Tamil Nadu Power Sector Reform and Restructuring - A Case Study

Size: px
Start display at page:

Download "Tamil Nadu Power Sector Reform and Restructuring - A Case Study"

Transcription

1 Tamil Nadu Power Sector Reform and Restructuring - A Case Study J.Anitha Roseline Department of Electrical and Electronics Engineering SSN college of Engineering Chennai, India anithar@ssn.edu.in Dr.B.L.Mathur Department of Electrical and Electronics Engineering SSN college of Engineering Chennai, India blmathur@ssn.edu.in Abstract Electricity is backbone for almost all economic activities in present times and it is a proven fact that access of this precious perishable commodity to people bears direct impact on pace of development of the country. The country s development is measured in terms of per capita consumption of electricity which in turn depends on electricity generated. India has the fifth largest installed power capacity in the world (the first four are US, Japan, China and Russia in that order), and is one of the top power consumers. India has an installed power capacity of approximately 150 MW for the year 2009, which is 4% of the global capacity. The per capita power consumption (per year) in India has increased to 720 KWh (or units) from 15.6 kwh as on , which is less than 5% of the per capita consumption in USA, and less than 20% than that of China. The global per capita consumption of power is about 2,340 KWh (or Units). The peak power shortage of 9.9% has been plaguing Indian power sector as on January As a result regulators worldwide are now implementing new regulating schemes and organizational reforms in an effort to improve the efficient operation of the electric utilities. Reforms and restructuring are taking place in the electricity sector by introducing competition in the electricity supply industry, wherever, it is technologically feasible and India is not exception to these reforms. In this paper, a case study of Tamil Nadu has been carried out, which is bordered on the north by the states of Andhra Pradesh and Karnataka and on the west by the state of Kerala. Kanyakumari, the southernmost tip of this land is the meeting point of the Bay of Bengal, the Arabian Sea and the Indian Ocean. In India, Tamil Nadu state ranks third in Electricity generation, Transmission and Distribution. Tamil Nadu is the first state in the country to achieve 100 % electrification of all villages as early as With the enactment of Electricity Act 2003, there has been tremendous improvement in the areas of transmission and distribution, tariff rationalization and in availability of power supply. Keywords Tamilnadu Electricity Board (TNEB), Tamilnadu Electricity regulatory Commission (TNERC), Energy Audit, Management Information System (MIS), sub-station (SS), restructuring, tariff rationalization, technical, transmission and distribution losses. EXPANSION OF ABBREVATIONS TNEB - Tamilnadu Electricity Board TNERC - Tamilnadu Electricity regulatory Commission MIS - Management Information System SS - sub-station MW - Mega watt SEBs - State Electricity Boards KW - Kilo- watt SCADA - Supervisor Control and Data Acquisition System PLCC - Power line Carrier Communication TRANTRANSCO - Tamil Nadu Transmission Corporation Ltd TANGEDCO - Tamil Nadu Generation and Distribution Corporation Ltd ADLS - Automatic Data Logger System DSM - Deman Side Management SRLDC - Southern regional Load Dispatch Centre T&D - Transmission and Distribution AT & C - Aggregate Technical and commercial losses MU - Million Unit HT - High Tension LT - Low tension I. INTRODUCTION The Electricity supply which was traditionally viewed as a natural monopoly developed dissatisfaction with limited incentives for efficient operation of a cost-of-service regulated or government owned electric utility [1]. As a result, new regulatory schemes and organizational reforms are now being implemented worldwide in an effort to improve the efficient operation of electric utilities. All these reforms are consistent with the view that competition should be introduced into the electricity supply industry wherever it is technologically feasible [2]. Only those portions which are most efficient and are being supplied by a single firm should remain regulated [3]-[5]. Power generation and public distribution started in Calcutta in April 1899, after which the Electricity Act, 1903 was brought into force. Subsequently this Act was replaced by /11/$ IEEE 1205

2 the Indian Electricity Act, 1910, which Act is still in force today, with quite a number of amendments. After 1 st Electricity Act, Government enacted the Electricity (supply) Act, 1948, the Indian Electricity Rules, 1956, the Electricity Regulatory Commissions Act, Recently Indian Electricity Act, 2003 was enacted to consolidate the laws relating to generation, transmission, distribution, trading and use of electricity and largely for taking measures conducive to development of electricity industry, promoting competition, protecting interest of consumers and supply of electricity to all areas, rationalization of electricity tariff, ensuring transparent policies regarding subsidies, and promoting of efficiency[6]- [7]. II. CASE STUDY OF TAMIL NADU Tamil Nadu is one of the most industrialized states in India with a high Human Development index. Chennai (formerly known as Madras), the capital city of Tamil Nadu, is the gateway of South India with an international airport, sea ports and rail and road network connectivity. The investment scenario in the State is very buoyant due to the transparent and proactive approach of the Government. The State has emerged as the front-runner in attracting new investments in manufacturing sector. The Tamil Nadu Electricity Board (TNEB) is a statutory body formed on under the Electricity Supply Act, 1948 as a successor to the erstwhile Electricity Department of the Government of Madras. The Board is responsible for the development of infrastructure and service relating to the state s growing need for electrical energy. Starting with a modest installed capacity of 156 MW (Mega Watt) at the dawn of independence, the Board s own generating capacity has grown by leaps and bounds to 11,631 MW as on The Board has an even mix of the various generating capacities such as 3220 MW of coal based four thermal stations, MW from the five Gas Turbine Stations and 2186 MW from 38 Hydro Stations. In addition, there is an infirm power of MW from Wind Farms and R.E.S. Besides, the Board has a share of 2825 MW from Central Generating Stations, 4270 MW of privately owned wind farms and 1180 MW of Independent Power projects. The peak reached is MW on and the maximum daily consumption was MU on In fulfilling its obligations over the last five decades, the Board has also been an effective tool for the Government in implementing its policies and fulfilling social obligations relating to agriculture and other weaker sections of the society that require positive support and special attention of the Government. This approach was however not unique to Tamil Nadu alone but has been adopted in some states, with reduced tariff to certain consumer segments. The TNEB occupies third rank in the list of top three SEBs in the country, along with Maharashtra and Gujarat, in terms of the size of its operation gauged by the generating capacity at its command, the amount of energy sold and the number of consumers serviced. Tamil Nadu ranks sixth in terms of per capital electricity consumption among States. The technical performance/ efficiencies of TNEB measured by the plant load factor, system load factors (83) the transmission and distribution losses have normally been above the All-India average and among the top five to six SEBs. TNEB has been in the forefront of rural electrification too. Extending electricity to rural areas and promoting electrification of agricultural pumps have also been accorded top most priority in the TNEB's agenda. Achievements of TNEB 1. First cascading hydro-electric scheme Kundah in the Nilgiris. This cascading hydroelectric scheme consists of 5 power houses. It was developed with Canadian aid and was put into operation stage by stage from 1957 to First Barrage type Power House - Four Barrage type Power Houses each 2 x 15 MW were developed and commissioned during the year across Cauvery River between Mettur and Bhavani. The Power Houses are located in the river bed itself. 3. Kadamparai Pumped Storage Hydro Electric station (4 x100 MW). The Kadamparai Pumped Storage Hydro Electric station (4 x100 MW) in Coimbatore District was commissioned in the year 1986 and is the first of its kind in the country to operate both in operation and pumping mode since In this Power House the off peak energy is utilized to pump water to the upper reservoir and during peak hours the Power House is put in generation mode. 4. First Gas Insulated Substation - In 1998 the first 230 KV Gas Insulated switchgear substations in the country was commissioned at Mylapore, Chennai. This was supplied and erected by M/s Merlin Gerin, France 5. Commissioning of 230 KV Transmission line - In 1960 TNEB commissioned 173 km long Kundah salem 230 KV transmission which was the first 230 KV network in the country. 6. SCADA project - SCADA (Supervisor Control and Data Acquisition System) of Chennai Distribution Control Centre is the first in the country and it remotely controls 95 distribution substations in Chennai City. 7. Pre-stressed Concrete poles - The technology of prestressed concrete was developed in the 1960s. TNEB was a pioneer in setting up a PSC pole yard at Samayanallur near Madurai in Power line Carrier Communication (PLCC) in Grid Operation - TNEB is the pioneer in India in introducing PLCC system for its own communication requirements. PLCC system utilizes 66/110/230/

