1 Suthern Califrnia Dredged Material Management Team (SC-DMMT) April 29, 2009 Meeting Ntes I. Participating Agencies/Attendees: a. Jrine Camppian (EPA) b. Jack Gregg (CCC) c. Mike Lyns (RWQCB - Regin 4) d. Allan Ota (EPA) e. Bill Paznkas (CDFG - San Dieg) f. Larry Simn (CCC) g. Cri Farrar (USACE Regulatry) h. Ken Wng (USACE Regulatry) i. Erin Hardisn (USACE Planning) j. Jdi Cliffrd (USACE Planning) k. Larry Smith (USACE Planning) l. Dan Swensn (USACE- Regulatry) m. David W. Smith (EPA) Agency representatives participating via telecnference. II. Determinatins 1 A. San Dieg Harbr Channel Maintenance Dredging SAR a. Discussin: Tier II & III results fr dredged material nt suitable fr beach nurishment (Areas 6, 8, 10-14). Areas 11, 12, & 13 very silty. Mst cnstituents < ERL. Cnstituents exceeding ERL were belw ERM. N water clumn txicity. N benthic txicity. PCBs were nn detect in Areas 1,2,3,6,8,10, and 14 and elevated in Areas 11,12,13. Biassays indicated the accumulatin f PCBs in Areas 10,11,12, and 13. EPA: biaccumulatin results shuld be frm steady-state cnditins, and 28-day expsure may nt yield steady-state cnditins. Therefre, the tissue cncentratins need t be multiplied by a factr f 1.7 t btain steady state cncentratins. Thugh the results may be well belw FDA levels, threshlds fr ecsystem impacts may be well belw FDA levels. PCB hlding time is 14 days if samples are frzen. Hwever, prject cres stred at 4 c since Octber PCB may nt exhibit substantial degradatin. b. Determinatin: i. Dredged materials frm areas 6, 8, and 14 suitable fr dispsal at LA-5. 1 Decisins f the CCC are partly based n recmmendatins prvided by its staff. Therefre, DMMT determinatins reflect the views f the CCC staff but nt necessarily f the CCC.

2 ii. Retest individual cres frm Areas 10, 11, 12, & 13 fr PCB t increase reslutin. Retesting f cres exceeding PCB hlding times acceptable. 2 iii. Prepare a site map f the cmpsite areas (Areas 10, 11, 12, 13) with the individual cre sample lcatins clearly identified, and ideally, rient the map s the utbard area near the Navy Pier 12 can be identified as well. 3 B. Lwer Newprt Bay Maintenance Dredging SAP a. Discussin: See attached detailed ntes frm EPA and Crps. In general, increased reslutin f cmpsites needed since in a number f cases a single cmpsite wuld characterize large areas r dredge vlumes. Variatins and suggestins fr cnstructing cmpsites discussed. Substrate nt fund t be suitable fr cean dispsal wuld mst likely nt be dredged. Tests by individual cres in areas where Hg was fund t be present. b. Determinatin: i. SAP wuld need t incrprate changes indicated in the attachments. ii. Once revisins have been incrprated, DMMT will again review the SAP and may request additinal revisins as needed prir t apprval. III. DMMT A. Draft DMMT Crdinatin Principles and Prcedures a. Substantial discussin cncerning relatinship between CSTF & DMMT as it relates t public participatin. b. Cre membership used t dente agencies that have direct permitting authrity ver dredging prjects. Participating agencies with n direct permitting authrity such as DFG can participate regularly n the DMMT. c. DMMT determinatins as it relates t the CCC reflect nly the determinatins f the CCC staff and nt the CCC itself. d. DMMT by majrity vte decided a firm tw week deadline fr submissin f agenda items. That is, prject managers & DMMT participants must submit agenda items exactly tw weeks prir t scheduled DMMT meetings. e. Suggested edits t the Crdinatin Principles and Prcedures need t be submitted t Dan Swensn by May 13, B. SAP/SAPR templates a. Parties respnsible fr SAP/SAR templates t bring draft versins f assignments fr discussin in the next DMMT meeting. 2 Allan Ota in (attached) received April 29, Ibid

