damage for local people. After completing draft of the EMP, the information will be publicized at: * At places: - People's committee of Vinh Loi District, Bac Lieu Province; people's committee of My Xuyen and Thach Tru Districts, Soc Trang Province (Vietnamese Version). - Office of nformation Development Center of the World Bank (VDC) - Building at 63 Ly Thai To, Ha Noi, Vietnam (English Version). - Office of the World Bank in Washington (WB infoshop). * Time: The announcement will promulgate within one month: Promulgation form: The draft of the EMP is pasted on above mentioned places After getting feedback information from the promulgation places, if necessary, the draft will be revised and finalized then officially publicized. Pleased see list of officers and impacted local people in meeting in Appendix of EMP. April,2007 Pape 16

20 m k V Bac Lieu -Soc Trang Transmnission Line Project - Environnent ManilAgement Plan - EMP 4- NEGATVE MPACTS MTGATON PLAN Stage ssues Negative impacts mitigation measures Cost Duty lmpacts on Cut down tree by hand, do not use machine and use Calculated in Construction and CONSTRUCTON vegetation and herbicide causing vegetation extermination. construction cost erection contractor resident area Enhance community awareness and sense on protection for ROW Gather waste to local disposal area or treat according to regulations Washout, deposition Ensure to reuse all excavation earth to minimize Calculated in Construction and and erosion of land disposal earth construction cost erection contractor Excavation, embankment earth have to ram after completed Control flow to protect land from erosion, washout soil to canal. Embankment and excavation locations for each pole foundation must be approved by local authorities. Acidification of Acidification will impact on soil and water and area Calculated io Cotonstruction water source and surrounding pole foundation locations, therefore, coiistructioii cost contractor surrounding area acidification shall be monitored during construction process. f ASS is detected, then impact mitigation measures such as treatment by powdered lime until meeting requirement must be carried out before discharging into environment. - _ -The contractor should supply powdered lime volume A pril,2 007 Ppe 1 7

21 229k V Bac Lieu -Soc Trang Tra,nsnmission Line Project - Environnent Management Plan - EMP Stage ssues Negative impacts mitigation measures Cost Duty sufficiently for treatment. Aluminated water should be examined pli degree by indicator paper. The Contractor must also arrange gathering area for aluminated excavation soil to protect canals, fish ponds, paddy fields from danger impacts of ASS. This ASS could be reuse for foundation pit. Air pollution Contractor commit all machines have been licensed Calculated in Construction and according to environmient standards including exhaust construction cost emission standard during construction time. Materials transport must be covered in order to prevent dust and water must be showered periodically in construction area if dust is over permit standard. erection contractor Do not burn trees, plants after cutting down. Noise pollutioll All of construction activities should be carried out in Calculated in Construction and daytime. f necessary to construct in night-time, construction cost erection contractor contractors should notify locals and get their agreements. Machines, vehicles and equipments must be licensed by special authorities according to environment standards including noise standard (commitment of the Contractor) Restrict to utilize horn, air -brake in resident area. Aprl,2007 Pape 18

22 220k VBac Lieu Soc Trang Transmission Line Project - Environnent Management Plan - EMP Stage ssues Negative impacts mitigation measures Cost Duty Site clearance and The project is designed so as impacted households as -Calculated in -PECC 2 removing impacted minimum as possible. design cost households Damages of evacuation households shall be -Calculated -Southern Power compensated adequately according to regulations of construction cost Project current code. Management Board Compensation shall be public, democratic and clearly. Compensated person could participate to compensation process. mpacts on traffic Before construction, the contractor will contact with Calculated in Construction and local road management boards to make regulations design cost erection contractor during and after construction time. The contractor must mitigate damage for roads and must be responsible to repair when roads damaged. The contractor should arrange construction time out of peak hour traffic to avoid traffic congestion Road traffic sign must be placed at construction areas. The Contractor must combine with local authorities to implement traffic directional distribution, placing road traffic sign during wire stretch time. Materials and equipments must be transported in suitable duration and must be planed by the Contractor. Especially, transportation of bulky equipments must be approved by traffic management authorities and road traffic sign must be placed prior to -- -_- -_- transportation _ Aprl2,007 Pape 19

23 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP Stage ssues Negative impacts mitigation measures Cost Duty OPERATON Safely on electric in design stage, electromagnetic intensity has been Calculated in the PECC2 and electromagnetic calculated meeting permissible limit in accordance designl cost fields with special standard (lower than 5kV/m for electric field an(d 5 microtesla for electromagnetic field). Knowledge of electric safety must be propaganda widely and deeply for housetholds living under ROW Operation cost Management Unit - (measures as public meeting, paper, manual...) Power Put signal board at risk potential places Transmission Supervise implementation of local people and offices Company 4 under and surrounding ROW according to Decree Operation cost Management Unit - 106/ND-CP. Power Prohibit exploiting close to pole foundation locations Transmission in order to prevent pole damage. Company 4 Lighting arrests must be installed at pole locations and they must be examined regularly. Cut down trees to Do not cut down trees lower than 3m. Calculate in the Management unit - mainitaini ROW Supervise and implement regularly of safety in operation cost Power accordance with Decree 106/ND-CP. Transmission Combine with relation offices to change of tree Company 4 structure in ROW in order to stabilize life and production as well as change composition of the architectural from inflammable materials to antiinflammable materials incliding private house. Collect waste to regullated places. April,2007 Ptape 20

24 220k V Bac Lieu -Soc Tranlg Transmission Line Project - Environnent Management Plan - EMP 5. MONTORNG PLAN Stage/ Monitored parameters Monitoring How to monitor Monitoring time Duty environment location of these parameters and frequency issues these and monitoring parameters equipment CONSTRUCTON STAGE ROW site - Site clearance method At treatment site Monitoring 01 time / month - Construction and clearance - Site clearance quantity during erection contractor - Refuse treatment after site construction stage - Monitoring by clearance Southern Power Project Management Board Air pollution - Check validity of operation At the Monitoring Before As above mentioned license and invalid day of constructioll site equipments have license of vehicles, allowed using at machines and equipments the project sites Lusing for construction. - Check dust at construction site. - Check applied measures of contractor. - mplemented measures if local people complaint. -_-_----_ Noise pollutioll - Noise level. At complaint Noise degree f complained As above ielintioned - Contractor's applied construction instrumentation per April,2007 Pape 21

