Completion Instructions for the Industrial SWP3 Template

Size: px
Start display at page:

Download "Completion Instructions for the Industrial SWP3 Template"

Transcription

1 Introduction Completion Instructions for the Industrial SWP3 Template The Oklahoma Department of Environmental Quality (DEQ) has created a template to help you develop your Stormwater Pollution Prevention Plan (SWP3). The template has sections that match the 2017 Multi-Sector General Permit (MSGP) OKR05 for industrial facilities. DEQ has also developed different Report Templates related to OKR05 Permit that you can use such as the Routine Facility Inspection Report, Corrective Action Report, and Quarterly Visual Monitoring Report. This SWP3 Template will help you address everything you must have in an SWP3 (Part 4 of the OKR05 Permit). For example, you tell us in the SWP3 what you have done and/or will do to prevent pollutants from your facility from getting into rain, snow, snowmelt, and stormwater runoff (using the control measures listed in Part 3.1 of the OKR05 Permit). You must also document in your SWP3 what you did (such as monitoring) to know that you are meeting your permit s effluent limits (Part 3.2 of the OKR05 Permit). Before completing the Template, make sure you read the entire 2017 OKR05 Permit (from Parts 1-10 and sector-specific requirements in Part 11) and understand all the requirements in the Permit. A copy of the 2017 OKR05 Permit is available at Tips for Completing the Industrial SWP3 Template This SWP3 Template is designed for use by all the facilities eligible for coverage under the 2017 OKR05 Permit. However, this template is NOT tailored for your individual industrial sector so you may need to address any additional SWP3 requirements outlined in Part 11 (sector specific requirements) depending on your industrial sector (see Table 1-3 of the 2017 OKR05 Permit) and your facility location. Prepare or update your SWP3 in accordance with the 2017 OKR05 Permit before submitting your NOI to DEQ to be covered under the Permit. Read the instructions for each section BEFORE you complete that section! Include your facility s specific information (based on permit requirements) in the space for each section in the SWP3 Template. DEQ developed the SWP3 Template in Microsoft Word so that you can easily include as much information as you need in order to address each section of the SWP3 Template. This might be a few sentences or a few pages. Feel free to include tables if that addresses what you do more clearly. To make it easier to complete, the SWP3 Template uses blue text where you are expected to enter information. Just delete the blue text when entering information or describing site-specific requirements in the SWP3 (based on permit requirements). DEQ has made every effort to ensure the accuracy of all instructions and guidance contained in the Instructions and SWP3 Template. But remember, if you see any differences between the 2017 OKR05 Permit and the SWP3 Template, you must follow the Permit - NOT the template. Also, if you find any differences, please share them with DEQ. That way we can consider them when making improvements to these documents in the future. DEQ welcomes any comments you have about this document and/or the SWP3 Templates and appreciates your feedback!

2 Table of Contents Section 1 Stormwater Team and Facility Information Stormwater Pollution Prevention Team Facility Information Facility Contact Information... 2 Section 2 Site Description Activity at the Facility Receiving Waterbody Information Official Waterbody Name and WBID Impaired Waterbodies and TMDLs Latitude and Longitude of each Stormwater Outfall Outstanding Resource Waters or Sensitive Waters and Watersheds General Location Map Site Map... 6 Section 3 Potential Pollutant Sources Industrial Activities List of Potential Pollutants Spills and Leaks Allowable Non-stormwater Discharges Information Unauthorized Non-stormwater Discharges Documentation Salt Storage Coal Storage Piles Sampling Data Summary... 9 Section 4 Stormwater Control Measures Non-numeric Technology-based Effluent Limits Minimize Exposure Good Housekeeping Preventive Maintenance Spill Prevention and Response Erosion and Sediment Controls Management of Runoff Salt Storage Piles or Piles Containing Salt Dust Generation and Vehicle Tracking of Industrial Materials Sector-Specific Applicable Non-Numeric Effluent Limits Page ii

3 4.3. Applicable Numeric Effluent Limitations Guidelines-Based Limits Applicable Numeric Effluent Limitations for Coal Pile Runoff Water Quality-based Effluent Limitations Requirements Relating to Endangered Species and Historic Properties Section 5 Procedures and Schedules Pertaining to Control Measures Used to Comply with Effluent Limitations (see 2017 OK05 Part ) Good Housekeeping Spill Prevention and Response Procedures Preventive Maintenance Erosion and Sediment Control Runoff Management Salt Storage Piles Employee Training Routine Facility Inspections Corrective Actions Monitoring Quarterly Visual Monitoring Annual Effluent Limitations Guidelines Monitoring Impaired Water Monitoring Annual Comprehensive Site Compliance Evaluation Report (ACSCER) Section 6 Documentation to Support Other Eligibility Documentation Regarding Endangered Species Documentation Regarding Historic Properties Documentation Regarding Unauthorized Non-stormwater Discharges Section 7 SWP3 Certification Section 8 SWP3 Modifications Section 9 Additional Documentation & SWP3 Attachments Page iii

4 Section 1 Stormwater Team and Facility Information 1.1. Stormwater Pollution Prevention Team See Part of 2017 OKR05 for the Permit requirements for Stormwater Pollution Prevention Team. You must identify the staff members of the facility s stormwater pollution prevention team by name and/or title. Incudes their telephone numbers as well. You must also include their individual roles and responsibilities. Stormwater pollution prevention team must have at least one member, but possibly several members, depending on the size and nature of the industrial facility. DEQ recommends, but does not require, that stormwater pollution prevention team include at least one individual from each shift so that there is always a stormwater pollution prevention team member on-site in case of an emergency. Your stormwater pollution prevention team, at minimum, is responsible for the following: Overseeing development of the SWP3. Making any modifications to the SWP3. Implementing and maintaining control measures and taking corrective actions when required. Performing routine facility inspections and monitoring. Supervising the housekeeping program. Making and documenting changes to the SWP3. Providing staff training. Communicating changes in the SWP3 to people working on the site Facility Information Instructions (see 2017 OKR05 Part 2.3): You will need the information from this section to complete your Notice of Intent (NOI). Print your facility s name, address, permit number (for existing permittee), primary industrial activity SIC Code or activity code. If you have co-located industrial activity, includes it s SIC Code or activity code too. A complete list of SIC Codes can be obtained from the 1987 version of the SIC Manual that is available on the US Department of Labor s website at For latitude and longitude of your facility (at the main entrance gate of your facility), open the DEQ GIS Data Viewer ( then zoom in to where your facility is. To locate your facility, you will probably need an aerial view. Click on the icon and then click on Basemap, and then click on Bing Maps Hybrid. Zoom in and put your pointer where the main entrance is located. You will see the latitude (it is the first number) and the longitude (begins with - as in -97.*** ) in the lower left corner of the map. You can also find the latitude and the longitude of each outfall using Google Earth, Compass or similar third party app in your smart phone. You must present physically at the entrance to determine latitude/longitude of the outfall using a smart phone. Please note that DEQ doesn t endorse any company or brand, it is up to you to use any specific app. Include the type of ownership of your industrial facility. Include total area of the facility, estimated total impervious area at the facility, and estimated area of industrial activity at the facility exposed to stormwater in one-tenth of acres. Page 1

5 Refer to the NOI Form B for more instructions. A copy of the NOI form is available at or in Appendix B of the 2017 OKR05 Permit. In your SWP3, you must include a copy of your 2017 OKR05 Permit in Attachment C of the SWP3 or you must include a reference or link to where your 2017 OKR05 Permit can be found Facility Contact Information You will need the information from this section of the SWP3 Template for your NOI. List the facility operator(s), facility owner and SWP3 contact(s). Indicate respective responsibilities, where appropriate, of facility operator(s), facility owner and SWP3 contact(s). Refer to NOI instructions (available in Appendix B of the 2017 OKR05). Section 2 Site Description 2.1. Activity at the Facility Instructions (see 2017 OKR05 Part 4.2.2): Provide a list with a general description of the industrial activities conducted at your facility. For this Permit, industrial activities include, but are not limited to, the following: Manufacturing and processing. Industrial materials or activities. Material handling equipment or activities. 1 Industrial machinery. Vehicle and equipment fueling, maintenance and/or cleaning. The following are examples of just some of the areas where there are activities at industrial facilities: Industrial plant yards Immediate access roads and rail lines used or traveled by carriers of raw materials, manufactured products, waste material, or by-products used or created by the facility Material handling sites 1 Refuse sites Sites used for the application or disposal of process waste waters Sites used for the storage and maintenance of material handling equipment Sites used for residual treatment, storage, or disposal Shipping and receiving areas 1 Material handling activities including storage; loading and unloading; transportation; or conveyance of any raw material, intermediate product, final product, by-product or waste product. Page 2