3 ATTACHMENT 1: EPA COMMENTS FOR LOWER NEWPORT BAY * Annual limit f LA-3 is 2.5 millin cy, this prject's vlume is 1.12 millin, and that is with the assumptin f nly ne ft f verdepth. The SAP shuld acknwledge the annual cap and prvide additinal details n prject timing and ther n-ging prjects in the OC area. * One-ft f verdepth des nt appear t be practicable fr the prject. As prpsed at the DMMT meeting, the dcument shuld be changed t tw feet f verdepth (1 paid, 1 unpaid). Vlumes and tables in the SAP shuld be updated t reflect this new depth. * All sediment testing must g dwn t prject depth +2. Cre tables and SAP language must be changed t reflect this. * Beneficial use discussin is absent frm SAP, and assumes cean dispsal, need at least a paragraph describing practicability f beneficial use. It was nted during the DMMT meeting that if material des nt meet cean dispsal criteria, it will nt be dredged. This shuld als be reflected in the SAP. * OK t streamline the testing prgram by skipping the suspended particulate phase (water clumn) tests where prpsed. * Acute biassays must include a wrm in additin t the amphipd fr all prpsed cmpsites. * Balba Reach - Tw additinal cres shuld be added t shaled areas n the suth side f the channel, ne t the east f cre 8, and ne t the west f cre 6, fr a ttal f 10 cres. * Harbr Isle Reach - Three additinal cres shuld be added t shaled areas: ne n the nrth side f the channel sutheast f cre 12. Tw cres n the suth side f the channel shuld be added: ne nrthwest f cre 13 and ne sutheast f cre 15, fr a ttal f 10 cres. * Lid Isle Reach - The Nrth and Suth sides f the channel shuld be split int tw cmpsites, ne representing the -10 prject depth, and the ther representing the -20 depth. Vlumes fr each f these cmps shuld be calculated. Three additinal cres shuld be added t the suth side f the channel in the shaled areas nrthwest f cre 23. One cre shuld be added n the Suthwest side, fr a ttal f fur additinal cres. * Balba Island Channel - One additinal cre shuld be added in the shaled area between cres 44 and 45 * Upper Newprt Channel - One additinal cre shuld be added in the shaled area f the suth east crner f the prject. * Yacht Anchrage - Add anther cmpsite in Sectin I such that there will nw be 5 cmpsites: cmpsite shwn in Figure 9 is OK; split int upper and lwer cmpsites in the area shwn in Figure 10; and split int upper and lwer cmpsites in the area shwn in Figure 11. * Linda Channels - These tw areas shuld be brken up int tw cmpsites, ne representing cres 76 and 77, the ther representing One additinal cre shuld be added in the entrance channel west f cre 77. Tw additinal cres shuld be added in the ther cmpsite, ne between pints 78 and 79 and ne between 80 and 81. * Hg Sampling -. EPA requests t wrk with the applicant n a sampling strategy fr Hg. In areas that have a histry f Hg ERL exceedences, individual cres shuld be

4 tested fr Hg. Additinally, EPA prpses that any cmpsite whse cmpsite result exceeds the ERL fr Hg, will be required t have the individual cres tested. * As always, archives f all cres shuld be kept fr subsequent testing. * EPA can fax ver cpies f additinal cre lcatins if that wuld help.

5 ATTACHMENT 2: CORPS COMMENTS FOR LOWER NEWPORT BAY Cmments n Draft Dredged Material evaluatin fr the Lwer Newprt Bay - Sampling and Analysis Plan (NewFields LLC, April 2009) Prvided by Crps f Engineers Regulatry Divisin Belw are cmments prvided by the Crps Regulatry Divisin. In additin, we request that yur results be prvided in the frmat shwn in the attached Excel spreadsheet. Page(s) Paragraph Cmment Table 1-1 Table 2-1 Revise Tables and assciated text t reflect 2 ft verdredge depth allwance instead f 1 ft OD. 2 Add new subsectin that includes a brief discussin n beneficial reuse; it shuld be included even if reuse isn t being prpsed (see EPA cmments fr details) Add new additinal figure(s) which verlay histrical testing sites and areas with prpsed testing sites and cmpsites and/r prvide a crsswalk table. The area names differ between prir evaluatins and the prpsed prject. It is als difficult t discern the verlap f testing sites t determine t what extent the histrical data are representative f areas prpsed fr dredging Reference the figures mst apprpriate t shw areas discussed Varius Table and 2 Table 2-2 Benthic testing will be required fr all areas. Wrm biassay results were last prvided in Given the change bserved in the Bay s sediment grain-size cmpsitin and the OTM testing standards, wrm biassay tests will be required in additin t amphipds fr all the areas (see EPA cmments fr specifics). Cmpsites the agencies believe several f the areas need a higher reslutin f testing than prpsed. Fr Linda Isle, change 1 cmpsite t 2 cmpsites. The cres frm the sampling statins in the inner marina can be cmbined as 1 cmpsite and the cres frm sampling statins in the uter tw intersecting channels can be cmpsited tgether as 1 ther cmpsite. Fr the Yacht Anchrage (YA), change 4 cmpsites t 5 cmpsites as fllws: YA-Nrth is fine as 1 cmpsite, unless City wants t have higher reslutin between upper and lwer hrizns t islate YA-Middle shuld be 2 cmpsites, 1 lwer hrizn and 1 upper hrizn YA-Suth shuld be 2 cmpsites, 1 lwer hrizn and 1 upper hrizn Nte: SC-DMMT agency indicated that arsenic shuld be evaluated in sandy material, if such material is bserved and prpsed fr reuse 49 Table 2-3 Add 1 additinal sampling statin nrthwest f statin 16 at the shaling area (-7 ft MLLW elevatin). Appendix A Figs 1-12 Lcatins f utfall structures r ther ptential cntaminant surces shuld be identified n the figures.

6 ATTACHEMENT 3: Allan Ota fr San Dieg Harbr Channel Maintenance Dredging Frm: Sent: Wednesday, April 29, :41 PM T: Swensn, Daniel P SPL Cc: Rss.Brian@epamail.epa.gv; Hardisn, Erin L SPL; Jrine Camppian/R9/USEPA/US@EPA "Wng, Kenneth SPL" <Kenneth.Wng@usace.army.mil> "Smith, Lawrence J SPL Subject: San Dieg Harbr - analysis f archived individual cre sediment samples Imprtance: High Dan, Ken, and Larry, An additin t the meeting ntes fr tday: Just gt wrd that it is OK t attempt the individual cre analysis fr PCBs n the unfrzen sediment samples (stred at 4 degrees C), with the assumptin that this cnstituent class wuld nt be degraded significantly since cllectin. If the archive samples had been split vertically (and remained separate), we wuld recmmend that "tp" and "bttm" subsamples be analyzed; therwise, prceed with the individual cres themselves. In the meantime, please prepare a site map f the cmpsite areas (Areas 10, 11, 12, 13) with the individual cre sample lcatins clearly identified, and ideally, rient the map s the utbard area near the Navy Pier 12 can be identified as well. We suspect that there may be a cmmn shal between the tw prject areas with the same cntaminatin issues. By the way, I thught the meeting was fairly prductive. Ken, thanks fr yur wrk n the meeting ntes. **************************************************************** Allan Ota Oceangrapher / Reginal Ocean Dumping Crdinatr Dredging and Sediment Management Team (WTR-8) U.S. Envirnmental Prtectin Agency, Regin 9 75 Hawthrne Street San Francisc, CA =================================== ffice fax ta.allan@epa.gv ===================================