25 220k V Buc Lieu -Soc Trang 7'ransmission Line Project - Environnent Management Plan - EMP measures for noise level location meter db(a) - Noise measurement method (machine... ) - Applied measures if local people complaint. Washout and - Monitor to collect redundant At pole Monitoring 01 time / month As above mentioned erosion materials after construction construction during the work finished. locations construction stage - Proposal water drainage and water treatment alternatives. - Washout and erosion level. mpact on traffic - Safety measures for traffic. At crossover Monitoring During As above mentioned - Damage levels of roads are point of road and construction stage caused from material river transportation and construction works items. - Damage levels of roads are caused when overcharge. - Applied measures if local - people complaint. Affects from - Sanitation and safety At construction Monitoring 01 time / month As above mentioned construction conditions at construction site during activities area. construction stage - Equipments deal with emergency situations OPERATON STAGE ROW protection - Site clearance method At treatment Monitoring 01 time / month Management Unit - - Refuse treatment after site location during operation Power Transmission April,2007 Pape 22

26 220k V Bac Liei -Soc Trang Transmission Line Project - Environnent Management Plan - EMP clearance stage Company l - Construct other building structures within ROW Safe operation of - Signal boards On the whole Monitoring 01 time / month As above mentioned the transmission - Safe equipments along the route during operation line transmission line stage - Training and enhancing knowledge of local community living inside and outside ROW April, 2007 Pape 23

27 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 6. ORGANSATONS PARTCPATE N ENVRONMENT MONTORNG PLAN No. Organization Main responsibility Content and form to report 1 Construction contractors Carry out impact mitigation Shown in table 7 measures as proposal Report to Project Management Board (PMB) on implementation of mitigation lmeasures 2 Technical monitoring of Mitigation measures PMB implementation assessment and Shown in table 8 parameters monitoring as proposal in EMP. Report to PMB 3 ndependent monitoring Mitigation measures Shown in table 8 implementation assessment and parameters monitoring as proposal in EMP Convoke community consultant meetings in order to collect feedback information and assessment from inhabitant and local on EMP of the project. l Frequency of monitoring: Safe guard independent monitoring consultant (SMC) shall be monitored 2 times. The first times monitoring shall be implemented in constructing stage (when construction volume is about a half). The second times monitoring shall be implemented after construction work finished. The project management board (PMB) should discuss and assign monitoring time for SMC. Responsibility of SMC SMC will be contracted by PMB to monitor EMP implementation and report these monitoring results to EVN and WB Example: operating of SMC during constructing time as follows: - Survey construction sites and make assessment and notification on environment results following: + Site clearance at construction locations after completed + Mitigation measures application or overcome solutions for separate impacted areas + Vegetation recovery state in areas as regulated..4pril,2007 Pape 24

28 2 2OkVBac Lieu -Soc Trang Transmission Line Project- Environnent Management Plan - EMP + mpact of construction work such as noise, dusty, degraded roads... + Construction camps situation and sanitation conditions for workers and community around construction site + Safety distance from the project to resident area and potential resident area + Safety measures implementation (caution board, restrict area, fence and isolated area) Community consultation meetings and interviewv impacted households: + Listen of environment issues and impacted households complaints + Answer report (if necessary) on environment issues to local authorities and people when having complaint + Assess participation level of local authorities in implementation of environment issues of the project (impacts by dusty, noise, traffic jam...) + Report minutes of meetings with local authorities' confirmation, in which should display clearly opinions on environment impacts by the project. A pril,2007 Pape 25

29 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 7. FORM FOR ENVRONMENT MONTORNG REPORT- (FOR CONTRACTOR) Name of the project: 220 kv Bac Lieu-Soc Trang transmission line Monitoring location: Name of construction contractor: Monitoring program implementation date: Report date: NO. MPACTS MTGATON NOTE Site clearance for ROW Air pollution Noise pollution Washout, erosion mpacts on traffic Name of the monitor: Title: Address: Telephone:.4pril,2007 Pape 26

30 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 8. FORM FOR ENVRONMENT MONTORNG REPORT (FOR PMU AND SMC) Name of the project: Project location: Commune: District: Province: Type of the report: 220 KV Bac Lieu-Soc Trang transmission line Ward No.10 Monthly report (yes/no): Quarterly report to WB (yes/no): Report Date: Soc Trang Town Soc Trang Province Quarterly report to EVN (yes/no): Report of SMC (yes/no): No. Monitoring parameters Assessment of monitors/ 1 Note reply of the community n construction stage Quantity of cut-down-trees, site clearance method 2 Deposition, erosion i 3 ~Noise level surrounding the construction site and its vicinal area 4 mpacts due to dust and exhaust emission l l 5 Safety measures implementation state l 6 'Management of equipment and materials 7 Waste collection and clearance work items -_ after completed construction work 8 mpact on traffic n the operation stage Safety measures of electricity, signal systems and frequency of monitoring l 2 ~Safe operation of the line Name of the monitor Title Address: Telephone: Monitored location: 34April, 2007 Pape 27

31 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - E;MP 9. MPLEMENTATON COST ESTMATON FOR ENVRONMENT MONTORNG PLAN No 1 TrM 1 UNTPRCE QUANTTY N! T OTAL COST Monitoring of contractor - Calculated in construction contracts 2 Technical supervision of Man-month / whole The whole route ncluding PMB route investment cost l 3 Monitoring of SMC Man-month/whole The whole route 1000USD during construction stage route (this cost ( 000USD/month) including investment cost of the project) TOTAL 1000USD A-pril,2007 Pape 28