6 Manufacturing buildings Storage areas (including tank farms) for raw materials, and intermediate & final products Areas where industrial activity has taken place in the past and significant materials remain and are exposed to stormwater DEQ recommends that you differentiate between activities that occur indoors from those that occur outdoors which could be exposed to stormwater. Don t overlook processes that are vented and may contribute pollutants to the roof Receiving Waterbody Information Instructions (see 2017 OKR05 Part 4.2.2): Provide the name of the nearest receiving water(s), including the following: Intermittent streams Dry sloughs Arroyos and the areal extent Description of any wetland areas Other special aquatic sites such as Outstanding Resource Water or Scenic River Waters (see Part 10 of 2017 OKR05 permit for definition) that may receive discharges from your facility Identify all of your facility s stormwater outfalls with a unique 3-digit ID (e.g., 001, 002). Include the latitude and longitude for each outfall. Locate the waterbody that each of those stormwater outfalls drains into and include its official name and waterbody identification number (WBID) which can be found using the procedures in Section below. Indicate if you are treating one or more outfalls as substantially identical under Parts , 7.1.1, and If the facility is discharging into a MS4, indicate so and provide its name. Indicate which of these waterbodies are listed as impaired. Impaired waterbodies are listed in Appendix C of the Integrated Report (IR). Appendix C of the IR is also known as the 303(d) List. Information about stream impairment can be found at this DEQ s website: You will need to indicate if there is a Total Maximum Daily Load (TMDL) or a watershed plan in lieu of a TMDL has been established for that waterbody. TMDL information can be found at this DEQ s website: The following is an explanation on how to use the DEQ GIS Data Viewer, to complete the Receiving Waterbody Information table in the SWP3 Template. You don t have to use the Data Viewer to get this information, but that is the easiest way to find all the information you will need to complete that table Official Waterbody Name and WBID The official name and WBID for each waterbody that receives stormwater from your facility can be found in Appendix B of the Integrated Report (IR). But it s much easier to find that information using the DEQ GIS Maps and Data Viewer ( If you hadn t done it before, open up the DEQ GIS Data Viewer and zoom into where your facility is located. You can also locate your facility using Location icon. Click on this icon then click on Layers and then click on Water Data. Page 3

7 Under that drop-down menu, nothing should be marked except for IR Waterbodies. On the map, click on the stream (one of five colors) or lake (if you are right next to one), into which the stormwater runs from that outfall. (If you don t know which direction your stormwater goes, click on Basemap and choose either Bing Maps Hybrid or USA Topo Map. Topo maps show elevation so look for the waterbody downhill from your facility.) Click once on the colored line representing the waterbody downhill from you, and a box will pop up on the map. The first line says WBID which is the waterbody ID. On the line below that is the official name of the waterbody Impaired Waterbodies and TMDLs Impaired waterbodies are the ones that appear as red or green on the DEQ GIS Data Viewer map. In order to find out what the impairments are, make sure that Water Data is marked, and then unmark everything in that dropdown menu except for 303(d) Waterbodies. Only impaired waterbodies will remain on the map. When you click on these waterbodies on the Data Viewer map, there will be either a 4 or 5 next to the impairments for that waterbody. Write those impairments down where indicated in the SWP3 Template. If the impairment is followed by 4a, that means a Total Maximum Daily Load (TMDL) has been completed for it Latitude and Longitude of each Stormwater Outfall Open the DEQ GIS Data Viewer ( then zoom in to where your facility is. To locate each outfall, you will probably need an aerial view. Click on the icon, and then click on Basemap, and then click on Bing Maps Hybrid. Zoom in and put your pointer where each of your outfalls is located. You will see the latitude (it is the first number) and the longitude (begins with - as in -97.*** ) in the lower left corner of the map. You can also find the latitude and the longitude of each outfall using Google Earth, Compass or similar third party app in your smart phone. You must be present physically at the outfall location to determine latitude/longitude of the outfall using a smart phone Outstanding Resource Waters or Sensitive Waters and Watersheds Outstanding Resource Water (ORW) is considered to be an outstanding resource or have exceptional recreational and/or ecological significance 2 as described in Title785, Chapter (a) in the 2015 version of Oklahoma s Water Quality Standards (WQS). These waters include: Streams designated Scenic River or ORW in Appendix A of the Oklahoma WQS. Waters located within Scenic Rivers watersheds. Additionally, ORW may include: Waters located within national and state parks. Waters located within forests. Waters located within wilderness areas. Waters located within wildlife management areas. 2 Additional information can be found in Section (Endangered and Threatened Species & Critical Habitat Protection) and Appendix A of the 2017 MSGP OKR05. Page 4

8 Waters located within wildlife refuges. Waters which contain species listed pursuant to the federal Endangered Species Act as described in 785: (c)(2)(A) of the Oklahoma WQS and 785: (c) of the Implementation of Oklahoma's Water Quality Standards (aka Chapter 46). No degradation of water quality is allowed in any of the waters which are designated as ORW in the Limitations column in the tables found in Appendix A of the Oklahoma WQS or are located within the boundaries of any of the areas listed on the tables in Appendix B of the Oklahoma WQS. There are also High Quality Waters (HQW) whose historic water quality and physical habitat provide more ecological refuges than other waters in the same ecoregion with similar chemistry and physical conditions. HQW are prohibited from having any new point source discharge(s) or an increased load or concentration from existing point source discharge(s) of oxygen demanding substances (CBOD or BOD), ammonia nitrogen and/or total organic nitrogen, phosphorus, or total suspended solids (TSS). There cannot be any discharges into HQW if that might lower its existing water quality. To find out if discharges from your facility are going into these sensitive waterbodies using the DEQ GIS Data Viewer, click on Water Data. Under that drop down menu, the only things that should be marked are the IR Waterbodies and OKR05 Stormwater Sensitive Areas. If your stormwater discharge goes into a waterbody in one of the aqua shaded areas, then you are in ORW or other sensitive waters General Location Map Instructions (see 2017 MSGP Part 4.2.2): Include a general location map under Attachment A of the completed SWP3. Prepare a general location map (e.g., DEQ Flex-viewer or U.S. Geological Survey (USGS) quadrangle map or aerial image from the internet) with enough detail to identify the location of your facility and all receiving waters for your stormwater discharges (include as Attachment A of this SWP3 Template). Examples of General Location Maps: or Example-1 Example-2 Page 5

9 2.4. Site Map Instructions (see 2017 OKR05 Part 4.2.2): Prepare a site map or series of maps showing the following information and include these maps under Attachment B of the completed SWP3: Boundaries of the property and the size of the property in acres. Location and extent of significant structures and impervious surfaces. Directions of stormwater flow (use arrows to show the directions of stormwater flow). Locations of all stormwater control measures (e.g., all structural BMPs). Locations of all receiving waters, including wetlands, in the immediate vicinity of your facility. Indicate which waterbodies are listed as impaired and which are identified by the state as outstanding resources waters. Locations of all stormwater conveyances including ditches, pipes and swales. Locations of potential pollutant sources identified under Part Locations where significant spills or leaks identified under Part have occurred. Locations of all stormwater monitoring points. Locations of stormwater inlets and discharge points, with a unique identification code for each discharge point (e.g., Discharge points 001, 002), indicating if you are treating one or more discharge points as substantially identical under Parts 3.2.3, , and 6.1.1, and an approximate outline of the areas draining to each discharge point. If applicable, MS4s and where your stormwater discharges to them. Areas of designated critical habitat for endangered or threatened species, if applicable. Locations of the following activities where such activities are exposed to precipitation: Fueling stations Vehicle and equipment maintenance and/or cleaning areas Loading/unloading areas Locations used for the treatment, storage or disposal of wastes Liquid storage tanks Processing and storage areas Immediate access roads and rail lines used or traveled by carriers of raw materials, manufactured products, waste material, or by-products used or created by the facility Transfer areas for substances in bulk Machinery Page 6

10 Example of a site map: Locations and sources of run-on to your site from adjacent property that contains significant quantities of pollutants Section 3 Potential Pollutant Sources Describe all areas at your facility where industrial materials or activities are exposed to stormwater or from which allowable non-stormwater discharges originate. Industrial materials or activities include, but are not limited to: material handling equipment or activities; industrial machinery; raw materials; industrial production and processes; and intermediate products, by-products, final products, and waste products. Material handling activities include, but are not limited to: the storage, loading and unloading, transportation, disposal or conveyance of any raw material, intermediate product, final product or waste product. For structures located in areas of industrial activity, you must be aware that the structures themselves are potential sources of pollutants. This could occur, for example, when metals such as aluminum or copper are leached from the structures as a result of acid rain. For each area identified, the SWP3 is included industrial activities, potential pollutants, spills and leaks, authorized nonstormwater discharges as mentioned Table 1-3 of 2017 OKR05 permit, unauthorized non-stormwater discharges, salt storage, stormwater sampling data and descriptions of control measures. Page 7

