APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING

Size: px
Start display at page:

Download "APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING"

Transcription

1 APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING

2 Source: TRCA/CVC LID Plannign and Design Guide (Version 1.0)

3 Figure Schematic of perforated pipe system integrated with a grass swale Source: Paul Wisner and Associates, 1994

4

5 Infiltration Sizing Canterbury GC Redevelopment Project Number: 1704 Date: September 2015 Designer: ETCK Amount Units Remarks Phosphorus Budget Infiltration Volume Required Total Site Area Total Average Annual Rainfall 758 mm Burketon McLaughlin, Ontario Roof Areas to Soakaways Average roof area m 2 Number of lots 124 Roof Area Drainage to Infiltration m 2 Rainfall depth to soakaway 20 mm Soakaway pit storage volume per lot 4.48 m 3 Total soakaway pit storage volume m 3 Represents 90% of average annual rainfall volume, per Figure 1a from the Wet Weather Flow Guideline - City of Toronto Therefore, soakaways infiltrate 90% of average annual rainfall depth Total Annual rainfall on roofs m 3 Annual Rainfall infiltrated from roofs to soakaways m 3 Preliminary Soakaway Pit Sizing Per Lot Porosity Coefficient 0.4 Clear Stone Media Depth 1.0 m Width 2.5 m Length 3.2 m Provided Volume 3.20 m 3 Road Areas to Road Infiltration Trenches (Street E) Road right-of-way (ROW) area 0.57 ha per draft plan of subdivsiion Road right-of-way (ROW) length 240 m per draft plan of subdivsiion Average ROW imperviousness 75% Driveways, pavement, curbs, sidewalk ROW impervious area 4275 m 2 " Driveways outside of right-of-way 1116 m 2 31 lots with 6m x 6m driveways Total Impervious area to storm sewers 5391 m 2 Rainfall depth to road infiltration trenches 20 mm Total road infiltration trench storage volume m 3 Therefore, road infiltration trenches will infiltrate 90% of average annual rainfall depth Total Annual rainfall (impervious areas to storm sewer) 4086 m 3 Represents 90% of average annual rainfall volume, per Figure 1a from the Wet Weather Flow Guideline - City of Toronto Annual Rainfall infiltrated from ROW to infiltration trenches 3678 m 3 rainfall event 90% of average annual rainfall since capturing 20 mm P:\1704 Geranium Simcoe Street Port Perry\Design\SWM\FSP\1704-p budget infiltration.xls

6 Infiltration Sizing Canterbury GC Redevelopment Project Number: 1704 Date: September 2015 Designer: ETCK Preliminary Road Infiltration Trench Sizing Required Infiltration trench volume per road length 0.45 m 3 /m Porosity Coefficient 0.4 Clear Stone Media Depth 1.20 m Width 1.0 m Length 1.0 m Provided Volume per road length 0.48 m 3 /m Road Areas to Road Infiltration Trenches (Street C Window Road Portion, Adjacent to Simcoe Road) Road right-of-way (ROW) area 0.4 ha per draft plan of subdivsiion Infiltration trench length 150 m Block 130 Average ROW imperviousness 75% Driveways, pavement, curbs, sidewalk ROW impervious area 3000 m 2 " Driveways outside of right-of-way 324 m 2 9 lots with 6m x 6m driveways Total Impervious area to storm sewers 3324 m 2 Rainfall depth to road infiltration trenches 20 mm Total road infiltration trench storage volume 66.5 m 3 Therefore, road infiltration trenches will infiltrate 90% of average annual rainfall depth Total Annual rainfall (impervious areas to storm sewer) 2520 m 3 Represents 90% of average annual rainfall volume, per Figure 1a from the Wet Weather Flow Guideline - City of Toronto Annual Rainfall infiltrated from ROW to infiltration trenches 2268 m 3 rainfall event 90% of average annual rainfall since capturing 20 mm Preliminary Road Infiltration Trench Sizing Required Infiltration trench volume per road length 0.44 m 3 /m Porosity Coefficient 0.4 Clear Stone Media Depth 1.20 m Width 1.0 m Length 1.0 m Provided Volume per road length 0.48 m 3 /m Road Areas to Road Infiltration Trenches (Street A Adjacent to lot 5) Road right-of-way (ROW) area 0.33 ha per draft plan of subdivsiion Infiltration trench length 40 m Adjacent to Lot 5 Average ROW imperviousness 75% Driveways, pavement, curbs, sidewalk ROW impervious area 2475 m 2 " Driveways outside of right-of-way 324 m 2 9 lots with 6m x 6m driveways Total Impervious area to storm sewers 2799 m 2 Rainfall depth to road infiltration trenches 20 mm Total road infiltration trench storage volume m 3 Therefore, road infiltration trenches will infiltrate 90% of average annual rainfall depth Total Annual rainfall (impervious areas to storm sewer) 2122 m 3 Represents 90% of average annual rainfall volume, per Figure 1a from the Wet Weather Flow Guideline - City of Toronto Annual Rainfall infiltrated from ROW to infiltration trenches 1909 m 3 rainfall event 90% of average annual rainfall since capturing 20 mm Preliminary Road Infiltration Trench Sizing Required Infiltration trench volume per road length 1.40 m 3 /m Porosity Coefficient 0.4 Clear Stone Media Depth 2.00 m Width 1.8 m Length 1.0 m Provided Volume per road length 1.44 m 3 /m Total Annual Rainfall Volume Infiltrated 7855 m 3 budget) (Excludes soakaways, as already included in water P:\1704 Geranium Simcoe Street Port Perry\Design\SWM\FSP\1704-p budget infiltration.xls