32 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMVP 10. ABLTY STRENGTHENNG t is unnecessary to purchase equipment for 220 kv Bac Lieu - Soc Trang transmission line, this part only consider staff training work. STAFF TRANNG Type of Number Time of Starting/ Location Training Cost training of training finishing training organiztrainee course time ation Environment days 2007 HCM City Selected by 300USD x 2 management persons or Can the Southern persons x 2 (by EVN) Tho Cit, Power Project days Management 1,200 USD Board n-place day Can Tho People who 300 USD training persons City or have trained Soc Trang environment ( or Bac management Lieu Town Total 1,500 USD TRANNG CONTENTS * Training course by EVN: Contents of the training course guide environment monitoring methods basing on the EMNP report and report methods on monitoring result according to quarterly or regularly. The training course also guide adjustment plan of action methods in case of some proposed activities in the EMP could not be done. * Training course by Southern Power Management Board: The training course shall be organized for staffs of local power agencies that are responsible to operate the project and representative of locally relevant agencies. ts contents will be focused on: + Training on safety: Contents on safety issues in operation and maintenance stage of the system. + Training on monitoring and report methods of environment management plan: Participants should be focused on representatives of people's committee of relevant communes/districts. The course will guide representatives of local authorities on roles and participations of the local authorities during EMP implement stage. The training course also guides environment quality monitoring methods at sites and ways to fill in monitoring report forms.,april 2007 Pape 29

33 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 11. MPLEMENTATON ORGANZATON 5 Role Duty { Organization Project owner Highest duty to manage whole of the project, EVN (the Department (including environment management) of Science, Technology, & Environment) i Organize and Take responsible to co-ordinate and manage Southern Power Project manage whole project implementation including instruction Management Board of the project and monitoring on EMP implementation. (PMB) Environment Take responsible and being a connector for Environment staff of staff environment issues. Southern Power Project Management Board Project Take responsible to manage the project daily Environment staff of organization including activities as follows: Southern Power implement - Make plan and apply environment Management Board management measures during construction stage - Co-ordinate other member units in order to implement environment issues. - mplement interior monitoring and independent monitoring. - Monitoring and allocation for monitoring activities. - Report environment information to related parties Project Take responsible to operate the project Operation management operation including environment management and Unit belonging to monitoring activities during operation stage Power Transmission Company 4 Environment Take responsible to prepare, implement reports PECC2 (Department of consultant and documents of EMP Environment) Technical Take responsible to supervise construction work PECC2 (Department of supervision of contractors including environment Transmission line and l management activities in EMP Substation Design) and Southern Power Project l _Management Board Construction Take responsible to construct and supervise Selected by Southern contractors activities that should be implemented Power Project themselves in EMP, including: Management Board i. Application mitigation measures during through bidding.4pril,2007 Pape 30

34 220kV Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP Role Duty Organization construction stage ii. Labour safety ensuring for workers and local people during construction process iii. According to policies of Vietnam and World Bank on environment protection during construction process ndependent Take responsible for independent monitoring on Selected by Southern monitor agency EMP implementations Power Project (SMC) Management Board.4pril,200)7 Pape 31

35 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Managemnent Plan - EMP 12. MONTORNG AND REPORT SYSTEM Type of report The first level report T he second level report The third level report Sender Receiver Frequency Sender Receiver Frequency Sender Receiver Frequency Environment Construction Southern 01 time before management at contractors Power Project construction the project sites Management commencement Board & every month continuously Environment T echnical Southern Monthly Southern EVN Quarterly EVN World Quarterly monitoring supervision of Power Project Power Project Bank during Southern Management Management construction Power Board Board stage Management Board SMC Southern Monthly SMC World 6 months Power Project Bank Management Board Environment Operation Power Monthly Power EVN 6 months EVN World Annually monitoring management Transmission Transmission Bank during operation unit - Power Company 4 Company 4 stage Transmission Company 4 April,2007 Pape 32

36 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP 13. MPLEMENTATON COST ESTMATON FOR ENVRONMENT MANAGEMENT PLAN No tems i mplementation Cost (USD) Construction stage 1 Operation stage mpact mitigation mplementation cost is Cost is calculated in measures calculated in contracts annual operation cost of with construction the project contractors 2 Monitoring cost of mplementation cost is mplementation cost is technical supervision - calculated in the calculated in operation PMB investment cost of the cost of the project project 3 Monitoring cost of 1000 independent monitoring agency SMC 4 Ability strengthening 1,500 -_ activities TOTAL COST AT ,500 EACH STAGE TOTAL 2,500 USD MPLEMENTATON COST.4pril,2'007 Pape 33

37 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP Appendix * List of participants to implement EMP report 1 Relative Documents of the project * Plane map of the 220 kv Bac Lieu- Soc Trang transmission line. Existing and proposed reservation areas along the transmission line * Pole foundation MB4.4-8x8 and MB x14 and pole height of the transmission line * Minutes of community consultation meetings ( at local areas) * Minutes of meeting * List of invited guest in meeting *List of impacted households in meeting * Memorandum of participants' opinions. Confirmation certification on environment standard of the project p,april,200)7 Pape 34

38 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP APPENDX 1: LST OF PARTCPANTS TO MPLEMENT EMP REPORT No. Name mplementation Works in charge of Experiences Special training courses place MSc. Chu Duy Tuyen Main Organize to carry out and 24 years Have been carried out EA, EMP responsibility participate reports preparation and RAP for power projects. (carried out by PECC2) - Environment mpact Assessment (EA) for power source projects (hydropower, thermopower) and power network projects. - Report implementation of Resettlement Action Plan (RAP) for power source projects (hydropower). - Report implementation of Environment Management Plant (EMP) for power network projects. - mplement and monitor compensation alternatives for impacted houselholds. -35-

39 220k V Bac Lieu -Soc Trang Transmission Line Project - Environnent Management Plan - EMP Appendix: * List of participants to implement EMP report * Relative Documents of the project * Plane map of the 220 kv Bac Lieu- Soc Trang transmission line * Existing and proposed reservation areas along the transmission line * Pole foundation MB4.4-8x8 and MB x14 and pole height of the transmission line * Minutes of community consultation meetings ( at local areas) * Minutes of meeting * List of invited guest in meeting * List of impacted households in meeting * Memorandum of participant's opinions * Confirmation certification on environment standard of the project