11 3.1. Industrial Activities Instructions (see 2017 OKR05 Part ): List/Name(s) of the industrial activities that are exposed to stormwater. Description shall include manufacturing and processing, material handling activities including storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product, by-product or waste product; and vehicle and equipment fueling, maintenance and cleaning List of Potential Pollutants Instructions (see 2017 OKR05 Parts and ): For the industrial activities identified in section 3.1 above, list the potential pollutants or pollutant constituents (e.g., motor oil, fuel, battery acid, and cleaning solvents). In your list of pollutants associated with your industrial activities, include all significant materials that have been handled, treated, stored, or disposed, and that have been exposed to stormwater in the three years prior to the date you prepare your SWP Spills and Leaks Instructions (see 2017 OKR05 Part ): Include the following in this section: Potential spills and leaks: A description of where potential spills and leaks could occur at your site that could contribute pollutants to your stormwater discharge, and specify which discharge points are likely to be affected by such spills and leaks. Past spills and leaks: A description of significant spills and leaks in the past three years of oil or toxic or hazardous substances that actually occurred at exposed areas, or that drained to a stormwater conveyance. Note: Significant spills and leaks include, but are not limited to, releases of oil or hazardous substances in excess of quantities that are reportable under CWA Section 311 (see 40 CFR and 40 CFR ) or Section 102 of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), 42 USC Allowable Non-stormwater Discharges Information Instructions (see 2017 OKR05 Parts 1.3 and ): You will need to document that you have evaluated all sources of allowable non stormwater that are/will be discharged under this Permit. Documentation of your evaluation must include: Identification of each allowable non-stormwater source. The location where it is likely to be discharged. Descriptions of appropriate BMPs for each source to minimize the impact of water quality Unauthorized Non-stormwater Discharges Documentation Instructions (see 2017 OKR05 Part ): Part 1.3 of the 2017 OKR05 permit identifies allowable nonstormwater discharges. You must document the following: Test or evaluate for the presence of any unauthorized non-stormwater discharges at your site that was not allowed in Part 1.3 of 2017 OKR05 Permit. List the procedures to get rid of any unauthorized non-stormwater discharges. Page 8

12 3.6. Salt Storage Instructions (see 2017 OKR05 Part ): Document the location of any storage piles containing salt used for deicing or other commercial or industrial purposes. Note: you will be asked additional questions concerning salt storage in Section of this SWP3 Template, below Coal Storage Piles Instructions (see 2017 OKR05 Part ): Document the location of any storage piles containing coal used for commercial or industrial purposes Sampling Data Summary Instructions (see 2017 OKR05 Part ): Include a brief summary of all stormwater discharge sampling data collected at the facility during the previous permit term. Section 4 Stormwater Control Measures Instructions (see 2017 OK05 Parts 3, 4.2.4, and 11): Stormwater Control measures are the best management practices (BMPs) or other structural or non-structural practices that are/will be used to prevent or reduce the discharge of pollutants in stormwater. Structural control measures, as the name implies, focus on installation of hard structures to control discharges. Structural controls include practices such as vegetative swales, collection and reuse of stormwater, inlet controls, infiltration devices, and wet retention measures. Nonstructural control measures are intended to prevent or reduce the generation of pollutants in stormwater and/or the volume of stormwater runoff using practices that focus on facility operations and procedures. Examples of non-structural control measures include procedural practices such as employee trainings and the posting of signs that raise staff awareness to the BMPs and procedures in place to control stormwater pollutants. Describe the stormwater control measures that you have installed or will install at your site to meet each section of the Permit in Sections of the SWP3 Template. Non-numeric technology-based effluent limits in Part Sector specific non-numeric technology-based effluent limits in Part 11. Applicable numeric effluent limitations guidelines-based limits in Part and Part 11. Applicable numeric effluent limitations for coal pile runoff in Part Water quality-based effluent limits in Part 3.2. Any additional measures that formed the basis of eligibility regarding threatened and endangered species, critical habitat, and/or historic properties in Part 3.3. In addition to your control measure descriptions, include explanations of how the controls fulfill the following requirements (in Part 3.1.1): The selection and design considerations. How they address the pollutant sources identified in section 3.1 of the SWP3 Template. Page 9

13 You may also check sector specific fact sheet to get more information regarding applicable/suitable control measures for your facility. Industrial Stormwater Factsheets for each of the 29 industrial sectors regulated by the Industrial Stormwater Permit are available on the EPA s website. Each fact sheet describes the types of facilities included in the sector, typical pollutants associated with the sector, and types of stormwater control measures including structural and non-structural best management practices (BMPs) used to minimize the discharge of the pollutants. You may also check Minnesota s Industrial Stormwater Best Management Practices Guidebook, or Oregon s Industrial Stormwater Best Management Practices Manual, or EPA s guidance document on Developing Stormwater Pollution Prevention Plan for selecting appropriate BMPs for your facility Non-numeric Technology-based Effluent Limits You must comply with the following non-numeric effluent limits (except where otherwise specified in Part 11) as well as any sector-specific non-numeric effluent limits in Part Minimize Exposure Instructions (see 2017 OKR05 Part ): Describe any structural controls or practices used to minimize the exposure of industrial activities such as manufacturing, processing, material storage areas, loading and unloading areas, dumpsters and other disposal areas, maintenance activities, and fueling operations to rain, snow, snowmelt and runoff. Describe where the controls or practices are being implemented at your site Good Housekeeping Instructions (see 2017 OKR05 Parts and ): Describe any practices you are using to keep exposed areas of your site clean and where these areas are located. Include a schedule for how often you do the following (Note: There are specific requirements for facilities that handle pre-production plastic.): Pickup and disposal of waste materials (this should be done regularly). Routine inspections for leaks and of the condition of drums, tanks and containers Preventive Maintenance Instructions (see 2017 OKR05 Parts and ): Describe procedures to maintain industrial equipment so that spills/leaks are avoided. Describe procedures to keep control measures in effective operating condition. Describe where these procedures are done on-site. Include the schedule that you follow for these maintenance activities. Describe the procedures being done at each site Spill Prevention and Response Instructions (see 2017 OKR05 Parts and ): Describe the structural controls and procedures used to minimize the chance of leaks, spills or other releases of hazardous chemicals. Page 10

14 Examples include: Store hazardous chemicals in containers with their original product labels. These labels should be legible. Properly label containers that hold waste chemicals (e.g., used oil, spent solvents,). Describe the procedures you use to safely store hazardous chemicals at your facility. Some examples might be: To store or transport hazardous materials away from drainage paths or waterways. To develop an inventory with the name and locations of all hazardous materials on-site. To surround the storage of hazardous materials with a berm or other appropriate containment best management practice (BMP). To minimize the use and handling of hazardous materials. To not store incompatible materials, such as chlorine and ammonia, in the same temporary containment facility. Train workers about the proper handling of containers of hazardous chemicals. Keep spill kits near areas where spills of hazardous chemicals might occur so they can be cleaned up quickly. Train workers about their roles if there were a spill, leak, or releases of hazardous chemicals so they know how to properly respond as soon as possible. They must know the appropriate facility personnel to be notified who have been trained on procedures to quickly stop, contain and cleanup of chemical leaks, spills, and other releases. Describe where each control is to be located or where applicable procedures will be implemented. Note: some facilities may be required to develop a Spill Prevention Control and Countermeasure (SPCC) plan under a separate regulatory program (40 CFR 112). If you are required to develop an SPCC plan, or you already have one, you should include references to the relevant requirements from your plan. DEQ recommends you include: Where a leak, spill or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302 occurs during a 24-hour period, you must notify the National Response Center (NRC) at (800) or, in the Washington, DC, metropolitan area, call (202) in accordance with the requirements of 40 CFR Part 110, 40 CFR Part 117, and 40 CFR Part 302 as soon as you have knowledge of the discharge. You may also need to report spills or discharges to local emergency response, DEQ and public health offices. Contact information must be in locations that are readily accessible and available Erosion and Sediment Controls Instructions (see 2017 OKR05 Parts and ): Permit requires you to select and implement control measures to limit erosion on areas of the site that, due to topography, land disturbing activities, soils, cover, materials, or other factors, are likely to experience erosion. Describe the following: Page 11