The role of non-animal safety assessment methods in implementation of the new TSCA

The role of non-animal safety assessment methods in implementation of the new TSCA The rle f nn-animal safety assessment methds in implementatin f the new TSCA Catherine Willett Humane Sciety f the United States Humane Sciety Internatinal The Frank R. Lautenberg Chemical Safety fr the

More information

Standard Operating Procedure Secchi Depth

Standard Operating Procedure Secchi Depth Standard Operating Prcedure revised January 8, 2017 Secchi Depth Page 1 f 5 Standard Operating Prcedure Secchi Depth Table f Cntents 1 POINT OF CONTACT... 1 2 OBJECTIVE... 1 3 DEFINITIONS AND ABBREVIATIONS...

More information

Southwestern Region 3 Carson National Forest Jicarilla Ranger District

Southwestern Region 3 Carson National Forest Jicarilla Ranger District United States Department f Agriculture Frest Service Suthwestern Regin 3 Carsn Natinal Frest Jicarilla Ranger District 664 East Bradway Blmfield, New Mexic 87413 (505) 632-2956 FAX (505) 632-3173 File

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

Section 8 Implementation and Monitoring Plans

Section 8 Implementation and Monitoring Plans Sectin 8 Implementatin and Mnitring Plans This sectin describes the prpsed implementatin plan, the mnitring required under the cntinuatin f the existing SJBGFMP, and the implementatin f the recmmended

More information

MEETING SUMMARY. Remand Stakeholder Engagement (RSE) Process Kickoff Meeting for Invited Stakeholders

MEETING SUMMARY. Remand Stakeholder Engagement (RSE) Process Kickoff Meeting for Invited Stakeholders MEETING SUMMARY Remand Stakehlder Engagement (RSE) Prcess Kickff Meeting fr Invited Stakehlders September 7, 2012, 1:00 3:00 p.m. Sheratn Grand Htel 1230 J Street, Sacrament, CA Gardenia Rm Attendees:

More information

Copies: Lisa Kellogg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh

Copies: Lisa Kellogg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh MEMO T: Yvnne Meeks/PG&E Cpies: Lisa Kellgg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh ARCADIS U.S., Inc. 100 Mntgmery Street Suite 300 San Francisc Califrnia 94104 Tel 415 374

More information

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL IN TWO-STAGE PROCEDURE (TECHNICAL ANNEX) RESEARCH AND INNOVATION ACTIONS & INNOVATION ACTIONS Nte: This is fr infrmatin nly. The definitive template fr yur call

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

Instructions for Conducting Sampling During Underground Storage Tank Closure

Instructions for Conducting Sampling During Underground Storage Tank Closure Instructins fr Cnducting Sampling During Undergrund Strage Tank Clsure Permitting and Cmpliance Assistance Prgram Divisin f Waste Management Flrida Department f Envirnmental Prtectin April 2016 [Incrprated

More information

Notice No Closing Date: December 18, 2015

Notice No Closing Date: December 18, 2015 Public Ntice U.S. Army Crps f Engineers Pittsburgh District In Reply Refer t Ntice N. belw US Army Crps f Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Applicatin N. LRP-2005-1230

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

Meeting Agenda Project Management and Oversight Subcommittee (PMOS)

Meeting Agenda Project Management and Oversight Subcommittee (PMOS) Meeting Agenda Prject Management and Oversight Subcmmittee (PMOS) March 6, 2013 1:00 p.m. 5:00 p.m. Muntain Hyatt Regency Albuquerque Fiesta 3-4 Rm 330 Tijeras Avenue NW Albuquerque, NM 87102 Intrductins

More information

EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN

EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN THE 111 TH CONGRESS Jhn Larsen and Rbert Heilmayr June 25, 2009 This analysis prvides an assessment f reductins in greenhuse gas (GHG) emissins relative

More information

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report UNC Request Wrkgrup Reprt At what stage is this dcument in the prcess? UNC 0594R: Meter Reading Submissin fr Advanced & Smart Metering The rllut f Advanced and Smart Metering delivers the pprtunity t utilise

More information

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide Visitr/Shpper Intercept Survey Data Guide June 26, 2014 Table f Cntents 1 Intrductin... 3 1.1 Timeline... 3 1.2 Availability f Data... 3 2 Overview... 4 2.1 Summary f Cntents... 4 2.2 Data Dictinary...