40 2t [ 9( 2g,, )7 - Y P N i; r\, D,? A- Nnn.X$LCS cqan OA N St:4,1: io /C'V.il:J,,r-..,,." -V/'v thzoll LluAtl vil-f C~ic irm hicn :ip 2.20KV S6c ;ny Q K V \./ vi a!wlrinftq,vcl wuc ic. Yio- ra CnC 1rw-, tr(:t. dayellv? YiLi: C idin d6c C6n.' ty T varn xav d tng d(in 2 Qua xc:. xc baiv 'eo caa-cot½d tv 7')r vtfn xflv du-ng dithn 2 v/ v- trk v dtmgi- - Ui.. ip 220KV S<Sc Tran. : )i lkv M1 T' vahu-. tu,v6r c;i- d-r& ty vyo - rn cic Tram. bi4n Alp tir-n. C1, i'ch b'73nyd -tnh S 6 c Yrarzg co y kcn ruiau: Thg, 1haL v 6 i d16 xuxt cua C5nrg, ty T kr vd'ii x2y dlrnig dirtn 2 vc V z-: x-- drng TLrar 1 3ida Ap 290KV S6c ha-ng, Th ilbl!tip 10'K%v Mv T6 vi ht-r1g :uyvtn Gzic dtr:no day v:o - ru "c ia C Za-±n., cu thlc nftl gzal: J Tramn bicn ip 120 KV S6c Trani;: dat tau khu cial ruqng. thu0c' g 10, [L X( S6c rarcg, n.axn v6 htuftg Tay 5 'a Qu6c 10 A. z-6ch QuCC i la Kf1oai 2-50M (d6i dicn v&i dutrng vao Trtrwit Daii - Trrd'n- Quari Ntr Quan khu X). DiEn Efch S ay dlmg Tramn dir ki,n ]d 230ni x 160 in vi (dlr&lm vio Tram. z6 di:rn tflh dioing 12Ur x 2'50m. V. Vi Lr xay dung T'ram 110KV M54 '': dat tzi khu d5l ruliolg Lliu6c l1 (i A, x.i My ziurting, C1ci Tin l L' 3 1ch oag.50rn: cziuh Ttrug &i thi a-,n Hiu nh HJu Ngt:la tionan nl DiCri Lfcl, dxay ilrm our k:i. li C01. C'Om vi; dluncg v-ko Tram c$ dicri Tfch khuzng x isn : A.LSOr ;. (cc diol tfcth dat Nay djrtzg Nh c,uaa!' T-T ) 5.Hrxrn- Luyc-'j dlroii- dty c 22 0 Y t5 Nlton - S6c< Tr.-a, (ajfl dt u;. dia buii tinil S6t. Trang,): &ni a n Le rarth ti r Sc -1 der, b i e d 4) 0KVMV 7. V Z5' i d czi kn J5t v6 Dsna LMc c.-.a Kenhl cach -Sc.-<1,nl khouinip() 3-14OC{!r -.) ;.;Ln (C('J r-airi >)itn dp OKV Nftv ; T6 1 ct'l 5RSC; 71,Ana LuOsv tuy-!i Liu)c 71oli n 13 v8 ;i:ia 1(ac inh 16, cich LTnh e;,r 3(YJ - 50Crn: d!6rl vi Li c ach zn- 5Sa X2K An (CiiU Tr&nr) kilv 2 ktn UNinh Lli br goc vlicu 71f1h 1(3 va ko :h.irg t16n vtrnt tuyeull ata:t>ng An di TNnh liuan Hung h zi 2kn c!ii b, g6: khn clutan dc-n hrarn Din. up 2ZOKV S;c T-iag.

41 /) ~~ ' v [2 -u:)k!-dh n L -aa -'.., n% r X 'nl X ' 4 : t)n1yn.l 'DS H.N'L LSS Oil 1 t-7 U 1,, A 3 Cd-1 i U.l 2 LJit :DO) t3 '. 1.1 S - ".' C) A,() LLOttJ t) 1; s f Op.P OTT W UQJTPQ1.A za-1 i Sutz U1J i. ^(p 5U4?fl :,PAtl wet 1- UcOs :flr ip APUt'x2 9Wr, s:)l4 :T.).1, ^N )O5.. >S ^l;> ;A11 -)a n,-) Tp U -p 71- ' " Y i(-) ;A i 2 W1 % LY ) LJO i ) TlA i L!,;) Q1 1S' a nl - UUn, mu ( fl) ( D6p -prt mnp! 1 0'( J. l:pfl tf ' J O U LT q ( 1 - LT. ~ :~,~j ~ ~ J'" [1 AlOZZ X" ' U1Q.nlP.) JT1 'r7 T = 03,o 1 wc ' l

42 J n's - C1,)! (11dn f 1C, ' K, (, ) ut C'), (' ' lrm CL jti 1'';*],( Lt - Jn,1'J ' ', CC C) Aj( rr (9C -.- CC ; ; C)c.,>. 'CD r.vr T ')( '--- rl ** rj (9 M,'C)Of; '' 1 :, C) j C)C (9 > t ' ) ( : g X C o " ;j(y ( (,,t ~- K) "Nj'SA(r t t - 2ti1, 1)t)i) n -. ) C? ' r 6 C' C - C) -C 'JLA C C

43 LOCATON OF PROJECT/V! TR DL, AN BAC LEU-SOC TRANG 220KV T/L- DUdNG DAY 220KV BAC LEU-SOC TRANG - ChAu T Tir ucon J K6 s3ch \ TiLeu GMn t Phung HiOp Li jrrid r.h: af' 1 \Tri Cu -- #~~ \ SOC TRANG 220kV SUBSTATON 1 "^*< r TBA 220kV SOC TRANG 6W:c Trnng t 4e \Long Fhu r- t ~~Thanh Tri / fh ue B8G L+U-SUr r,,, 2.")kV - L /G 1 Thh ChOu BAC LEU 220kV SUBSTATON TBA 22OkV BAC LEU T1TtXa3qc Lieu Vegetation type Kieu rung E U Evergreen foresi J F/ ng ihuldng xanh Legend Chu giai ProPeced area Khu bao ve Coniferous foresi RUing la kim Provi ncial border J Ra n h gi6i 1in h Deciduous foresi Ring rung lia (kh6p) -- - * Olsiricl border f Ra n h gi6i h uye n Semi-deciduous foresi / Ring nita rung la B* S- T1.ng 220kV TL * Limeslone foresi J Ring nui da DVkv d&y n220kv BlC Li.sc Trrng Bamboo f Ring ire nira U Planlalion foresi f FRing lr 6 ng N Grassland and scrub JEl r6ng Agncullural land ii nong nghi4p Waler bodies f 1Mita nluoc W-- Mangrove f Ring ngbp man Mltaleuca Ring ram