7 Effective Drainage Area to Stormwater Filter Canterbury GC Redevelopment Project Number: 1704 Date: September 2015 Designer: ETCK Catchment 222b - To stormwater filter Total Catchment Area 4.41 ha Total Roof Area 1.29 ha (assumed roof area) Remaining Total Catchment Area 3.12 ha Of remaining Catchment Area: ROW Area % impervious ROW Area impervious-ha Driveways (63 driveways, 6 m x 6 m) 1.30 impervious-ha Weight Runoff Coefficeint for filter sizing Area C CxA Impervious Area Pervious Areas P:\1704 Geranium Simcoe Street Port Perry\Design\SWM\FSP\1704-p budget infiltration.xls

8 Determining Number of Cartridges for Flow Based Systems Date 25/09/2015 Black Cells = Calculation Site Information Project Name Canterbury GC Redevelopment Project Location Port Perry, ON OGS ID MFS Drainage Area, Ad 7.71 ac (3.12 ha) Impervious Area, Ai 2.97 ac Pervious Area, Ap 4.74 % Impervious 39% Runoff Coefficient, Rc 0.50 Treatment storm flow rate, Q treat 1.99 cfs (56.4 L/s) Peak storm flow rate, Q peak TBD cfs Filter System Filtration brand MFS Cartridge height 22 in Specific Flow Rate 1.67 gpm/ft 2 Flow rate per cartridge gpm SUMMARY Number of Cartridges 64 Media Type Perlite Annual TSS Removal 80% Percent Runoff Capture 90% Recommend (2) MFS814 vaults installed in parallel with bypass 2012 CONTECH Engineered Solutions conteches.com 200 Enterprise Drive Scarborough, ME Phone Fax of 1