3 KV transmission lines as the medium for communication. PLCC provides for limited channels for speech communication, low speed data communication (200 bps) and protection tripping. In 1960 PLCC sets and protection couplers of Brown Boveri Corporation, Switzerland make were put into service in 66 stations. 9. Tamil Nadu is a pioneer in introducing cogeneration in sugar mills and continues to lead with installed capacity of 466 MW of which exportable surplus is 266 MW, which is about 250% of installed capacity in India. The installed capacity from biomass is MW. (includes waste to energy projects) The overall demand shortage is of the order 2.71 % to %. The energy shortages were of the order 3.59 % to 9.04 %.The registered system peak demands, unrestricted demand and registered minimum demand during the year is (23rd Feb 10) (Mar 10) 5236 (Nov 09). Figure.1 Installed Capacity in Tamil Nadu (MW) III. ESTABLISHMENTS MADE FOR POWER SECTOR REFORM IN TAMIL NADU The Government of Tamil Nadu is committed to reform its Power Sector with a vision to achieve commercial viability and provide reliable and quality power at competitive prices to all consumers in the state. To achieve these objectives the following provisions have been made: A. Restructuring: Government of Tamil Nadu have accorded in- principle approval for the re-organisation of TNEB by way of establishment of a holding company, by the name TNEB Ltd and two subsidiary companies, namely Tamil Nadu Transmission Corporation Ltd (TANTRANSCO) and Tamil Nadu Generation and Distribution Corporation Ltd (TANGEDCO) with the stipulation that the aforementioned companies shall be fully owned by Government. The Govt. has also constituted a Steering Committee to finalise the transfer scheme for the re-organisation of Board under section 131 of the Electricity Act The Ministry of Power s (MOP s) Restructured Accelerated Power Development and Reforms Programme (R-APDRP) is being implemented in TNEB. The focus of this programme is on establishment of baseline data and fixation of accountability, besides reduction of Aggregate Technical & Commercial (AT & C) losses and adoption of information technology. B. Power generation : The total installed generation capacity of Tamil Nadu as on is 15,800 Mega Watts as detailed below and in Fig.1 and Fig.2: a. Hydel, Coal, oil based and conventional sources:- TNEB s own generating stations: 5690 MW (Hydel, Thermal, Gas and wind) Private Sector Power Plants (IPP): 1,180 MW Share from Central Sector generating stations: 2,825 MW External assistance: 305 MW Others (Captive Power Plants): 214 MW (Supply to TNEB) TOTAL: MW b. Renewable or Non-conventional energy sources:- Wind Mills (Private) (in-firm power): MW Co-Generation: MW; and Bio-mass: MW Total (Renewable sources): MW Grand Total MW. There is an increase of 700 MW over last year. Besides the above 851 MW capacity of captive power plants are also available for their own use and sale. The maximum peak demand so far reached during is 10,180MW (on ). Highest daily consumption of Million Units was recorded on Total energy consumption during as on has been Million Units. Figure.2 Installed Capacity sector wise c. Manpower Rationalization: The number of employees per million units of scale for the year , and work out to 1.38, 1.40 and 1.35 which is lower than the norms, indicated by TNERC. d. Renewable Energy: Tamil Nadu has achieved tremendous success in harnessing renewable energy for generation of grid quality power. It has an installed capacity of 4790 MW from renewable sources as on against country's installed capacity of MW, which is about 33%. As a share of 1207

4 grid power, renewable energy with installed capacity of 4790 MW accounts for about 32% of TNEB's total grid capacity of about 15,100 MW while the national average is 9% only. Dividing the , the total units generated in Tamil Nadu from Renewable energy sources are 7532 million units which is 11% of Tamil Nadu is grid consumption. Wind power: Tamil Nadu is No. 1state in India with an installed capacity of 4287 MW as on , which is about 42% of the total installed capacity in India. The private investment in wind power exceeds Rs Crores. The power generation has exceeded 40 billion units (cumulative). South EDC. Linking of these ADLS with Centralised Monitoring Station at Coimbatore Circle has also been done and is under observation. Energy audit is being conducted internally and quarterly returns are being submitted to the TNERC. g. Metering of Energy: TNERC has accorded extension of time up to for installation of meters in hut services and agricultural service connections. TNEB has not yet furnished any roadmap for installation of meter in hut and agricultural services. h. Power Procurement: The TNERC has ordered TNEB to instruct all the Independent Power producers to swap/restructure the high cost rupee term loans to low cost rupee term loan and to hedge all the foreign currency to Indian currency loan. Figure.3 Growth of wind Power Solar: solar domestic lighting systems have been installed in Tamil Nadu with assistance from Government Solar street lights have been installed in public places/streets mostly in village panchayats with Government assistance and active support and involvement of Rural Development Department. Solar water and air heating/drying systems have been installed for a collector area of sq. Biomass gasifiers with cumulative capacity of 5444 KW are in operation. 189 nos. of community and toilet linked biogas plants have been constructed in the State under subsidy scheme. e. Management information Systems: The slab wise consumption and revenue details are maintained and furnished for all categories such as domestics, place of worship, power loom and locally body consumers. 100% computerisations for all sections have been completed. f. Energy Audit: TNEB has an excellent record of billing and collection of CC charges from customers. It has around 98% level of collection efficiency which is the highest among the various power utilities in the country. The board has an effective meter replacement program wherein the defective meter replacement is carried out on a priority basis. Static meters have been installed at all the output points at each SS all 22/11 kv feeders (99.65%). Based on the energy accounting study is undertaken in different distribution circles at the rate of 2 Nos. HT feeders per SS, the No. of HT feeders having high line loss were identified as Improvement works have so far been carried out in 751 Nos. feeders. Monthly energy balance assessment is being carried out from 230 KV level to 11KV bus. A pilot scheme, Automatic Data Logger System (ADLS) has been commissioned in six substations of Coimbatore i. Demand Side Management (DSM): TNEB is taking various steps in implementing DSM measures and a separate division is constituted to look after the DSM aspects. The government of Tamil Nadu is implementing the scheme of replacing the existing pump sets with ISI energy efficient pumps sets in the agriculture sector by giving subsidy through the agricultural engineering department. Recently TNEB has approved the proposal for awarding the work of implementing lighting energy efficiency program under Bachat Lamp Yojana scheme in the domestic sector comprising 13 million domestic consumers in the state of Tamil Nadu. j. Transmission and Distribution losses: The transmission and distribution losses in Tamil Nadu have been estimated as 18% for the years shown in Fig.4. Figure.4 Transmission and Distribution losses TNEB is continuously carrying out the following improvement works to reduce the losses to the maximum extent possible. a. Reduction of HT: LT ratio by erecting more high tension lines and erecting new distribution transformers. b. Establishment of new sub-stations. c. Strengthening of HT line conductors d. Installations of HT shunt Capacitors at substation end. 1208