44 5 BAC LOCATON OF PROJECT/V TRi DLi AN LEU-SOC TRANG 220KV TL- DEONG DAY 220KV BAC LJEU-SOC TRANG Chau Th6nh o-swx ;,\ Cu K Chau T %N K SAch Tiu GM, Phung Hi6p Ali r LT H- GO,SOC TRANG 220kV SUBSTATO TBA 220kV SOC TRANG T 6c Trang je X Long PhO d r C$ 1' Thanh Tri Bac tll-'es T,,",x 220kV T L Xr iw V~~nh Lhau\ BAC LEU_220kV SUBSTATON \O - 4 T8A 220kV BAC LEU TEXsTjXac Lieu Vegetation type ) Kie-u rung Legend Chu giai * Evergreen foresi R%ng lhtrdng xanh Pro1ecied area (K hu bao ve - Coniferous foresi f Ring la kim Provi ncial border Ra n h gi6i 1in h Deciduous foresi t Ri ng rung a (khop) s1ric1 border Ranh gidi huyen * Semi-deciduous forest rring nl1a rung la Ebc -Soc Trang 22MV TA - Limesione tores1 J Ring nui da WV U Bamboo Ring ire nira Plan1alion foresi Ring ir-ong CGrassland and scrub 061 1rong Agncullural land 11 nong nghi6p Waler bodies J Mil nlaic Mlangrove i %ng ngap man btblaleuca J Ring iram dy% M- 220v Bac L.ku-S9 TrAng N 8

45 c 77, '~7- '-777~7~ 7T'~ - / ~ Ls Y-\ 147ff '/ 7. \- 7i77t,7 ~ > *7-7Z 77 >7-7' 7 - r * * 'N.* N77~.'7~~77-7'f \~/7 77 /~. '7-77-~- * ~ L'~~4\

46 . -. ' N- / N /' * '--...'r-r *.-- N.N' /f-* > * -'A ' - A - N *..-...Z)-- -. N' -N / -N- - -N-'.- 7..'- - N -.- * > ,/<NN2 - - NC'. * N-' /.A \./ '* - f- -<7 / *.-- k J2.'t /, 4 -N-... -S. / N 'N.. 'N.,.i --- N-. * / -' N--.. N -N-N ZN.' -4, -, "C.>- -.. / NN / *; * *" N N N ' N-N--N / ) N. / N-. / -' '4,4* ' / 7.7*,.Z '---N- /N-' 'N -,* & ->. K 2 - 'A2, / Nj *.. czz > \,. FC\7' A.> 'N-.'- - ' \ 4. - AN /* '-. '2-' -N 'N N- N.'N.. - '-N--. '-z.'- K / N.' /4.- * 'N /*'-' V ' {*. \. -.k. 'N' / - 'N,N-\ / *, N. /... N 2-SV / / 1/, NV / 4./.C /4 *./ - '*\.,. * /- / / ' Z\\ *. 4-,' 4-. ' Ll *. / N. // ") - / f4-. '4. N K / N-N.. \ N-. / N-.N-' N,/ 744' / N3. /. N- - '5 'N N- 'N N 7.. '. / *7'5. -a- N--N-,-. - '4/ -. N N.. /,. ' *N'N..'N \' / / N- *. * L *\ /.-,--*'--- - 'N N N- N-. -N-- 7\;'4N/4 \-j'-,... 4,ŽKt'.).. 4 4S.* -,.N/ N / *.N- 4/ K ". ' N-,--.4-' -N- - / - N-N'-'- N.. S '' & 7"/'> --- N---' -N- / /4. -. \.N.'-'. - / N '>,-"'- K // N-N :7 'N ---. *''N-4::-.. S. //.4-.Y'v/ 7u-.Ž- -N.- -N , 4-. NNj(Qk / / - / N- - - N C& 4 / A-, - /. -' / 1'--,-- - V7 7/ > N-...'-. /,2 - -''-N / N *. /.'N

47 '- ' -P - / '7V ~, -. A 2~<ay ~ 'Q-.C c) 77, 7- -' T'-N-".. i/ -7 Y- r.-) -',-G /-.4 E 1-7 ~ ~ ~ '#N-'N.L 2. * ~,, /7', 'NN ~ L T.... : * ~ ft~ d *.*- A 'N',. 20k ', AG -' 71 0 O,k V f G)u~c Dan dcray - ~. 7 '. \.. V~ N a _ _ - -..'62 N110kVE hffi'jk h

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED ENVIRONMENTAL MANAGEMENT PLAN

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject: Mai Chau 110 kv substation and 35 kv power line supply for construction of

More information

SUBPROJECT: Rehabilitation of transmission overheadline 180, 181 E1.1 Dong Anh (Section from pole No. 70 to E1.15)

SUBPROJECT: Rehabilitation of transmission overheadline 180, 181 E1.1 Dong Anh (Section from pole No. 70 to E1.15) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized HA NOI POWER CORPORATION ------------------------------------------------------------

More information

REGULATIONS OF ENVIRONMENTAL MANAGEMENT OF THE CONSTRUCTION PROJECTS Dr. Pham Van Bo Vice president Academy of Managers for Construction and Cities Ministry of Construction - Vietnam List of abbreviations

More information

VIE: Mong Duong 1 Thermal Power Plant

VIE: Mong Duong 1 Thermal Power Plant 7 th Independent Monitoring Report September 2011 VIE: Mong Duong 1 Thermal Power Plant Prepared by the Development Research and Consultancy Center (DRCC) for Viet Nam Electricity (EVN) Thermal Power Project

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line Environmental Monitoring Report Quarterly Report October to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sub-project: Improving grid medium, low voltage NORTH POWER COORATION Electric Network

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report 4th Quarterly Report February 2016 VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by Southern