15 A narrative description of areas of your site that are susceptible to erosion (note: the site map will also identify these areas); A description of erosion and sediment control measures used at your site to stabilize exposed areas and contain runoff to minimize onsite erosion and potential offsite discharges of sediment. Describe flow velocity dissipation devices placed at all discharge locations and all structural and nonstructural control measures to prevent the discharge of sediment. If applicable, describe the type and purpose of any polymers and/or chemical treatments used to control erosion and the location at your site where each control is implemented Management of Runoff Instructions (see 2017 OKR05 Parts and ): Describe controls used at your site to divert, infiltrate, reuse, contain or otherwise reduce stormwater runoff. Describe the location at your site where each control is implemented Salt Storage Piles or Piles Containing Salt Instructions (see 2017 OKR05 Parts and ): If applicable, describe structures at your site that either cover or enclose salt storage piles or piles containing salt, and any controls that minimize or prevent the discharge of stormwater from such piles. Also, describe any controls or procedures used to minimize exposure resulting from adding to or removing materials from the pile. Describe the location at your site where each control and/or procedure is implemented Dust Generation and Vehicle Tracking of Industrial Materials Instructions (see 2017 OKR05 Part ): Describe controls and procedures that will be used at your site to minimize generation of dust and off-site tracking of raw, final or waste materials in order to minimize pollutant discharges Sector-Specific Applicable Non-Numeric Effluent Limits Instructions (see 2017 OKR05 Part 11): Describe any controls or procedures that will be used at your site to comply with any sector-specific requirements that apply to you in Part 11 of the 2017 OKR05 Permit. Describe the location at your site where each control and/or procedure will be implemented. Note: Sector-specific non-numeric effluent limits apply to Sectors A, C, E, F, G, H, I, J, L, M, N, O, P, Q, R, S, T, U, V, X, Y, Z and AA Applicable Numeric Effluent Limitations Guidelines-Based Limits Instructions (see 2017 OKR05 Part 3.1.3): If you are in an industrial category subject to one of the effluent limitations guidelines identified in the table below (Table 3-1 of the 2017 OKR05), describe controls or procedures that will be implemented at your site to meet these effluent limitations guidelines. Note: Sector-specific numeric effluent limits apply only to Sectors A, C, D, E, J, K, L, O, and S. Regulated Activity Discharges resulting from spray down or intentional wetting of logs at wet deck storage areas 40 CFR Part/Subpart Part 429, Subpart I Effluent Limit See Part 8.A.7 Runoff from phosphate fertilizer manufacturing facilities that comes into contact with Part 418, Subpart A See Part 8.C.4 Page 12

16 Regulated Activity any raw materials, finished product, by-products or waste products (SIC 2874) 40 CFR Part/Subpart Effluent Limit Runoff from asphalt emulsion facilities Part 443, Subpart A See Part 8.D.4 Runoff from material storage piles at cement manufacturing facilities Part 411, Subpart C See Part 8.E.5 Mine dewatering discharges at crushed stone, construction sand and gravel, or industrial sand mining facilities Part 436, Subparts B, C, or D See Part 8.J.9 Runoff from hazardous waste landfills Part 445, Subpart A See Part 8.K.6 Runoff from non-hazardous waste landfills Part 445, Subpart B See Part 8.L.10 Runoff from coal storage piles at steam electric generating facilities Part 423 See Part 8.O.8 Runoff containing urea from airfield pavement deicing at existing and new primary airports Part 449 See Part 8.S Applicable Numeric Effluent Limitations for Coal Pile Runoff Instructions (see 2017 OKR05 Part 3.1.4): If your facility has stormwater runoff from coal storage piles, describe what control measures will you use to comply with the effluent limitations identified in Part of OKR05 permit for all discharges containing the coal storage pile runoff, regardless of your industrial activity Water Quality-based Effluent Limitations Instructions (see 2017 OKR05 Part 3.2): Describe the measures that will be implemented at your site to control industrial stormwater discharge as necessary to meet applicable water quality standards of the State (i.e., your discharge must not cause or contribute to an exceedance of applicable water quality standards of the State). DEQ expects that compliance with the conditions in this permit will control discharges as necessary to meet applicable water quality standards. If at any time you become aware, or DEQ determines, that your discharge does not meet applicable water quality standards, you must take corrective action(s) as required in Part 6.1 of the 2017 OKR05 Permit and document the corrective actions as required in Part 6.3 of the 2017 OKR05 Permit. DEQ may also require that you undertake additional control measures (to meet the narrative water quality-based effluent limit above) on a site-specific basis, or require you to obtain coverage under an individual permit, if information in your NOI, required reports, or from other sources indicates that your discharges are not controlled as necessary to meet applicable water quality standards. You must implement all measures necessary to be consistent with an available wasteload allocation in an established TMDL or watershed plan in lieu of a TMDL. You must follow the applicable requirements in Part or Part or Part You may also need to follow the requirements in Part Note: If you are a new discharger and discharge to a waterbody or watershed designated ORW commencing after June 25, 1992, you are not eligible for coverage under this Permit Requirements Relating to Endangered Species and Historic Properties Describe any additional measures that will form the basis of eligibility regarding threatened and endangered species, critical habitat, and/or historic properties in Part 3.3. Page 13

17 Section 5 Procedures and Schedules 5.1. Pertaining to Control Measures Used to Comply with Effluent Limitations (see 2017 OK05 Part ) Good Housekeeping Instructions: Document a schedule or the process used for determining when pickup and disposal of waste materials occurs (e.g., roll off dumpsters are collected when full). Provide a schedule for routine inspections for leaks and conditions of drums, tanks and containers Spill Prevention and Response Procedures Instructions: Describe procedures for preventing and responding to spills and leaks, including notification procedures. For preventing spills, include control measures for material handling and storage, and the procedures for preventing spills that can contaminate stormwater. Also specify cleanup equipment, procedures and spill logs, as appropriate, in the event of spills. You may reference the existence of other plans for Spill Prevention Control and Countermeasure (SPCC) developed for the facility under Section 311 of the CWA or BMP programs otherwise required by an OPDES permit for the facility. Include emergency Spill Notification contact phones numbers Preventive Maintenance Instructions: Document preventative maintenance procedures, including regular inspections, testing, maintenance and repair of all control measures to avoid situations that may result in leaks, spills, and other releases, and any back-up practices in place should a runoff event occur while a control measure is off-line. Include the schedule or frequency for maintaining all control measures used to comply with the effluent limits in Part 3 of the 2017 OKR Erosion and Sediment Control Instructions: Document if polymers and/or other chemical treatments are used for erosion and sediment control and identify the polymers and/or chemicals used and the purpose Runoff Management Instructions: Document procedures and schedules to divert, infiltrate, reuse, contain or otherwise reduce stormwater runoff to minimize pollutants in your discharges Salt Storage Piles Instructions: Document procedures and schedules to minimize exposure resulting from adding to or removing materials from the salt storage pile Employee Training Instructions (see 2017 OKR05 Part and Part ): Provide the elements of your training plan, including: The content of the training. The frequency/schedule of training for employees who work in areas where industrial materials or activities are exposed to stormwater, or who are responsible for implementing activities necessary to meet the conditions of the Permit. Page 14

18 Employee training must be conducted at least annually or more frequently if employee turnover is high. The following personnel, at a minimum, must receive training, and therefore should be listed out individually in the table below: Personnel who are responsible for the design, installation, maintenance, and/or repair of controls (including pollution prevention measures). Personnel responsible for the storage and handling of chemicals and materials that could become contaminants in stormwater discharges. Personnel who are responsible for conducting and documenting inspections and monitoring as required in Parts 5 and 7. Personnel who are responsible for taking and documenting corrective actions as required in Part 6. Part of the 2017 OKR05 Permit requires that the personnel who are required to be trained must also be trained to understand the following if related to the scope of their job duties (e.g., only personnel responsible for conducting inspections need to understand how to conduct inspections): An overview of what is in the SWP3. Spill response procedures, good housekeeping, maintenance requirements, and material management practices. The location of all controls on the site required by this permit, and how they are to be maintained. The proper procedures to follow with respect to the Permit s pollution prevention requirements. When and how to conduct inspections, record applicable findings, and take corrective actions Routine Facility Inspections Instructions (see 2017 OKR05 Part and Part 5): Describe the procedures you will follow for conducting routine facility inspections in accordance with Part 5 of the 2017 OKR05 Permit. Document any findings of your facility inspections and maintain this Inspection Report with your SWP3 as required in Part 4.5 of the 2017 OKR05 Permit. Summarize your findings in the annual report per Part 8.3 of the 2017 OKR05 Permit. Any corrective action required as a result of a routine facility inspection must be performed consistent with Part 6 of the 2017 OKR05 Permit. Note: Inspections must be performed by a qualified person with at least one participating member of the stormwater pollution prevention team. Inspectors must consider the results of visual and analytical monitoring (if any) for the past year when planning and conducting inspections. Qualified personnel are those who possess the knowledge and skills to assess conditions and activities that could impact stormwater quality at your facility, and who can also evaluate the effectiveness of control measures. Inspections must be conducted at least quarterly (i.e., once each calendar quarter), or in some instances more frequently (e.g., monthly or weekly, see Part 11 of the OKR05 permit for sector-specific requirements), as appropriate. Increased frequency may be appropriate for some types of equipment, processes and stormwater control measures, or areas of the facility with significant activities and materials exposed to stormwater. At least one of your routine inspections must be conducted during a period when a stormwater discharge is occurring. Page 15