5 e. Erection of link lines. f. Re-routing of feeders k. Grid Discipline: Tamil Nadu falls in the Southern Region Load Dispatch Centre (SRLDC) with its headquarters at New Delhi. TNEB is maintaining grid discipline, complying with Indian Electricity Grid Code and carrying out the directions of the Regional Load Dispatch Centre. l. Computerized and online Billing: Tamil Nadu already has computerised billing for most of its consumers in the state. The collection through banks (on line), Any Time Payment (Kiosk) machine have been introduced in Chennai Metropolitan area. The collection through post offices is worked out and is likely to be materialised shortly. These efforts have improved the overall efficiency of the organization. IV. TRANSMISSION AND DISTRIBUTION LOSSES The transmission and distribution losses are the areas of major concern in any power utility in the country. Lot of energy generated and transmitted goes unmetered in the form of losses, pilferage and theft of energy. This area need to be addressed at the priority level. These losses cannot be reduced overnight. (a) Component of T and D Losses: Losses occur in the process of supplying electricity due to technical and commercial losses. The losses are due to: Overloading of existing lines and substation equipment Absence of up gradation of old lines and equipment Poor repair and Maintenance of equipment Non-installation of sufficient capacitors These technical losses are inherent in a system and can be reduced to an optimum level. The losses can be further sub divided depending upon the stage of power transformation & transmission system as transmission losses (400kV/220kV/132kV/66kV), as Sub transmission losses (33kV / l l kv) Distribution losses (l l kv/0.4kv). The commercial losses are caused due to: i. Low metering/billing/collection efficiency ii. Theft & Pilferage and tampering of meters iii. Low accountability of employees iv. Absence of Energy Accounting & Auditing (b) Barriers in private sector participation The lack of realistic estimates of T& D losses acts as a disincentive for private sector participation in power distribution as the party cannot have an idea of the realistic revenue potential of the area being privatized. (c) Aggregate Technical and commercial losses (AT&C): T&D loss is purely technical in nature and is assessed considering the energy fed in to the grid and the energy billed. The AT&C losses on the other hand is assessed considering the energy fed into the grid and the energy for which revenue realized which accounts for the collection efficiency TABLE I. AT and C Losses Data for AT & C Losses during S.No ITEM UNIT 1 Self-Generation (ex-bus) MU Purchase MU Total input(ui)(1+2) MU Units traded with other utilities (UT) MU Units traded with licensed area (3-4) (Utl) MU Units billed within utility licensed area MU Amount Billed within licensed Rs. utility area (Ab) Crores Amount realized within utility Rs. licensed area(ar) Crores Collection efficiency (CE=Ar/Ab x 100) % Units realized (Ur) = (UbxCE)/100 MU AT&C losses Ui-Ur MU AT&C losses {(Utl - Ur/Utl)} x 100 % TNERC has fixed the following year wise target of AT&C losses to be achieved by TNEB up to 2012 as shown in Fig.5. Figure.5 AT and C Losses in Tamil Nadu (d) Status of Transmission and Distribution Losses in Tamil Nadu: T & D losses in the State are at present among the lowest in the country, with latest TNERC Tariff Order assessing the losses at 18%. Most of the T & D losses are technical in nature. T & D losses are assessed as the difference between the energy input and the estimated sales. The various steps that are being undertaken by the Board like strengthening of lines, addition of distribution transformers, etc. an overall loss level of 18% has been considered for calculating the various components of the annual revenue requirement for the year. (e) Realization of outstanding dues: The current consumption charges arrears realised from the government for the local bodies and other government departments is shown: 1209

6 TABLE II. Outstanding Dues Year Rs. Crores The accumulated arrears of local bodies as on are Rs Crores. (f) Rating of power sector: ICRA Limited (formerly Investment Information and Credit Rating Agency of India Limited) was set up in 1991 by leading financial/investment institutions, commercial banks and financial services companies as an independent and professional Investment Information and Credit Rating Agency. Tamil Nadu rank 5 th among all the states in INDIA as per the rating given by ICRA limited for the year 2005.A score of has been assigned to the power sector in Tami Nadu. The distribution of marks against the parameters is shown: TABLE III. Scores assigned to the power Sector in Tamil Nadu S.No 1 Parameter State Government related parameters Maximum Score Score Assigned SERC related parameters Generation Transmission and distribution Financial risk analysis others Progress in attaining commercial viability Total V. CONCLUSION As a result of restructuring or enactment of Electricity Act 2003, the power scenario in Tamil Nadu in particular and all over India in general has improved significantly and hopefully will overcome the present grim power situation in future. The reduction in the losses occurs due to identification of the weakest areas in the distribution system and strengthening/improving them so as to draw the maximum benefits of the limited resources. Reactive power mismatch is the area which needs to be tackled on priority. The power quality and reliability of power supply in the state has also improved markedly. The computerization and implementation of information technology has resulted transparency in commercial business of power utility in state. REFERENCES [1]. A. Srivastava, M. Shahidehpour, "Restructuring choices for the Indian power sector", IEEE Power Engineering Review, Vol. 22, Issue 11, Nov. 2002, pp [2]. S. A. Khaparde, "Power sector reforms and restructuring in India", IEEE Power Engineering Society General Meeting, Vol. 2, 6-10 June 2004, pp [3]. R.J. Thomas, "Introduction: Electric power systems restructuring: Engineering, Economics and Policy Track", 40th Annual Hawaii International Conference on System Sciences, Jan. 2007, pp [4]. B. Cory, "Power system restructuring and deregulation: trading, performance and information technology", Power Engineering Journal, Vol. 16, Issue 1, Feb. 2002, pp [5]. J.T. Cain, "Power System Restructuring [Asian and Australian Power Policy]", IEEE Power Engineering Review, Vol. 16, Issue 2, Feb pp. 9. [6]. Tripta Thakur, S.G. Deshmukh, S.C. Kaushik, Mukul Kulshrestha, "Impact assessment of the Electricity Act 2003 on the Indian power sector", Energy Policy 33, [7]. Tripta Thakur, S.C. Kaushik, S.G. Deshmukh and S.C. Tripathi, "Indian Electricity Act 2003: Implications for the Generation, Transmission And Distribution Sectors", IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies (DRPT2004), April 2004 Hong Kong, pp [8]. O.P Rahi, Harish Kumar Thakur, and a.k. chandel, Power Sector reform in India: A Case Study, Power System Technology and IEEE Power India Conference, POWERCON Joint International Conference on Oct. 2008, pages 1-4 [9]Tamil Nadu Energy Development agency. [www. teda.gov.in] [10] Tamil Nadu Regulatory Commission. [ [11]Tamil Nadu Electricity Board. [ [12] Department of Evaluation & Applied Research. BIOGRAPHIES J.Anitha Roseline received her B.E. in Electrical and Electronics Engineering and M.E. Power Electronics and Drives from SSN College of Engineering in 2002 and 2006 respectively.currently she is pursuing Ph.D. degree in Anna University in the area of Restructured power system. She has been working in the teaching field for about 9 Years. She has published 4 papers in National conferences, 1 paper in referred International conferences in the area of power electronics & drives and restructured power systems. She is a life member in ISTE and member in IEEE. Dr.Badrilal Mathur is a Professor in SSN College of Engineering, Chennai. He obtained is M.Tech in Power Systems from IIT, Bombay in 1964.He completed his Ph.D. in 1979 from IISc, Bangalore. His Ph.D. thesis was adjudged as the best for application to industries in the year 1979 and awarded Sir Vitthal N. Chandavarkar Memorial Gold Medal. He has published 30 papers in National and International journals and 80 in National and International conferences. He has been working in the teaching field for about 44 Years. His area of interest includes Power systems, Power Electronics & Renewable energy sources. 1210