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION ---------------------------------------------------------------

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line Environmental Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report Quarterly Report October to December 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by

More information

El712 VOL. 35. Rural Distribution Project. Volume 3 Environmental Management Plan SUB - PROJECT TIEN GIANG PROVINCE. Public Disclosure Authorized

El712 VOL. 35. Rural Distribution Project. Volume 3 Environmental Management Plan SUB - PROJECT TIEN GIANG PROVINCE. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Rural Distribution Project SUB - PROJECT TEN GANG PROVNCE El712 VOL. 35 Volume 3 Environmental

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject NORTH POWER CORPORATION Electric Network Project Management Board -------------------------------

More information

MOIT FiT Circular No. 02 Decision No. 39

MOIT FiT Circular No. 02 Decision No. 39 Renewable Energy Vietnam Client Alert January 2019 For further information, please contact: Fred Burke +84 28 3520 2628 frederick.burke@bakermckenzie.com Dang Chi Lieu +84 24 3936 9341 chilieu.dang@bakermckenzie.com

More information

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TABLE OF CONTENTS 1. INTRODUCTION... 5 2. LEGAL FRAMEWORKS... 5 2.1. Vietnamese Legislations...

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION ---------------------------------------------------------------

More information

Statement at East Asian and Middle-South American Conference on Environmental Industry

Statement at East Asian and Middle-South American Conference on Environmental Industry Mr. LÊ VĂN DỤC Vice Director Department of Construction Hanoi, Vietnam Statement at East Asian and Middle-South American Conference on Environmental Industry Subject: Sanitation of Water Source and Treatment

More information

POWER GRID IMPROVEMENT PROJECT

POWER GRID IMPROVEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Draft Environmental Code of Practices POWER GRID IMPROVEMENT PROJECT (Project ID: P149599)

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Resettlement Due Diligence Report April 2016 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation for the Asian Development Bank. Resettlement

More information

E1712 VOL. 28 ENVIRONMENTAL MANAGEMENT PLAN ELECTRICITY OF VIETNAM POWER COMPANY I

E1712 VOL. 28 ENVIRONMENTAL MANAGEMENT PLAN ELECTRICITY OF VIETNAM POWER COMPANY I Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY OF VIETNAM POWER COMPANY I COMPONENT: RD - 110KV THANH NONG - KIM BOI TRANSMISSION

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Social Monitoring Report #1 Semestral Report Project Number: 46391-001 August 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh Power Corporation for the

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject NORTH POWER CORPORATION Electric Network Project Management Board -------------------------------

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION SOUTHERN POWER PROJECT MANAGEMENT BOARD -------------------------------

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 June

More information

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity.

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity. ORDINANCE NO. AN ORDINANCE AMENDING ORDINANCE NO. 1060 KNOWN AS THE WILLMAR ZONING ORDINANCE BY ADDING SECTION 11 RELATING TO WIND ENERGY CONVERSION SYSTEMS (WECS) The City of Willmar does ordain as follows:

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

The KUND System: A sustainable way to ensure drinking water supply in the rural Mekong Delta under flood conditions

The KUND System: A sustainable way to ensure drinking water supply in the rural Mekong Delta under flood conditions A Project Proposal under the theme of Infrastructure development under increased flooding/storm intensity The KUND System: A sustainable way to ensure drinking water supply in the rural Mekong Delta under

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

SUBPROJECT: IMPROVEMENT AND UPGRADING OF THE CAI LAY- CAO LANH 220kV TRANSMISSION LINE

SUBPROJECT: IMPROVEMENT AND UPGRADING OF THE CAI LAY- CAO LANH 220kV TRANSMISSION LINE Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION SOUTHERN POWER PROJECT MANAGEMENT BOARD ------------------------------- Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL

More information

ROADS: OPERATION AND MAINTENANCE

ROADS: OPERATION AND MAINTENANCE ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service

More information

Roadmap toward Effective Flood Hazard Map in Lampang Thailand. JICA region-focused training course on flood hazard mapping JFY 2005

Roadmap toward Effective Flood Hazard Map in Lampang Thailand. JICA region-focused training course on flood hazard mapping JFY 2005 Roadmap toward Effective Flood Hazard Map in Lampang Thailand JICA region-focused training course on flood hazard mapping JFY 2005 Prepared by MR. SOMCHIT AMNATSAN Chief of Water Planning and Solution

More information

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment 1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related

More information

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions Phoenix Building Construction Code Updated Amendments to the Administrative Provisions CHAPTER 1 ADMINISTRATION Section 101.2 Change to read as shown: 101.2 Scope. The provisions of this Code shall apply

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

FAQs on ESIA of CASA-1000

FAQs on ESIA of CASA-1000 FAQs on ESIA of CASA-1000 I. Technical Questions A. When will the project start in my (province/municipality/region)? The project implementation schedule will be finalized after selection of the contractor

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Project Activity Pre Location of transmission towers and transmission line and Equipment specifications and parameters Transmission line Substation location and Location of

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY NORTH POWER CORPORATION Electric Network Project Management Board

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN NATIONAL POWER TRANSMISSION CORPORATION NORTHERN VIET NAM POWER PROJECT MANAGEMENT BOARD TRANSMISSION EFFICIENCY PROJECT TR2-09-005B SUB-PROJECT BAC NINH 3 220KV SUBSTATION AND CONNECTION LINE ENVIRONMENTAL

More information

CHALLENGES OF INTEGRATED WATER RESOURCES PLANNING & MANAGEMENT IN MEKONG DELTA

CHALLENGES OF INTEGRATED WATER RESOURCES PLANNING & MANAGEMENT IN MEKONG DELTA CHALLENGES OF INTEGRATED WATER RESOURCES PLANNING & MANAGEMENT IN MEKONG DELTA st Rhine-Mekong Symposium Climate change and its influence on water and related sectors 8- May 4, Koblenz, Germany Nguyen

More information

NORTHERN POWER TRANSMISSION EXPANSION PROJECT

NORTHERN POWER TRANSMISSION EXPANSION PROJECT SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT Project Number: 38196-013 Period: July- December 2013 NORTHERN POWER TRANSMISSION EXPANSION PROJECT Prepared by the Local Implementation consultant (LIC) for