19 Exception for Routine Facility Inspections: If you are invoking the exception for inactive and unstaffed sites relating to routine facility inspections, you must include documentation to support your claim that your facility has changed its status from active to inactive and unstaffed. To invoke this exception you must also include a statement in your SWP3 per Part indicating that the site is inactive and unstaffed, and that there are no industrial materials or activities exposed to stormwater, in accordance with the substantive requirements in 40 CFR (g)(4)(iii). The statement must be signed and certified in accordance with Part 9.16 of the OKR05 Permit. Note: If circumstances change and industrial materials or activities become exposed to stormwater or your facility becomes active and/or staffed, this exception no longer applies and you must immediately resume routine facility inspections. If you are not qualified for this exception at the time you become authorized under the 2017 OKR05, but during the Permit term you become qualified because your facility becomes inactive and unstaffed, and there are no industrial materials or activities that are exposed to stormwater, you must include the same signed and certified statement as above and retain it with your records pursuant to Part 4.5. Inactive and unstaffed facilities covered under Sectors J (Non-Metallic Mineral Mining and Dressing) are not required to meet the no industrial materials or activities exposed to stormwater standard to be eligible for this exception from routine inspections, per Parts 11.J.6. Routine Facility Inspection Report: You will need to document the findings of your facility inspections and related information in a Routine Facility Inspection Report in accordance with Part 5.2 of OKR05 permit and maintain this report with your SWP3. You will also need to summarize your findings in the Annual Report per Part 8.3 and keep a copy of the corrective action report in the SWP3. You may use DEQ s Template for Routine Facility Inspection Report to document your inspection findings or edit/prepare your own to meet your facility needs Corrective Actions Instructions (see 2017 OKR05 Part and Part 6): Describe the procedures for taking corrective action in compliance with Part 6 of the 2017 OKR05 Permit. When any of the following conditions occur or are detected during an inspection, monitoring or other means, the facility will appropriate corrective actions so that the condition is eliminated and pollutant discharges are minimized: An unauthorized release or discharge (e.g., spill, leak, or discharge of non-stormwater not authorized by this or another OPDES permit) occurs at your facility. A discharge violates a numeric effluent limit. Control measures are not stringent enough for the discharge to meet applicable water quality standards or the non-numeric effluent limits. A required control measure was never installed, was installed incorrectly, or not in accordance with the OKR05 permit or is not being properly operated or maintained. Note: All corrective actions must be performed by a qualified person with at least one participating member of the stormwater pollution prevention team. Qualified personnel are those who possess the knowledge and skills to assess conditions and activities that could impact stormwater quality at your facility, and who can also evaluate the effectiveness of control measures. Corrective Action Report: You will need to document corrective action related information in a Corrective Action Report in accordance with Part of OKR05 permit. You will also need to summarize your findings in the Annual Report per Part 8.3 and keep a copy of the corrective action report with the SWP3. Page 16

20 You may use DEQ s Template for Corrective Action Report to document your findings or edit/prepare your own to meet your facility needs Monitoring Instructions (see 2017 OKR05 Part and Part 7.2): Describe your procedures for conducting the four types of analytical monitoring specified by the 2017 OKR05 Permit, where applicable to your facility, including: Quarterly Visual Monitoring (Part of the 2017 OKR05) Annual effluent limitations guidelines monitoring (Part and sector-specific requirements in Part 11 of the 2017 OKR05). Impaired waters monitoring (Part of the 2017 OKR05). Other monitoring as required by DEQ (Part of the 2017 OKR05). Depending on the type of facility you operate, and the monitoring requirements to which you are subject, you must collect and analyze stormwater samples and document monitoring activities consistent with the procedures described in Parts 7, 9.10, and 9.16 of the 2017 OKR05, and any additional sector-specific requirements in Part 11 of the 2017 OKR05. Refer to Part 8 of the 2017 OKR05 for reporting and recordkeeping requirements. Note: All monitoring, except visual monitoring, must be conducted in accordance with the relevant sampling and analysis requirements at 40 CFR Part 136. Include in your description procedures for ensuring compliance with these requirements. It is recommended that the facility maintain an on-site rain gauge to determine when a qualifying rain event occurs. If you plan to use the substantially identical discharge point exception for your quarterly visual monitoring and impaired water monitoring, you must include the following documentation: Location of each of the substantially identical discharge points. Description of the general industrial activities conducted in the drainage area of each discharge point. Description of the control measures implemented in the drainage area of each discharge point. Description of the exposed materials located in the drainage area of each discharge point that are likely to be significant contributors of pollutants to stormwater discharges. An estimate of the runoff coefficient of the drainage areas (low = under 40%, medium = 40 to 65%, high = above 65%). The runoff coefficient is the ratio of excess runoff to the amount of precipitation for a given time over a given area, with a 0 runoff coefficient meaning no runoff potential and 1.0 meaning a completely impervious surface and all stormwater runs off. The runoff coefficient is related to the amount of impervious surfaces (buildings, pavement, sidewalks, etc.) versus pervious surfaces (grass, graveled areas, etc.) at the site. The more impervious surface a facility has, the larger the runoff coefficient. Light industrial facilities typically have a runoff coefficient between 40% and 65% and heavy industrial facilities typically have a runoff coefficient above 65%. Why the discharge points are expected to discharge substantially identical effluents. Note that the substantially identical outfall exception could not be used if there are in fact differences in any of the required components defined above. Page 17

Appendix O Example Industrial SWPPP Template

Appendix O Example Industrial SWPPP Template Appendix O Example Industrial SWPPP Template Arizona Department of Environmental Quality Multi-Sector General Permit Stormwater Pollution Prevention Plan (SWPPP) Template Introduction To help you develop

More information

Industrial Stormwater

Industrial Stormwater Industrial Stormwater 2017 Multi-Sector General Permit OKR05 for Stormwater Discharges from Industrial Activity Ismat Esrar, P.E. Municipal Discharge & Stormwater Permitting Water Quality Division Department

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

Part 2.0 Non-Numeric Effluent Limitations

Part 2.0 Non-Numeric Effluent Limitations 2017 NH Small MS4 General Permit Page 50 of 67 report on its findings and progress towards making the practices allowable. (Information available at: http://www.epa.gov/region1/npdes/stormwater/assets/pdfs/addressingbarrier2lid.pdf

More information

Appendix A: SWPPP Template Instructions

Appendix A: SWPPP Template Instructions Appendix A: SWPPP Template Instructions To help you develop the narrative section of your construction site SWPPP, EPA has created this electronic SWPPP template. The template is designed to help guide

More information

Industrial Storm Water Permits. Summit County Safety Council Meeting Nov 15, 2018

Industrial Storm Water Permits. Summit County Safety Council Meeting Nov 15, 2018 Industrial Storm Water Permits Summit County Safety Council Meeting Nov 15, 2018 Why regulate storm water runoff? It can wash pollutants off your site! Storm sewers drain to surface waters How Ohio EPA

More information

General Permit No.: OHR Page 2 of 141

General Permit No.: OHR Page 2 of 141 General Permit No.: OHR000005 Page 2 of 141 NPDES MULTI-SECTOR GENERAL PERMITS FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY TABLE OF CONTENTS 1. Coverage under this Permit....6 1.1 Eligibility....