9

10 FOR INFORMATIONAL PURPOSES ONLY NOT INTENDED AS A CONSTRUCTION DOCUMENT - BYPASS AND JUNCTION STRUCTURES MAY OR MAY NOT BE SUPPLIED BY CONTECH - MFS SYSTEM 5'-0" MIN. RECOMMENDED BYPASS MANHOLE JUNCTION MANHOLE BYPASS TO OUTFALL 5'-0" MIN. RECOMMENDED BYPASS WEIR LENGTH AND CREST ELEVATION TO BE DETERMINED BY CONTECH ENGINEERED SOLUTIONS LLC MFS SYSTEM ACTUAL ORIENTATION AND LAYOUT MAY VARY DUE TO SITE SPECIFIC CONSIDERATIONS MEDIA FILTRATION SYSTEM MFS THIS PRODUCT IS PROTECTED BY U.S. PATENT: 6,998,038; RELATED FOREIGN PATENTS, OR OTHER PATENTS PENDING. The design and information shown on this drawing is provided as a service to the project owner, engineer and contractor by Contech Engineered Solutions LLC ("Contech"). Neither this drawing, nor any part thereof, may be used, reproduced or modified in any manner without the prior written consent of Contech. Failure to comply is done at the user's own risk and Contech expressly disclaims any liability or responsibility for such use. If discrepancies between the supplied information upon which the drawing is based and actual field conditions are encountered as site work progresses, these discrepancies must be reported to Contech immediately for re-evaluation of the design. Contech accepts no liability for designs based on missing, incomplete or inaccurate information supplied by others Enterprise Dr ive, Scar borough, ME FAX TYPICAL PARALLEL BYPASS LAYOUT MFS STORMWATER TREATMENT SYSTEM DATE: 3/25/15 SCALE: NONE PROJECT No.: SEQ. No.: N/A DRAWN: SDS CHECKED: ---

11 ECHELON ENVIRONMENTAL 505 HOOD ROAD UNIT 26 MARKHAM, ON L3R 5V6 P E info@echleonenvironmental.ca Annual TSS Removal Efficiency Using Historical Weather Data Area (ha) = 2.12 Engineer: SCS Consulting Group Ltd. C = 0.45 Contact: Erich Knechtel, P. Eng. Rational Conv converts from m3/s to l/s Report Date: 14-Sep-15 CDS Model: PMSU2025_5 Flowrate = 45 l/s Site: Canterbury GC Redevelopment Weather Station: Location: Port Perry, ON PSD: FINE OGS ID: Area 3 Rainfall Intensity Range (mm/hr) Total Rainfall* (mm) Rainfall intensity mm/hr (I) Runoff Rate Per The Rational Method (l/s) Q = C x I x A x 2.77 Rainfall Volume % CDS Flow Rate (l/s) Operating Rate Efficiency** (%) Relative Efficiency (%) % % % % % % % % % % % % % % % % % % % % % % TSS Removal: 88.9% Efficiency Adjustment: 6.5% Net Annual TSS Removal: 82.4% Net Annual Volume Treated: 96.8% * Historical Data including years 1982 to 1998 from Ontario Climate Centre ** CDS Efficiency based on Washington Department of Ecology TAPE Water Quality Control Test Protocol *** Adjustment for use of 60 minute time step data on site with a time of concentration less than 30 minutes

12

13

14 ECHELON ENVIRONMENTAL 505 HOOD ROAD UNIT 26 MARKHAM, ON L3R 5V6 P E info@echleonenvironmental.ca Annual TSS Removal Efficiency Using Historical Weather Data Area (ha) = 7.92 Engineer: SCS Consulting Group Ltd. C = 0.45 Contact: Erich Knechtel, P. Eng. Rational Conv converts from m3/s to l/s Report Date: 24-Sep-15 CDS Model: PMSU4040_8 Flowrate = 170 l/s Site: Canterbury GC Redevelopment Weather Station: Location: Port Perry, ON PSD: FINE OGS ID: Area 1 & 2 Rainfall Intensity Range (mm/hr) Total Rainfall* (mm) Rainfall intensity mm/hr (I) Runoff Rate Per The Rational Method (l/s) Q = C x I x A x 2.77 Rainfall Volume % CDS Flow Rate (l/s) Operating Rate Efficiency** (%) Relative Efficiency (%) % % % % % % % % % % % % % % % % % % % % % % TSS Removal: 89.0% Efficiency Adjustment: 6.5% Net Annual TSS Removal: 82.5% Net Annual Volume Treated: 96.8% * Historical Data including years 1982 to 1998 from Ontario Climate Centre ** CDS Efficiency based on Washington Department of Ecology TAPE Water Quality Control Test Protocol *** Adjustment for use of 60 minute time step data on site with a time of concentration less than 30 minutes

15

16

APPENDIX E Drainage and Stormwater Management Report

APPENDIX E Drainage and Stormwater Management Report APPENDIX E Drainage and Stormwater Management Report Drainage and Stormwater Management Report Courtneypark Drive East Class EA & Preliminary Design Prepared for: City of Mississauga Prepared by: Stantec