More information

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8 Summary of Preliminary Study Result for Technical Cooperation Project Date: 2008/10/8 1. Full title of the Project The Project on Integrated UMRT and Urban Development for Hanoi 2. Type of the study Feasibility

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

VIE: Northern Power Transmission Expansion Sector Project

VIE: Northern Power Transmission Expansion Sector Project Environmental Monitoring Report Semestral Report July-December 2012 VIE: Northern Power Transmission Expansion Sector Project Prepared by the Local Implementation consultant (LIC), with information mostly

More information

Briefing on Drought on Mekong Delta

Briefing on Drought on Mekong Delta 2016/SOM3/EPWG/016 Agenda Item: 9.3 Briefing on Drought on Mekong Delta Purpose: Information Submitted by: Viet Nam 10 th Emergency Preparedness Working Group Meeting Lima, Peru 15-16 August 2016 THE 10

More information

Subproject: Jointing 110kV line at 220kV Bim Son substation

Subproject: Jointing 110kV line at 220kV Bim Son substation Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject: Jointing 110kV line at 220kV Bim Son substation NORTH POWER CORPORATION Electric

More information

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized -4L&-~~A>f Technical Support Staff Basic Training Training Documents (English Translations)

More information

EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM

EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM Le Anh Tuan Can Tho Univerity E mail: latuan@ctu.edu.vn The Mekong

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRCTY OF VET NAM POWER COMPANY No. 2 RURAL DSTRBUTON PROJECT SUBPROJECT : RURAL MV

More information

WISDOM 6th PhD Scientific Seminar

WISDOM 6th PhD Scientific Seminar WISDOM project Water-related Information System for the sustainable Development Of the Mekong Delta in Vietnam WISDOM 6th PhD Scientific Seminar REUSE OF WASTEWATER AS A CLIMATE CHANGE ADAPTATION MEASURE

More information

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project NORTH POWER CORPORATION Electric Network Project Management Board -------------------------------

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

1. ENVIRONMENT MANAGEMENT PLAN

1. ENVIRONMENT MANAGEMENT PLAN 1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Action Plan (EMP) is required to ensure sustainable development of the proposed Sewerage System in District A of Allahabad, Uttar Pradesh. The

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Ef) EVN SPC. I Final Version I ENVIRONMENTAL MANAGEMENT PLAN. Sub-project: 110 KV GIONG TROM - BINH OAI TRANSMISSIO LINE, BEN TRE PROVINCE

Ef) EVN SPC. I Final Version I ENVIRONMENTAL MANAGEMENT PLAN. Sub-project: 110 KV GIONG TROM - BINH OAI TRANSMISSIO LINE, BEN TRE PROVINCE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRCTY OF VETNAlVl SOUTHERN POWER CORPORATON RURAL DSTRBUTON PROJECT Credit WB 4444

More information

SECTION TEMPORARY FACILITIES AND CONTROLS

SECTION TEMPORARY FACILITIES AND CONTROLS SECTION 015000 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 GENERAL A. Each Contractor shall be responsible for arranging for and providing construction facilities and temporary controls as required

More information

THE GOVERNMENT. DECREES: Chapter I GENERAL PROVISIONS

THE GOVERNMENT. DECREES: Chapter I GENERAL PROVISIONS Search Maps THE GOVERNMENT Number: 39/2010/ND-CP SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness Ha Noi,day 07 month 04 year 2010 Decree No. 39/2010/ND-CP of April 7, 2010, on management

More information

If a new residence s electrical service is not located within 200 feet of existing

If a new residence s electrical service is not located within 200 feet of existing Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close

More information

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board ENVIRONMENTAL MANAGEMENT PLAN (EMP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project : Rural Energy Project No. II Supporting the Medium Voltage for the North (The

More information

Sustainable Water Supply and Sewerage Services for Small Towns in Vietnam

Sustainable Water Supply and Sewerage Services for Small Towns in Vietnam Sustainable Water Supply and Sewerage Services for Small Towns in Vietnam O. M. Keski-Saari Water and Sanitation Programme for Small Towns in Vietnam, 37 Le Dai Hanh, Hanoi, Vietnam (E-mail: olli.keski-saari@lappavesi.fi)

More information

THE GOVERNMENT THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No. 64/2012/ND-CP Hanoi, September 04, 2012

THE GOVERNMENT THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No. 64/2012/ND-CP Hanoi, September 04, 2012 THE GOVERNMENT THE SOCIALIST REPUBLIC OF VIETNAM ------- Independence Freedom Happiness --------------- No. 64/2012/ND-CP Hanoi, September 04, 2012 DECREE ON CONSTRUCTION PERMIT Pursuant to the Law on

More information

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,

More information

DECISION Approving a program to strengthen and upgrade the sea dyke system From Quang Ngai to Kien Giang

DECISION Approving a program to strengthen and upgrade the sea dyke system From Quang Ngai to Kien Giang PRIME MINISTER ------- No: 667/QD-TTg SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness -------------- Hanoi, 27 2005 2009 DECISION Approving a program to strengthen and upgrade the sea

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN (EMP) BUILDING DISASTER/CLIMATE RESILIENCE IN COMMUNITIES

More information

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks) ENVIRONMENT MANAGEMENT PLAN For Excavation of Brick Earth (Total Mining Area 2.121 Ha.) (for Manufacturing of Bricks) By M/s Bhagwati Eth (bzv) Udyog Village Shokanangla, Pargana & Tehsil Bazpur, District-

More information

SUMMARY INITIAL ENVIRONMENTAL EXAMINATION. HCMC ENVIRONMENTAL IMPROVEMENT PROJECT (Loan 1702-VIE[SF]) IN THE SOCIALIST REPUBLIC OF VIET NAM

SUMMARY INITIAL ENVIRONMENTAL EXAMINATION. HCMC ENVIRONMENTAL IMPROVEMENT PROJECT (Loan 1702-VIE[SF]) IN THE SOCIALIST REPUBLIC OF VIET NAM SUMMARY INITIAL ENVIRONMENTAL EXAMINATION HCMC ENVIRONMENTAL IMPROVEMENT PROJECT (Loan 1702-VIE[SF]) IN THE SOCIALIST REPUBLIC OF VIET NAM November 2003 CURRENCY EQUIVALENTS (as of 31 October 2003) Currency