More information

OHIO ENVIRONMENTAL PROTECTION AGENCY

OHIO ENVIRONMENTAL PROTECTION AGENCY Page 1 of 171 OHIO ENVIRONMENTAL PROTECTION AGENCY AUTHORIZATION TO DISCHARGE STORM WATER ASSOCIATED WITH INDUSTRIAL ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM MULTI-SECTOR GENERAL

More information

KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM

KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM Storm Water Pollution Prevention, Control, Reduction and Minimization In Compliance with Kansas City, MO Municipal Separate Storm Sewer System

More information

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE STORM WATER PLAN (SWP) GUIDANCE TEMPLATE Name of Facility: Address: Phone Number: Date: INTRODUCTION This Storm Water Plan (SWP) is written in accordance with the State of Delaware Regulations Governing

More information

Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State of Oklahoma

Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State of Oklahoma Oklahoma Department of Environmental Quality Water Quality Division Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

12-SW General Permit

12-SW General Permit Maryland Department of the Environment 12-SW General Permit for Stormwater Discharges Associated With Industrial Activity (Tentative Determination) Overview for Solid Waste Association of North America

More information

Save time by filing your NOI electronically using the E-NOI found on the Departments website

Save time by filing your NOI electronically using the E-NOI found on the Departments website 6052362228 tice of Intent GP017004 This is the tice of Intent for Stormwater Discharges Associated with Industrial Activity under the State Pollutant Discharge Elimination System (SPDES) Multi General

More information

15-MM & 16-MA NOI and SWPPP Overview

15-MM & 16-MA NOI and SWPPP Overview Maryland Department of the Environment 15-MM & 16-MA NOI and SWPPP Overview General Permit for Mineral Mines, Concrete and Asphalt Plants (15MM / NPDES MDG49) and General Permit for Marinas (16MA / NPDES

More information

April 5, Susan McClendon, Chief Financial Officer Drew Foam Co., Inc Highway 278 East Monticello, AR 71655

April 5, Susan McClendon, Chief Financial Officer Drew Foam Co., Inc Highway 278 East Monticello, AR 71655 April 5, 2017 Susan McClendon, Chief Financial Officer Drew Foam Co., Inc. 1093 Highway 278 East Monticello, AR 71655 RE: Drew Foam Co., Inc. Inspection (Drew Co) AFIN: 22-00057 NPDES Permit No.: ARR000817

More information

Appendix L Multi-sector General Permit

Appendix L Multi-sector General Permit Appendix L Multi-sector General Permit AZPDES MULTI-SECTOR GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM NON-MINING FACILITIES TABLE OF CONTENTS 1.0 Coverage under

More information

Arizona Department of Environmental Quality Industrial Stormwater Program (Multi-Sector General Permit) Spencer J. York, Project Manager

Arizona Department of Environmental Quality Industrial Stormwater Program (Multi-Sector General Permit) Spencer J. York, Project Manager Arizona Department of Environmental Quality Industrial Stormwater Program (Multi-Sector General Permit) Spencer J. York, Project Manager Arizona Department of Environmental Quality Stormwater and General

More information

Good Housekeeping and Spill Response

Good Housekeeping and Spill Response Good Housekeeping and Spill Response Presented By: Michele Loudenback, R.P.E.S Carrie J. Evenson, Ph.D., P.E. Industrial Wastewater Enforcement Section Water Quality Division Department of Environmental

More information

November 13, Ron Alexander Hackney Ladish, Inc. 708 S. Elmira Ave. Russellville, AR Industrial Stormwater Inspection (Pope Co)

November 13, Ron Alexander Hackney Ladish, Inc. 708 S. Elmira Ave. Russellville, AR Industrial Stormwater Inspection (Pope Co) November 13, 2014 Ron Alexander Hackney Ladish, Inc. 708 S. Elmira Ave. Russellville, AR 72802 RE: Industrial Stormwater Inspection (Pope Co) AFIN: 58-00042 NPDES Permit No.: ARR00A378 Dear Mr. Alexander:

More information

STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) STORM WATER POLLUTION PREVENTION PLAN (SWPPP) Name of Tenant and Facility Date: Emergency Contact: Title: Phone: INSTRUCTIONS FOR MERRILL FIELD TENANTS TO OBTAIN COVERAGE UNDER THE NPDES STORM WATER DISCHARGE

More information

Oklahoma Department of Environmental Quality Water Quality Division

Oklahoma Department of Environmental Quality Water Quality Division Oklahoma Department of Environmental Quality Water Quality Division Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State

More information

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009 Clean Water Act Industrial Stormwater Applicability Flowchart July 2009 Office of Compliance Office of Enforcement and Compliance Assurance U.S. Environmental Protection Agency 1200 Pennsylvania Avenue,

More information

CHAPTER 6 - How to Prepare a SWPPP

CHAPTER 6 - How to Prepare a SWPPP All construction sites which disturb an area of 1 acre or more, currently need a UPDES permit from the State of Utah. As a condition of the permit, a Stormwater Pollution Prevention Plan (SWPPP) must be

More information

Non-Storm Water Discharges

Non-Storm Water Discharges 06/30/2009. This fact sheet was developed for the Port sector but can be used by any sector. The following information was extracted from the 2008 Multi Sector General Permit (MSGP) for industrial storm

More information

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date:

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date: Stormwater Pollution Prevention Plan for: Idaho Materials Portable HMA 11148 ID-55 Cascade, ID 83611 208-382-3418 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite 100

More information

Maryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity

Maryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity Maryland Department of the Environment 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity Stormwater Permit Background The Clean Water Act (CWA or the Act) establishes a

More information

Page 1 of 6 Permit No: MN R J. Mineral Mining and Dressing

Page 1 of 6 Permit No: MN R J. Mineral Mining and Dressing Page 1 of 6 J. Mineral Mining and Dressing 1. Authorized Stormwater Discharges The requirements in Sector J apply to stormwater discharges associated with industrial activity from active, temporarily inactive

More information

DEQ Form Oct 18, Part A: Operator Information and Certification. DEQ Authorization Number: OKR10

DEQ Form Oct 18, Part A: Operator Information and Certification. DEQ Authorization Number: OKR10 DEQ Form 606-005 Oct 18, 2017 Oklahoma Department of Environmental Quality Annual Comprehensive Site Compliance Evaluation Report (ACSCER) for Stormwater Discharges Associated with Construction Activity

More information

Storm Water Pollution Prevention Plan For: SWPPP Contact(s): SWPPP Preparation Date:

Storm Water Pollution Prevention Plan For: SWPPP Contact(s): SWPPP Preparation Date: Storm Water Pollution Prevention Plan For: Easy Horse/Running Horse Jump Creek Road Homedale, ID 83639 208-939-6866 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018 City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting June 11, 2018 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history,

More information

11/1/2011. Annual Employee Training

11/1/2011. Annual Employee Training MS4 Address activities at WWTP in SWMP 1987 CWA Amendments Storm Water NPDES Industrial WWTP Design Flow 1 MGD WWTP Required to have approved Pretreatment Program Lynette Hablitzel, PE Ohio EPA Division

More information

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date:

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date: Stormwater Pollution Prevention Plan for: Jerome HMA 391 E 300 S Jerome, ID 83338 208-939-6866 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite 100 Ogden, UT 84401 801-409-2415

More information

Managing Industrial Stormwater In Minnesota

Managing Industrial Stormwater In Minnesota Managing Industrial Stormwater In Minnesota Sector S: Air Transportation Zach Chamberlain wq-strm3-20d Overview History General requirements SWPPP BMPs Monitoring benchmarks No Exposure Exclusion 2 What

More information

Storm Water Pollution Prevention Plan For: SWPPP Contact(s): SWPPP Preparation Date:

Storm Water Pollution Prevention Plan For: SWPPP Contact(s): SWPPP Preparation Date: Storm Water Pollution Prevention Plan For: Edwards Pit 2500 East 1800 South Franklin, ID 83237 208-939-6866 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite 100 Ogden,

More information

Stormwater Pollution Prevention Plan for:

Stormwater Pollution Prevention Plan for: for: 14535 Robert Larson Boulevard Las Cruces, NM 88005 (575) 528 3800 SWPPP Contact: South Central Solid Waste Authority Patrick Peck Director 2865 West Amador Avenue Las Cruces, NM 88005 (505) 528 3800

More information

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012 State of Georgia Department of Natural Resources Environmental Protection Division For official use only NOTICE OF INTENT NOI - Version 2012 For Coverage Under NPDES General Permit GAR050000 (2012 IGP)

More information

UNDERSTANDING YOUR FACILITY S STORMWATER POLLUTION PREVENTION PLAN

UNDERSTANDING YOUR FACILITY S STORMWATER POLLUTION PREVENTION PLAN UNDERSTANDING YOUR FACILITY S STORMWATER POLLUTION PREVENTION PLAN This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description

More information

SUBCHAPTER 1. INTRODUCTION

SUBCHAPTER 1. INTRODUCTION SUBCHAPTER 1. INTRODUCTION Section 252:606-1-2. Definitions [AMENDED] 252:606-1-4. Date of federal regulations incorporated [AMENDED] 252:606-1-2. Definitions In addition to terms defined in Title 27A

More information

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date:

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date: Stormwater Pollution Prevention Plan for: Heron River S Seneca Springs Way Star, ID 83669 208-939-6866 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite 100 Ogden, UT