More information

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012 Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website

More information

Method 1: Establish a rating scale for each criterion. Some options are:

Method 1: Establish a rating scale for each criterion. Some options are: Decisin Matrix Als called: Pugh matrix, decisin grid, selectin matrix r grid, prblem matrix, prblem selectin matrix, pprtunity analysis, slutin matrix, criteria rating frm, criteria-based matrix. Descriptin

More information

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS The Cre Team Prcess: Making Risk-Infrmed Decisins fr On-site Mnitring at the SRS Mary A. Flra Directr, Envirnmental Cmpliance & Area Cmpletin Prjects Savannah River Nuclear Slutins, LLC January 10, 2014

More information

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request Stage 01: Request 0XXX: Meter Reading Submissin fr Advanced & Smart Metering At what stage is this dcument in the prcess? The rllut f Advanced and Smart Metering delivers the pprtunity t utilise mre frequent

More information

Version 4.0 LineDesign Engineering 11/1/04

Version 4.0 LineDesign Engineering 11/1/04 Ple Lading Prgram (Transverse, Vertical, Guying & Buckling) User's Guide Versin 4.0 LineDesign Engineering 11/1/04 Cntents Intrductin 3 Descriptin f Tabs 4-7 Ple Data 7 Wire Data 8-9 Inputs, Drives & Flders.....

More information

Kootenai River Restoration Master Plan: Master Plan Overview

Kootenai River Restoration Master Plan: Master Plan Overview Ktenai River Restratin Master Plan: Master Plan Overview Ktenai River Restratin Prject #200200200 Restre Natural Recruitment Ktenai River White Sturgen Prject Overview In late 2006, the KTOI received prject

More information

PA STATE SYSTEM OF HIGHER EDUCATION Shared Administrative System TM Travel Management Create Travel Expense Report

PA STATE SYSTEM OF HIGHER EDUCATION Shared Administrative System TM Travel Management Create Travel Expense Report All Travel Expense Reprts will be entered by either the Traveler r Travel Assistant via the prtal. Lg int the prtal File:I:\Finance\Travel Management\Training\TM - _v2.dcx Page 1 f 18 Revised: 05/2014

More information

a. Project proponent: Trancas Property Owner Association

a. Project proponent: Trancas Property Owner Association Southern California Dredged Material Management Team (SC-DMMT) April 27, 2011 Final Meeting Notes I. Participating Agencies /Attendees: a. Larry Simone (CCC) b. Mike Lyons (RWQCB Los Angeles) c. Allan

More information

Project: Sydney Metro - Utility in stigations, Application Title:

Project: Sydney Metro - Utility in stigations, Application Title: Sydney Metr Integrated Management System (IMS) (Uncntrlled when printed) Iv' sydney METRO Pre-Cnstructin Minr Wrks Apprval Frm Minr Wrks are defined as any lw impact activities that are undertaken prir

More information

5. EXAMPLE OF A DEGREE DAY MODEL: HINTEREISFERNER, AUSTRIA

5. EXAMPLE OF A DEGREE DAY MODEL: HINTEREISFERNER, AUSTRIA Glacial Gelgy 5. Example f a Degree Day Mdel 5. EXAMPLE OF A DEGREE DAY MODEL: HINTEREISFERNER, AUSTRIA 30 + 25 = 55 Pints Objective: t create a psitive degree-day mdel f glacial mass balance. Yu shuld

More information

Completing a 90 Day Evaluation Review Using the Online Performance Appraisal System Standard Form

Completing a 90 Day Evaluation Review Using the Online Performance Appraisal System Standard Form Cmpleting a 90 Day Evaluatin Review Using the Online Perfrmance Appraisal System Standard Frm Step One: Cmpleting Perfrmance Expectatins Standard Frm Yu will receive an email frm HR Manager alerting yu

More information

Public record pursuant to s39(l) of the Environmental Protection Act 1986

Public record pursuant to s39(l) of the Environmental Protection Act 1986 Envirnmental Prtectin Authrity GOVERNMENT OF WESTERN AUSTRALIA Public recrd pursuant t s39(l) f the Envirnmental Prtectin Act 1986 Prpsal Title: Prpsal Lcatin: Case Number: CMS 15314 Lt 383, Cttesle Date

More information

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION INTRODUCTION As stipulated in Sectin 21002.1(a) f the CEQA Statutes (Public Resurces Cde): The purpse f an envirnmental impact reprt is t identify the

More information

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report Lndn BRT Transit Prject Assessment Prcess Draft Envirnmental Prject Reprt Table f Cntents 6 Permits and Apprvals... 6-1 Federal... 6-2 Prvincial... 6-2 Municipal... 6-3 Utilities... 6-3 Institutins...

More information

Chapter 2. Public Guide

Chapter 2. Public Guide Chapter 2. Public Guide 2.1 Purpse This chapter prvides a guide fr reading and using the It describes the rganizatin f the Plan, the layut f a typical chapter, and the relatinship f this dcument t ther

More information

Balcony drainage for a multi-level apartment building at 5 O Reily Avenue, Wellington

Balcony drainage for a multi-level apartment building at 5 O Reily Avenue, Wellington Balcny drainage fr a multi-level apartment building at 5 O Reily Avenue, Wellingtn 1 The matter t be determined 1.1 This is a determinatin under Part 3 Subpart 1 f the Building Act 2004 1 ( the Act ) made

More information

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module. Integrating MYOB with TimePr With TimePr s MYOB Integratin Mdule, yu can imprt TimePr time recrds int MYOB fr invice prcessing r payrll integratin. These recrds are then used t generate: Sales Invices,

More information

VEHICLE MILES TRAVELED (VMT)

VEHICLE MILES TRAVELED (VMT) DATE: April 13, 2017 TO: FROM: RE: San Francisc Planning Department Transprtatin Cnsultants Wade Wietgrefe, Senir Planner In September 2016, a memrandum was sent t the transprtatin cnsultant pl regarding