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

Rated for 80% TSS Removal by Metro Nashville Water Services

Rated for 80% TSS Removal by Metro Nashville Water Services This is a regional document for Nashville, TN TN Nashville, TN Stormwater Design Guide Rated for 80% TSS Removal by Metro Nashville Water Services The is a modular, high-rate stormwater filtration technology

More information

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Prepared for The C and C Group of Companies Attention: Mr. Bob Cousins

More information

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and

More information

Simple Method for Estimating Phosphorus Export

Simple Method for Estimating Phosphorus Export Appendix L Simple Method for Estimating Phosphorus Export 1. The Simple Method The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. The method

More information

WinSLAMM v Program Modifications Final, 3/16/19

WinSLAMM v Program Modifications Final, 3/16/19 WinSLAMM v 10.4.1 Program Modifications Final, 3/16/19 1. Printing Set up a printing option for.pdf files for input data and output summary data. 2. Added the Pipe input data to the printing input data

More information

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES

More information

Applying the Water Quality Volume

Applying the Water Quality Volume Applying the Water Quality Volume Justin Reinhart, PE Division of Surface Water Northeast Ohio Stormwater Training Council Cleveland, Ohio & Richfield, Ohio July 12, 2018 July 25, 2018 Post-Construction

More information

WinSLAMM v Program Modifications Final, 12/12/17

WinSLAMM v Program Modifications Final, 12/12/17 WinSLAMM v 10.3.4 Program Modifications Final, 12/12/17 1. Corrected an error in the Biofilter caused by an improperly defined variable that caused an overflow during very long model runs. 2. Corrected

More information

ENGINEERED SOLUTIONS

ENGINEERED SOLUTIONS ENGINEERED SOLUTIONS CDS Solutions Guide Scan Me! Continuous Deflective Separation - CDS Superior Stormwater Trash and Sediment Removal The CDS is a swirl concentrator hybrid technology that uses continuous

More information

ENGINEERED SOLUTIONS. ChamberMaxx. Open-Bottom Infiltration

ENGINEERED SOLUTIONS. ChamberMaxx. Open-Bottom Infiltration ChamberMaxx Open-Bottom Infiltration The experts you need to solve your stormwater challenges Contech is the leader in stormwater solutions, helping engineers, contractors and owners with infrastructure

More information

WinSLAMM v 10.0 User s Guide. Stormwater Control Devices

WinSLAMM v 10.0 User s Guide. Stormwater Control Devices WinSLAMM v 10.0 User s Guide Stormwater Control Devices Control Devices Summary Biofiltration Catch Basins Cisterns Media Filters Other Control Device Porous Pavement Filter Strips Street t Cleaning Grass

More information

low impact development demonstration project

low impact development demonstration project NORTH HUMBER EXTENSION NEIGHBOURHOOD - KLEINBURG TMIG TRIECA Conference 2012 March 27 and 28 The International Centre Mississauga 8800 Dufferin Street Suite 200 Vaughan ON CA L4K 0C5 905 738 5700 www.tmig.ca

More information

ENGINEERED SOLUTIONS. CDS Guide Operation, Design, Performance and Maintenance

ENGINEERED SOLUTIONS. CDS Guide Operation, Design, Performance and Maintenance ENGINEERED SOLUTIONS CDS Guide Operation, Design, Performance and Maintenance CDS Design Basics Using patented continuous deflective separation technology, the CDS system screens, separates and traps debris,

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

VERIFICATION STATEMENT

VERIFICATION STATEMENT Verification Statement Verification Statement Verification Statement VERIFICATION STATEMENT GLOBE Performance Solutions Verifies the performance of Filterra Bioretention System Distributed and marketed

More information

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Jill Bicknell, P.E., EOA, Inc. Presentation Overview Sizing/Design of Self Treating and Self Retaining Areas

More information

Appendix E.2 Preliminary Hydrology Report

Appendix E.2 Preliminary Hydrology Report Appendix E.2 Preliminary Hydrology Report PRELIMINARY HYDROLOGY STUDY HARVARD WESTLAKE SCHOOL PARKING STRUCTURE 3700 Coldwater Canyon North Hollywood, CA 91604 KPFF Job # 109046 August 12, 2013 CLIENT:

More information

PERKFILTER. Design Guide

PERKFILTER. Design Guide PERKFILTER Design Guide TABLE OF CONTENTS Description Function Treatment Processes System Hydraulics System Sizing PerkFilter Configurations Inspection and Maintenance Requirements Verification and Approvals

More information

LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT

LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT 2017 LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT 1 Low Impact Development Interim Guidance City of Barrie 1 Introduction This document was prepared to provide interim design guidance and the requirements

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

Credit Calculations and Calculator Functions

Credit Calculations and Calculator Functions MIDS Work Group Meeting May 20, 2010 Credit Calculations and Calculator Functions p-gen3-13c Today s Goals The Foundation for the Credits & Calculator Discuss proposed calculations Performance goal requirement

More information

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By: Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph

More information

Water Resources Management Plan

Water Resources Management Plan B u r n s v i l l e M i n n e s o t a Water Resources Management Plan - Volume Control / Infiltration Worksheet This Appendix contains a worksheet and related information that can be used for evaluating

More information

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031 1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report Marshall Homes Project # E15031 August 2016 Table of Contents 1.0 Introduction and Background... 1 2.0 Existing

More information

Manufactured Water Quality Solutions

Manufactured Water Quality Solutions Manufactured Water Quality Solutions Problem. Solution. Parking Lot Project Scenario #1 Parking Lot Expansion with a net increase of impervious area Scenario #2 Parking Lot Redevelopment with no increase

More information

The proponent is responsible for meeting all approval requirements from relevant agencies.

The proponent is responsible for meeting all approval requirements from relevant agencies. 5.0 INFILL DEVELOPMENT 5.1 General Infill projects can range in size from a single lot to the complete redevelopment of significantly larger areas. Many forms of infill development can be more intensive

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario Report No. 13030-SWM February 6, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY

Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY PRE POST (ACTUAL) WHICH IS THE APPROPRIATE PERFORMANCE STANDARD? Post = 90% of Pre vs. 55% N and 80% P reduction

More information

WinSLAMM v 10 Theory and Practice

WinSLAMM v 10 Theory and Practice WinSLAMM v 10 Theory and Practice Using WinSLAMM v10 to Meet Urban Stormwater Management Goals 1 We will cover... WinSLAMM Purpose, History and Unique Features Model Applications Small Storm Hydrology

More information

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Should vs. Must In Chapter 4, should means should, and must means must. Poorly Drained Soils Well-Drained Soils Flat Terrain

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Project: Developer/Designer: Reviewer:

Project: Developer/Designer: Reviewer: City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;

More information

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303) January 20, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter

More information

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development

More information

APPENDIX L Hydrology and Stormwater Pond Analysis

APPENDIX L Hydrology and Stormwater Pond Analysis APPENDIX L Hydrology and Stormwater Pond Analysis This page is left intentionally blank. Hydrology and Stormwater Pond Analysis Liesch Associates, Inc. June 1, 2012 Minneapolis-St. Paul International Airport

More information

DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN)

DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN) DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN ( PLAN) ALAMITOS BEACH CONCESSION BUILDING 780 E. SHORELINE DRIVE LONG BEACH, CALIFORNIA Prepared For: Long Beach Public Works 333 W. Ocean

More information

Hutchinson. Environmental Sciences Ltd. Preliminary Phosphorus Budget for the Proposed Redevelopment of the Canterbury Golf Course

Hutchinson. Environmental Sciences Ltd. Preliminary Phosphorus Budget for the Proposed Redevelopment of the Canterbury Golf Course Hutchinson Environmental Sciences Ltd. Preliminary Phosphorus Budget for the Proposed Redevelopment of the Canterbury Golf Course Prepared for: Canterbury Land Development Corporation Job #: J150033 September

More information

ENGINEERED SOLUTIONS

ENGINEERED SOLUTIONS ENGINEERED SOLUTIONS Hydrodynamic Separation Solutions Guide Scan Me! Hydrodynamic Separation Selecting the Right Stormwater Solution Just Got Easier... It s simple to choose the right stormwater solution