More information

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE STORM WATER POLLUTION PREVENTION PLAN TEMPLATE Cover Page Certifications Project, Owner, Operator, SWPPP Preparer, Date, Project Dates Signed by RIDOT (Owner) and CONTRACTOR (as Operator) of Contents Introduction

More information

EPA s 2015 Multi-Sector General Permit (MSGP)

EPA s 2015 Multi-Sector General Permit (MSGP) EPA s 2015 Multi-Sector General Permit (MSGP) August 13, 2015 Suzanne Warner U.S. EPA, Region 1 617-918-1383 warner.suzanne@epa.gov David Gray, P.E. U.S. EPA, Region 1 617-918-1577 gray.davidj@epa.gov

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Stormwater Pollution Prevention Plan for: SWPPP Contact(s):

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): Stormwater Pollution Prevention Plan for: Interstate Concrete & Asphalt Co. Sandpoint Facility 1000 Baldy Mountain Road Sandpoint, ID 208-263-0538 SWPPP Contact(s): Interstate Concrete & Asphalt Co. Scott

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

Stormwater Preparing an Effective Industrial Stormwater Pollution Prevention Plan

Stormwater Preparing an Effective Industrial Stormwater Pollution Prevention Plan PDHonline Course C314 (6 PDH) Stormwater Preparing an Effective Industrial Stormwater Pollution Prevention Plan Instructor: Jeffrey R. Sotek, PE, CSP, CIH 2012 PDH Online PDH Center 5272 Meadow Estates

More information

City of Waukegan, Illinois

City of Waukegan, Illinois City of Waukegan, Illinois NPDES Phase II Stormwater Program Stormwater Pollution Prevention Plan Public Works Facility July 2011 City of Waukegan, Illinois Stormwater Pollution Prevention Plan for the

More information

POLLUTION PREVENTION TEAM MEMBER ROSTER. Leader: Members: (1) Title: Worksheet #1 Completed by: Title: Date: Title: Office Phone: Responsibilities:

POLLUTION PREVENTION TEAM MEMBER ROSTER. Leader: Members: (1) Title: Worksheet #1 Completed by: Title: Date: Title: Office Phone: Responsibilities: POLLUTION PREVENTION TEAM MEMBER ROSTER Worksheet #1 Leader: Responsibilities: Office Phone: Members: (1) Responsibilities: Office Phone: (2) Responsibilities: Office Phone: (3) Responsibilities: Office

More information

TPDES INDUSTRIAL STORMWATER MULTI-SECTOR GENERAL PERMIT (TXR050000) Lindsay Garza. Stormwater and Pretreatment Team Water Quality Division

TPDES INDUSTRIAL STORMWATER MULTI-SECTOR GENERAL PERMIT (TXR050000) Lindsay Garza. Stormwater and Pretreatment Team Water Quality Division TPDES INDUSTRIAL STORMWATER MULTI-SECTOR GENERAL PERMIT (TXR050000) Lindsay Garza Stormwater and Pretreatment Team Water Quality Division INDUSTRIAL STORMWATER PERMIT APPLICABILITY If a facility discharges

More information

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS ATTACHMENT C RISK LEVEL 1 REQUIREMENTS A. Effluent Standards [These requirements are the same as those in the General Permit order.] 1. Narrative Risk Level 1 dischargers shall comply with the narrative

More information

17 th Annual USEPA Region 6 Stormwater/MS4 Conference Hot Springs, AR Oct 20, 2015 Kerri McCabe, Inspector Supervisor, ADEQ Water Division Field

17 th Annual USEPA Region 6 Stormwater/MS4 Conference Hot Springs, AR Oct 20, 2015 Kerri McCabe, Inspector Supervisor, ADEQ Water Division Field 17 th Annual USEPA Region 6 Stormwater/MS4 Conference Hot Springs, AR Oct 20, 2015 Kerri McCabe, Inspector Supervisor, ADEQ Water Division Field Services/Inspection Branch Before We Get Started: Please

More information

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY 1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations

More information

DRAFT OHIO EPA INDUSTRIAL STORMWATER GENERAL PERMIT. I. Comparison with Existing General Permit (OHR000004)

DRAFT OHIO EPA INDUSTRIAL STORMWATER GENERAL PERMIT. I. Comparison with Existing General Permit (OHR000004) DRAFT OHIO EPA INDUSTRIAL STORMWATER GENERAL PERMIT I. Comparison with Existing General Permit (OHR000004) A. See attached comparison chart courtesy of Curt Spence, Spence Environmental Consulting, Inc.

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

NPDES Permit No.: AR , ARR00A412

NPDES Permit No.: AR , ARR00A412 July 7, 2011 Donnie Pretty Acme Brick Company- Perla Facility 3024 Acme Brick Plaza Fort Worth, Texas 76109 AFIN: 30-00008 NPDES Permit No.: AR0043354, ARR00A412 Dear Mr. Pretty: On June 16, 2011, I performed

More information

Annual Stormwater Pollution Prevention Training

Annual Stormwater Pollution Prevention Training Annual Stormwater Pollution Prevention Training Columbus Airport August 2018 Agenda 1. Regulatory Background 2. Regulated Activities 3. Roles and Responsibilities 4. Best Management Practices 5. Spill

More information

Construction Phasing Bad

Construction Phasing Bad Construction Entrances Construction Phasing Remove mud and dirt from the tires of construction vehicles before they enter a paved roadway. Propoerly size entrance BMP's for all anticipated vehicles. Make

More information

FACT SHEET. Owners/Operators of Splash Pads located in the State of Oklahoma

FACT SHEET. Owners/Operators of Splash Pads located in the State of Oklahoma FACT SHEET FOR THE GENERAL PERMIT TO DISCHARGE WASTEWATER FROM SPLASH PADS LOCATED OUTSIDE OF MS4 BOUNDARIES TO WATERS OF THE UNITED STATES UNDER THE OKLAHOMA POLLUTANT DISCHARGE ELIMINATION SYSTEM (OPDES)

More information

DANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN

DANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN DANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN EFFECTIVE JULY 1, 2016 TABLE OF CONTENTS TAB TITLE 1 DCC MS4 PROGRAM PLAN MCM 1: PUBLIC EDUCATION AND OUTREACH ON STORMWATER IMPACTS BMP 1.1: Implement

More information

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date:

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date: Stormwater Pollution Prevention Plan for: Ireland Pit NE Standish Road Mountain Home, ID 83647 208-939-6866 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite 100 Ogden,

More information

Three copies (one original and two copies) of your completed NOI should be submitted to:

Three copies (one original and two copies) of your completed NOI should be submitted to: To: Prospective Applicants for a Stormwater General Permit Associated with Construction Activity Greater than 5 Acres Attached is a Stormwater General Permit Associated with Construction Activity Greater

More information

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum LOUISIANA URBAN STORMWATER COALITION EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum SWPPP NOTIFICATION SIGN Post sign at entrance of site or areas where the public can easily access.

More information

Hay Bale Barriers are prohibited

Hay Bale Barriers are prohibited Amber McIntyre OKR10 General Permit If an acre or more will be disturbed, you must obtain an authorization to discharge under the OKR10 General Permit from the Oklahoma Department of Environmental Quality.

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE TITLE: NUMBER: ISSUER: Storm Water Discharges Associated with Construction and Land Disturbance Activities REF-6286.0 John Sterritt, Director Enrique G. Boull t, Chief Operating Officer Office of the Chief

More information

The Solution to Pollution is Dilution

The Solution to Pollution is Dilution The Solution to Pollution is Dilution The cornerstone of surface water quality protection in the United States gave EPA the authority to implement pollution control programs and... established the basic

More information

Industrial Storm Water Permitting in Ohio. The New Multi-sector General Permit (MSGP) September 2011

Industrial Storm Water Permitting in Ohio. The New Multi-sector General Permit (MSGP) September 2011 Industrial Storm Water Permitting in Ohio The New Multi-sector General Permit (MSGP) September 2011 Background Storm water discharges associated with industrial activity and larger construction sites are

More information

Stormwater Pollution Awareness. Leader s Guide and Quiz

Stormwater Pollution Awareness. Leader s Guide and Quiz 4230 Stormwater Pollution Awareness Leader s Guide and Quiz This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description

More information

NDDOT Erosion & Sediment Control Construction Course

NDDOT Erosion & Sediment Control Construction Course NDDOT Erosion & Sediment Control Construction Course Module 4: Stormwater Pollution Prevention Plan (SWPPP) 1 What s covered in this module? 1. What is a SWPPP 2. Important initial considerations that