ACCELERATED POWER DEVELOPMENT AND REFORM PROGRAMME IN INDIA

ACCELERATED POWER DEVELOPMENT AND REFORM PROGRAMME IN INDIA ACCELERATED POWER DEVELOPMENT AND REFORM PROGRAMME IN INDIA P. K. Kukde D. A. Sathe S. V. Kulkarni The Tata Power Company Limited, Department of Electrical Engineering, Mumbai, India IIT Bombay, Mumbai,

More information

SECTOR ASSESSMENT: BIHAR POWER SECTOR

SECTOR ASSESSMENT: BIHAR POWER SECTOR P P Central Bihar Power System Improvement Project (RRP IND 41626) SECTOR ASSESSMENT: BIHAR POWER SECTOR A. Introduction 1 1. The power sector in India has an installed capacity of 159,400 megawatt (MW),PF

More information

Energy Introduction Performance of State Sector, Installed Capacity

Energy Introduction Performance of State Sector, Installed Capacity 5 Energy 5.1. Introduction T he power position in the State was very comfortable during 2003-04 and 2004-05. There was a sizeable increase in the installed capacity and power availability during the period.

More information

Paper Presented on Renewable Energy Sources Policies of India. Author- Rucha Korhale

Paper Presented on Renewable Energy Sources Policies of India. Author- Rucha Korhale Paper Presented on Renewable Energy Sources Policies of India Author- Rucha Korhale BE-Instrumentation Lecturer, VPM s Polytechnic, Thane 1 Renewable Energy Sources Policies of India Abstract:- In today

More information

A Review of Restructured Power Development and Reform Programme in India

A Review of Restructured Power Development and Reform Programme in India A Review of Restructured Power Development and Reform Programme in India Abstract: Manish Chaware (PG Scholar) Department of Electrical & Electronic, Scope College of Engineering, Bhopal, India manishchaware23@gmail.com

More information

Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector

Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector Dr. Pradeep Perera Head Energy ( India) Principal Energy Specialist Asian Development Bank Generation

More information

POWER SECTOR A STUDY OF INDIA

POWER SECTOR A STUDY OF INDIA POWER SECTOR A STUDY OF INDIA Dr. Farah Naaz Gauri* Dr. Riyazuddin Qureshi** Dr. Hares Ahmed Qureshi*** Associate Professor, Dept. of Management Science, Jazan University, Jazan, K.S.A.* Assistant Professor,

More information

RE Tariff Setting Approach

RE Tariff Setting Approach Satadru Chakraborty Sr Research Associate, WISE Training Programme on the Regulatory and Policy Framework for Market Development for Renewable Energy in India Presentation Outline Policy & Regulatory provisions

More information

State and Utility Perspective of Smart Grid

State and Utility Perspective of Smart Grid State and Utility Perspective of Smart Grid Mr.Tushar Giri Nath, I.A.S., Managing Director Smart Grid Vision for India s Power Sector June 2010 BESCOM : FACTS and PROFILE BESCOM covers an area of 41,092

More information

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8 Solar and Wind Power Development Project (RRP IND 47920) SECTOR OVERVIEW A. The Energy Sector in India 1. India remains in chronic need of additional power generation capacity. Although, the electrification

More information

SMALL HYDRO PROGRAMME IN INDIA

SMALL HYDRO PROGRAMME IN INDIA SMALL HYDRO PROGRAMME IN INDIA Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy Hydropower represents use of water resources towards inflation free energy due to absence of fuel cost with mature

More information

RENEWABLE ENERGY INTEGRATION IN TAMILNADU

RENEWABLE ENERGY INTEGRATION IN TAMILNADU RENEWABLE ENERGY INTEGRATION IN TAMILNADU Generator Installed Capacity in MW CGS Nuclear 6% PURCHASE (LTOA, MTOA) 18% TN Hydro 2308 TN Thermal 4320 TN Gas 516 TN IPP 746 CGS Thermal 15% CPP 3% TN IPP 3%

More information

Chapter-3 ENERGY CONSERVATION AND RENEWABLE ENERGY OPTIONS TO MEET INDIAN ELECTRICITY DEMAND

Chapter-3 ENERGY CONSERVATION AND RENEWABLE ENERGY OPTIONS TO MEET INDIAN ELECTRICITY DEMAND Chapter-3 37 ENERGY CONSERVATION AND RENEWABLE ENERGY OPTIONS TO MEET INDIAN ELECTRICITY DEMAND 3.1 Introduction In chapter 2, it has been observed that there will be a huge gap between demand and supply

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) Installed capacity (GW) Solar Rooftop Investment Program (RRP IND 49419) Sector Road Map SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) 1. Sector Performance, Problems, and Opportunities

More information

Fact Track-Power Distribution Sector in India

Fact Track-Power Distribution Sector in India June 2013 Fact Factor Report Series Copyright 2013, All rights reserved Fact Track-Power Distribution Sector in India 2 Power Distribution Sector in India- An Overview Research Base AT&C Losses Over the

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Nepal, 2013-2017 A. Overview 1. Nepal has long recognized the development of its large hydropower potential as an important cornerstone

More information

Renewable Energy. These Slides Accompany the YouTube Video Tutorial: https://www.youtube.com/watch?v=u-h7eqmc9rq&t=41s

Renewable Energy. These Slides Accompany the YouTube Video Tutorial: https://www.youtube.com/watch?v=u-h7eqmc9rq&t=41s Renewable Energy Indian Scenario 11 th Largest Economy & 4 th Largest in Purchasing Power Potential Ahead Power Scenario in India (Installed 263.66 GW & Renewable Energy 34.35 GW) Ministry of Non-Conventional

More information

JICA s Experiences in Renewable Energy and Energy Efficiency

JICA s Experiences in Renewable Energy and Energy Efficiency JAAI Regional Chapter Technical Seminar JICA s Experiences in Renewable Energy and Energy Efficiency 21 January, 2018 Takema Sakamoto Chief Representative Japan International Cooperation Agency (JICA)

More information

CHAPTER-VII POWER RESOURCE. Power is of fundamental importance in the economic development of

CHAPTER-VII POWER RESOURCE. Power is of fundamental importance in the economic development of CHAPTER-VII POWER RESOURCE Power is of fundamental importance in the economic development of any given region and it helps maximize the standard of living of people of that region. Generally, higher per

More information

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines New Business Opportunities Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines 1 Coverage Need for new business models for wind Potential in India Repowering Offshore MW scale Wind-Solar

More information

Renewable Energy Sources Policies of India. Author- Miss. Rucha Korhale BE-Instrumentation, Lecturer, V.P.M s Polytechnic, Thane.