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project Project for Updating Dakar Urbanization Master Plan by

More information

Chapter 2 Worksheets for Commercial and Industrial Activities

Chapter 2 Worksheets for Commercial and Industrial Activities Chapter 2 Worksheets for Commercial and Industrial Activities This worksheet is designed for use by business and industry operators. Complete the entire worksheet by checking the appropriate boxes for

More information

VIE: Northern Power Transmission Expansion (Sector) Project

VIE: Northern Power Transmission Expansion (Sector) Project Environmental Monitoring Report Post-Evaluation Report January 2016 VIE: Northern Power Transmission Expansion (Sector) Project Prepared by the Local Implementation Consultant (LIC) for Northern Power

More information

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO: PERMIT NUMBER: GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD 57701 ID NO: (605) 394-4157 PIN NO: APPLICATION DATE: DATE ISSUED: PROPERTY INFORMATION CONTRACTOR INFORMATION LOT ADDRESS

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

ELECTRICITY OF VIETNAM '-. ~---~~- ~ -~~~.C--T:~---'''-----'---Y~.;' -;'> POWER COMPANY 1...

ELECTRICITY OF VIETNAM '-. ~---~~- ~ -~~~.C--T:~---'''-----'---Y~.;' -;'> POWER COMPANY 1... Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E533 v.46 ELECTRICITY OF VIETNAM '-. ~---~~- ~ -~~~.C--T:~---'''-----'---Y~.;' -;'> POWER

More information

REPORT ON ENVIRONMENTAL IMPACT ASSESSMENT

REPORT ON ENVIRONMENTAL IMPACT ASSESSMENT Ha Nam Province People's Committee Phu Ly City People's Committee Public Disclosure Authorized Public Disclosure Authorized MEDIUM CITIES DEVELOPMENT PROJECT - PHU LY CITY SUBPROJECT, HA NAM PROVINCE REPORT

More information

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction Additional Financing for Third East West Highway Improvement Project EXECUTIVE

More information

MINISTRY OF TRANSPORT DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 =================

MINISTRY OF TRANSPORT DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 =================

More information

Meeting Vietnam s Energy Demands in a Sustainable Way

Meeting Vietnam s Energy Demands in a Sustainable Way TRUNG SON HYDROPOWER PROJECT Meeting Vietnam s Energy Demands in a Sustainable Way Photo by: World Bank 1 Photo by: Mai Ky/World Bank, 2012 OVERVIEW Trung Son Hydropower Project (TSHPP) is a US$411.57

More information

SUMMARY OF COMMENTS/RECOMMENDATIONS

SUMMARY OF COMMENTS/RECOMMENDATIONS SUMMARY OF COMMENTS/RECOMMENDATIONS PROPONENT: 6409840 Manitoba Ltd. (Tritec Concrete) PROPOSAL NAME: Tritec Concrete Concrete Batch Plant CLASS OF DEVELOPMENT: 1 TYPE OF DEVELOPMENT: Manufacturing - CLIENT

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report Semestral Report July to December 2015 VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by Southern

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

If you have any questions, feel free to contact the office of the Planning Commission at

If you have any questions, feel free to contact the office of the Planning Commission at Attention: Enclosed, is an application for a zoning permit for the Townships of Amboy, Franklin, Fulton & York. You may return your application and check made payable to: ZONING FEES Fulton County Regional

More information

ENGAGING LOCAL STAKEHOLDERS IN FLOOD MANAGEMENT TOWARDS LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM

ENGAGING LOCAL STAKEHOLDERS IN FLOOD MANAGEMENT TOWARDS LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM ENGAGING LOCAL STAKEHOLDERS IN FLOOD MANAGEMENT TOWARDS LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM Joint Actions on Climate Change, 8-10 Junel 2009, Aalborg Congress and Culture Centre, Denmark Bach

More information

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM By Dr. To Trung Nghia Director of Institute of Water Resources Planning Chief of the Red Thai Binh RBO Office E-mail: iwrp.hanoi@hn.vnn.vn INTRODUCTION

More information

... WB credit VN ENVIRONMENTAL ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN VIETNE1M RURAL ENERGY 11 HA NAM PROVINCE

... WB credit VN ENVIRONMENTAL ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN VIETNE1M RURAL ENERGY 11 HA NAM PROVINCE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E959 VOL. 16 ELECTRICITY OF VIETNAM POWER COMPANY NO.1 POWER NETWORK PROJECT MANAGEMENT

More information

E208. REPORT OF ENVIRONMENTAL IMPACT ASSESSM[1P-v- Volume 5. K'->-''<L l-:ll- LINE & CHAU DOC 220 KV SUBSTVrION PROJECT

E208. REPORT OF ENVIRONMENTAL IMPACT ASSESSM[1P-v- Volume 5. K'->-''<L l-:ll- LINE & CHAU DOC 220 KV SUBSTVrION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY OF VIET NAM SOUTHERN POWER PROJECT MANAGEMENT BO RD E208 Volume 5 K'->-''

More information

APPENDIX C REQUEST FOR REVIEW, APPLICATION INFORMATION, AND PROJECT COMMENTS

APPENDIX C REQUEST FOR REVIEW, APPLICATION INFORMATION, AND PROJECT COMMENTS APPENDIX C REQUEST FOR REVIEW, APPLICATION INFORMATION, AND PROJECT COMMENTS Date Case GLENN COUNTY PLANNING AND PUBLIC WORKS AGENCY 777 North Colusa Street WILLOWS, CA 95988 (530) 934-6540 FAX (530)

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EVNPECC4 ISO 9001:2008 VIETNAM ELECTRICITY POWER ENGINEERING CONSULTING JOINT STOCK COMPANY

More information

Marble River Wind Farm: Contact Information

Marble River Wind Farm: Contact Information : Contact Information For more information on the, please contact the project developers at www.horizonwind.com, www.acciona.es or www.aes.com. Our current Marble River office is located at the Adirondack

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information