More information

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 ADDENDUM 2 des nt change the due date r time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (lcal time) Due Date: May 4, 2017 Successful Offerrs will be

More information

Fort McMurray Burned and Unburned Soil Samples

Fort McMurray Burned and Unburned Soil Samples Frt McMurray Burned and Unburned Sil Samples The analysis in this dcument was cnducted using publically available test results frm sil samples cllected in the weeks fllwing the Frt McMurray wildfire. These

More information

FLOOD HAZARD ZONE DEVELOPMENT PERMIT

FLOOD HAZARD ZONE DEVELOPMENT PERMIT COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FORT BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650

More information

o Mitigation measures are required to be identified. Soil

o Mitigation measures are required to be identified. Soil Mitigatin measures are required t be identified. Sil Pllutin f sil due t handling, use and strage f hazardus substances during cnstructin and peratin. The lss f available tp sil. Mitigatin measures are

More information

Community Consultation Results. Maura Walker June 6, 2011

Community Consultation Results. Maura Walker June 6, 2011 Cmmunity Cnsultatin Results Maura Walker June 6, 2011 Input Opprtunities 7 pen huses Exit survey One n ne discussin Grup discussin Dt exercise On-line survey Phne and email Hard cpy survey fr Apex Survey

More information

OP 4: Building Design and Construction

OP 4: Building Design and Construction OP 4: Building Design and Cnstructin 3 pints available A. Credit Ratinale This credit recgnizes institutins that have incrprated envirnmental features int their design and cnstructin prjects. Decisins

More information

Your available balance is displayed on the lower left-hand side of the myprintcenter, as highlighted below.

Your available balance is displayed on the lower left-hand side of the myprintcenter, as highlighted below. Using the LSC Pay-t-Print myprintcenter Website LSC Students, Faculty and Staff and HCPL r MCML Library Card hlders What can I d with the myprintcenter? With myprintcenter (Standard) yu can: Check available

More information

WITH EXAMPLES FROM THE WINDWARD ISLANDS. Andrew Bartlett. Keynote Presentation. 1st National Workshop on Development Communications.

WITH EXAMPLES FROM THE WINDWARD ISLANDS. Andrew Bartlett. Keynote Presentation. 1st National Workshop on Development Communications. PRINCIPLES OF EFFECTIVE DEVELOPMENT COMMUNICATION: WITH EXAMPLES FROM THE WINDWARD ISLANDS Andrew Bartlett Keynte Presentatin 1st Natinal Wrkshp n Develpment Cmmunicatins March 1986 Federal Agricultural

More information

Fax completed form to BOMA at (612) by noon on Friday, September 18.

Fax completed form to BOMA at (612) by noon on Friday, September 18. TOBY Awards 2016 Intent t Participate If yu are receiving this frm in hard cpy, we ask that yu cmplete the electrnic versin that is available n www.bmampls.rg/educatin-events/tby-cmpetitin. Fax cmpleted

More information

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP Objectives Q1. What are the bjectives f the Remediatin Technlgies prjects? A1. Kuwait Oil Cmpany is cmmitted t a sustainable remediatin slutin

More information

Extended Inventory Items

Extended Inventory Items Extended Inventry Items Using the Item Number SmartFinder buttn Extended Inventry Items Extended Inventry Items is an enhanced replacement fr the Sage I/C Items screen. It prvides yu with mre functinality

More information

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority Request fr Prpsals t Develp a New Persnnel Plicy Manual fr the Red Wing Husing and Redevelpment Authrity March 20, 2015 Red Wing Husing and Redevelpment Authrity 428 West Fifth Street Red Wing, MN 55066

More information

Section 7: INTERGOVERNMENTAL COOPERATION

Section 7: INTERGOVERNMENTAL COOPERATION Sectin 7: INTERGOVERNMENTAL COOPERATION Intrductin Pursuant t the Wiscnsin Cmprehensive Planning Law, this element f the Cmprehensive Plan ffers gals, bjectives, plicies, and prgrams fr jint planning and

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

Frequently Asked Questions (FAQs) Goals and Performance

Frequently Asked Questions (FAQs) Goals and Performance AUDIENCE BACKGROUND Frequently Asked Questins (FAQs) Gals and Perfrmance mycareer @CHOP Gals and mycareer @CHOP Perfrmance are electrnic, integrated tls that supprt develping gals and tracking perfrmance.

More information

Model Drought Contingency Plan for Irrigation Districts

Model Drought Contingency Plan for Irrigation Districts Initially Prepared Plan Mdel Drught Cntingency Plan fr Irrigatin Districts Mdel Drught Cntingency Plan fr Irrigatin Districts Drught Cntingency Plan fr [Irrigatin Districts] Date TABLE OF CONTENTS 1. Objectives...