Renewable Energy Sources Policies of India. Author- Miss. Rucha Korhale BE-Instrumentation, Lecturer, V.P.M s Polytechnic, Thane. Renewable Energy Sources Policies of India Author- Miss. Rucha Korhale BE-Instrumentation, Lecturer, V.P.M s Polytechnic, Thane. View Points Current Energy scenario in India. Power for ALL by 2012- ambitious

More information

International Journal of Advance Research in Engineering, Science & Technology

International Journal of Advance Research in Engineering, Science & Technology Impact Factor (SJIF): 3.632 International Journal of Advance Research in Engineering, Science & Technology e-issn: 2393-9877, p-issn: 2394-2444 (Special Issue for ITECE 2016) A Study on the Environmental

More information

PROJECT TECHNICAL DESCRIPTION

PROJECT TECHNICAL DESCRIPTION Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) PROJECT TECHNICAL DESCRIPTION A. Introduction 1. Power Grid Corporation of India Limited (POWERGRID) is India s national power transmission

More information

A Multi Stakeholder Perspective

A Multi Stakeholder Perspective A Multi Stakeholder Perspective 1 Agenda Wind Vision Initiative Setting up of Wind Vision : 200 GW by 2032 Recommendations Wind Project Development Regulatory Incentives Financing Wind Vision 2032 Grid

More information

Address for Correspondence

Address for Correspondence Research Paper RECENT TRENDS IN WIND POWER GENERATION: INDIAN SCENARIO G.C. Biswal, S.P. Shukla Address for Correspondence Department of Electrical Engineering, BIT, Durg, CG, India ABSTRACT: In India,

More information

Renewable Energy Technologies - Present and Future Prospects in Indian Economy

Renewable Energy Technologies - Present and Future Prospects in Indian Economy Renewable Energy Technologies - Present and Future Prospects in Indian Economy Dr. Sukhvinder Kaur Department of Zoology, Guru Nanak College for Girls (India) ABSTRACT Energy is the most essential component

More information

Hydro & Small Hydro Outlook in India 2017

Hydro & Small Hydro Outlook in India 2017 Hydro & Small Hydro Outlook in India 217 Evaluating Business Case & Future Scenario of Large & Small Hydro Power Plants in India Report Summary enincon consulting llp, 217, New Delhi, India Enincon s Key

More information

ISSN: International Journal Of Core Engineering & Management (IJCEM) Volume 2, Issue 11, February 2016

ISSN: International Journal Of Core Engineering & Management (IJCEM) Volume 2, Issue 11, February 2016 REVIEW OF DISTRIBUTED GENERATION PRODUCTION AND INTERCONNECTION WITH RENEWABLE RESOURCES IN INDIA Surbhi Bakshi Research Scholar Deptt. of Electrical Engineering PEC University of Technology, Chandigarh,

More information

Power Sector in India: Issues, Challenges & Prospects

Power Sector in India: Issues, Challenges & Prospects Power Sector in India: Issues, Challenges & Prospects Anupam Sharma 1, Deepak P. Chodankar 2, Jayesh G. Priolkar 3 PG Student, Electrical & Electronics Department, Goa College of Engineering, Farmagudi,

More information

Session IV: Access to Electricity Services in Rural Areas

Session IV: Access to Electricity Services in Rural Areas Session IV: Access to Electricity Services in Rural Areas Mini Grids: Experience from India Debajit Palit Fellow and Internal Resource Advisor The Energy and Resources Institute, New Delhi Mini-Grids in

More information

Market Mechanisms in India s Clean Energy Efforts

Market Mechanisms in India s Clean Energy Efforts Market Mechanisms in India s Clean Energy Efforts Renewable Energy Certificate Mechanism Balawant Joshi Director, ABPS Infrastructure Advisory Pvt. Ltd. ABPS Infrastructure Advisory Advisory Pvt. Ltd October,

More information

Q3 & 9M FY15 Results. Leading Diversified Renewable Energy Generation Company

Q3 & 9M FY15 Results. Leading Diversified Renewable Energy Generation Company Q3 & 9M FY15 Results Leading Diversified Renewable Energy Generation Company Financial & Operational Highlights Q3 & 9M FY15 Performance Highlights Q3 FY15 witnessed a sales growth of 11% on a Y-o-Y basis

More information

WIND ENERGY FOR POWER GENERATION

WIND ENERGY FOR POWER GENERATION International Journal of Mechanical, Robotics and Production Engineering. Volume VI, Special Issue, 2016, ISSN 2349-3534, www.ijmpe.com, email editor@ijmpe.com WIND ENERGY: AN ATTEMPT TO ANALYZE AND REVIEW

More information

CH2356 Energy Engineering Hydro Power. Dr. M. Subramanian

CH2356 Energy Engineering  Hydro Power.  Dr. M. Subramanian CH2356 Energy Engineering Hydro Power Dr. M. Subramanian Associate Professor Department of Chemical Engineering Sri Sivasubramaniya Nadar College of Engineering Kalavakkam 603 110, Kanchipuram(Dist) Tamil

More information

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy SMALL HYDRO PROGRAMME IN INDIA Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy e-mail : bhattbk88@gmail.com; bkbhatt@nic.in MILESTONES IN RENEWABLE ENERGY DEVELOPMENT IN INDIA 1980s - Setting

More information

Reforms of Power Sector & Liberalisation. The Indian Perspective

Reforms of Power Sector & Liberalisation. The Indian Perspective Reforms of Power Sector & Liberalisation The Indian Perspective Background Indian power sector, characterised by vertically integrated Govt-owned State Electricity Boards (SEBs). A structure since Independence

More information

Development and Financing of Renewable Energy Projects in India

Development and Financing of Renewable Energy Projects in India Development and Financing of Renewable Energy Projects in India A Perspective By K.S. Popli Director (Technical) Indian Renewable Energy Development Agency Limited New Delhi ( India ) World primary energy

More information

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems A COUNTRY REPORT OF NEPAL Presented by: Pralhad Prasad Sapkota Under Scretary Government of Nepal,Ministry of Energy, Kathmandu, Nepal Content Introduction Institutional Arrangement Energy Policy Documents

More information

Water State at a Glance: Manipur, Vol. 1(8), 2016

Water State at a Glance: Manipur, Vol. 1(8), 2016 Water List of Tables 6.1: Distribution of Large Dams Completed 6.2: Live Storage Capacity of Large Dams/Reservoirs/Projects 6.3: Ultimate Irrigation Potential (UIP) 6.4: Plan-wise Financial Expenditure

More information

WELLSPUN RENEWABLES Metamorphosis competition Metamorphosis Vista The Metamorphosis challenge: Metamorphosis Disclaimer: Metamorphosis

WELLSPUN RENEWABLES Metamorphosis competition Metamorphosis Vista The Metamorphosis challenge: Metamorphosis Disclaimer: Metamorphosis WELLSPUN RENEWABLES This report shows how Government incentives for 'Make in India' can boost the renewable energy sector. It proposes an expansion strategy for Welspun Renewables towards achieving economic

More information

SECTOR ASSESSMENT (SUMMARY): POWER

SECTOR ASSESSMENT (SUMMARY): POWER Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) A. Power Generation SECTOR ASSESSMENT (SUMMARY): POWER 1. The energy sector in Bangladesh is characterized by an acute