More information

Stantec Consulting Ltd Hagey Boulevard, Waterloo ON N2L 0A4

Stantec Consulting Ltd Hagey Boulevard, Waterloo ON N2L 0A4 Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 17, 2017 File: 1614-13551/29 Attention: Ms. Nancy Shoemaker Black, Shoemaker, Robinson and Donaldson Ltd. Surveyors 351 Speedvale

More information

ENGINEERED SOLUTIONS

ENGINEERED SOLUTIONS ENGINEERED SOLUTIONS Hydrodynamic Separation Solutions Guide Scan Me! Hydrodynamic Separation Selecting the Right Stormwater Solution Just Got Easier... It s simple to choose the right stormwater solution

More information

Dunpar Developments Inc.

Dunpar Developments Inc. Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site

More information

Operation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS

Operation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS Operation & Maintenance (OM) Manual v01 Bioretention Systems ENGINEERED SOLUTIONS Bioretention Systems Table of Contents Overview Filterra General Description Filterra Schematic Basic Operations Design

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of

More information

Water Resources Management Plan Appendix B

Water Resources Management Plan Appendix B B u r n s v i l l e M i n n e s o t a Water Resources Management Plan Appendix B Appendix B Page B-1 Burnsville, Minnesota STORM WATER LOW-IMPACT DEVELOPMENT GUIDE MANUAL SHORT ELLIOTT HENDRICKSON INC.

More information

Modelling and Analysis of EES Systems Using SWMM

Modelling and Analysis of EES Systems Using SWMM Planning and Design of a Right-of-Way LID (Etobicoke Exfiltration System) July 24 th 2015 Toronto, Ontario, Canada ling and Analysis of EES Systems Using SWMM Darko Joksimovic Department of Civil Engineering,

More information

Final Drainage Report

Final Drainage Report Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite

More information

Model Results Operation and Maintenance (O& M) Results Cost-Benefit Analysis Results Conclusions

Model Results Operation and Maintenance (O& M) Results Cost-Benefit Analysis Results Conclusions BMP Performance and Outline Background Model Results Operation and Maintenance (O& M) Results Results Conclusions Melissa Baker, Water Resource Technician Capitol Region Watershed District, St. Paul, MN

More information

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual

More information

PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO Job No. 17232 ENGINEERING REPORT Prepared For: 219 Toronto Street South Developments Inc. 150 Woodbine Avenue Suite 3005 Toronto,

More information

Remediation and Treatment Technology Development and Support for DOE Oak Ridge Office: XPSWMM Model Configuration

Remediation and Treatment Technology Development and Support for DOE Oak Ridge Office: XPSWMM Model Configuration TECHNICAL PROGRESS REPORT Remediation and Treatment Technology Development and Support for DOE Oak Ridge Office: Date submitted: September 14, 2012 Principal Investigators: Leonel E. Lagos, Ph.D., PMP

More information

Using WinSLAMM v10 to Predict Stormwater Pollutant Loads and Evaluate LID Management Approaches Overview

Using WinSLAMM v10 to Predict Stormwater Pollutant Loads and Evaluate LID Management Approaches Overview Evaluating CSO Management Goals through Monitoring and Modeling of Green Infrastructure: Kansas City EPA National Demonstration Project (and some comments from on going Cincinnati Projects) Using WinSLAMM

More information

Attachment 1. Manufactured Treatment Device (MTD) Registration

Attachment 1. Manufactured Treatment Device (MTD) Registration Attachment 1 Manufactured Treatment Device (MTD) Registration 1. Manufactured Treatment Device Name: BioPod Biofilter System with StormMix Media 2. Company Name: Oldcastle Precast, Inc., DBA Oldcastle

More information

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 November 17, 2017 Ms. Sheila Page, Town Planner 101 Main

More information

Alternative Analysis Cherry Creek Reservoir West Boat Ramp Parking Lot Water Quality Improvements

Alternative Analysis Cherry Creek Reservoir West Boat Ramp Parking Lot Water Quality Improvements January 2012 Submitted to: Cherry Creek Basin Water Quality Authority 8390 E Crescent Parkway, Suite 500 Greenwood Village, CO 80111 Submitted by: AMEC Earth & Environmental, Inc. 2000 S. Colorado Blvd.,