More information

PM 2.5 Design Values. Data inputs Completeness requirements Calculations Current levels. Mark Schmidt EPA-OAQPS

PM 2.5 Design Values. Data inputs Completeness requirements Calculations Current levels. Mark Schmidt EPA-OAQPS Design Values Data inputs Cmpleteness requirements Calculatins Current levels Mark Schmidt EPA-OAQPS Schmidt.mark@epa.gv (919) 541-2416 Design Values - Data Inputs Only data present in EPA's Air Quality

More information

10. Position Management- Mass Reorganization Last revised: March 2016 Last reviewed: June 2017 Next review: June 2018

10. Position Management- Mass Reorganization Last revised: March 2016 Last reviewed: June 2017 Next review: June 2018 Submissin f infrmatin t the HRSC fr mass rerganizatins is t include: Date the re-rganizatin is t ccur The number f psitins affected If the csting is changing ALL CHANGES FOR A MASS REORGANIZATION, INCLUDING

More information

MS4 REQUIREMENTS TABLE INSTRUCTIONS

MS4 REQUIREMENTS TABLE INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER MS4 REQUIREMENTS TABLE INSTRUCTIONS Revised, July 29, 2016 Intrductin The Pennsylvania Department f Envirnmental

More information

O c t o b e r 1 0 th,

O c t o b e r 1 0 th, Oil and Gas Study Octber 10 th, 2011 Agenda 1. Intrductins 2. Shale gas extractin and resurces in NC 3. Prcess f the DENR il and gas study 4. Public input pprtunities 5. Prpsed utline fr the il and gas

More information

Completing an Introductory Review Using the Online Performance Appraisal System Standard Form

Completing an Introductory Review Using the Online Performance Appraisal System Standard Form Cmpleting an Intrductry Review Using the Online Perfrmance Appraisal System Standard Frm Step One: Cmpleting Perfrmance Expectatins Standard Frm Yu will receive an email frm HR Manager alerting yu that

More information

SABAL TRAIL PROJECT. RESOURCE REPORT 12 PCB Contamination. FERC Docket No. CP

SABAL TRAIL PROJECT. RESOURCE REPORT 12 PCB Contamination. FERC Docket No. CP SABAL TRAIL PROJECT RESOURCE REPORT 12 PCB Cntaminatin FERC Dcket N. CP15- -000 Nvember 2014 TABLE OF CONTENTS 12.0 RESOURCE REPORT 12 PCB CONTAMINATION... 12-1 12.1 INTRODUCTION... 12-1 Resurce Reprt

More information

(Base Bid Only) $ 1,891, $ 1,997, $ 2,100, $ 2,227, Budget Account Information

(Base Bid Only) $ 1,891, $ 1,997, $ 2,100, $ 2,227, Budget Account Information TO: Anna Mre, Interim Cunty Manager David Larsn, Assistant Cunty Manager FROM: W. F. White, Purchasing Directr DATE: May 6, 2013 SUBJECT: PURCHASE RECOMMENDATION: BID# 2120 Design-Build Delivery f a Fire

More information

In this fact sheet we answer the four most common questions new clients ask:

In this fact sheet we answer the four most common questions new clients ask: Wrking With Federal Prpsals Intrductin In this fact sheet we answer the fur mst cmmn questins new clients ask: What tasks d yu perfrm and what d yu need frm us? Hw d we use the Virtual War Rms? Hw much

More information

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley)

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley) Summary AB 1739 (Dickinsn), SB 1168 (Pavley) and SB 1319 (Pavley) The Sustainable Grundwater Management Act empwers lcal agencies t manage grundwater basins in a sustainable manner ver a lng-term hrizn.

More information

Troubleshooting TAC GradeBook Averages

Troubleshooting TAC GradeBook Averages The Department f Student Infrmatin Trubleshting TAC GradeBk Averages Teacher Access center v2.5 The fllwing prcedures steps yu thrugh checking student averages, lading t the grade bk, and verriding grade

More information

Outbreak, Surveillance and Investigation Reports (OSIR)

Outbreak, Surveillance and Investigation Reports (OSIR) Outbreak, Surveillance and Investigatin Reprts (OSIR) is an nline publicatin n epidemilgical wrks f health prfessinals in Asia and the Pacific. Backgrund Few jurnals regularly publish utbreak investigatins

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

Pickup Request Process Update Non-Deposit Bulk Pesticide Containers

Pickup Request Process Update Non-Deposit Bulk Pesticide Containers Pickup Request Prcess Update Nn-Depsit Bulk Pesticide Cntainers Dear retail cllectin partner, Please be advised that the prcess fr requesting a pick-up f nn-depsit bulk pesticide cntainers is changing

More information

Malibu Schools Alignment Project & CEQA Review. Board Meeting November 1, 2018

Malibu Schools Alignment Project & CEQA Review. Board Meeting November 1, 2018 Malibu Schls Alignment Prject & CEQA Review Bard Meeting Nvember 1, 2018 Agenda 1. Intrductin 2. CEQA Purpses & Prcess 3. Prject Descriptin 4. Schedule 5. CEQA Findings 6. Public Participatin 7. Requested

More information

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL PROFESSIONAL SERVICE CONTRACT PIER B SOUTH REHABILITATION RFQ Number: ASPA-TS-2018-02 MARCH 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEER DESIGN &

More information

Acceptance criteria for process capability indexes generated from statistical tolerance intervals as per ISO

Acceptance criteria for process capability indexes generated from statistical tolerance intervals as per ISO Acceptance criteria fr prcess capability indexes generated frm statistical tlerance intervals as per Backgrund Justificatin fr sampling plans and statistical analysis f results is a requirement fr prcess

More information

Birmingham Airport Response REDACTED (for external use)

Birmingham Airport Response REDACTED (for external use) The aim f the questins belw is t allw us t understand hw yu cnducted the recent pen tender prcesses. The questins frm a brad guide t ur areas f interest. We request that as well as either written r ral

More information

USA Wrestling USMC Junior & Cadet National Championships

USA Wrestling USMC Junior & Cadet National Championships USA Wrestling USMC Junir & Cadet Natinal Champinships ONLINE REGISTRATION PROCESS The website is, fr the mst part, self-guiding and self-explanatry. There are a few instructins belw that are necessary