More information

State wise analysis of RPO Regulation for Captive users

State wise analysis of RPO Regulation for Captive users State Regulation for Captive Users Definition of renewable Energy as per the commission order Remarks Andhra Pradesh Every consumer owning a captive generating plant of installed capacity of one (1) MW

More information

DISCUSSION PAPER DISTRIBUTION FRANCHISEE FRAMEWORK ASSAM ELECTRICITY REGULATORY COMMISSION

DISCUSSION PAPER DISTRIBUTION FRANCHISEE FRAMEWORK ASSAM ELECTRICITY REGULATORY COMMISSION DISCUSSION PAPER ON DISTRIBUTION FRANCHISEE FRAMEWORK ASSAM ELECTRICITY REGULATORY COMMISSION TABLE OF CONTENTS: Sl. No. Main Titles/ Sub Titles Page No. 1 Introduction 3 2 Need of Franchisee 3-4 3 Role

More information

Tamil Nadu Moving towards 24/7 Sustainable Power Supply

Tamil Nadu Moving towards 24/7 Sustainable Power Supply Conference on Tamil Nadu Moving towards 24/7 Sustainable Power Supply Chennai 6 th October 2017 V. Sriram Chief Operating Officer, IMaCS Agenda TN s power situation: a snapshot Prospects, challenges and

More information

Exploratory Trends in Renewable Energy in India

Exploratory Trends in Renewable Energy in India Exploratory Trends in Renewable Energy in India Dr. (Mrs.) Asha Sharma Post Doctoral Fellow, UGC, Project work at Department of Commerce, Mahila P.G. Mahavidhalaya Jai Narain Vyas University, Jodhpur,

More information

Power Distribution Outlook in India 2018

Power Distribution Outlook in India 2018 Power Distribution Outlook in India 2018 Evaluating Current Dynamics Amid Implementation of UDAY Scheme and Examining Sector s Outlook Basis Changing Power Procurement dynamics of Discoms E-REP Trends

More information

Indian Energy Scenario:

Indian Energy Scenario: Terveisiä Intiasta! Indian Energy Scenario: Distributed Generation A Green Solution to Energy Deficiency VTT: Espoo 04.06.2009 Arun Sahay India Facts & Figures 60% of our population lives in rural India.

More information

Transmission Policy and Wind Energy

Transmission Policy and Wind Energy Transmission Policy and Wind Energy Grid Operational Challenges and Regulatory Measures V Subramanian, CEO and Secretary General Indian Wind Energy Association (InWEA) Present Status and Enabling Provisions/Framework

More information

Comparative study on power situation in the Northern and Central states of India

Comparative study on power situation in the Northern and Central states of India Comparative study on power situation in the Northern and Central states of India PHD Research Bureau September 2011 PHD Chamber of Commerce and Industry PHD House, August Kranti Marg, New Delhi 110016

More information

World Renewable Energy Technology Congress

World Renewable Energy Technology Congress World Renewable Energy Technology Congress SMALL HYDRO POWER - POTENTIAL ASSESSMENT & ISSUES Dr. SUNIL K SINGAL Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee email : sunilfah@iitr.ernet.in,

More information

Potential Gains from Regional Cooperation and Trade of Electricity in South Asia

Potential Gains from Regional Cooperation and Trade of Electricity in South Asia Potential Gains from Regional Cooperation and Trade of Electricity in South Asia Govinda R. Timilsina and Mike Toman The World Bank, Washington, DC 5 th Asian Conference of IAEE University of Western Australia

More information

May 24, 2018 I Industry Research. Power: Yearly Update and Outlook. Graph 1 Electricity Generation Mix (FY18)

May 24, 2018 I Industry Research. Power: Yearly Update and Outlook. Graph 1 Electricity Generation Mix (FY18) Power: Yearly Update and Outlook Contact: Madan Sabnavis Chief Economist madan.sabnavis@careratings.com 91-22- 6754 3489 Ashish K Nainan Research Analyst ashish.nainan@careratings.com 91-22-6754 3443 Mradul

More information

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd) (Formerly known as Amtek Energy & Power Pvt Ltd) SOLAR BUSINESS CATALOGUE 2015-16 2 P a g e Contents 1. Introduction 2. Mission SOLAR 3. Why us? 4. Engineering Procurement Construction Services 4.1 Process

More information

Member State Perspectives

Member State Perspectives Member State Perspectives ENERGY SITUATION IN NEPAL Presenter : Sameer Ratna Shakya, Ministry of Energy (NEPAL) Energy Resources Hydropower Renewable (Alternative) Energy Mini & Micro Biomass Solar Wind

More information

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India WEST BENGAL ELECTRICITY REGULATORY COMMISSION Cogeneration and Generation of Electricity

More information

Q3 FY Analyst Meet Mumbai February 10, 2017

Q3 FY Analyst Meet Mumbai February 10, 2017 Q3 FY 2016-17 Analyst Meet Mumbai February 10, 2017 Disclaimer By attending the meeting where this presentation is made, or by reading the presentation slides, you agree to be bound by the following limitations:

More information

PEER a tool to Design, Measure and Monitor the performance of Smart Grid

PEER a tool to Design, Measure and Monitor the performance of Smart Grid PEER a tool to Design, Measure and Monitor the performance of Smart Grid Mili Majumdar Managing Director Ishaq Sulthan Technical Manager: PEER Aumkar Borgaonkar Technical Specialist: PEER Abstract India

More information

First Meeting of Task Force 2 on Advance Transmission System Interconnections

First Meeting of Task Force 2 on Advance Transmission System Interconnections First Meeting of Task Force 2 on Advance Transmission System Interconnections 21-22 August 2013 Thimpu, Bhutan K.L.R.C.Wijayasinghe Deputy Director Ministry of Power and Energy Sri Lanka Sri Lanka Population

More information

Power For India Efficient, Cost effective and Clean

Power For India Efficient, Cost effective and Clean Power For India Efficient, Cost effective and Clean Agenda Introduction Projected Power Supply Position in INDIA Current Installed Capacity from Various Sources What is Clean Energy? Important factors

More information

BEFORE THE HONOURABLE TAMIL NADU ELECTRICITY REGULATORY COMMISSION. MP No 15 of 2011.

BEFORE THE HONOURABLE TAMIL NADU ELECTRICITY REGULATORY COMMISSION. MP No 15 of 2011. BEFORE THE HONOURABLE TAMIL NADU ELECTRICITY REGULATORY COMMISSION MP No 15 of 2011. IN THE MATTER OF : Miscellaneous petition for filing a comprehensive proposal to overcome the power shortage in the

More information

Assessment of Energy Conservation at Amman Try Steel Industries through Led Lighting Retrofit

Assessment of Energy Conservation at Amman Try Steel Industries through Led Lighting Retrofit Assessment of Conservation at Amman Try Steel Industries through Led Lighting Retrofit [1] K Sarath Kumar [] M Sathyamoorthi [3] M Selva Kumar [4] V Heawin Jeba Kumar Final year EEE, Saranathan College

More information

Abhilakh Singh General Manager 12th April, 2016

Abhilakh Singh General Manager 12th April, 2016 Presentation on solar rooftop Abhilakh Singh General Manager 12th April, 2016 Power Scenario India, energy demand which was nearly 700 mtoe in 2010 is expected to cross 1500 mtoe by 2030. Dependence on