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP Stormwater and LEED Vancouver LEED User s Group May 27, 2005 Craig Kipkie, M.Sc., P.Eng, LEED AP Outline Sustainable Sites 2 Stormwater credits SSc6.1 SSc6.2 Synergies with other Credits Case Study How

More information

Conditional Interim Certification Findings

Conditional Interim Certification Findings NJDEP Technology Certification Program: Conditional Interim Certification Findings Bureau of Sustainable Communities & Innovative Technologies Division of Science, Research & Technology 401 E State Street,

More information

ENGINEERED SOLUTIONS. The Stormwater Management StormFilter. Solutions Guide

ENGINEERED SOLUTIONS. The Stormwater Management StormFilter. Solutions Guide ENGINEERED SOLUTIONS The Stormwater Management StormFilter Solutions Guide Stormwater Filtration Selecting the right stormater solution just got easier... It s simple to choose the right low impact development

More information

ENGINEERED SOLUTIONS

ENGINEERED SOLUTIONS ENGINEERED SOLUTIONS The Stormwater Management Stormfilter Solutions Guide Scan Me! Stormwater Filtration Selecting the right stormater solution just got easier... It s simple to choose the right low impact

More information

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report

More information

Philadelphia Water Department. Stormwater Regulations Update. BIA & Fox Rothschild LLP

Philadelphia Water Department. Stormwater Regulations Update. BIA & Fox Rothschild LLP Philadelphia Water Department Stormwater Regulations Update BIA & Fox Rothschild LLP May 13, 2015 1 Overview Upcoming Regulatory Changes Procedural Improvement Stormwater Management Guidance Manual v3.0

More information

North Allston Sub watershed Restoration Plan. Green Infrastructure Concept Plan and Strategies

North Allston Sub watershed Restoration Plan. Green Infrastructure Concept Plan and Strategies North Allston Sub watershed Restoration Plan Green Infrastructure Concept Plan and Strategies Study Area for Green Infrastructure Retrofits Environmental Design Goals for Study Area: Manage stormwater

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental Industrial Health & Safety (613) 860-0923 210 Prescott Street P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

STORMFILTER THE MOST PROVEN. stormwater filtration system

STORMFILTER THE MOST PROVEN. stormwater filtration system STORMFILTER THE MOST PROVEN stormwater filtration system SOLVES THE MOST STRINGENT PROBLEMATICS in stormwater treatment The evolution and implementation of a more stricter regulatory framework is gradually

More information

Introduction to Storm Sewer Design

Introduction to Storm Sewer Design A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream

More information

968 St. Laurent Bulevard, Ottawa. Stormwater Management Report. Prepared for: Eric Haar Architect Inc.

968 St. Laurent Bulevard, Ottawa. Stormwater Management Report. Prepared for: Eric Haar Architect Inc. 968 St. Laurent Bulevard, Ottawa Stormwater Management Report Prepared for: Eric Haar Architect Inc. March 2012 968 St. Laurent Blvd. Ottawa Storm Water Management Report Table of Contents 1. Introduction...

More information

Stormwater Drainage Criteria Manual. City Of Clearwater Engineering Department Effective July 1, 2015

Stormwater Drainage Criteria Manual. City Of Clearwater Engineering Department Effective July 1, 2015 Stormwater Drainage Criteria Manual City Of Clearwater Engineering Department Effective July 1, 2015 Engineering Department STORMWATER DRAINAGE CRITERIA MANUAL Table of Contents STORMWATER DRAINAGE CRITERIA

More information

CASE STUDIES: BMPTRAINS MODEL

CASE STUDIES: BMPTRAINS MODEL CASE STUDIES: BMPTRAINS MODEL B Y : M A R T Y W A N I E L I S T A A N D E R I C L I V I N G S T O N August, 2016 Escambia County ACKNOWLEDGEMENTS The Low Impact Design BMP workshops were presented on August