More information

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants

More information

Landfills And The New Virginia Stormwater Management Program Regulations

Landfills And The New Virginia Stormwater Management Program Regulations Landfills And The New Virginia Stormwater Management Program Regulations Agenda Overview of regulatory programs Specific guidance from DEQ Quiz Questions and Answers Why Is this such a hot topic? NEW REGULATIONS

More information

Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities

Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works

More information

Nevada Department of Transportation (NDOT)

Nevada Department of Transportation (NDOT) Nevada Department of Transportation (NDOT) Stormwater Pollution Prevention Plan (SWPPP) Template for Construction Activities NDOT STORMWATER COMPLIANCE & ENFORCEMENT Table of Contents Page # STORM WATER

More information

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date:

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date: Stormwater Pollution Prevention Plan for: Ice Caves Pit 1495 N 460E Shoshone, ID 83352 208-939-6866 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite 100 Ogden, UT 84401

More information

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE Agenda Overview of regulatory program Specific guidance on: Mulching Composting

More information

Permit Number: 1200-COLS Effective: September 1, 2011 Expiration: August 31, 2016 Page 1 of 102

Permit Number: 1200-COLS Effective: September 1, 2011 Expiration: August 31, 2016 Page 1 of 102 Permit Number: 1200-COLS Effective: September 1, 2011 Expiration: August 31, 2016 Page 1 of 102 ISSUED TO: GENERAL PERMIT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM STORMWATER DISCHARGE PERMIT Department

More information

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN CONTENTS Introduction 1 The Challenge 5 The Solution 7 Tracking Progress 11 What can you do? 15 INTRODUCTION The DC Stormwater

More information

Solving Your Stormwater Compliance Challenges

Solving Your Stormwater Compliance Challenges Solving Your Stormwater Compliance Challenges Presented by: Tory R. Walker, PE, CFM, LEED GA, QISP Alex J. Smith, MS, EIT, QISP 11/03/2017 Welcome & Introductions Tory R. Walker, PE, CFM, LEED GA, QISP

More information

Development and Implementation of an Industrial Facility Stormwater Pollution Prevention Program in New England

Development and Implementation of an Industrial Facility Stormwater Pollution Prevention Program in New England Development and Implementation of an Industrial Facility Stormwater Pollution Prevention Program in New England NEWEA 2015 Annual Conference Technical Session 18 January 27, 2015 Introductions Charlie

More information

Common Plan SWPPP for

Common Plan SWPPP for Stormwater Pollution Prevention Plan Template (SWPPP) (This SWPPP Template is for the Only, and does NOT address SWPPP requirements found in the CGP.) Common Plan SWPPP for Date 1. Project Information

More information

Storm Water Pollution Prevention Plan For: SWPPP Contact(s): SWPPP Preparation Date:

Storm Water Pollution Prevention Plan For: SWPPP Contact(s): SWPPP Preparation Date: Storm Water Pollution Prevention Plan For: Dingle 1895 South Dingle Road Montpelier, ID 83254 208-939-6866 SWPPP Contact(s): Idaho Materials and Construction Patrick Clark 2350 S 1900 W Suite 100 Ogden,

More information

Stormwater Pollution Prevention Plan for:

Stormwater Pollution Prevention Plan for: Stormwater Pollution Prevention Plan for: Lemon Creek Valley Juneau, Alaska Under the NPDES 2008 Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activities: Permit No.

More information

Outdoor Equipment Operations SC-32

Outdoor Equipment Operations SC-32 Description Outside process equipment operations and maintenance can contaminate stormwater runoff. Activities, such as grinding, painting, coating, sanding, degreasing or parts cleaning, landfills and

More information

Stormwater Management - Basic Overview for Municipal Employees

Stormwater Management - Basic Overview for Municipal Employees Stormwater Management - Basic Overview for Municipal Employees October 13 th, 2011 Scott D. Cook Environmental Program Specialist 2 NYSDEC - Region 7 Syracuse Division of Water 315-426-7502 sdcook@gw.dec.state.ny.us

More information

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 606. OKLAHOMA POLLUTANT DISCHARGE ELIMINATION SYSTEM (OPDES) STANDARDS

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 606. OKLAHOMA POLLUTANT DISCHARGE ELIMINATION SYSTEM (OPDES) STANDARDS TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 606. OKLAHOMA POLLUTANT DISCHARGE ELIMINATION SYSTEM (OPDES) STANDARDS SUBCHAPTER 1. INTRODUCTION 252:606-1-1. Purpose (a) Intent. This Chapter sets

More information

Appendix A. Definitions, Abbreviations and Acronyms

Appendix A. Definitions, Abbreviations and Acronyms Page 109 of 146 Appendix A Definitions, Abbreviations and Acronyms Page 110 of 146 Appendix A. Definitions, Abbreviations, and Acronyms (for the purposes of this permit). Action Area all areas to be affected

More information

DIVISION of WATER QUALITY NDPDES PROGRAM

DIVISION of WATER QUALITY NDPDES PROGRAM DIVISION of WATER QUALITY NDPDES PROGRAM THIS PAGE IS NOT PART OF ANY SWPPP CONSTRUCTION Storm Water Pollution Prevention Plan * SWPPP Template (2016-01) A SWPPP must be prepared and implemented for all

More information

Suggested Best Management Practices (BMPs)

Suggested Best Management Practices (BMPs) Suggested Best Management Practices (BMPs) Preface The purpose of this Best Management Practices (BMP) Manual is to help educate and instruct on ways to reduce stormwater pollution and help prevent it

More information

Developing your Storm Water Pollution Prevention Plan

Developing your Storm Water Pollution Prevention Plan MARYLAND DEPARTMENT OF THE ENVIRONMENT Water Management Administration Wastewater Permits Program 1800 Washington Blvd. Suite 455 Baltimore Maryland 21230 (410) 537-3323 1-800-633-6101 http://www.mde.state.md.us

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

FACILITY TYPE: 2 - Industrial FACILITY EVALUATION RATING: N

FACILITY TYPE: 2 - Industrial FACILITY EVALUATION RATING: N FACILITY INFORMATION NAME: Del-Tin Fiber, LLC LOCATION: 757 Del-Tin Highway CITY: El Dorado, AR RESPONSIBLE OFFICIAL NAME: / TITLE Darrin Cannon / Plant Manager COMPANY: Del-Tin Fiber MAILING ADDRESS:

More information

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706) Memo To: From: cc: Local Issuing Authorities, Design Professionals, Plan Reviewers and Other Interested Parties The Georgia Soil and Water Conservation Commission and the Georgia Environmental Protection

More information

Stormwater Outreach for Regional Municipalities (STORM) Overview. Maintaining an Updated SWPPP Site Map Required Elements Good Examples Bad Examples

Stormwater Outreach for Regional Municipalities (STORM) Overview. Maintaining an Updated SWPPP Site Map Required Elements Good Examples Bad Examples Stormwater Outreach for Regional Municipalities (STORM) Kevin Boesch, CPESC Overview Maintaining an Updated SWPPP Site Map Required Elements Good Examples Bad Examples Inspection Frequencies Inspection

More information

New Jersey Department of Environmental Protection Division of Water Quality Bureau of Nonpoint Pollution Control FACT SHEET

New Jersey Department of Environmental Protection Division of Water Quality Bureau of Nonpoint Pollution Control FACT SHEET New Jersey Department of Environmental Protection Division of Water Quality Bureau of Nonpoint Pollution Control FACT SHEET Masterfile #: Varies PI #: Varies This fact sheet sets forth the principal facts

More information

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date:

Stormwater Pollution Prevention Plan for: SWPPP Contact(s): SWPPP Preparation Date: Stormwater Pollution Prevention Plan (SWPPP) Stormwater Pollution Prevention Plan for: CUNNINGHAM STATION 986 SH 483 (12 Mi. W of Hobbs On US Hwy 62/180, then 1 Mi. N on Hwy 483) Hobbs, NM 88240 Lea County

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index.

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index. Stormwater: General Inspection Checklist Department: Environmental Protection Program: Stormwater This inspection checklist can be used by Stormwater Division or Environmental Services Coordinator to Conduct

More information

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS C3.1 Purpose... C3-1 C3.2 Responsibility of Implementation... C3-2 C3.3

More information

Inspection Requirements of the CGP 2013

Inspection Requirements of the CGP 2013 Inspection Requirements of the CGP 2013 Stormwater Outreach for Regional Municipalities (STORM) Dennis L. Turner Surface Water Programs Consultant Arizona Department of Environmental Quality (ADEQ) dt1@azdeq.gov

More information

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre Approved by: City of Camarillo Stormwater Program Manager Date: CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre Project Name: Project #: Project Location:

More information