More information

Grid Integration in Sri Lanka

Grid Integration in Sri Lanka Auf in neue Märkte! Exportinitiative Energie MIDIGASPE SAMITHA 05.09.2017 Chief Engineer (Renewable Energy Projects) Ceylon Electricity Board Sri Lanka Grid Integration in Sri Lanka Overview Country Overview

More information

Electricity Distribution Companies in India: Preparing for an uncertain future

Electricity Distribution Companies in India: Preparing for an uncertain future Electricity Distribution Companies in India: Preparing for an uncertain future Authors: Ann Josey, Shantanu Dixit, Ashwini Chitnis, Ashwin Gambhir Webinar presentation by Ashwin Gambhir 31 st October,

More information

International Journal Of Engineering Research & Management Technology

International Journal Of Engineering Research & Management Technology International Journal Of Engineering Research & Management Technology ISSN: 2348-4039 Email: editor@ijermt.org July- 2014 Volume 1, Issue-4 www.ijermt.org Cost Analysis for Infrastructural Development

More information

International Journal of Scientific & Engineering Research, Volume 6, Issue 5, May-2015 ISSN

International Journal of Scientific & Engineering Research, Volume 6, Issue 5, May-2015 ISSN 149 INDIAN ENERGY AT PRESENT AND PLANNING TO REDUCE ENERGY PROBLEM AND TO GENERATE ELECTRICITY BY RES(RENEWABLE ENERGY SOURCES) SHAHEEN HASAN EMAIL ID:shasan39@gmail.com 1. INTRODUCTION India is a country

More information

Wind Energy Status in India

Wind Energy Status in India ANES ASSIGNMENT Wind Energy Status in India RGIPT Submitted by: Group No.6 Manish Dhelia (M-09-15) Sandeep Sahu (M-09-28) Saurabh Sharma ( M-09-29) Saurav Kumar (M-09-30) Sreelal MS (M-09-31) Wind Energy

More information

Presentation on Investment Opportunities in Indian Power Sector

Presentation on Investment Opportunities in Indian Power Sector Presentation on Investment Opportunities in Indian Power Sector By Rajeev Sharma Director (Projects) Power Finance Corporation Ltd., New Delhi (November 09, 2009) 1 POWER INFRASTRUCTURE IN INDIA TOTAL

More information

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013.

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013. Wind Power Policy 2013 Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA-102001-3054-B Sachivalaya, Gandhinagar. Dated the 25 July, 2013. Preamble Wind Power as an energy source is

More information

State at a Glance: Arunachal Pradesh, Vol. 1(2), Water

State at a Glance: Arunachal Pradesh, Vol. 1(2), Water Water 6.1: Details of Inland Fishery Water Resources of Various Types in Arunachal Pradesh (A.P.) 6.2: Installation of off-grid/decentralized Renewable Energy Systems/Devices 6.3: Source wise Installed

More information

CH2356 Energy Engineering Wind Power. Dr. M. Subramanian

CH2356 Energy Engineering  Wind Power.  Dr. M. Subramanian CH2356 Energy Engineering Wind Power Dr. M. Subramanian Associate Professor Department of Chemical Engineering Sri Sivasubramaniya Nadar College of Engineering Kalavakkam 603 110, Kanchipuram(Dist) Tamil

More information

Democratic Socialist Republic of Sri Lanka Commercial Capital: Colombo Administrative Capital: Sri Jayawardenapura Kotte

Democratic Socialist Republic of Sri Lanka Commercial Capital: Colombo Administrative Capital: Sri Jayawardenapura Kotte SRI LANKA Country Profile Democratic Socialist Republic of Sri Lanka Commercial Capital: Colombo Administrative Capital: Sri Jayawardenapura Kotte Sri Lanka is an island in the Indian Ocean, South Asia

More information

REPOWERING OF OLD WIND FARMS IN INDIA

REPOWERING OF OLD WIND FARMS IN INDIA REPOWERING OF OLD WIND FARMS IN INDIA BIG OPPORTUNITY TO UNEARTH Rajendra V. Kharul Sr Fellow and Head Centre for Wind Power World Institute of Sustainable Energy, Pune 26 NOV. 2008, WIND INDIA 2008 1.

More information

Murdoch University. School of Engineering an Information Technology PEC624. Master of Science in Renewable Energy Dissertation

Murdoch University. School of Engineering an Information Technology PEC624. Master of Science in Renewable Energy Dissertation Murdoch University School of Engineering an Information Technology PEC624 Master of Science in Renewable Energy Dissertation A Study on Tamil Nadu s Approach to Deal with the Electricity Crisis and Analyze

More information

Resources Discussions Annual Plan Summary Statement. Name of the State Power Utility (SPU) / ED

Resources Discussions Annual Plan Summary Statement. Name of the State Power Utility (SPU) / ED Resources Discussions Annual Plan 2013-14 Summary Statement Proforma-1 Name of the State Power Utility (SPU) / ED Sl.No. Item 2009-10 2010-11 2011-12 2012-13 2013-14 A A A BE RE Annual Plan 1. Installed

More information

A GREEN ENERGY INITIATIVE WITH COMMUNITY PARTICIPATION IN MICRO/MINI HYDRO POWER PROJECTS

A GREEN ENERGY INITIATIVE WITH COMMUNITY PARTICIPATION IN MICRO/MINI HYDRO POWER PROJECTS A GREEN ENERGY INITIATIVE WITH COMMUNITY PARTICIPATION IN MICRO/MINI HYDRO POWER PROJECTS Arun Kumar Tyagi (Chief Project Officer, UREDA, Uttarakhand) & Abhishek Pandey (Senior Project Engineer, UREDA,

More information

CONDITION BASED MAINTENANCE FOR IMPROVING POWER PLANT ECONOMICS

CONDITION BASED MAINTENANCE FOR IMPROVING POWER PLANT ECONOMICS CONDITION BASED MAINTENANCE FOR IMPROVING POWER PLANT ECONOMICS DR.V.BHUJANGA RAO, SC G & ASSOCIATE DIRECTOR, NAVAL SCIENCE & TECHNOLOGICAL LABORATORY VISAKHAPATNAM-530 027, INDIA E-mail : vepcrew1@rediffmail.com

More information

Energy Efficiency & ESCO Services

Energy Efficiency & ESCO Services 1 Energy Efficiency & ESCO Services SUJAY KUMAR SAHA Head of Group Demand Side Management 2 About Tata Power-DDL Parameter Unit July 02 March 17 % change One of the Most Successful Private Power Distribution

More information

SUPPORT EXISTING FOR AND

SUPPORT EXISTING FOR AND Indian Biomass Power sector 1 FINANCIAL FRAMEWORK TO SUPPORT EXISTING FOR AND NEW BIOMASS POWER PLANTS MNRE Workshop on Biomass Sector - 9 th June 2014 Indian Biomass Power Association Why Biomass Power?