More information

Examiner Tip Sheet Independent Review

Examiner Tip Sheet Independent Review Examiner Tip Sheet Independent Review Welcme t Independent Review! The purpse f Independent Review is fr each team member t independently evaluate the applicant s prcesses and results by identifying areas

More information

ABC Business Magazines Reporting Standards (UK)

ABC Business Magazines Reporting Standards (UK) September 2016 ABC Business Magazines Reprting Standards (UK) Changes have been agreed t the ABC Business Magazine and Multi-Platfrm Reprting Standards. We have updated the latest Reprting Standards t

More information

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen Mem Date: Mnday, January 05, 2015 Prject: T: Frm: Subject: Suth Rchfrd Rad Type recipient(s) here HDR, Inc. Radway Optins fr Prtectin f Irn Fen Wetlands Backgrund Sphagnum angustiflium a U.S. Frest Service

More information

City of Surrey ADDITIONAL PLANNING COMMENTS File: Rezoning from A-1 to CD (based on A-1) Housing Agreement

City of Surrey ADDITIONAL PLANNING COMMENTS File: Rezoning from A-1 to CD (based on A-1) Housing Agreement City f Surrey ADDITIONAL PLANNING COMMENTS File: 7909 0151 00 Planning Reprt Date: Octber 19, 2009 PROPOSAL: Rezning frm A-1 t CD (based n A-1) Husing Agreement in rder t permit the develpment f a 17 unit

More information

MARINE CONSENTS GUIDANCE

MARINE CONSENTS GUIDANCE MARINE CONSENTS GUIDANCE FEBRUARY 2008 CONTROLLED DOCUMENT STATUS PROJECT TITLE DOCUMENT TITLE DOCUMENT REF BR Marine Cnsents Guide.dc REVISION RECORD STATUS DATE SUMMARY OF CHANGES CHECKED APPROVED 0

More information

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS 11 LIQUID AND EMULSIFIED ASPHALT ITEMS 1 1 OVERV IEW All Liquid and emulsified asphalt items have a unit f measure (UOM) f tns r square yards. All liquid

More information

Questions and Answers

Questions and Answers Questins and Answers Fr: Instructr Led and Online Training Supprt Blanket Purchase Agreement Issued by: Insight Systems Crpratin (hereinafter PRIME r Insight) In supprt f: The Feed the Future Knwledge-Driven

More information

Gainesville Regional Transit System Rapid Transit Study. Public Involvement Plan

Gainesville Regional Transit System Rapid Transit Study. Public Involvement Plan Gainesville Reginal Transit System Rapid Transit Study Public Invlvement Plan Prepared fr: Gainesville Reginal Transit System P.O. Bx 490, Statin 4 Gainesville, FL 32602 ph (352) 334-2609, fax (352) 334-2607

More information

ESOL Skills for Life RQF Level: Entry 3 Assessor Booklet - Speaking and Listening Sample Version

ESOL Skills for Life RQF Level: Entry 3 Assessor Booklet - Speaking and Listening Sample Version ESOL Skills fr Life RQF Level: Entry 3 Assessr Bklet - Speaking and Listening Sample Versin INSTRUCTIONS FOR CENTRES: This assessment takes apprximately 25 minutes t cmplete. Each task can be undertaken

More information

EMAC 2019 Conference, May 28-31, 2019 University of Hamburg, Germany SUBMISSION GUIDELINES FOR COMPETITIVE PAPERS

EMAC 2019 Conference, May 28-31, 2019 University of Hamburg, Germany SUBMISSION GUIDELINES FOR COMPETITIVE PAPERS EMAC 2019 Cnference, May 28-31, 2019 University f Hamburg, Germany SUBMISSION GUIDELINES FOR COMPETITIVE PAPERS The final submissin date is December 5, 2018 (14:00 CET Time). Please read these guidelines

More information

February 14, Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324

February 14, Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 February 14, 2012 Burt Fleischer, R.E.A., R.E.P. Directr, Envirnmental Affairs Hilmar Cheese Cmpany 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Lwer Aquifer Data Gap Prgress Reprt #1 Hilmar Cheese

More information

Inquiry processing. 1. Purpose. 2. Scope. 3. Description

Inquiry processing. 1. Purpose. 2. Scope. 3. Description 1. Purpse T describe the assessment f inquiry dssiers submitted t ECHA accrding t Article 26(1) f the REACH Regulatin and the steps taken t ensure that the data sharing amng ptential and previus registrants

More information

RunnerStone, LLC. Page1 M E M O R A N D U M

RunnerStone, LLC. Page1 M E M O R A N D U M RunnerStne, LLC 3709 N. High Street, Suite 100, Clumbus, OH 43214 M E M O R A N D U M Date: Octber 13, 2017 T: Ohi Manufacturers Assciatin Energy Grup Frm: Jhn Seryak, PE (RunnerStne, LLC) Kim Bjk, Energy

More information

CCE Application Guidelines

CCE Application Guidelines CCE Applicatin Guidelines - 2017 General This dcument cntains infrmatin n hw t cmplete and submit yur CCE applicatin. If yu have any questins, please cntact Susan McGuire at smcguire@acce.rg. Tips befre

More information

Malibu Schools Alignment Project & CEQA Review. Community Meeting October 9, 2018

Malibu Schools Alignment Project & CEQA Review. Community Meeting October 9, 2018 Malibu Schls Alignment Prject & CEQA Review Cmmunity Meeting Octber 9, 2018 Agenda 1. Intrductin 2. CEQA Purpses & Prcess 3. Prject Descriptin 4. Schedule 5. CEQA Findings 6. Public Participatin 7. Q &

More information

Renewable Energy & Eastern Oregon Landscape Conservation Partnership (aka Sagebrush Conservation Partnership ) Declaration of Cooperation

Renewable Energy & Eastern Oregon Landscape Conservation Partnership (aka Sagebrush Conservation Partnership ) Declaration of Cooperation Renewable Energy & Eastern Oregn Landscape Cnservatin Partnership (aka Sagebrush Cnservatin Partnership ) Declaratin f Cperatin Preamble The State f Oregn has adpted laws fr cnservatin, renewable energy

More information

Offshore Insights Help Guide Series. HELP GUIDE SERIES: Visiting Offshore Suppliers By neoit. June 2003 Issue 1.