More information

Conservation Design Approach for New Development

Conservation Design Approach for New Development Effective Best Management Practices in Urban Areas Chad Christian City of Tuscaloosa, AL Robert Pitt University of Alabama Tuscaloosa, AL Energy Independence and Security Act of 2007 signed into Law on

More information

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

9220 Wightman Road, Suite 120 Montgomery Village, Maryland Phone Fax

9220 Wightman Road, Suite 120 Montgomery Village, Maryland Phone Fax 9220 Wightman Road, Suite 0 Montgomery Village, Maryland 20886-79 Engineers Planners Landscape Architects Surveyors Phone 301.670.0840 Fax 301.948.0693 www.mhgpa.com STORMWATER MANAGEMENT SUMMARY Project:

More information

NJ Future CSO Permittee Meeting

NJ Future CSO Permittee Meeting NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create

More information

ENGINEERED SOLUTIONS. low impact development application guide

ENGINEERED SOLUTIONS. low impact development application guide ENGINEERED SOLUTIONS low impact development application guide Lower Your Impact with Contech. Our flexible, customizable systems can be easily integrated onto your site to meet Low Impact Development (LID)

More information

Chapter 12 - Emerging Technologies

Chapter 12 - Emerging Technologies Chapter 12 - Emerging Technologies This Chapter addresses emerging (new) technologies that have not been evaluated in sufficient detail to be acceptable for general usage in new development or redevelopment

More information

Appendix A. Compliance Calculator Guidance

Appendix A. Compliance Calculator Guidance Compliance Calculator Guidance Appendix A Appendix A. Compliance Calculator Guidance A.1 Introduction The Center for Watershed Protection created the compliance calculator spreadsheet to allow a designer

More information

4.4.6 Underground Detention

4.4.6 Underground Detention 4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention

More information

WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FINAL

WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FINAL WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FINAL Prepared for the Northern Territory Department of Planning and Infrastructure GPO Box 2520 Darwin NT 0801 May 2009 This document has been

More information

LID PLANTER BOX MODELING

LID PLANTER BOX MODELING LID PLANTER BOX MODELING Clear Creek Solutions, Inc., 2010 Low Impact Development (LID) planter boxes are small, urban stormwater mitigation facilities. They are rain gardens in a box. WWHM4 provides the

More information

Section 1 - Introduction

Section 1 - Introduction VERSION 1.0 Stormwater Solutions for Residential Sites Section 1 - Introduction Prepared for EcoWater Solutions A Department of Waitakere City Council 113 Central Park Drive Henderson WAITAKERE CITY November

More information

Chapter 10 Infiltration Measures

Chapter 10 Infiltration Measures Chapter 10 Infiltration Measures Definition: A sub-surface water filtration system designed to allow water to infiltrate into surrounding soils. Purpose: To encourage stormwater to infiltrate into surrounding

More information

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech

More information

Landfill design General principles

Landfill design General principles Landfill design General principles Average height of a landfill should be at least 15 m Each section (cell) should accommodate waste to be landfilled during 5 years period Sections/cells should be hydraulically

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers

More information

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI

More information

Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts

Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts Maine Stormwater Conference (Portland, ME, 2015) Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts Park Jongpyo, Lee Kyoungdo: HECOREA. INC Shin Hyunsuk: Busan National University

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON

More information

Hydrologic Assessment of LID Honda Campus, Markham, ON

Hydrologic Assessment of LID Honda Campus, Markham, ON TECHNICAL BRIEF The 17.9 hectare Honda Canada Campus employs a number of innovative Low Impact Development (LID) technologies to manage stormwater runoff, improve water quality, reduce potable water use

More information

Stormwater Disposal to Soakpits

Stormwater Disposal to Soakpits Engineering Appendix Two Stormwater Disposal to Soakpits 1. INTRODUCTION TO SOAKPITS... 2 2. WHAT SIZE IS MY SOAK PIT... 3 2.1 Carry out a Percolation test on site... 3 2.2 Determine the soakage rate...

More information

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014 Decatur, Georgia Stormwater Management Policy Guidelines Stormwater Management Policy Guidelines Decatur, Georgia STORMWATER MANAGEMENT POLICY GUIDELINES 1.0 Introduction... 3 2.0 Determining Predevelopment

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information