More information

Ministry of Non- Conventional Energy Sources (MNES) Statement of Outlays and Outcomes / Targets: Annual Plan Target (MW)

Ministry of Non- Conventional Energy Sources (MNES) Statement of Outlays and Outcomes / Targets: Annual Plan Target (MW) Sl. No. Name of the Scheme/ Programme Statement of Outlays and Outcomes / Targets: Annual Plan Objective / Outcome Outlay Target (MW) (MW / Rs.1 cr.) Processes/ Timelines (Rs.in crore) Remarks / Risk Factors

More information

THE STATUS OF ELECTRICITY POWER SECTOR IN TAMIL NADU SINCE ECONOMIC REFORM PERIOD

THE STATUS OF ELECTRICITY POWER SECTOR IN TAMIL NADU SINCE ECONOMIC REFORM PERIOD THE STATUS OF ELECTRICITY POWER SECTOR IN TAMIL NADU SINCE ECONOMIC REFORM PERIOD B.Neppolian 1 & Dr.L.Ganesan 2 1 ICSSR Research Fellow, Department of Economics, Bharathidasan University, Tiruchirappalli

More information

PEO Study No.122 EVALUATION OF RURAL ELECTRIFICATION PROGRAMME - VOLUME - I The Study

PEO Study No.122 EVALUATION OF RURAL ELECTRIFICATION PROGRAMME - VOLUME - I The Study PEO Study No.122 EVALUATION OF RURAL ELECTRIFICATION PROGRAMME - VOLUME - I - 1982 1. The Study Rural Electrification, aimed at bringing about a rural urban continuum by bridging the gulf between them,

More information

EMPIRICAL ANALYSIS FOR MANAGEMENT OF INDIAN ELECTRICITY DISTRIBUTION UTILITIES

EMPIRICAL ANALYSIS FOR MANAGEMENT OF INDIAN ELECTRICITY DISTRIBUTION UTILITIES EMPIRICAL ANALYSIS FOR MANAGEMENT OF INDIAN ELECTRICITY DISTRIBUTION UTILITIES Seema Saxena* 1 and Tripta Thakur 2 1. Department of Electrical Engineering, U. I. T., Rajiv Gandhi Technical University.

More information

Renewable Energy Programmes in India

Renewable Energy Programmes in India Renewable Energy Programmes in India Amit Kumar TERI, India Outline Indian Energy Scenario Renewable Energy in India Grid connected power Distributed generation Sustainable buildings Bio-energy Policy

More information

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SREP Sub- Committee Meeting, Cape Town June 21, 2011 1 Introduction Kenya is one of the six Pilot Countries selected to benefit

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: IND, 2013 2017 SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector overview. The demand for power in India has

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Power Sector Rehabilitation Project (RRP KGZ 44198) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunity a. Introduction 1. The Kyrgyz Republic is a landlocked

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Azerbaijan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Azerbaijan is rich in energy resources. The

More information

Status - Indian Electrical Industry April to March

Status - Indian Electrical Industry April to March Status - Indian Electrical Industry April to March 2016-2017 Source: CEA & MNRE 112% achievement with Thermal power achieving 127% addition on planned Generation 60% achievement with power achieving 104%

More information

1.Overview of the activities in the JSCA. 2.Effects of urbanization and economic growth on energy use. 3.Proposal of the JSCA International Strategy W

1.Overview of the activities in the JSCA. 2.Effects of urbanization and economic growth on energy use. 3.Proposal of the JSCA International Strategy W ISGAN Public Seminar Integration of Smart Grids and Renewables Activity Report by the JSCA International Strategy Working in ASEAN. Mr. Hiroki Yamamoto, International Business Division, CTI Engineering

More information

HYDROPOWER DEVELOPMENT AND REGIONAL INTEGRATION FOR NEPAL

HYDROPOWER DEVELOPMENT AND REGIONAL INTEGRATION FOR NEPAL HYDROPOWER DEVELOPMENT AND REGIONAL INTEGRATION FOR NEPAL DR. XIAOPING WANG, ENERGY PROGRAM LEAD FOR NEPAL, THE WORLD BANK MAY 2018 World Bank Group Engagement in Hydropower Electricity Supply in Nepal:

More information

Utility CEO Forum on DSM Renewable Energy enabled Demand Side Management in Tamil Nadu

Utility CEO Forum on DSM Renewable Energy enabled Demand Side Management in Tamil Nadu Utility CEO Forum on DSM Renewable Energy enabled Demand Side Management in Tamil Nadu Table of Contents Section Page 1 Need of RE enabled DSM 1 2 Findings from feasibility analysis 5 3 Role of TANGEDCO

More information

(Draft Captive and Renewable Energy Generating Plants) Regulations

(Draft Captive and Renewable Energy Generating Plants) Regulations 307 Sl. No. UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Description (Draft Captive and ) Regulations - 2014 1. Short title, extent and commencement. 2. Scope and extent of application Summary (i) Uttar

More information

Energy Consumption Profile

Energy Consumption Profile Presentation to BY Objectives Availability of energy on sustainable basis to achieve planned GDP targets Reliance on indigenous resources shift of energy mix towards local resources Construction of new

More information

Flexibility in Indian Power System

Flexibility in Indian Power System www.nsgm.gov.in Flexibility in Indian Power System Atul Bali, NSGM-PMU, INDIA Indian Power Sector Overview Installed Capacity 329 GW Thermal: 66.7% Hydro: 13.5% Nuclear: 2.1% Renewables: 17.7% Peak Demand

More information

INDIA: LONG-TERM ENERGY ISSUES I POST-2003 ELECTRICITY ACT - POWER SECTOR CHALLENGES AND OPTIONS WORKSHOP OUTCOMES ON SELECTED ISSUES

INDIA: LONG-TERM ENERGY ISSUES I POST-2003 ELECTRICITY ACT - POWER SECTOR CHALLENGES AND OPTIONS WORKSHOP OUTCOMES ON SELECTED ISSUES Public Disclosure Authorized 69535 Public Disclosure Authorized Public Disclosure Authorized INDIA: LONG-TERM ENERGY ISSUES I POST-2003 ELECTRICITY ACT - POWER SECTOR CHALLENGES AND OPTIONS WORKSHOP OUTCOMES

More information

Regional Consultation on Climate Services for the 3 rd Pole and other High Mountain Areas

Regional Consultation on Climate Services for the 3 rd Pole and other High Mountain Areas Regional Consultation on Climate Services for the 3 rd Pole and other High Mountain Areas - Energy Sector WMO Consultative Meeting Jaipur, 9-11 March, 2016 B. Mukhopadhyay IMD Pune Scope of Climate Services

More information

1.1 In compliance with section 3 of the Electricity Act 2003 the Central Government hereby notifies the National Electricity Policy.

1.1 In compliance with section 3 of the Electricity Act 2003 the Central Government hereby notifies the National Electricity Policy. The Gazette of India EXTRAORDINARY PART I - Section 1 PUBLISHED BY AUTHORITY No., New Delhi, Dated. Ministry of Power New Delhi, Dated the 12th, February, 2005 RESOLUTION No. 23/40/2004-R&R (Vol.II) 1.0

More information

FUTURE SCADA SYSTEM WITH SMARTER GRID A SMART VISION FOR INDIA

FUTURE SCADA SYSTEM WITH SMARTER GRID A SMART VISION FOR INDIA FUTURE SCADA SYSTEM WITH SMARTER GRID A SMART VISION FOR INDIA Bharat Nayyar 1, Pratipal Singh 2 1 Department of Computer Science, SKIT, (India) 2 Department of Computer Science, SKIT, (India) ABSTRACT

More information

Transmission of Power to the Island Using HVDC (From Indian continent to Lakshadweep island)

Transmission of Power to the Island Using HVDC (From Indian continent to Lakshadweep island) Transmission of Power to the Using HVDC (From Indian continent to Lakshadweep island) B. Vijayalakshmi, C. Ram Kumar 2 Assistant professor, ECE, Sri Ramakrishna Institute of Technology Assistant professor,

More information