Offshore Insights Help Guide Series. HELP GUIDE SERIES: Visiting Offshore Suppliers By neoit. June 2003 Issue 1. Offshre Insights Help Guide Series www.neit.cm June 2003 Issue 1 HELP GUIDE SERIES: Visiting Offshre Suppliers By neit Page: 2 Intrductin Risks surrunding ffshre utsurcing must be understd and addressed

More information

CCE Application Guidelines

CCE Application Guidelines CCE Applicatin Guidelines - 2018 General This dcument cntains infrmatin n hw t cmplete and submit yur CCE applicatin. If yu have any questins, please cntact Susan McGuire at smcguire@acce.rg. Tips befre

More information

EVALUATION AND RATING. Guidelines and instructions for completing the application for evaluation and rating via the NRF Online Submission System

EVALUATION AND RATING. Guidelines and instructions for completing the application for evaluation and rating via the NRF Online Submission System EVALUATION AND RATING Guidelines and instructins fr cmpleting the applicatin fr evaluatin and rating via the NRF Online Submissin System Please nte that the clsing date fr applicatins is 15 February 2017

More information

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria. Memrandum T: Bassett Creek Watershed Management Cmmissin Frm: Barr Engineering C. Subject: Item 6Dii Cnsider Apprval f Prpsal t Prepare Feasibility Study fr Westwd Lake Water Quality Imprvement Prject

More information

PLEASE ENSURE THAT YOU SAVE THIS DOCUMENT ON YOUR COMPUTER BEFORE

PLEASE ENSURE THAT YOU SAVE THIS DOCUMENT ON YOUR COMPUTER BEFORE Apprved Aviatin Adjudicatin Applicatin Frm What is this Applicatin fr? This applicatin frm is fr passengers t bring a claim against an airline r airprt if they have nt been able t reslve the cmplaint directly

More information

etime Sheet Setup and Processing

etime Sheet Setup and Processing etime Sheet Setup and Prcessing Updated: 10/3/16 PC and CY Belw are instructins n hw t setup and prcess etime Sheets. 1. Setup the Optins needed in the SDS Web Office Settings fr etime Sheet Prcessing

More information

EID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ]

EID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ] Plicy Guidelines: The District has established criteria and guidelines t assist staff in evaluating and administering, and the directrs in apprving and/r rejecting, applicatins fr increases in irrigatin

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater

More information

Federal Wetland Jurisdiction

Federal Wetland Jurisdiction Federal Wetland Jurisdictin Tri White Deputy Chief, Regulatry Divisin USACE, Jacksnville District July 24, 2014 US US Army Army Crps Crps f f Engineers Engineers BUILDING BUILDING STRONG STRONG Bttm Line

More information

How to Work with Production in SAP Business One 9.3

How to Work with Production in SAP Business One 9.3 Hw-t Guide Dcument Versin: 4.0 2017-08-18 Hw t Wrk with Prductin in SAP Business One 9.3 Typgraphic Cnventins Type Style Example Descriptin Wrds r characters quted frm the screen. These include field names,

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

Manual 11: Energy & Ancillary Services Market Operations Revision History

Manual 11: Energy & Ancillary Services Market Operations Revision History 2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required

More information

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report March 6, 2018 Ministry f the Envirnment 70 Fster Drive, Suite 110 Sault Ste. Marie, ON P6A 6V4 ATTENTION: Safe Drinking Water Branch RE: ELLIOT LAKE Wastewater Treatment Plant Annual Perfrmance Reprt -

More information

Information Visualization

Information Visualization Tracking Air Quality Trends with SASIGRAPH David Mintz, U.S. EPA, Research Triangle Park, NC Terence Fitz-Simns, U.S. EPA, Research Triangle Park, NC Michelle Wayland, U.S. EPA, Research Triangle Park,

More information

LINKING THE ACCOUNTING FRAMEWORKS OF THE SEEA AND THE TSA

LINKING THE ACCOUNTING FRAMEWORKS OF THE SEEA AND THE TSA UNWTO Statistics and Turism Satellite Accunt Prgramme COMMITTEE ON STATISTICS AND THE TOURISM SATELLITE ACCOUNT Seventeenth meeting UNWTO Headquarters, Madrid, Spain 24-25 January 2017 LINKING THE ACCOUNTING

More information

ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURT th STREET NEWPORT NEWS, VIRGINIA MCS JOB #13-031S

ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURT th STREET NEWPORT NEWS, VIRGINIA MCS JOB #13-031S ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURT 741-34 th STREET NEWPORT NEWS, VIRGINIA MCS JOB #13-031S Marine Chemist Service, Inc. 11850 Tug Bat Lane, Newprt News, VA 23606-2527 Phne: (757) 873-0933

More information